PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California

Similar documents
JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

fjj. p... D For approval D Approved as submitted D Resubmit copies for approval

APPENDIX J HYDROLOGY AND WATER QUALITY

Plan B Dam Breach Assessment

Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points.

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018

ANSWERS TO QUESTIONS IN THE NOTES AUTUMN 2018

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

Technical Report Culvert A Hydraulic Analysis

OPEN CHANNEL FLOW WORKSHEET 3 WATER SURFACE PROFILES


WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

Exercise (3): Open Channel Flow Rapidly Varied Flow

2D Modelling Series. Modelling Structures in Floodplains

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Exercise (4): Open Channel Flow - Gradually Varied Flow

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

Transition Submergence and Hysteresis Effects in Three-Foot Cutthroat Flumes

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

Annex E Bridge Pier Protection Plan

TABLE OF CONTENTS EXECUTIVE SUMMARY 1

2O-2 Open Channel Flow

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek

General Information for Culvert Design

2. RAPIDLY-VARIED FLOW (RVF) AUTUMN 2018

CHAPTER 5 CULVERT DESIGN

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

APPENDIX C. Fluvial and Tidal Hydraulics Report

Section 5: Pond Outlets

Modeling of Long Culverts and Stormdrains A Comparison of Different Methods

The Basics of Culvert and Inlet Design

SUBMERGED VENTURI FLUME. Tom Gill 1 Robert Einhellig 2 ABSTRACT

Stormwater Management Pond Design Brief. Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa -

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

Defra / Environment Agency FCERM Joint Science Programme. SC030218/PR Afflux Estimation System. August 2007

CLAIBORNE LOCK AND DAM PERTINENT DATA

Quantification of the Effect of Bridge Pier Encasement on Headwater Elevation Using HEC-RAS

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Components of a Barrage

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Water surface slope extending up to 20 channel widths up and downstream of crossing.

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

CE 535, Spring 2002 Preliminary Design Example 1 / 6

Gaviota Creek Fish Passage and Geomorphic Assessment

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA

Installation & Commissioning Report

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Hydraulic Modeling of Stream Enhancement Methods

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB)

3. GRADUALLY-VARIED FLOW (GVF) AUTUMN 2018

VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

Section 10 - Hydraulic Analysis

HYDRAULIC JUMP AND WEIR FLOW

Culvert Hydraulics: Comparison of Current Computer Models

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Evaluating the Spillway Capacity of the Morning Glory Spillway at Harriman Dam

Spillway Design for Small Dams

Modelling of Pressurised Pipes within InfoWorks ICM and CS

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

FORMAT FOR SENDING COMMENTS. Title: CRITERIA FOR DESIGN OF CANAL HEAD REGULATORS (Second revision of IS 6531)

Hydraulic Modelling of the Ngongotaha Stream

Broadly speaking, there are four different types of structures, each with its own particular function:

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

Fremont Weir Fish Passage Proof of Concept. Final Engineering Report

Subject: Developed fish ladder alternatives for Pastori Avenue at San Anselmo Creek

ATTACHMENT 5 8, 2013, CESPK-ED-HD

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

7 Flumes. 7.1 Long-throated flumes Description

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

CALIFORNIA SALMONID STREAM HABITAT RESTORATION MANUAL APPENDIX IX-A CULVERT CRITERIA FOR FISH PASSAGE INTRODUCTION

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

APPENDIX G : ON-SITE PLAN EXAMPLE A

City of Cape Coral Gator Slough Storm Water Model. Final Report

Cross-Vane Plan View FIN-UP Habitat Consultants, Inc. 220 Illinois Avenue Manitou Springs, CO (719) P.

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Sussex County, DE Preliminary Study Overview

Presented by Fred Halterman, URS Jennie Agerton, URS

Hydraulic Engineering

HISTORY OF CONSTRUCTION

Greenup Lock Filling and Emptying System Study

Transcription:

HEC-RAS Version 3.1.3 May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California X X XXXXXX XXXX XXXX XX XXXX X X X X X X X X X X X X X X X X X X X XXXXXXX XXXX X XXX XXXX XXXXXX XXXX X X X X X X X X X X X X X X X X X X X X X XXXXXX XXXX X X X X XXXXX PROJECT DATA Project Title: SR 3015 over Sandy Creek Project File : PENNDRAIN.prj Run Date and Time: 3/26/2008 1:11:54 PM Project in English units Project SR 3015 Raymilton Bridge over Sandy Creek PLAN DATA Plan Title: Plan 03 Plan File : G:\02\8101802--SR 3015\HEC RAS\HEC RAS\PENNDRAIN.p03 Geometry Title: Geometry Geometry File : G:\02\8101802--SR 3015\HEC RAS\HEC RAS\PENNDRAIN.g01 Flow Title Flow File : Sandy Creek at Raymilton : G:\02\8101802--SR 3015\HEC RAS\HEC RAS\PENNDRAIN.f03 Plan Summary Information: Number of: Cross Sections = 21 Multiple Openings = 0 Culverts = 0 Inline Structures = 0 Bridges = 1 Lateral Structures = 0 Computational Information Water surface calculation tolerance = 0.01 Critical depth calculation tolerance = 0.01 Maximum number of iterations = 20 Maximum difference tolerance = 0.3 Flow tolerance factor = 0.001 Computation Options Critical depth computed only where necessary Conveyance Calculation Method: At breaks in n values only Friction Slope Method: Average Conveyance Computational Flow Regime: Subcritical Flow Page 1

FLOW DATA Flow Title: Sandy Creek at Raymilton Flow File : G:\02\8101802--SR 3015\HEC RAS\HEC RAS\PENNDRAIN.f03 Flow Data (cfs) River Reach RS 2-Year Storm 10-Year Storm 25-Year Storm 50-Year Storm 100-Year Storm 500-Year Storm MAIN RIVER UPSTREAM 1 11046.06 2025 3500 4270 4850 5450 6850 MAIN RIVER UPSTREAM 1 10880.47 2025 3500 4270 4850 5450 6850 MAIN RIVER UPSTREAM 1 10687.08 2025 3500 4270 4850 5450 6850 MAIN RIVER UPSTREAM 1 10330.14 2025 3500 4270 4850 5450 6850 MAIN RIVER UPSTREAM 1 10880.47 2025 3500 4270 4850 5450 6850 MAIN RIVER UPSTREAM 1 10687.08 2025 3500 4270 4850 5450 6850 MAIN RIVER UPSTREAM 1 10330.14 2025 3500 4270 4850 5450 6850 Boundary Conditions River Reach Profile Upstream Downstream MAIN RIVER UPSTREAM 1 2-Year Storm Normal S = 1111.8 Normal S = 1107.5 MAIN RIVER UPSTREAM 1 10-Year Storm Normal S = 1111.8 Normal S = 1107.5 MAIN RIVER UPSTREAM 1 25-Year Storm Normal S = 1111.8 Normal S = 1107.5 MAIN RIVER UPSTREAM 1 50-Year Storm Normal S = 1111.8 Normal S = 1107.5 MAIN RIVER UPSTREAM 1 100-Year Storm Normal S = 1111.8 Normal S = 1107.5 MAIN RIVER UPSTREAM 1 500-Year Storm Normal S = 1111.8 Normal S = 1107.5 GEOMETRY DATA Geometry Title: Geometry Geometry File : G:\02\8101802--SR 3015\HEC RAS\HEC RAS\PENNDRAIN.g01 REACH: UPSTREAM 1 RS: 11046.06 Page 2

Station Elevation Data num= 29-300 1127-272 1126-255 1125-220 1120-89.79 1115.19-81.233 1113.3-80.194 1113.07-46.081 1113.44-40.097 1113.49-39.655 1113.49-381112.378-351110.364-34.667 1110.14-33.775 1109.78-301109.592 2.382 1107.98 3.326 1107.9 3.741 1107.97 24.509 1111.43 24.621 1111.55 26.665 1113.01 27.609 1113.02 36.044 1113.13 38.642 1113.25 51.243 1115.01 61.185 1120.89 65.125 1123.57 72.486 1124.93 150 1140-300.06-38.045 26.665.06-38 26.665 5 26.04 35.1.3 Skew Angle = 30 REACH: UPSTREAM 1 RS: 11020.02 Station Elevation Data num= 35-300 1127-272 1126-255 1125-220 1120-204 1115-160 1114.09-122.75 1114.6-103.68 1115.19-93.8 1113.3-92.6 1113.07-53.21 1113.44-46.3 1113.49-45.79 1113.49-40.03 1110.14-39.001 1109.78-381109.737-341109.564-321109.478 2.75 1107.98 3.84 1107.9 4.32 1107.97 281111.387 28.3 1111.43 28.43 1111.55 301112.521 30.79 1113.01 31.88 1113.02 41.62 1113.13 44.62 1113.25 59.17 1115.01 70.65 1120.89 75.2 1123.57 83.7 1124.93 84.41 1124.99 150 1140-300.06-40.03.045 28.06-40.03 28 60 61.63 75.1.3 REACH: UPSTREAM 1 RS: 10958.39 Station Elevation Data num= 45-273 1126-250 1125-191 1120-180 1115-175 1114-157.22 1113.64-90.02 1114.98-66.52 1115.39-61.79 1115.41-51.99 1114.22-38.83 1112.1-30.81 1111.98-27.91 1110.03-26.33 1109.35-241109.251-20 1109.08-151108.868 2.79 1108.11 11.45 1107.69 18.45 1109.13 28.27 1111.47 28.73 1111.79 30.32 1112.43 32.07 1112.71 331112.746 351112.823 381112.938 41.18 1113.06 58.7 1114.17 69.26 1115.05 90.79 1116.98 91.98 1117.03 97.44 1117.25 113.2 1118.39 125.73 1119.88 128.02 1120.25 135.07 1122.03 139.55 1122.74 140.56 1123.5 141.28 1123.59 141.58 1123.67 145.72 1123.97 153.37 1124.09 160 1124.2 180 1140 Page 3

-273.06-38.83.045 35.06-38.83 35 86 77.92 55.1.3 REACH: UPSTREAM 1 RS: 10880.47 Station Elevation Data num= 41-194 1126-179.93 1125.6-162.7 1124.69-156.89 1124.33-117.48 1120.78-104.11 1119.71-79.93 1114.26-75.7 1113.08-73.49 1112.76-70.71 1112.69-601112.458-55.97 1112.37-501112.353-45.68 1112.34-41.61 1112.75-40.45 1111.99-39.6 1111.19-36.16 1109-22.91 1108.71-10.87 1109.15 121109.547 13.91 1109.58 201109.996 32.48 1110.85 35.27 1110.99 37.43 1111.18 39.35 1111.15 42.65 1111.75 45.43 1112.47 56.33 1112.94 60.8 1113 90.58 1113.86 104.81 1114.97 112.36 1116.66 126.07 1117.28 139.47 1117.2 150.29 1117.76 151.33 1117.81 165 1120 175 1122 255 1140-194.06-39.6.045 35.27.06-39.6 35.27 30.03 57.59 59.99.1.3 REACH: UPSTREAM 1 RS: 10822.88 Station Elevation Data num= 31-136.14 1124.49-125.22 1124.36-109.04 1124.01-105.66 1123.84-91.04 1122.86-82.21 1121.86-68.11 1120.59-53.53 1117.15-48.34 1115.88-45.05 1115.55-251113.011-20.49 1112.44-19.53 1111.17-15.37 1108.81-8.46 1108.42 151109.687 20.79 1110 22 1110.14 23.87 1111.42 24.04 1111.46 27.3 1111.65 59.5 1112.81 73.05 1113.33 80.04 1113.59 109.82 1113.78 116.3 1113.97 120.89 1114.35 123.95 1115.01 157.07 1117.15 160 1117.14 500 1140-136.14.06-25.045 23.87.06-25 23.87 80 80.42 80.1.3 Page 4

REACH: UPSTREAM 1 RS: 10742.46 Station Elevation Data num= 38-143.07 1123.7-102.81 1122.78-97.76 1122.74-92.34 1122.32-76.85 1121.38-65.97 1120.88-58.95 1119.13-50.34 1115.92-34.88 1113.75-17.64 1112.32-15.08 1109.54-13.01 1107.75-5.81 1107.5 1.72 1109.28 181109.373 19.14 1109.38 201109.491 21.78 1109.72 28.07 1111.18 29.37 1111.41 31.17 1111.63 34.19 1111.95 41.57 1111.86 54.25 1111.73 62.94 1111.87 96.77 1112.6 105.67 1113.01 125.07 1113.93 127.51 1114.05 131.06 1114.31 138.09 1114.84 142.3 1115.9 149.02 1116.42 154.01 1117.49 160 1117.78 193 1120 201 1121 450 1140-143.07.06-17.64.045 18.06-17.64 18 68 55.38 34.1.3 REACH: UPSTREAM 1 RS: 10687.08 Station Elevation Data num= 51-203 1126-154.55 1122.99-149.64 1122.67-140.14 1122.63-134.17 1121.95-118.29 1121.41-106.84 1119.15-94.71 1118.55-88.67 1117.18-70.11 1115.58-61.31 1115.22-54.83 1114.9-401113.516-39.19 1113.44-351113.182-24.4 1112.53-22.94 1111.28-20.57 1109.1-201109.102 41109.175 51109.178 18.74 1109.22 20.71 1109.2 22.2 1109.39 22.57 1109.31 22.92 1109.54 27.53 1111.44 27.63 1111.45 29.99 1111.52 52.84 1112.18 66.02 1112.46 87.69 1112.44 92.59 1112.72 94.66 1112.54 95.37 1111.89 98.59 1112.01 100 1112.26 107.7 1113.82 108.25 1113.92 110.19 1114.04 111.76 1115 118.13 1118.08 118.32 1118.11 119.34 1118.05 134.4 1119.05 152.43 1118.81 160 1119.09 182 1120 193 1121 214 1122 302.3 1129-203.06-22.94.045 27.53.06-22.94 27.53 65 57.66 60.1.3 REACH: UPSTREAM 1 RS: 10629.42 Station Elevation Data num= 36-215 1130-160 1122.79-159.25 1122.78-142.4 1122.63-140.52 1122.67 Page 5

-139.89 1122.67-129.67 1121.41-110.89 1120.84-97.31 1120.2-95.11 1120.15-84.85 1120.06-80.25 1119.86-76.41 1117.68-74.15 1113.93-63.98 1113.95-50.88 1112.33-37.53 1111.62-24.72 1111.44-23.79 1111.06-20.91 1109.22-201109.141-17.01 1108.88.46 1107.67 9.07 1108.08 22 1108.91 251109.717 27.17 1110.3 29.58 1111.01 31.5 1111.54 35.68 1112.83 38.29 1114.08 45.73 1117.55 49.96 1118.54 53.21 1119.68 192 1120 335 1125-215.06-20.045 25.06-20 25 65 60.02 65.1.3 REACH: UPSTREAM 1 RS: 10569.40 Station Elevation Data num= 35-174 1130-160 1124.52-155.89 1122.73-148.9 1120.12-132.17 1119.97-130.06 1119.97-125 1120.05-96.94 1119.88-90.8 1118.75-72.73 1118.18-63.62 1115.8-56.24 1112.18-36.79 1110.73-33.29 1110.7-31.95 1110.66-25.13 1109.37-24.47 1109.14-201108.667-8.48 1107.45-3.11 1107.06 11.49 1107.58 181107.895 251108.233 25.55 1108.26 30.72 1109.54 33.48 1110.65 38.85 1111.63 44.34 1113.87 50.22 1116.65 72 1118.26 72.47 1118.3 72.95 1118.32 73.99 1118.35 200 1120 334 1125-174.065-25.13.055 30.72.065-25.13 30.72 65 59.94 60.1.3 REACH: UPSTREAM 1 RS: 10509.46 Station Elevation Data num= 52-160 1120.48-132.35 1119.33-119.93 1117.91-100.42 1117.49-96.11 1117.48-75.43 1117.81-60.38 1118.17-56.99 1118.02-46.13 1117.65-45.47 1117.64-43.69 1117.94-43.57 1117.95-43.43 1117.94-36.41 1109.55-36.27 1109.28-36.26 1109.3-36.11 1109.02-36.09 1108.92-35.86 1108.88-35.57 1108.92-351108.858-34.56 1108.81-16.8 1107.65-13.93 1107.39-10.88 1108.19 1.14 1106.53 8.27 1107.78 10.18 1107.91 24.19 1108.05 30.43 1108.3 33.55 1110.04 34.54 1110.47 351110.619 37.22 1111.34 37.84 1111.91 38.74 1114.6 40.35 1117.95 41.46 1117.99 44.37 1118 44.94 1118.04 45.43 1117.96 45.77 1117.01 48.54 1117.78 60.47 1118.09 62.5 1118.16 67.48 1118.33 105.48 1117.85 110.28 1117.91 150.51 1118.25 154.09 1118.31 160 1118.47 259.5 1122.6 Page 6

-160.075-35.07 35.075-35 35 30 29.56 30.3.5 Ineffective Flow num= 2 Sta L Sta R Elev Permanent -160-43 1117.7 F 43 259.5 1118.4 F BRIDGE REACH: UPSTREAM 1 RS: 10491.47 SR 3015 Distance from Upstream XS = 9.24 Deck/Roadway Width = 17.5 Weir Coefficient = 2.6 Upstream Deck/Roadway Coordinates num= 11 Sta Hi Cord Lo Cord Sta Hi Cord Lo Cord Sta Hi Cord Lo Cord -211.5 1120.3-198.5 1120.2-148.5 1118.4-98.5 1117.7-85.5 1117.9-48.5 1118.8-38 1118.8 1117.05 38 1118.8 1117.05 101.5 1118.4 151.5 1118.6 201.5 1120.07 Upstream Bridge Cross Section Data Station Elevation Data num= 52-160 1120.48-132.35 1119.33-119.93 1117.91-100.42 1117.49-96.11 1117.48-75.43 1117.81-60.38 1118.17-56.99 1118.02-46.13 1117.65-45.47 1117.64-43.69 1117.94-43.57 1117.95-43.43 1117.94-36.41 1109.55-36.27 1109.28-36.26 1109.3-36.11 1109.02-36.09 1108.92-35.86 1108.88-35.57 1108.92-351108.858-34.56 1108.81-16.8 1107.65-13.93 1107.39-10.88 1108.19 1.14 1106.53 8.27 1107.78 10.18 1107.91 24.19 1108.05 30.43 1108.3 33.55 1110.04 34.54 1110.47 351110.619 37.22 1111.34 37.84 1111.91 38.74 1114.6 40.35 1117.95 41.46 1117.99 44.37 1118 44.94 1118.04 45.43 1117.96 45.77 1117.01 48.54 1117.78 60.47 1118.09 62.5 1118.16 67.48 1118.33 105.48 1117.85 110.28 1117.91 150.51 1118.25 154.09 1118.31 160 1118.47 259.5 1122.6-160.075-35.07 35.075 Bank Sta: Left Right Coeff Contr. Expan. -35 35.3.5 Ineffective Flow num= 2 Sta L Sta R Elev Permanent -160-43 1117.7 F 43 259.5 1118.4 F Downstream Deck/Roadway Coordinates num= 11 Sta Hi Cord Lo Cord Sta Hi Cord Lo Cord Sta Hi Cord Lo Cord -211.5 1120.3-198.5 1120.2-148.5 1118.4-98.5 1117.7-85.5 1117.9-48.5 1118.8-38 1118.8 1117.05 38 1118.8 1117.05 101.5 1118.4 151.5 1118.6 201.5 1120.07 Page 7

Downstream Bridge Cross Section Data Station Elevation Data num= 47-160 1118.75-149.51 1118.4-125.91 1118.09-108.63 1117.9-91.55 1117.14-83.65 1117.42-61.36 1117.1-55.83 1117.23-39.83 1117.24-39.7 1117.26-37.95 1117.53-37.2 1117.9-36.28 1117.89-33.39 1117.96-32.9 1115.06-31.57 1108.4-31.35 1108.32-30.64 1108.21-17.08 1107.36-6.63 1107.23-2.26 1106.47 6.99 1107.92 8.79 1107.85 20.51 1109.03 24.97 1107.99 28.65 1106.97 36.75 1107.2 38.27 1107.62 40.87 1109.47 41.6 1109.74 43.08 1110.38 44.49 1115.49 45.4 1118.03 46.43 1118.09 47.48 1117.31 47.75 1117.57 48.1 1117.97 50.74 1117.98 51.02 1117.96 51.79 1118 72.2 1117.88 75.89 1117.85 77.05 1117.83 108.5 1117.59 121.98 1117.98 150.54 1118.05 160 1118.13-160.075-32.9.07 44.49.075 Bank Sta: Left Right Coeff Contr. Expan. -32.9 44.49.3.5 Ineffective Flow num= 2 Sta L Sta R Elev Permanent -160-39.5 1117.05 F 39.5 160 1117.05 F Upstream Embankment side slope = 0 horiz. to 1.0 vertical Downstream Embankment side slope = 0 horiz. to 1.0 vertical Maximum allowable submergence for weir flow =.95 Elevation at which weir flow begins = Energy head used in spillway design = Spillway height used in design = Weir crest shape = Broad Crested Number of Piers = 2 Pier Data Pier Station Upstream= -13.75 Downstream= -13.75 Upstream num= 4 Width Elev Width Elev Width Elev Width Elev 8.5 1107.5 8.5 1110.3 1.51110.301 1.5 1117.1 Downstream num= 4 Width Elev Width Elev Width Elev Width Elev 8.5 1107.5 8.5 1109.6 1.51109.601 1.5 1117.1 Pier Data Pier Station Upstream= 13.75 Downstream= 13.75 Upstream num= 4 Width Elev Width Elev Width Elev Width Elev 8.5 1107.5 8.5 1110.3 1.51110.301 1.5 1117.1 Downstream num= 4 Width Elev Width Elev Width Elev Width Elev 8.5 1107.5 8.5 1109.6 1.51109.601 1.5 1117.1 Number of Bridge Coefficient Sets = 1 Low Flow Methods and Data Energy Momentum Cd = 1 Yarnell KVal = 1.05 Selected Low Flow Methods = Highest Energy Answer High Flow Method Energy Only Page 8

Additional Bridge Parameters Add Friction component to Momentum Do not add Weight component to Momentum Class B flow critical depth computations use critical depth inside the bridge at the upstream end Criteria to check for pressure flow = Upstream energy grade line REACH: UPSTREAM 1 RS: 10479.90 Station Elevation Data num= 47-160 1118.75-149.51 1118.4-125.91 1118.09-108.63 1117.9-91.55 1117.14-83.65 1117.42-61.36 1117.1-55.83 1117.23-39.83 1117.24-39.7 1117.26-37.95 1117.53-37.2 1117.9-36.28 1117.89-33.39 1117.96-32.9 1115.06-31.57 1108.4-31.35 1108.32-30.64 1108.21-17.08 1107.36-6.63 1107.23-2.26 1106.47 6.99 1107.92 8.79 1107.85 20.51 1109.03 24.97 1107.99 28.65 1106.97 36.75 1107.2 38.27 1107.62 40.87 1109.47 41.6 1109.74 43.08 1110.38 44.49 1115.49 45.4 1118.03 46.43 1118.09 47.48 1117.31 47.75 1117.57 48.1 1117.97 50.74 1117.98 51.02 1117.96 51.79 1118 72.2 1117.88 75.89 1117.85 77.05 1117.83 108.5 1117.59 121.98 1117.98 150.54 1118.05 160 1118.13-160.075-32.9.07 44.49.075-32.9 44.49 25 20.57 25.3.5 Ineffective Flow num= 2 Sta L Sta R Elev Permanent -160-39.5 1117.05 F 39.5 160 1117.05 F REACH: UPSTREAM 1 RS: 10459.33 Station Elevation Data num= 30-108.24 1122.46-100.35 1117.7-89.35 1116.48-80.65 1115.91-76.33 1114.88-64.4 1114.34-60.4 1113.69-52.06 1112.56-40.66 1111.26-34.8 1109.82-28.91 1108.6-28.81 1108.57-28.61 1108.54-14.42 1106.19-3.55 1106.04 7.71 1106.75 33.9 1108.31 35.02 1109.1 41.05 1111.07 44.99 1111.28 50.7 1112.92 55.56 1112.9 75.95 1115.11 88.22 1115.21 103.93 1115.3 124.8 1116.18 137.13 1117.04 160 1117.45 255 1120 330 1125-108.24.065-64.4.055 50.7.065-64.4 50.7 50 49.85 50.1.3 Page 9

REACH: UPSTREAM 1 RS: 10409.48 Station Elevation Data num= 35-111.69 1130.34-90.09 1116.54-89.863 1116.43-89.22 1116.4-64.96 1114.81-62.02 1114.43-54.03 1112.26-45.38 1111.27-38.25 1110.61-31.88 1108.54-30.11 1108.08-5.79 1107.83 -.59 1107.06 10 1107.51 23.02 1107.98 25.67 1109.95 29.03 1111.54 37.29 1112.84 46.97 1114.18 54.87 1114.16 68.51 1114.13 73.96 1114.31 86.87 1114.83 114.92 1114.36 116.26 1114.37 144.96 1116.02 145.55 1116.05 145.91 1116.1 146.28 1116.12 147.73 1116.17 160 1116.56 197 1118 260 1119 274 1120 332 1125-111.69.06-62.02.045 46.97.06-62.02 46.97 25 23.48 25.1.3 REACH: UPSTREAM 1 RS: 10386.00 Station Elevation Data num= 35-91.59 1120.74-79.52 1114.31-69.39 1114.43-64.95 1114.13-55.29 1112.87-53.16 1112.28-47.78 1111.67-39.95 1110.75-36.51 1110.34-31.66 1108.63-30.19 1108-21.2 1107.59.59 1107.36 7.97 1107.63 22.27 1108.17 24.77 1109.16 28.6 1111.04 32.8 1111.69 45.42 1113.18 49.41 1113.73 73.95 1113.66 75.78 1113.66 82.99 1113.88 89.64 1114.04 92.67 1114.09 128.61 1114.21 131.02 1114.3 148.12 1113.57 160 1113.77 183 1114 209 1117 244 1118 287 1119 297 1120 333 1125-91.59.06-64.95.045 49.41.06-64.95 49.41 53 55.86 25.1.3 REACH: UPSTREAM 1 RS: 10330.14 Station Elevation Data num= 34-112.6 1130.9-104.34 1130.67-95.47 1130.38-90.6 1126.93-70.96 1113.36-68.75 1113.52-60 1113.06-42.84 1113.34-41.3 1112.81-35.54 1110.01 Page 10

-29.02 1109.51-21.49 1108.92-10.88 1108.03 2.15 1107.07 11.15 1107.38 22.05 1107.21 24.93 1108.33 34.8 1111.53 35.02 1111.53 42.2 1111.81 43.94 1112.17 56.87 1112.29 75.78 1112.3 82.15 1112.35 96.56 1112.23 108.36 1112.56 127.49 1112.95 128.43 1112.98 128.63 1112.99 128.82 1113 140.14 1113.53 143.82 1113.53 160 1113.65 200 1120-112.6.06-41.3.045 34.8.06-41.3 34.8 50 48.14 50.1.3 REACH: UPSTREAM 1 RS: 10282.00 Station Elevation Data num= 29-88.4 1123.18-71.29 1113.8-59.02 1112.67-50.28 1112.14-33.86 1109.98-30.63 1109.64-29.75 1109.2-26.85 1108.97-19.92 1107.53-14.26 1107.19 4.46 1107.01 11.16 1106.92 22.34 1107.03 35.08 1111.47 35.25 1111.53 35.36 1111.53 36.3 1111.54 40.4 1112.33 57.6 1111.91 69.91 1111.92 79.85 1111.84 102.72 1111.81 109.1 1112.02 131.91 1112.68 136.63 1112.99 138.88 1113.34 139.28 1113.4 160 1113.74 200 1120-88.4.06-50.28.045 35.08.06-50.28 35.08 60 63.22 60.1.3 REACH: UPSTREAM 1 RS: 10218.78 Station Elevation Data num= 29-87.5 1127.19-85.65 1125.85-72.37 1115.47-60.59 1113.23-52.54 1111.47-40.02 1110.48-28.42 1109.55-22.08 1106.91-21.6 1106.66-6.04 1106.6.55 1106.48 22 1106.59 29.06 1110.01 30.06 1110.27 32.28 1110.31 45.4 1110.95 82.41 1111.25 84.15 1111.25 84.7 1111.26 85.98 1111.26 109.53 1111.21 119.11 1111.45 124.9 1111.76 139.57 1112.05 143.7 1113.11 145.38 1113.58 145.39 1113.58 160 1113.47 200 1120-87.5.06-28.42.045 32.28.06-28.42 32.28 70 73.18 70.1.3 Page 11

REACH: UPSTREAM 1 RS: 10145.60 PENNDRAIN.rep Station Elevation Data num= 28-87.05 1130.33-73.6 1128.37-61.31 1117.97-52.35 1110.43-46.86 1111.38-44.83 1111.59-32.96 1110.13-27.97 1108.99-25.33 1107.6-22.55 1106.64.38 1105.64 4.09 1105.39 10.06 1105.63 22 1106.05 31.56 1108.56 34.27 1109.49 42.07 1109.82 53.57 1110.07 80.22 1109.89 98.25 1109.82 123.82 1110.53 128.72 1110.68 135.44 1111.18 145.46 1111.9 145.97 1112.03 153.43 1112.8 160 1112.77 280 1120-87.05.06-32.96.045 34.27.06-32.96 34.27 75 74.28 75.1.3 REACH: UPSTREAM 1 RS: 10071.32 Station Elevation Data num= 26-67.24 1128.4-62.51 1127.81-51.53 1119.44-38.8 1109.48-34.71 1109.17-29.41 1108.99-25.32 1107.59-24.07 1106.79-9.47 1105.81 -.47 1105.35 15.25 1105.85 22.19 1106.11 24.32 1106.86 31.19 1108.73 36.22 1109.11 48.48 1109.42 54.51 1109.62 83.23 1109.5 103.88 1109.37 105.48 1109.46 116.42 1109.64 123.07 1109.81 125.08 1109.85 148.61 1110.2 160 1110.44 280 1120-67.24.06-29.41.045 31.19.06-29.41 31.19 70 75.425 70.1.3 REACH: UPSTREAM 1 RS: 9995.895 Station Elevation Data num= 24-71.28 1130.4-70.04 1130.24-56.05 1127.91-55.69 1127.64-53.68 1126.19-29.9 1109.02-27.94 1108.15-23.43 1106.72-22.57 1106.11-13.91 1105.67-1.01 1105.02 17.24 1105.79 23.13 1106.1 26.99 1107.98 27.42 1108.13 33.63 1108.22 54.55 1108.67 92.26 1108.71 99.32 1108.68 114.25 1109.32 135.01 1109.86 148.18 1109.74 160 1109.77 280 1120 Page 12

-71.28.06-29.9.045 26.99.06-29.9 26.99 10 10.72 10.1.3 REACH: UPSTREAM 1 RS: 9985.175 Station Elevation Data num= 24-71.28 1130.4-70.04 1130.24-56.05 1127.91-55.69 1127.64-53.68 1126.19-29.9 1109.02-27.94 1108.15-23.43 1106.72-22.57 1106.11-13.91 1105.67-1.01 1105.02 17.24 1105.79 23.13 1106.1 26.99 1107.98 27.42 1108.13 33.63 1108.22 54.55 1108.67 92.26 1108.71 99.32 1108.68 114.25 1109.32 135.01 1109.86 148.18 1109.74 160 1109.77 280 1120-71.28.06-27.94.045 26.99.06-27.94 26.99 0 0 0.1.3 SUMMARY OF MANNING'S N VALUES River:MAIN RIVER Reach River Sta. n1 n2 n3 UPSTREAM 1 11046.06.06.045.06 UPSTREAM 1 11020.02.06.045.06 UPSTREAM 1 10958.39.06.045.06 UPSTREAM 1 10880.47.06.045.06 UPSTREAM 1 10822.88.06.045.06 UPSTREAM 1 10742.46.06.045.06 UPSTREAM 1 10687.08.06.045.06 UPSTREAM 1 10629.42.06.045.06 UPSTREAM 1 10569.40.065.055.065 UPSTREAM 1 10509.46.075.07.075 UPSTREAM 1 10491.47 Bridge UPSTREAM 1 10479.90.075.07.075 UPSTREAM 1 10459.33.065.055.065 UPSTREAM 1 10409.48.06.045.06 UPSTREAM 1 10386.00.06.045.06 UPSTREAM 1 10330.14.06.045.06 UPSTREAM 1 10282.00.06.045.06 UPSTREAM 1 10218.78.06.045.06 UPSTREAM 1 10145.60.06.045.06 UPSTREAM 1 10071.32.06.045.06 UPSTREAM 1 9995.895.06.045.06 UPSTREAM 1 9985.175.06.045.06 Page 13

SUMMARY OF REACH LENGTHS PENNDRAIN.rep River: MAIN RIVER Reach River Sta. Left Channel Right UPSTREAM 1 11046.06 5 26.04 35 UPSTREAM 1 11020.02 60 61.63 75 UPSTREAM 1 10958.39 86 77.92 55 UPSTREAM 1 10880.47 30.03 57.59 59.99 UPSTREAM 1 10822.88 80 80.42 80 UPSTREAM 1 10742.46 68 55.38 34 UPSTREAM 1 10687.08 65 57.66 60 UPSTREAM 1 10629.42 65 60.02 65 UPSTREAM 1 10569.40 65 59.94 60 UPSTREAM 1 10509.46 30 29.56 30 UPSTREAM 1 10491.47 Bridge UPSTREAM 1 10479.90 25 20.57 25 UPSTREAM 1 10459.33 50 49.85 50 UPSTREAM 1 10409.48 25 23.48 25 UPSTREAM 1 10386.00 53 55.86 25 UPSTREAM 1 10330.14 50 48.14 50 UPSTREAM 1 10282.00 60 63.22 60 UPSTREAM 1 10218.78 70 73.18 70 UPSTREAM 1 10145.60 75 74.28 75 UPSTREAM 1 10071.32 70 75.425 70 UPSTREAM 1 9995.895 10 10.72 10 UPSTREAM 1 9985.175 0 0 0 SUMMARY OF CONTRACTION AND EXPANSION COEFFICIENTS River: MAIN RIVER Reach River Sta. Contr. Expan. UPSTREAM 1 11046.06.1.3 UPSTREAM 1 11020.02.1.3 UPSTREAM 1 10958.39.1.3 UPSTREAM 1 10880.47.1.3 UPSTREAM 1 10822.88.1.3 UPSTREAM 1 10742.46.1.3 UPSTREAM 1 10687.08.1.3 UPSTREAM 1 10629.42.1.3 UPSTREAM 1 10569.40.1.3 UPSTREAM 1 10509.46.3.5 UPSTREAM 1 10491.47 Bridge UPSTREAM 1 10479.90.3.5 UPSTREAM 1 10459.33.1.3 UPSTREAM 1 10409.48.1.3 UPSTREAM 1 10386.00.1.3 UPSTREAM 1 10330.14.1.3 UPSTREAM 1 10282.00.1.3 UPSTREAM 1 10218.78.1.3 UPSTREAM 1 10145.60.1.3 UPSTREAM 1 10071.32.1.3 UPSTREAM 1 9995.895.1.3 UPSTREAM 1 9985.175.1.3 Page 14