Zarvona Energy LLC DAILY OPERATIONS

Similar documents
Zarvona DAILY WORKOVER / COMPLETION REPORT

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report

FORGE Energy UL 21 Pahaska 1H API Number:

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

FORGE Energy UL 21 Freedom 1 API Number:

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

ENDEAVOR ENERGY RESOURCES

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

Practice Exam IADC WellSharp Driller and Supervisor

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Daily Drilling Report

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

1. The well has been shut in on a kick and the kill operation has not started.

Hydro-Mech Bridge Plug

FREQUENTLY ASKED QUESTIONS

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

DB Bridge Plug. Features. Benefits. Applications

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Study Guide IADC WellSharp Driller and Supervisor

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

Casing Design. Casing Design. By Dr. Khaled El-shreef

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

Colorado Oil and Gas Conservation Commission

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

IWCF Equipment Sample Questions (Surface Stack)

EP WELLS DAILY OPERATIONS REPORT Report 1 08/03/2016

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas

Deepwater Horizon Incident Internal Investigation

BP SIT Testing Franks Facility Lafayette

5k Slickline Lightweight Pressure Control Equipment 4 ID

Rig Math. Page 1.

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

PHE KE30-A8 WORKOVER PROGRAM

Pasquale Imbò e Marco Pelucchi ENI S.pA;

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

Abandonment Program for Paramount Fort Liard F 36

Coal Bed Methane (CBM) Permeability Testing

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Live well deployment of long perforating gun system using combined CT technologies

Extended leak off testing

Drilling Morning Report

Engineered solutions for complex pressure situations

SUBSEA KILL SHEET EXERCISE No. 5

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

Disposal/Injection Well Pressure Test Report (H-5)

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Monte Besler Consultant FracN8R Consulting LLC UNITED STATES

Hydrostatic Pressure Testing

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

WELL NO: BJN-8. Lower master valve

Dynamic Underbalance (DUB)

VOLUMETRIC METHODS and STRIPPING OPERATIONS

PRESSURE ADJUSTMENT Main pressure adjustment

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

VortexFlow DX (Downhole) Tool Installation Instructions

W I L D W E L L C O N T R O L COMPLICATIONS

LIMITED ENTRY CLUSTER PERFORATING SYSTEM IMPROVES FRACTURING EFFICIENCY IN HORIZONTAL WELLS

MANUAL BE SERIES Test Benches

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Float Equipment TYPE 925/926

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

Steam Locomotive Operating Procedures SVLS Locomotive 1973 Steam Up

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

Chapter 5 HORIZONTAL DRILLING

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Presents the following instructional slide show:

TAM Single SeT inflatable

OCEAN DRILLING PROGRAM

Completions & Workovers Module 1.9

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

HYDRAULIC CYLINDER TEST

RST INSTRUMENTS LTD.

BaraShield -664 LCM Standard Field Application Procedure

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary

Operating Instructions Model and Hydrostatic Test Pump

HPHT Annular Casing Packer. Obex Annular Casing Packer

W I L D W E L L C O N T R O L COMPLETIONS AND WORKOVERS

Perforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

KJ4000 Operating Instructions & Parts Manual NSN

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

Model A Sleeve Valve Cement Retainer

SPE MS. Copyright 2015, Society of Petroleum Engineers

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

Transcription:

DAYS FROM SPUD: 120 DAYS ON 0 Jun 28 2016 RIG SUPERVISOR: Tyler Dupriest MIRU pulling unit MIRU pulling unit, move in and tally TBG. SDFN RIH with RBP

DAYS FROM SPUD: 121 DAYS ON 1 Jun 29 2016 RIG SUPERVISOR: Tyler Dupriest RIH with RBP PU RBP and MU to 2 7/8" TBG. PU TBG and RIH to tag liner top.;tag liner top and POOH and set top of RBP 50' above liner top. Unlatch from RBP and pressure test to 500 psi to ensure a good set. Tested for 25 min, tested good. Spot 1,000 lbs of 20/40 mesh sand on top of RBP and POOH and stand back TBG;POOH and stand back 70 stands of TBG and SDFN Perf and test

DAYS FROM SPUD: 122 DAYS ON 2 Jun 30 2016 RIG SUPERVISOR: Tyler Dupriest PERF AND TEST POOH AND STAND BACK ALL TBG.;MIRU WIRELINE AND MU PERF GUNS. HAND WRONG STUDS FOR LUBRICATOR. HAVEING STUDS DELIVERED.;RIH WITH PERF GUNS AND TAG SAND. CORRELATED DEPTHS TO WELL LOG AND SHOOT FIRST PERF GUN @ 9980'-9982'. POOH AND SHOOT SECOND PERF GUN @ 9450'- 9451'. POOH AND RDMO WIRELINE;PU 7" PACKER AND RIH WITH TBG TO 9550' AND SET PACKER TO TEST CIRCULATION. SET PACKER AND SET DOWN 20K LBS AND SHUT IN WELL.;RIG UP REVERSE UNIT AND PUMP @ 2.5 BPM TO BREAK CIRCULATION. PUMPED 40 BBLS @ 200 PSI TO ESTABLISH CIRCULATION. INCREASED RATE TO 3 BPM AND STARTED TEST.;CIRCULATE WELL @ 3 BPM FOR 30 MIN @ 200 PSI. DID NOT GAIN OR LOOSE ANY FLUID DURING TEST. SHUT DOWN PUMP AND BLEED OFF WELL.;RELEASE PACKER AND POOH AND STAND BACK TBG. NOTIFIED LYNNETTE SCHILLO AT RRC @ 3:50 P.M. THAT WE WOULD BE PUMPING CEMENT AT 7:00 A.M. FRIDAY MORNING 7/1/2016. SDFN RIH WITH CEMENT RETAINER

DAYS FROM SPUD: 123 DAYS ON 3 Jul 1 2016 RIG SUPERVISOR: Tyler Dupriest SET CEMENT RETAINER POOH 14 STAND TBG AND LD PACKER. PU CEMENT RETAINER AND RIH AND SET RETAINER AT 9,556', RETAINER FAILED TO SET. CIRC 50 BBLS FRESH WATER AND ATTEMPT TO SET AGAIN AT 9,556'. RETAINER SET, CIRC WELLBORE CLEAN WITH 380 BBLS FRESH WATER AND SDFN. Pump cement

DAYS FROM SPUD: 124 DAYS ON 4 Jul 2 2016 RIG SUPERVISOR: Tyler Dupriest SQUEEZE WELL MIRU HALLIBURTON CEMENTING CREW. HOLD SAFETY MEETING. PRESSURE TEST ALL EQUPMENT TO 5000 PSI. ESABLISH CIRCULATION @ 3.8 BPM AND PERFORM SUICIDE SQUEEZE. ALL 42.5 BBLS CEMENT PUMPED AWAY WITH A MAX PRESSURE @ 1500 PSI. STING OUT OF RETAINER AND DUMP LAST 4 BBLS OF CEMENT ON TOP OF RETAINER. POOH 10 STANDS OF TBG AND REVERSE CIRC 113 BBLS OF FRESH WATER. RETURNS WERE CLEAN. SD PUMPS AND POOH AND STAND BACK TBG. RDMO CEMENT CREW.;POOH AND STAND BACK TBG.;MIRU WIRELINE. PU CBP AND RIH TO SET PLUG @ 8530'. PLUG SET DOWN @ 1,000' AND UNABLE TO RIH, POOH TO INSPECT PLUG. PLUG HAD BROKEN BOTTOM SLIPS. REPLACE SLIPS AND RIH WITH CBP. CORRELATED DEPTH TO SCHLUMBERGER ISOLATION SCANNER LOG. SET PLUG @ 8530' POOH TO PU PERF GUN;PRESSURE TEST CBP TO 500 PSI FOR 15 MIN. TESTED GOOD. PU PERF GUN AND RIH TO PERF @ 8490'-8491'. PULLED 100' GAMMA STRIP TO ENSURE CORRECT DEPTH AND SHOOT PERF GUN @ 8490'-8491' POOH AND RDMO WIRELINE. SDFN RIH WITH PACKER

DAYS FROM SPUD: 125 DAYS ON 5 Jul 3 2016 RIG SUPERVISOR: Tyler Dupriest Test perf and set CCR PU PACKER AND RIH WITH TBG AND ATTEMPT TO SET PACKER @ 8470'. WOULD NOT SET, POOH 5' AND SET PACKER @ 8465' AND SET DOWN 25K LBS. RIG UP REVERSE UNIT AND PUMP DOWN TBG TO ESTABLISH INJECTION RATE. PUMPED 45 BBLS @ 3BPM @ 700 PSI. BLEED OFF TBG AND PRESSURE TEST 7" CSG ABOVE PACKER TO ENSURE NO LEAKS. TESTED FOR 15 MIN @ 1500 PSI. TESTED GOOD. BLEED OFF WELL AN POOH AND STAND BACK TBG AND LD PACKER. PU CCR AND RIH AND SET CCR @ 8465'. RIG UP REVERSE UNIT AND PRESSURE TEST 7" CSG ABOVE CCR TO 1500 PSI FOR 15 MIN. TESTED GOOD, BLEED OFF PRESSURE AND STING IN AND OUT OF CCR TO ENSURE INTEGRITY OF TOOL. PUMP 3 BPM DN TBG @ 700 PSI TO ENSURE RATE. PUMPED 65 BBLS. SDFN, WILL PUMP CEMENT ON 7/5/2016 Pump cement

DAYS FROM SPUD: 128 DAYS ON 8 Jul 6 2016 RIG SUPERVISOR: Tyler Dupriest Squeeze Wolfcamp BLEED OFF TBG AND WAIT ON HALLIBURTON CEMENT CREW.;MIRU CEMENT CREW;WAITING ON POP OFF FOR 7" CSG;INSTALL 1000 PSI POP OFF ON 7" CSG.;STING IN AND OUT OF CEMENT RETAINER TO ENSURE TOOL INTEGRITY. LOAD AND TEST LINES ON TO 5000 PSI. ETABLISH INJECTION RATE @ 2 BPM @ 800 PSI. LOAD ANNULUS TO 500 PSI. BEGIN PUMPING SQUEEZE. PUMPED 21 BBLS CEMENT AVERAGING 15.25 PPG. PUMPED 43 BBLS FRESH WATER @ 1100 PSI MAX PRESSURE AND SHUT DOWN FOR 15 MIN WITH 6 BBLS OF CEMENT LEFT IN TBG TO HESITATE SQUEEZE. AFTER 15 MIN BROUGHT RATE UP TO.7 BPM AND PUMPED 3 BBLS FRESH WATER @ 800 PSI AND SHUT DOWN PUMPS. WELL FLOWED BACK 3 BBLS, PUMPED 3 BBLS FRESH WATER DN TBG AND SHUT IN TBG. BLEED OFF 7" CSG AND OPEN BOP. STING OUT OF TBG AND LD 2 JOINTS. REVERSE CIRC WELL WITH 240 BBLS FRESH WATER AND RECOVERED APPROX 3 BBLS CEMENT. CIRC WELLBORE CLEAN AND SHUT DOWN PUMPS. LD 10 JOINTS TBG AND SDFN DUE TO WEATHER. LD TBG

DAYS FROM SPUD: 129 DAYS ON 9 Jul 7 2016 RIG SUPERVISOR: Tyler Dupriest POOH AND LD TBG POOH AND LD ALL TBG. RDMO PULLING UNIT AND LET CEMENT CURE Let cement cure

DAYS FROM SPUD: 134 DAYS ON 14 Jul 12 2016 RIG SUPERVISOR: Tyler Dupriest Drill out cement MIRU PULLING UNIT, TALLY TBG. NOTIFIED LYNNETTE @ RRC THAT WE WOULD BE PRESSURE TESTING TOP SQUEEZE TUESDAY MORNING, 7-12-2016. PU DRILL COLLARS AND BIT. RIH AND TAG CEMENT @ 8427'. PU SWIVEL AND BEGIN DRILLING OUT CEMENT. TAG TOP OF CEMENT RETAINER @ 8465'.;DRILL OUT CEMENT RETAINER.;DRILL OUT CEMENT TO 8473' AND SDFN DUE TO LIGHTNING. PRESSURETEST

DAYS FROM SPUD: 135 DAYS ON 15 Jul 13 2016 RIG SUPERVISOR: Tyler Dupriest DRILL OUT CEMENT, PRESSURE TEST DRILL OUT CEMENT TO TOP OF CBP. TAG TOP OF CBP @ 8530'.;PUMP TRUCK ONLY HAD A 1500 PSI CHART RECORDER. CALLED IN TO HAVE A 3000 PSI RECORDER DELIVERED TO LOCATION.;PRESSURE UP 7 " CSG TO 1550 PSI FOR 30 MIN TEST. TESTED GOOD.;DRILL OUT CBP @ 8530' AND RIH WITH TBG. TAGGED TOP OF CEMENT @ 9437'. DRILL OUT CEMENT TO 9453' AND SDFN. DRILL OUT CEMENT, PRESSURE TEST

DAYS FROM SPUD: 136 DAYS ON 16 Jul 14 2016 RIG SUPERVISOR: Tyler Dupriest DRILL OUT CEMENT, PRESSURE TEST DRILL OUT CEMENT TO 9500'. PRESSURE TEST WELL TO 500 PSI FOR 30 MIN TO ENSURE WELL WOULD HOLD PRESSURE. NOTIFY RAILROAD COMMISION THAT THE WELL IS READY FOR PRESSURE TESTING.;WAIT FOR RAILROAD COMMISION TO WITNESS TEST;PRESSURE TEST WEL TO 1550 PSI FOR 30 MIN. UNSURE OF QUALITY OF CHART FOR TEST. BLEED OFF WELL AND RETEST. PRESSURE UP WELL TO 1520 PSI FOR 30 MIN. TESTED GOOD. PU SWIVEL AND DRILL OUT CCR;DRILL OUT CCR, DRILL DOWN TO 9551' AND SDFN. DRILL OUT CEMENT AND CCR

DAYS FROM SPUD: 137 DAYS ON 17 Jul 15 2016 RIG SUPERVISOR: Tyler Dupriest DRILL OUT CEMENT FINISH DRILLING OUT CEMENT RETAINER. DRILL OUT CEMENT TO 10,025' AND FELL THROUGH BTM OF CEMENT. RIH TO 10,052' AND CIRC WELL CLEAN. NOTIFIED RAILROAD COMMISION THAT WE WOULD BE ON SCHEDULE TO PRESSURE TEST FRIDAY MORNING. SDFN PRESSURE TEST

DAYS FROM SPUD: 138 DAYS ON 18 Jul 16 2016 RIG SUPERVISOR: Tyler Dupriest PRESSURE TEST WELL LOAD AND PRESSURE TEST 7" CSG TO 1500 PSI FOR 30 MIN DOWN TO 10,052'. FIRST TEST LOST APPROX 5 PSI DUE TO AIR IN LINES. BLEED OFF ALL AIR AND CIRC WELL FULL OF WATER. RETEST TO 1500 PSI FOR 30 MIN. TESTED GOOD. BLEED DOWN WELL AND CLEAN OUT REVERSE PIT, SDFN. NONE

DAYS FROM SPUD: 143 DAYS ON 23 Jul 21 2016 RIG SUPERVISOR: Tyler Dupriest POOH TBG AND LD BIT MIRU PULLING UNIT. CIRC WELL CLEAN @ 10040'. POOH AND STAND BACK TBG. LD DRILL COLLARS AND BIT. PU RBP RETRIEVAL TOOL AND RIH WITHH 71 STANDS OF TBG AND SDFN RIH WITH RBP RETRIEVAL TOOL

DAYS FROM SPUD: 144 DAYS ON 24 Jul 22 2016 RIG SUPERVISOR: Tyler Dupriest RETRIEVE RBP RIH TO RBP AND CIRC WELL CLEAN WITH 430 BBLS FRESH WATER. LATCH ON TO RBP AND RELEASE. POOH AND STAND BACK TBG. PULLED 280 JOINTS AND SDFN MILL LINER TOP

DAYS FROM SPUD: 145 DAYS ON 25 Jul 23 2016 RIG SUPERVISOR: Tyler Dupriest MILL AND POLISH LINER TOP POOH AND STAND BACK TBG. LD RBP. PU WEATERFORD LINER MILL AND RIH WITH TBG TO LINER TOP. PU SWIVEL AND BREAK CIRC. MILL AND POLISH LINER TOP AND CIRC WELL CLEAN. LD SWIVEL AND POOH AND LD TBG. NONE

DAYS FROM SPUD: 152 DAYS ON 32 Jul 30 2016 RIG SUPERVISOR: Tyler Dupriest RIH WITH 4 1/2" CSG MIRU PULLING UNIT. MOVE IN TIE BACK LINER. CLEAN, DRIFT AND TALLY 4 1/2" CSG. PU WEATHERFORD SEAL STEM AND RIH WITH CSG. LAND CSG WITH 321 JOINTS AND 2 SUBS WITH 35K LBS SET DOWN. ND BOP AND NU FRAC STACK. RDMO PULLING UNIT TOE PREP

DAYS FROM SPUD: 153 DAYS ON 33 Jul 31 2016 RIG SUPERVISOR: Tyler Dupriest TOE PREP MIRU CTU. HAD BLUE QUAIL TRANSFER 5,500 BBLS FRESH WATER FROM ZARVONA WATER PIT TO FRAC TANKS ON LOCATION.;PRESSURE TEST 7" CSG TO 1000 PSI. TESTED GOOD, LEFT PRESSURE ON 7". TEST STACK TO 9000 PSI, TESTED GOOD, BLEED OFF PRESSURE TO PIT. OPEN BOP AND PRESSURE TEST 4 1/2" CSG TO 8500 PSI, GOT TO 6000 PSI AND 7" CSG PRESSURE WAS 1500 PSI. BLED OFF 7" TO 1200 PSI AND CONTINUED TO PRESSURE UP 4 1/2" CSG TO 8500 PSI. TESTED GOOD, 7" CSG PRESSURE STAYED @ 1200 PSI WITH 8500 PSI ON 4 1/2" CSG. PU MOTOR AND 3 3/4" JZ BIT TO PREP TOE.;RIH PUMPING 2 BPM TO CURVE THEN INCREASE RATE TO 3 BPM. BEGAN TAGGING CEMENT @ 16,400'. DRILL OUT CEMENT TO 16,730' AND TAG SHOE. PUMPED 10 BBL SWEEP AND POOH. LD MOTOR AND BIT AND PU CAPITAIN TCP GUNS AND RIH TO PERF FIRST STAGE.;RIH WITH TCP GUNS.;SHUT IN WELL AND PRESSURE UP TO 2100 PSI AND FIRE FIRST GUN AND PERF FROM 16,710'-16,711'. POOH AND FIRE SECOND GUN FROM 16,675'- 16,676'. POOH AND FIRE THIRD GUN FROM 16,640'-16,641'. POOH AND FIRE FOURTH GUN FROM 16,605'- 16,606'. POOH AND FIRE FIFTH GUN FROM 16,570'-16,571. POOH AND FIRE SIXTH GUN FROM 16,535'-16,536'. OPEN WELLHEAD AND PUMP 1500 GAL OF 15% ACID. SHUT IN WELL ONCE ACID IS AT END OF COIL. BREAK DOWN FIRST STAGE. FORMATION BROKE @ 4000 PSI PUMPING 3 BPM. OPEN WELL HEAD AND POOH TOE PREP

DAYS FROM SPUD: 154 DAYS ON 34 Aug 1 2016 RIG SUPERVISOR: Tyler Dupriest RDMO CTU POOH COIL;LD TCP GUNS AND TOOLS. RDMO CTU NONE

DAYS FROM SPUD: 156 DAYS ON 36 Aug 3 2016 RIG SUPERVISOR: Chris Cummings MIRU Cudd SDFN;MIRU CUDD, QAQC testing, Load and test lines, Set pop offs on frac iron & annulus. Tested lines to 8,989 psi set pop off to 8,506 psi, back set pop off is set to 1,200 ;Waiting for day crew to arrive to start treatment of well QAQC testing, Load and Test lines

DAYS FROM SPUD: 157 DAYS ON 37 Aug 4 2016 RIG SUPERVISOR: Rocky Vines MIRU CUDD Hold safety meeting with all personel on location. Cudd still fueling up equipment. E-tech repairing communication issues with the pump down pumps.applying 300 psi on the backside of the 4.5'' tie back string.;"stage 1 Frac: SICP: 1,458 psi, Formation broke at 4,439 psi, while pumping 4 bpm. Pumpdown bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 10,826 bbls. Load to recover for this stage: 10,921 bbls. Total load to recover: 10,921 bbls. Containing: Total 100 Mesh: 80,000 lbs, Total 40/70 Ottawa: 262,520 lbs, Total 40/70 Garnet: 69,935 lbs. Proppant pumped this stage: 412,455 lbs. Total proppant pumped: 412,455 lbs. ISIP: 3,128 psi, with a Frac Gradient of 0.724 psi/ft. Qavg: 58.8 bpm, Pavg: 7,191 psi, Qmax: 61.6 bpm, Pmax: 7,928 ***Notes*** I shut down during pad due to the backside pressure falling from 280 psi to 85 I had Stuarts install a needle gauge on the backside of the 7'', as well as had Cudd pressure up the backside of the 4.5'' to 650 Opened well back up and continued the stage. I extended the pad to obtain enough rate to start sand. I brought the 100 mesh up in.25 ppa increments and did not get above 1.25 ppa. I started the 40/70 white at.50 ppa and brought it up in.25 ppa increments as well, due to not being able to obtain designed rate. We did not get above 1.75 ppa due to high friction pressure. Stage pumped with all sand away. ";RIH set stage 2 CBP at 16,536'. Perforated: 16,500'-16,501', 16,465'-16,466', 16,430'-16,431', 16,395'-16,396', 16,360'-16,361'. 16,325'-16,326'. All shots fired. Logging a collar strip while POOH. Cudd could not get the flowmeter to work correctly on pumpdown side. Was shut down for 20 minutes while e-tech repaired comms.;stage 2 Frac: SICP: 2,595 psi, Formation broke at 5,094 psi, while pumping 7 bpm. Pumpdown 172 bbls. containing: Total 100 Mesh: 85,150 lbs, Total 40/70 Ottawa: 265,973 lbs, Total 40/70 Garnet: 65,596 lbs. Load to recover for this stage: 10,858 bbls. Total load to recover: 21,951 bbls. Containing: Total 100 Mesh: 85,150 lbs, Total 40/70 Ottawa: 265,973 lbs, Total 40/70 Garnet: 65,596 lbs. Proppant pumped this stage: 416,719 lbs. Total proppant pumped: 829,174 lbs. ISIP: 3,498 psi, with a Frac Gradient of 0.758 psi/ft. Qavg: 54.7 bpm, Pavg: 7,138 psi, Qmax: 59.9 bpm, Pmax: 7,714 ***Notes*** During 40/70 Garnet we had a hose on a frac pump start leaking rate was adjusted and pump as brought down too neutral. Max rate was not obtained due to pressure. Designed amount of sand was placed.;rih set stage 3 CBP at 16,326'. Perforated: 16,286'-16,287', 16,255'-16,256', 16,220'-16,221', 16,185'-16,186', 16,150'-16,151'. 16,118'-16,119'. All shots fired.;stage 3 Frac: SICP: 2,624 psi, Formation broke at 7,524 psi, while pumping 13 bpm. Pumpdown 181 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 10,151 bbls. Load to recover for this stage: 10,246 bbls. Total load to recover: 32,378 bbls. Containing: Total 100 Mesh: 87,246 lbs, Total 40/70 Ottawa: 261,856 lbs, Total 40/70 Garnet: 67,237 lbs. Proppant pumped this stage: 416,339 lbs. Total proppant pumped: 1,245,513 lbs. ISIP: 3,435 psi, with a Frac Gradient of 0.752 psi/ft. Qavg: 58.2 bpm, Pavg: 7,323 psi, Qmax: 61. bpm, Pmax: 8,459 ***Notes*** During pad we had a pressure spike that caused all pumps to kick out. Pumps were brought back on quickly and treatment was continued. Stage was not pumped to design max rate was not obtained. Designed amount of sand was placed.;rih set stage 4 CBP at 16,119'. Perforated: 16,080'-16,081', 16,045'-16,046', 16,010'-16,011', 15,975'-15,976', 15,944'-15,945'. 15,905'-15,906'. All shots fired.;pumping Stage 4 QAQC testing, Load and Test lines

DAYS FROM SPUD: 158 DAYS ON 38 Aug 5 2016 RIG SUPERVISOR: Rocky Vines Frac and perf "Stage 4 Frac: SICP: 2,996 psi, Formation broke at 6,522 psi, while pumping 12 bpm. Pumpdown 170 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 12,052 bbls. Load to recover for this stage: 12,147 bbls. Total load to recover: 44,695 bbls. Containing: Total 100 Mesh: 86,655 lbs, Total 40/70 Ottawa: 258,545 lbs, Total 40/70 Garnet: 70,361 lbs. Proppant pumped this stage: 415,561 lbs. Total proppant pumped: 1,661,074 lbs. ISIP: 3,368 psi, with a Frac Gradient of 0.746 psi/ft. Qavg: 54.8 bpm, Pavg: 7,029 psi, Qmax: 60.1 bpm, Pmax: 8,341 ***Notes*** During 1.00# 100 Mesh pressure was unsteady and screws were cut once we got a steady pressure increase and a sweep was intended to be ran until we got a good pressure break. Screws were cut back on and sand was ramped back up to an 1.00# and sub stage was held a little long to see sand hit formation. Once sand hit formation Treatment was continued on. I had to run a clean sweep due to a slow steady gain in pressure while on 1.50 ppa 40/70 white. Came back on with.50 ppa and did not get above 1.25 ppa due to pressure responses. We ran the Flotech Stimlube this stage at 1 gpt, but did not see a noticeable change in friction pressure. I cut the scale, as well as the breaker, but still had no change. Was only able to obtain 54 bpm. Stage pumped with all sand away. ";RIH set stage 5 CBP at 15,906'. Perforated: 15,870'-15,871', 15,835'-15,836', 15,800'-15,801', 15,765'-15,766', 15,730'-15,731'. 15,695'-15,696'. All shots fired.;cudd prime up and attempted to pressure test, but could not get a good test. A flange on the flowcross was leaking, and Stuarts had to tighten it up.;"stage 5 Frac: SICP: 2,681 psi, Formation broke at 5,421 psi, while pumping 7 bpm. Pumpdown 134 bbls. Pumped: Total 15% HCL Acid: 143 bbls. Total Slickwater: 11,786 bbls. Load to recover for this stage: 11,929 bbls. Total load to recover: 56,758 bbls. Containing: Total 100 Mesh: 83,270 lbs, Total 40/70 Ottawa: 264,433 lbs, Total 40/70 Garnet: 69,054 lbs. Proppant pumped this stage: 416,757 lbs. Total proppant pumped: 2,077,831 lbs. ISIP: 3,435 psi, with a Frac Gradient of 0.752 psi/ft. Qavg: 51.2 bpm, Pavg: 7,081 psi, Qmax: 53.1 bpm, Pmax: 8,217 ***Notes*** I ran an additional 2000 gal of 15% HCL slug in the attempt to break open more perfs, but did not see any change in pressure once acid was on. The overall pad was extended to obtain enough rate to start sand. I had to run a clean sweep while.75 ppa 100 mesh was on formation, and with 1.00 ppa 100 mesh in the wellbore. Friction pressure extremely high. Got pressure rolled over and came back on with.50 ppa 100 mesh. We did not get above 1.00 ppa on 100 mesh. Stage pumped with all sand away. We did not get above 2.00 ppa on 40/70 Garnet. ";RIH set stage 6 CBP at 15,696'. Perforated: 15,660'-15,661', 15,623'-15,624', 15,590'-15,591', 15,555'-15,556', 15,520'-15,521'. 15,485'-15,486'. All shots fired. Guns are 3 1/8 guns with.52 holes;stage 6 Frac: SICP: 2,775 psi, Formation broke at 6,816 psi, while pumping 13 bpm. Pumpdown 130 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 11,007 bbls. Load to recover for this stage: 11,102 bbls. Total load to recover: 67,990 bbls. Containing: Total 100 Mesh: 80,131 lbs, Total 40/70 Ottawa: 261,516 lbs, Total 40/70 Garnet: 74,845 lbs. Proppant pumped this stage: 416,492 lbs. Total proppant pumped: 2,494,323 lbs. ISIP: 3,575 psi, with a Frac Gradient of 0.765 psi/ft. Qavg: 51.5 bpm, Pavg: 7,351 psi, Qmax: 53.6 bpm, Pmax: 8,405 ***Notes*** When starting up we had a check valve start leaking we had to shut down temporary to shut pump in with bad check valve. Stage was not pumped to design Max rate was not achieved. Designed amount of sand was placed.;rih set stage 7 CBP at 15,486'. Perforated: 15,445'-15,446', 15,415'-15,416', 15,380'-15,381', 15,345'-15,346', 15,310'-15,311'. 15,275'-15,276'. All shots fired.;cudd rolling acid;stage 7 Frac: SICP: 2,809 psi, Formation broke at 5,394 psi, while pumping 12 bpm. Pumpdown 150 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 10,328 bbls. Load to recover for this stage: 10,423 bbls. Total load to recover: 78,413 bbls. Containing: Total 100 Mesh: 85,528 lbs, Total 40/70 Ottawa: 253,196 lbs, Total 40/70 Garnet: 47,872 lbs. Proppant pumped this stage: 386,596 lbs. Total proppant pumped: 2,880,919 lbs. ISIP: 3,851 psi, with a Frac Gradient of 0.791 psi/ft. Qavg: 52.7 bpm, Pavg: 7,365 psi, Qmax: 55. bpm, Pmax: ***Notes*** Pad was extended to obtain enough rate for sand. Stage was not pumped to design. Max rate and max sand conc was not achieved. Sand was cut short on 2.00# 40/70 Garnet due to steady pressure increase. Well was fully flushed with us having to lower rate during flush due to pressure getting close to max ;RIH w/ Wireline for Stage 8 Frac and perf

DAYS FROM SPUD: 159 DAYS ON 39 Aug 6 2016 RIG SUPERVISOR: Rocky Vines Frac and perf RIH set stage 8 CBP at 15,276'. Perforated: 15,240'-15,241', 15,205'-15,206', 15,170'-15,171', 15,135'-15,136', 15,100'-15,101'. 15,065'-15,066'. All shots fired.;"stage 8 Frac: SICP: 2,879 psi, Formation broke at 5,415 psi, while pumping 7 bpm. Pumpdown 125 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 11,121 bbls. Load to recover for this stage: 11,216 bbls. Total load to recover: 89,904 bbls. Containing: Total 100 Mesh: 84,494 lbs, Total 40/70 Ottawa: 206,236 lbs. Proppant pumped this stage: 290,730 lbs. Total proppant pumped: 3,171,649 lbs. ISIP: 3,491 psi, with a Frac Gradient of 0.757 psi/ft. Qavg: 47.3 bpm, Pavg: 7,258 psi, Qmax: 47.6 bpm, Pmax: 8,141 ***Notes*** I had to run a clean sweep with 1.00 ppa 40/70 white on formation due to sharp increase in pressure. Got wellbore flushed, but had very little pressure relief. I walked the sand back up from.25 ppa - 1.25 ppa 40/70 white, with friction pressure responses each time the different concentrations hit formation. Stage was cut short due to a sharp increase in pressure with 1.25 ppa 40/70 white on formation, as well as going beyond the designed volume. No Garnet was pumped this stage, and we were only able to obtain 47 bpm max. ";"RIH set stage 9 CBP at 15,066'. Perforated: 15,025'-15,026', 14,995'-14,996', 14,956'-14,957', 14,925'-14,926', 14,890'-14,891'. 14,855'-14,856'. All shots fired. Guns were Geodynamics Frac Plane guns. ";Stage 9 Frac: SICP: 2,891 psi, Formation broke at 4,204 psi, while pumping 7 bpm. Pumpdown 116 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 11,029 bbls. Load to recover for this stage: 11,124 bbls. Total load to recover: 101,144 bbls. Containing: Total 100 Mesh: 84,966 lbs, Total 40/70 Ottawa: 254,130 lbs, Total 40/70 Garnet: 76,963 lbs. Proppant pumped this stage: 416,059 lbs. Total proppant pumped: 3,587,708 lbs. ISIP: 4,830 psi, with a Frac Gradient of 0.882 psi/ft. Qavg: 48.8 bpm, Pavg: 7,196 psi, Qmax: 50. bpm, Pmax: 8,318 ***Notes*** Stage was not pumped to design we were unable to achieve max rate. All sand was placed in formation at a max conc of 2.00#;Waiting for guns;rih set stage 10 CBP at 14,856'. Perforated: 14,815'-14,816', 14,787'-14,788', 14,750'-14,751', 14,715'-14,716', 14,680'-14,681'. 14,645'-14,646'. All shots fired.;stage 10 Frac: SICP: 2,879 psi, Formation broke at 6,187 psi, while pumping 12 bpm. Pumpdown 128 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 11,561 bbls. Load to recover for this stage: 11,656 bbls. Total load to recover: 112,928 bbls. Containing: Total 100 Mesh: 84,717 lbs, Total 40/70 Ottawa: 255,099 lbs, Total 40/70 Garnet: 37,848 lbs. Proppant pumped this stage: 416,009 lbs. Total proppant pumped: 4,003,717 lbs. ISIP: 4,180 psi, with a Frac Gradient of 0.822 psi/ft. Qavg: 53.8 bpm, Pavg: 7,413 psi, Qmax: 58. bpm, Pmax: 8,413 ***Notes*** Pad was held long to allow enough rate to pump sand. 0.50# 100 was held long due to no pressure change once sand hit formation once pressure was on a steady decline sand was ramped up to 1.00#. During 40/70 bridging was observed throughout sand stages zero to none pressure declines were observed. During 1.75# 40/70 Cudd has issues with a pump causing the rate to bounce around which made the pressure bounce around as well. During 2.00# Garnet we had a steady pressure increase and screws were cut and a sweep was inserted into treatment. Once sand cleared pressure broke back and screws were cut back on and sand was ramped up from a 0.50#-1.50#. During ramp Cudd had another issue with a pump with the electronics causing the rate to drop, rate was caught with other pumps. Stage was not pumped to design Max rate or Max Conc were not achieved during treatment. Designed amount of sand was placed in formation and well was fully flushed.;rih w/ Wireline to plug and perf stage 11 Frac and perf

DAYS FROM SPUD: 160 DAYS ON 40 Aug 7 2016 RIG SUPERVISOR: Rocky Vines Frac and perf RIH set stage 11 CBP at 14,646'. Perforated: 14,610'-14,611', 14,575'-14,576', 14,540'-14,541', 14,505'-14,506', 14,468'-14,469'. 14,435'-14,436'. All shots fired.;"stage 11 Frac: SICP: 2,981 psi, Formation broke at 5,221 psi, while pumping 7 bpm. Pumpdown 118 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 10,826 bbls. Load to recover for this stage: 10,921 bbls. Total load to recover: 123,967 bbls. Containing: Total 100 Mesh: 84,916 lbs, Total 40/70 Ottawa: 262,626 lbs, Total 40/70 Garnet: 61,178 lbs. Proppant pumped this stage: 408,720 lbs. Total proppant pumped: 4,412,437 lbs. ISIP: 4,564 psi, with a Frac Gradient of 0.857 psi/ft. Qavg: 52.7 bpm, Pavg: 7,304 psi, Qmax: 53.3 bpm, Pmax: 8,162 ***Notes*** Pad was extended to obtain rate to start sand. The 1.25 ppa and 1.50 ppa stages were extended due to steady increases in pressures. Stage was pumped with all sand away except for about 10,000 lbs of 40/70 Garnet, due to a sharp rise in pressure with 1.75 ppa on formation. ";RIH set stage 12 CBP at 14,436'. Perforated: 14,400'-14,401', 14,365'-14,366', 14,330'-14,331', 14,297'-14,298', 14,260'-14,261'. 14,225'-14,226'. All shots fired.;"stage 12 Frac: SICP: 3,066 psi, Formation broke at 5,350 psi, while pumping 6 bpm. Pumpdown 110 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 10,537 bbls. Load to recover for this stage: 10,632 bbls. Total load to recover: 134,709 bbls. Containing: Total 100 Mesh: 85,200 lbs, Total 40/70 Ottawa: 262,760 lbs, Total 40/70 Garnet: 63,209 lbs. Proppant pumped this stage: 411,169 lbs. Total proppant pumped: 4,823,606 lbs. ISIP: 4,333 psi, with a Frac Gradient of 0.836 psi/ft. Qavg: 50.5 bpm, Pavg: 7,315 psi, Qmax: 51.2 bpm, Pmax: 8,108 ***Notes*** Stage treated well. Pad was extended again to gain rate. Stage pumped with all sand away, except for about 5,000 lbs of Garnet, due to a sharp spike in pressure, at 51 bpm. We did not get above 1.75 ppa. ";RIH set stage 13 CBP at 14,226'. Perforated: 14,185'-14,186', 14,154'-14,155', 14,120'-14,121', 14,085'-14,086', 14,050'-14,051'. 14,015'-14,016'. All shots fired.;stage 13 Frac: SICP: 2,898 psi, Formation broke at 7,123 psi, while pumping 12 bpm. Pumpdown 93 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 11,735 bbls. Load to recover for this stage: 11,830 bbls. Total load to recover: 146,632 bbls. Containing: Total 100 Mesh: 85,993 lbs, Total 40/70 Ottawa: 195,069 lbs, Total 40/70 Garnet: 32,738 lbs. Proppant pumped this stage: 370,716 lbs. Total proppant pumped: 5,194,322 lbs. ISIP: 4,210 psi, with a Frac Gradient of 0.824 psi/ft. Qavg: 54.2 bpm, Pavg: 7,657 psi, Qmax: 57. bpm, Pmax: 8,469 ***Notes*** Pad was held due to no having enough rate for sand. 0.25# was pumped starting 100 mesh due to low rate and high treating pressure. Once 0.25# 100 mesh was on formation pressure started to break back and sand conc was continued on schedule. During 40/70 sub stages pressure stayed high and FR conc was increased from 1.00 GPT to 1.25 GPT with very little pressure change was the higher setup was in the wellbore. During 1.25# 40/70 pressure continued to stay high and a sweep was pumped. Once sand cleared formation we had a small pressure break and then shortly after that we had a steady pressure increase. We lowered our rate from 55 bpm to 53 bpm and at the lower rate had a good downward trend in pressure and ramped our sand up from a 0.50#-1.50# conc. During 2.00# Garnet we had a heavy pressure increase and had to cut the screws and call flush. We were short 43,000 lbs of designed garnet. Stage was successfully flushed.;rih set stage 14 CBP at 14,016'. Perforated: 13,980'-13,981', 13,945'-13,946', 13,910'-13,911', 13,875'-13,876', 13,840'-13,841'. 13,809'-13,810'. All shots fired.;stage 14 Frac: SICP: 2,954 psi, Formation broke at 6,467 psi, while pumping 12 bpm. Pumpdown 90 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 11,134 bbls. Load to recover for this stage: 11,229 bbls. Total load to recover: 157,951 bbls. Containing: Total 100 Mesh: 85,046 lbs, Total 40/70 Ottawa: 173,189 lbs, Total 40/70 Garnet: 53,975 lbs. Proppant pumped this stage: 390,684 lbs. Total proppant pumped: 5,585,006 lbs. ISIP: 4,687 psi, with a Frac Gradient of 0.869 psi/ft. Qavg: 50.5 bpm, Pavg: 7,602 psi, Qmax: 52.1 bpm, Pmax: 8,345 ***Notes*** On acid we shut down for ten min to let acid soak just to try something new. During 1.25# 40/70 we had a steady pressure increased and a dirty sweep of 0.50# was pumped. Once the dirty sweep was on formation a good steady pressure decrease was observed and sand was ramp back up. We cut Garnet short by 15,000 lbs due to a continuous pressure increase. screws were cut and flush was called. During flush we had to keep lowering our rate due to not pressuring out. Stage was fully flush. Max conc or rate were not achieved during stage.;rih w/ Wireline for stage 15 Frac and perf

DAYS FROM SPUD: 161 DAYS ON 41 Aug 8 2016 RIG SUPERVISOR: Rocky Vines Frac and perf RIH set stage 15 CBP at 13,810'. Perforated: 13,770'-13,771', 13,735'-13,736', 13,700'-13,701', 13,665'-13,666', 13,632'-13,633'. 13,595'-13,596'. All shots fired.;"stage 15 Frac: SICP: 2,839 psi, Formation broke at 5,652 psi, while pumping 7 bpm. Pumpdown 89 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 13,851 bbls. Load to recover for this stage: 13,946 bbls. Total load to recover: 171,986 bbls. Containing: Total 100 Mesh: 85,105 lbs, Total 40/70 Ottawa: 262,244 lbs, Total 40/70 Garnet: 68,928 lbs. Proppant pumped this stage: 416,277 lbs. Total proppant pumped: 6,001,283 lbs. ISIP: 5,126 psi, with a Frac Gradient of 0.91 psi/ft. Qavg: 48.2 bpm, Pavg: 7,604 psi, Qmax: 48.8 bpm, Pmax: 8,245 ***Notes*** Stage treated very tight. Pad was extended to gain enough rate to start sand at.25 ppa. I ran a.25 ppa dirty sweep with 1.50 ppa 40/70 on formation due to gradual pressure increase, but did not get much relief in pressure. I walked the sand back up in.25 ppa increments, but never got above 1.00 ppa due to pressure responses from formation. Stage was pumped with all sand placed, but volume was extended well beyond design. ";RIH set stage 16 CBP at 13,596'. Perforated: 13,560'-13,561', 13,525'-13,526', 13,490'-13,491', 13,455'-13,456', 13,420'-13,421'. 13,385'-13,386'. All shots fired.;stuarts greasing the wellhead.;stage 16 Frac: SICP: 2,926 psi, Formation broke at 5,637 psi, while pumping 7 bpm. Pumpdown 83 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 11,270 bbls. Load to recover for this stage: 11,365 bbls. Total load to recover: 183,434 bbls. Containing: Total 100 Mesh: 84,128 lbs, Total 40/70 Ottawa: 252,743 lbs, Total 40/70 Garnet: 78,833 lbs. Proppant pumped this stage: 415,704 lbs. Total proppant pumped: 6,416,987 lbs. ISIP: 3,907 psi, with a Frac Gradient of 0.796 psi/ft. Qavg: 49.7 bpm, Pavg: 7,397 psi, Qmax: 50.5 bpm, Pmax: 8,043 ***Notes*** Pad was extended to gain rate to start sand. I had to run a clean sweep due to Cudd dropped a pumped at the same time.25 ppa 100 mesh was hitting formation, causing pressure to rapidly spike. Stage was not pumped to design. Max conc or rate were not achieved. All designed proppant was placed.;rih set stage 17 CBP at 13,386'. Perforated: 13,350'-13,351', 13,315'-13,316', 13,280'-13,281', 13,245'-13,246', 13,210'-13,211'. 13,175'-13,176'. All shots fired.;stage 17 Frac: SICP: 2,777 psi, Formation broke at 6,357 psi, while pumping 14 bpm. Pumpdown 85 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 10,021 bbls. Load to recover for this stage: 10,116 bbls. Total load to recover: 198,550 bbls. Containing: Total 100 Mesh: 84,957 lbs, Total 40/70 Ottawa: 251,137 lbs, Total 40/70 Garnet: 70,103 lbs. Proppant pumped this stage: 406,197 lbs. Total proppant pumped: 6,823,184 lbs. ISIP: 4,878 psi, with a Frac Gradient of 0.887 psi/ft. Qavg: 56.8 bpm, Pavg: 7,067 psi, Qmax: 58.7 bpm, Pmax: 8,227 ***Notes*** Stage was not pumped to design. Max conc or rate was not pumped. We also cut Garnet short 10,000 lbs due to pressure was on a steady increase once garnet sand hit. Sweep was not pumped because we were too far in the sand stage. Well was fully flushed.;rih set stage 18 CBP at 13,176'. Perforated: 13,136'-13,137', 13,105'-13,106', 13,070'-13,071', 13,035'-13,036', 13,000'-13,001'. 12,965'-12,966'. All shots fired.;pumping Stage 18 Frac and perf

DAYS FROM SPUD: 162 DAYS ON 42 Aug 9 2016 RIG SUPERVISOR: Rocky Vines Frac and perf "Stage 18 Frac: SICP: 2,942 psi, Formation broke at 6,897 psi, while pumping 14 bpm. Pumpdown 62 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 11,925 bbls. Load to recover for this stage: 12,020 bbls. Total load to recover: 210,717 bbls. Containing: Total 100 Mesh: 84,987 lbs, Total 40/70 Ottawa: 270,757 lbs, Total 40/70 Garnet: 61,418 lbs. Proppant pumped this stage: 417,162 lbs. Total proppant pumped: 7,240,346 lbs. ISIP: 3,788 psi, with a Frac Gradient of 0.785 psi/ft. Qavg: 55.6 bpm, Pavg: 7,385 psi, Qmax: 59.9 bpm, Pmax: 8,497 ***Notes*** Pad was extended to gain rate. I ran a.25 ppa dirty sweep due to pressure response with 1.50 ppa 40/70 on formation. Walked sand back up in.25 ppa increments, and never got above 1.75 ppa. Stage pumped with all sand placed. ";RIH set stage 19 CBP at 12,966'. Perforated: 12,930'-12,931', 12,895'-12,896', 12,860'-12,861', 12,825'-12,826', 12,790'-12,791'. 12,755'-12,756'. All shots fired.;"stage 19 Frac: SICP: 2,965 psi, Formation broke at 4,792 psi, while pumping 7 bpm. Pumpdown 110 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 12,118 bbls. Load to recover for this stage: 12,213 bbls. Total load to recover: 223,040 bbls. Containing: Total 100 Mesh: 85,800 lbs, Total 40/70 Ottawa: 262,946 lbs, Total 40/70 Garnet: 68,155 lbs. Proppant pumped this stage: 416,901 lbs. Total proppant pumped: 7,657,247 lbs. ISIP: 3,842 psi, with a Frac Gradient of 0.79 psi/ft. Qavg: 58.7 bpm, Pavg: 7,510 psi, Qmax: 59.5 bpm, Pmax: 7,940 ***Notes*** We were able to obtain higher rate, so pad was run as designed. I had to run a.25 ppa dirty sweep due to gradual rising pressure, with 1.50 ppa 40/70 on formation. Sand was walked back up in.25 ppa increments, but never got back above 1.25 ppa. Stage pumped with all sand placed. ";While we were RIH with plug and guns, wireline became stuck @ 137' in the well. They brought pump down on at 3 bpm to help, but could not move up or down. Wireline stuck in the grease head. We shut the wireline BOPs, bled pressure off of the lubricator, picked it up with the crane, and ''T'' clamped the line. With the ''T'' clamp installed, we pulled the line out of the grease head with the crane. Rigged the lubricator back up on the well and POOH. Wireline will cut 500' of line off, rehead, and clean the grease head out. While we were doing this, we had another acid leak on the acid tank manifold. Dalbo is bringing 3 new acid tanks, and Cudd will transfer all acid from the 3 TFH tanks over to the Dalbo tanks.;rih set stage 20 CBP at 12,756'. Perforated: 12,720'-12,721', 12,685'-12,686', 12,654'-12,655', 12,615'-12,616', 12,580'-12,581'. 12,545'-12,546'. All shots fired.;spotting new acid tanks in and transferring acid from bad ones to new ones. While transferring acid into new tanks we had a new tank leak. We had to transfer from new bad tank into second tank.;stage 20 Frac: SICP: 2,656 psi, Formation broke at 5,957 psi, while pumping 14 bpm. Pumpdown 52 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 10,261 bbls. Load to recover for this stage: 10,356 bbls. Total load to recover: 233,448 bbls. Containing: Total 100 Mesh: 84,827 lbs, Total 40/70 Ottawa: 264,150 lbs, Total 40/70 Garnet: 58,989 lbs. Proppant pumped this stage: 407,966 lbs. Total proppant pumped: 8,065,213 lbs. ISIP: 3,945 psi, with a Frac Gradient of 0.8 psi/ft. Qavg: 58.7 bpm, Pavg: 7,227 psi, Qmax: 59.2 bpm, Pmax: 8,305 ***Notes*** We pumped the garnet sand at a 1.75# due to slight build in pressure. Stage was cut short due to steady pressure increase. We were short 8,000 lbs. well was flushed.;rih set stage 21 CBP at 12,546'. Perforated: 12,510'-12,511', 12,478'-12,479', 12,440'-12,441', 12,405'-12,406', 12,370'-12,371'. 12,335'-12,336'. All shots fired.;pumping Stage 21 Frac and perf

DAYS FROM SPUD: 163 DAYS ON 43 Aug 10 2016 RIG SUPERVISOR: Rocky Vines Frac and perf "Stage 21 Frac: SICP: 2,939 psi, Formation broke at 5,544 psi, while pumping 14 bpm. Pumpdown 52 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 10,281 bbls. Load to recover for this stage: 10,376 bbls. Total load to recover: 243,876 bbls. Containing: Total 100 Mesh: 85,350 lbs, Total 40/70 Ottawa: 263,750 lbs, Total 40/70 Garnet: 68,025 lbs. Proppant pumped this stage: 417,125 lbs. Total proppant pumped: 8,482,338 lbs. ISIP: 3,936 psi, with a Frac Gradient of 0.799 psi/ft. Qavg: 63.2 bpm, Pavg: 7,137 psi, Qmax: 64.5 bpm, Pmax: 8,132 ***Notes*** Pad was extended to gain rate. We were able to obtain 64 bpm after all 100 mesh was cleared of the wellbore. We also ran the 40/70 Garnet at 2.00 ppa. Stage treated well and with all sand placed. ";RIH set stage 22 CBP at 12,336'. Perforated: 12,300'-12,301', 12,265'-12,266', 12,230'-12,231', 12,195'-12,196', 12,160'-12,161'. 12,125'-12,126'. All shots fired.;stuarts greasing the wellhead.;"stage 22 Frac: SICP: 2,964 psi, Formation broke at 5,575 psi, while pumping 10 bpm. Pumpdown 54 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 10,991 bbls. Load to recover for this stage: 11,086 bbls. Total load to recover: 255,016 bbls. Containing: Total 100 Mesh: 85,415 lbs, Total 40/70 Ottawa: 263,128 lbs, Total 40/70 Garnet: 60,172 lbs. Proppant pumped this stage: 408,715 lbs. Total proppant pumped: 8,891,053 lbs. ISIP: 4,258 psi, with a Frac Gradient of 0.829 psi/ft. Qavg: 61. bpm, Pavg: 7,409 psi, Qmax: 62.8 bpm, Pmax: 7,849 ***Notes*** We had to flush the well and shut down, while on 1.75 ppa 40/70 white, due to a hole being washed out in a down stock on a pump. Cudd replaced the down stock and pressure tested it to 8500 Opened well and successfully finished the stage. Stage pumped with all sand placed, except for about 5,000 lbs of 40/70 Garnet due to a sharp pressure spike at the end. ";RIH set stage 23 CBP at 12,126'. Perforated: 12,090'-12,091', 12,055'-12,056', 12,020'-12,021', 11,990'-11,991', 11,950'-11,951'. 11,915'-11,916'. All shots fired.;down due to large lightning storm in the area. We had two lightning strikes just off of location. This fried an electrical panel in the data van that controls the master kill switch and fried a cable on the hydration unit. E-techs and mechanics have repaired both units. Primed up, pressure tested, and kill tested all pumps.;stage 23 Frac: SICP: 2,882 psi, Formation broke at 6,928 psi, while pumping 14 bpm. Pumpdown 42 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 11,540 bbls. Load to recover for this stage: 11,635 bbls. Total load to recover: 266,693 bbls. Containing: Total 100 Mesh: 85,562 lbs, Total 40/70 Ottawa: 264,753 lbs, Total 40/70 Garnet: 62,736 lbs. Proppant pumped this stage: 413,051 lbs. Total proppant pumped: 9,304,104 lbs. ISIP: 3,830 psi, with a Frac Gradient of 0.789 psi/ft. Qavg: 60.9 bpm, Pavg: 7,103 psi, Qmax: 63.9 bpm, Pmax: 8,407 ***Notes*** While on pad we had to shutdown due to a leak on a flange on the wellhead. We had to shut down again during pad due to a wheel valve leaking. Cudd had multiple issues with their pumps during the stage and will be working on them during wireline. All designed sand was placed in formation.;rih set stage 24 CBP at 11,916'. Perforated: 11,880'-11,881', 11,845'-11,846', 11,913'-11,914', 11,775'-11,776', 11,740'-11,741'. 11,705'-11,706'. All shots fired.;rolling Acid;Stage 24 Frac: SICP: 2,962 psi, Formation broke at 7,095 psi, while pumping 14 bpm. Pumpdown 40 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 10,314 bbls. Load to recover for this stage: 10,409 bbls. Total load to recover: 276,742 bbls. Containing: Total 100 Mesh: 85,487 lbs, Total 40/70 Ottawa: 264,319 lbs, Total 40/70 Garnet: 67,039 lbs. Proppant pumped this stage: 416,845 lbs. Total proppant pumped: 9,720,949 lbs. ISIP: 4,292 psi, with a Frac Gradient of 0.832 psi/ft. Qavg: 62.4 bpm, Pavg: 7,358 psi, Qmax: 63.6 bpm, Pmax: 8,413 ***Notes*** Before Acid we shut down to check the valves on the back on the pumps. We had 4 pumps 1st gear full throttle and was only getting 5.7 bpm. Checking everything out we found out that the blender was not in the proper gear. Stage was pumped with all designed sand no issues with stage after we had shut down.;rih set stage 25 CBP at 11,706'. Perforated: 11,668'-11,669', 11,638'-11,639', 11,600'-11,601', 11,656'-11,657', 11,530'-11,531'. 11,490'-11,491'. All shots fired. Frac and perf

DAYS FROM SPUD: 164 DAYS ON 44 Aug 11 2016 RIG SUPERVISOR: Rocky Vines Frac and perf "Stage 25 Frac: SICP: 2,974 psi, Formation broke at 5,565 psi, while pumping 10 bpm. Pumpdown 34 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 12,763 bbls. Load to recover for this stage: 12,858 bbls. Total load to recover: 289,634 bbls. Containing: Total 100 Mesh: 85,370 lbs, Total 40/70 Ottawa: 262,983 lbs, Total 40/70 Garnet: 57,447 lbs. Proppant pumped this stage: 405,800 lbs. Total proppant pumped: 10,126,749 lbs. ISIP: 4,862 psi, with a Frac Gradient of 0.885 psi/ft. Qavg: 57. bpm, Pavg: 7,348 psi, Qmax: 60.7 bpm, Pmax: 8,150 ***Notes*** We had to flush the well and shut down during.75 ppa 40/70 white, due to the discharge pump on the blender went down. We got the well flushed at 25 bpm. Cudd swapped out blenders and we continued the stage. I ran a.25 ppa 40/70 Garnet dirty sweep due to pressure response when 1.75 ppa 40/70 Garnet hit formation. We did not get much pressure relief from sweep. Walked sand back up in.25 ppa increments, but never got back above.75 ppa due to pressure responses from formation. Stage was cut short by 10,000 lbs of 40/70 Garent due to a sharp pressure spike when.75 ppa 40/70 Garnet hit formation. Well was successfully flushed. Cudd had communication issues with the blender denso, and e-tech will repair during wireline run. ";RIH set stage 26 CBP at 11,491'. Perforated: 11,460'-11,461', 11,435'-11,436', 11,402'-11,403', 11,375'-11,376', 11,345'-11,346'. 11,310'-11,311'. All shots fired.;cudd had to replace one ground isolation valve on the main lines. Primed up and pressure tested to 8500 ;"Stage 26 Frac: SICP: 2,976 psi, Formation broke at 5,562 psi, while pumping 13 bpm. Pumpdown 34 bbls. Pumped: Total 15% HCL Acid: 95 bbls. Total Slickwater: 9,719 bbls. Load to recover for this stage: 9,814 bbls. Total load to recover: 299,482 bbls. Containing: Total 100 Mesh: 83,879 lbs, Total 40/70 Ottawa: 267,129 lbs, Total 40/70 Garnet: 58,298 lbs. Proppant pumped this stage: 409,306 lbs. Total proppant pumped: 10,536,055 lbs. ISIP: 4,306 psi, with a Frac Gradient of 0.833 psi/ft. Qavg: 61.4 bpm, Pavg: 7,317 psi, Qmax: 63.5 bpm, Pmax: 8,265 ***Notes*** Stage was cut short by 5,000 lbs of 40/70 Garnet due to a sharp rise in pressure with 2.00 ppa on formation, and Cudd also lost the hopper on the blender. Well was successfully flushed and turned over to wireline. ";RIH set stage 27 CBP at 11,311'. Perforated: 11,285'-11,286', 11,255'-11,256', 11,225'-11,226', 11,195'-11,196', 11,165'-11,166'. 11,135'-11,136'. All shots fired.;stage 27 Frac: SICP: 3,010 psi, Formation broke at 6,215 psi, while pumping 14 bpm. Pumpdown 30 bbls. Pumped: Total 15% HCL Acid: 94 bbls. Total Slickwater: 10,235 bbls. Load to recover for this stage: 10,329 bbls. Total load to recover: 309,841 bbls. Containing: Total 100 Mesh: 82,694 lbs, Total 40/70 Ottawa: 267,520 lbs, Total 40/70 Garnet: 71,744 lbs. Proppant pumped this stage: 421,958 lbs. Total proppant pumped: 10,958,013 lbs. ISIP: 4,596 psi, with a Frac Gradient of 0.86 psi/ft. Qavg: 58.2 bpm, Pavg: 7,240 psi, Qmax: 58.5 bpm, Pmax: 8,420 ***Notes*** Stage was pumped with no issues. Design proppant placed in well.;rih to set cap Plug @ 10,190';Frac and wireline RD. Stuart RD top wheel valve, goat head, and hydraulic valve. They left the flow cross and the master valve. Finish frac/set kill plug

DAYS FROM SPUD: 165 DAYS ON 45 Aug 12 2016 RIG SUPERVISOR: Tyler Dupriest POOH LD 4 1/2" CSG MIRU PULLING UNIT, NU BOP. POOH LD 4 1/2" CSG. ND BOP and NU STACK FOR DRILLOUT. SDFN Drill Out plugs

DAYS FROM SPUD: 166 DAYS ON 46 Aug 13 2016 RIG SUPERVISOR: Tyler Dupriest/gordon highfield MIRUCTU DRILL OUT PLUGS RDMO PULLING UNIT. MIRU REDZONE 2 3/8" CTU PULL TESTED TO CTU TO 35000 LBS PICK UP TOOLS,DUAL FLAPPER CHECK VALVUE,BOWEN DRILLING JAR, HYDRAULIC DISCONNECT, DUAL CIRC. SUB AGITATOR,2.875 MOTOR MUD MOTOR, BIT SUB, JZMILL TOOTH SEALED BEARING. TESTED TOOLS TO 4 BPM ON, MAKE UP LUBACTOR TO BOP PRESSURE TEST STACK TO 6500 PSI FOR 10 MIN TESTED GOOD.;RIH TO PLUG NUMBER 1. TAGGED PLUG NUMBER 1 @10190 ' PUMPING 4 BPM AT 1/2 FR CIRCULATING PRESSURE 6700 PSI, WELLHEAD PSI 120, DRILLED PLUG FOR 38 MINS AND LOST PUMP POH 20 GOT BACK UP PUMP GOING AT 3 BPRM,RIH DIDNT SEE PLUG,PLUG SKID GETTING 13.2 BPM, CHOCKED BACK TO 4.7 BPM WITH A 34 CHOCKE WELL HEAD PRESSURE CAME UP TO 3200 PSI,RIH TO PLUG @2;TAGGED PLUG 2 @ 11290, WELL HEAD PRESSURE 1950, CIRCULATING PRESSURE 5100 PSI, @3BPM. DRILLED PLUG FOR 8 MINS WELL HEAD PSI 1850, CIRCULATING PRESSURE 4900, RIH TO PLUG #3. PUMP 10,10,10 SWEEP, 5.5BPM RETURNS, TAGGED PLUG #3 @ 11470 WELL HEAD PRESSURE 1850 PSI, CIRCULATING PRESSURE 5300 PSI @3BPM,PLUG GONE SENT 10 BBL SWEEP POOH SHORT TRIPAND DUE TO LIGHTNING LET STORM PASS STOPPED @9950 10,10,10 SWEEP CAME TO ;RIH TO PLUG @ 4. TURN OVER TO NIGHTSHIFT.;TAG PLUG 4 @ 11,674'/CTM PUMPING 3.5 BPM IN WITH 4.5 BPM OUT, WHP - 1860 PSI, CIRC PRESSURE - 6300 PSI, DRILLOUT PLUG IN 4 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 5.;TAG PLUG 5 @ 11,888'/CTM PUMPING 3.5 BPM IN WITH 4.5 BPM OUT, WHP - 2020 PSI, CIRC PRESSURE - 5700 PSI, DRILLOUT PLUG IN 2 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 6.;TAG PLUG 6 @ 12,094'/CTM PUMPING 3.5 BPM IN WITH 4.5 BPM OUT, WHP - 1940 PSI, CIRC PRESSURE - 5950 PSI, DRILLOUT PLUG IN 2 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 7.;TAG PLUG 7 @ 12,298'/CTM PUMPING 3.5 BPM IN WITH 4.5 BPM OUT, WHP - 1800 PSI, CIRC PRESSURE - 6100 PSI, DRILLOUT PLUG IN 4 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 8.;TAG PLUG 8 @ 12,511'/CTM PUMPING 3.5 BPM IN WITH 4.5 BPM OUT, WHP - 1880 PSI, CIRC PRESSURE - 6130 PSI, DRILLOUT PLUG IN 4 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 9.;TAG PLUG 9 @ 12,719'/CTM PUMPING 3.5 BPM IN WITH 4.5 BPM OUT, WHP - 1875 PSI, CIRC PRESSURE - 6180 PSI, DRILLOUT PLUG IN 3 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 10.;TAG PLUG 10 @ 12,928'/CTM PUMPING 3.5 BPM IN WITH 4.5 BPM OUT, WHP - 1850 PSI, CIRC PRESSURE - 6000 PSI, DRILLOUT PLUG IN 2 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 11.;TAG PLUG 11 @ 13,145'/CTM PUMPING 3.5 BPM IN WITH 4.5 BPM OUT, WHP - 1860 PSI, CIRC PRESSURE - 5900 PSI, DRILLOUT PLUG IN 2 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 12.;TAG PLUG 12 @ 13,351'/CTM, SHORT TRIP TO 9975'/CTM @ 30'/M, PU WT - 40K. SENDING SWEEP TO EXIT CT BEFORE ENTERING CURVE. RIH TO PLUG 12.;TAG PLUG 12 @ 13,351'/CTM PUMPING 3.5 BPM IN WITH 4.7 BPM OUT, WHP - 1790 PSI, CIRC PRESSURE - 5800 PSI, DRILLOUT PLUG IN 4 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 13.;TAG PLUG 13 @ 13,549'/CTM PUMPING 3.5 BPM IN WITH 4.7 BPM OUT, WHP - 1940 PSI, CIRC PRESSURE - 5650 PSI, DRILLOUT PLUG IN 4 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 14.;TAG PLUG 14 @ 13,750'/CTM PUMPING 3.5 BPM IN WITH 4.6 BPM OUT, WHP - 1895 PSI, CIRC PRESSURE - 5900 PSI, DRILLOUT PLUG IN 2 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 15.;TAG PLUG 15 @ 13,974'/CTM PUMPING 3.5 BPM IN WITH 4.6 BPM OUT, WHP - 1850 PSI, CIRC PRESSURE - 6100 PSI, DRILLOUT PLUG IN 2 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 16.;TAG PLUG 16 @ 14,170'/CTM PUMPING 3.5 BPM IN WITH 4.6 BPM OUT, WHP - 1800 PSI, CIRC PRESSURE - 5800 PSI, DRILLOUT PLUG IN 3 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 17.;TAG PLUG 17 @ 14,387'/CTM PUMPING 3.5 BPM IN WITH 4.5 BPM OUT, WHP - 1820 PSI, CIRC PRESSURE - 6000 PSI, DRILLOUT PLUG IN 3 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 18.;TAG PLUG 18 @ 14,600'/CTM PUMPING 3.5 BPM IN WITH 4.5 BPM OUT, WHP - 1850 PSI, CIRC PRESSURE - 6100 PSI, DRILLOUT PLUG IN 4 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 19.;TAG PLUG 19 @ 14,804'/CTM PUMPING 3.5 BPM IN WITH 4.5 BPM OUT, WHP - 1900 PSI, CIRC PRESSURE - 6000 PSI, DRILLOUT PLUG IN 3 MINUTES, SEND 10 BBL 100 cp VIS SWEEP. CONTINUE RIH TO PLUG 20.;TAG PLUG 20 @ 15,005'/CTM, SHORT TRIP TO 10,000'/CTM @ 30'/M, TIMING & SENDING 10 BBL 100 VIS SWEEP TO EXIT CT @ BOTTOM OF CURVE. ALL SWEEPS ACCOUNTED FOR. RIH TO PLUG 20. DRILL OUT PLUGS

DAYS FROM SPUD: 167 DAYS ON 47 Aug 14 2016 RIG SUPERVISOR: Tyler Dupriest/gordon highfield drill out plugs FINISH SHORT TRIPPING, PUMPED A 10 BBL SWEEP, RIH TO TAG PLUG #20;TAGGED PLUG #20 @ 15042 WELL HEAD PRESSURE 1950, CIRCULATING PRESSURE 6520, @ 3.5 BPM, DRILLEDTHRU PLUG IN 2 MINS AND PUMPED 10 BBL SWEEP, TAGGED PLUG #21 @15257 WELL HEAD PRESSURE 1920, CIRCULATING PRESSURE 6300, @ 3.5 BPM, DRILLED THRU PLUG IN 3 MINS AND PUMPED 10 BBL SWEEP;TAGGED PLUG #22 @15467 WELL HEAD PRESSURE 1850, CIRCULATING PRESSURE 6105,@ 3.5 BPM,DRILLED THRU PLUG IN 3 MINS AND PUMPED 10 BBL SWEEP, TAGGED PLUG #23 @15667, WELL HEAD PRESSURE 1740, CIRCULATING PRESSURE 5780,@ 3.5 BPM, DRILLED THRU PLUG IN 4 MINS AND PUMPED 10 BBL SWEEP;TAGGED PLUG #24 @ 15884 WELL HEAD PRESSURE 1700, CIRCULATING PRESSURE 5750 @ 3.5 BPM, DRILLED THRU PLUG IN 4 MINS PUMPED 10 BBL SWEEP, TAGGED PLUG #25 @ 16097 WELL HEAD PRESSURE 1930, CIRCLUATING PRESSURE 6300 @ 3.5 BPM, DRILLED THRU PLUG IN 6 MINS, PUMPED 10 BBL SWEEP, TAGGED PLUG #26 @ 16307 WELL HEAD PRESSURE 1920, CIRCULATING PRESSURE 5800 @ 3.5 BPM, DRILLED THRU PLUG IN 3 MINS AND PUMPED 10 BBL SWEEP;TAGGED PLUG #27 @ 16517 WELL HEAD PRESSURE 1900, CIRCULATING PRESSURE 6100 @ 3.5 BPM, DRILLED THRU PLUG IN 4 MINS AND PUMPED 10 BBL SWEEP, WENT DOWN TO TAG SHOE PULLED UP 60 ' AND SHUT DOWN TO DO REGEN ON CTU;SHUT DOWN FOR REGEN ON CTU;STARTED POOH, AND PUMPED A 10 BBP SWEEP, SWEEP EXIT CT @ 12,000', CONTINUE POOH @ 40'/M TO VERTICLE, INCREASE POOH SPEED TO 140'/M TO 100', SLOW DOWN TO 10'/M PULL INTO LUBRICATOR & BUMP UP, SHUT IN MANUAL FRAC VALVE (15 TURNS), CHECK FLOW @ PIT, NONE. PULL OFF WELL & LAY DOWN COBRA BHA, VISUALLY INSPECT JZ BIT, GOOD.;LAY DOWN CT LUBRICATOR, NU ON WELL & BLOW DRY. RDMO PATRIOT MIXING PLANT.;RDMO REDZONE CT. 4 BOLT NIGHT CAP ON FLOWCROSS. WELL SECURE FOR NIGHT.;SICP - 2200 WAIT ON DAYLIGHT OPERATIONS TO WL LUBRICATE PACKER IN & SET. lubacate in packer

DAYS FROM SPUD: 168 DAYS ON 48 Aug 15 2016 RIG SUPERVISOR: Tyler Dupriest/gordon highfield LUBERCATE PACKER IN MIRU WIRELINE, PICKED UP LUBERCATOR, AND BOP, RIH WITH 7" AS1-X PACKER SICP WAS 2200 PSI, SET @10064, BLEED OFF PRESSURE TO ZERO, POOH AND RIGGED DOWN WIRELILNE NIPPLE DOWN FLOWCROSS AND MASTER VALVUE AND NIPPLE UP BOP.SHUT DOWN FOR NIGHT NONE