MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida

Similar documents
FM #: ETDM #: 11241

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

US 1 Express Lanes Public Kick-Off Meeting

Alternatives Public Workshop

Financial Project ID No(s).: and ETDM No(s).: and 14181

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

Reams Road RCA Study. Board of County Commissioners Public Hearing

West End Connectivity Master Plan

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

Casablanca Boulevard & GO Station Access

Malabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Public Hearing October 21, 2014 University of North Florida Adam W. Herbert University Center Alumni Drive Jacksonville, FL 32224

Basalt Creek Transportation Refinement Plan Recommendations

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

Welcome to the Open House

Non-Motorized Overpass at SR 5/US1

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

Public Information Meeting

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Route 7 Corridor Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Project Development & Environment (PD&E) Study JUNE 22, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Fairfax County Parkway Widening Fairfax County

Executive Summary. September 3, 2014

2012 PRIORITY TRANSPORTATION PROJECTS

TRANSPORTATION NEEDS ASSESSMENT

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

Roundabout Feasibility Memorandum

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Highway 56 Traffic Study Rymal Road to Cemetery Road

Clackamas County Comprehensive Plan

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Osceola County Expressway Authority. Alternatives Public Meeting

Route 15 Congestion Report Findings

CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

Donahue Drive Corridor Traffic Operational Evaluation

PROJECT OVERVIEW. Auburn Station Access Improvements Project

Owl Canyon Corridor Project Overview and Summary

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Welcome to the Sellwood Bridge Project Open House!

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

Transportation Policy Manual

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

TRANSPORTATION COMMISSION Agenda Staff Report

1. Provide a dedicated westbound approach bus lane at the intersection;

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

San Tomas Expressway

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Mobility Plan Status Report 2012 Average Annual Daily Traffic

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Washington DC Section of ITE Project Briefing

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL WORK SESSION AUGUST 8, 2017

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Florida Department of Transportation

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Community Advisory Committee

Southcote Road Improvements Class Environmental Assessment Study

I-395 Express Lanes Northern Extension Project Public Hearings

Regional Transportation Needs Within Southeastern Wisconsin

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

122 Avenue: 107 Street to Fort Road

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

Interstate 66 Tier 1 Environmental Impact Statement. Cooperating and Participating Agencies Meeting March 19, 2012

North Coast Corridor:

Fleur Drive Reconstruction

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

Access Management Regulations and Standards

Route 7/15 Norwalk. Route 7/15 Norwalk Project Project Advisory Committee Meeting #2. Tuesday, May 23 rd, Norwalk City Hall

City of Fairfax, Virginia City Council Work Session

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

AMATS Complete Streets Policy

Terwillegar Drive Expressway Draft Concept Plan

Transcription:

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida Citizens Advisory Committee Meeting March 13, 2018 ETDM NUMBER: 11482 MDX WORK PROGRAM NO.: 83618 mdxway.com

Everglades National Park Study Area Study Area Unincorporated Miami-Dade County Study area bounded by o NW 12 th Street to the north o o o SW 136 th Street to the south SW 152 nd Avenue to the east SW 177 th Avenue (Krome Ave.) to the west Everglades National Park Kendall Tamiami Airport Fastest growing area in the County Limited options for north-south travel Limited access to expressways Congested roadway network Safety concerns Miccosukee Resort & Gaming Legend Urban SW 136TH ST Development Boundary Miami Executive Airport SW 8TH ST 2

Where Are We? PHASE 1: Corridor Analysis PHASE 2: Alternatives Analysis 1 Planning / Concept Report 2 Alternative Corridor Evaluation (ACE) Process 3 Project Development and Environment (PD&E) Study 5 4 6 7 DESIGN RIGHT-OF-WAY ACQUISITION CONSTRUCTION MAINTENANCE Future Phases 3

Schedule PHASE 1: Corridor Analysis PHASE 2: Alternatives Analysis 1 2 3 4 5 6 7 Project/Study Initiation Agency and Elected Officials Kickoff Meeting Public Kickoff Meeting Alternative Corridor Evaluation Corridor Workshop Refined Corridors Environmental & Engineering Alternatives Analysis Alternatives Public Workshop Public Hearing December 2013 Fall 2014 Fall 2014 Fall 2017 2017-2018 Fall 2017 Summer 2018 Summer 2016 Public Involvement Citizens Advisory Committee Meetings Environmental Forums 4

Phase 2: Alternatives Analysis Engineering Purpose and Need Mobility and Traffic Operations Geometric Compliance to Design Criteria Accessibility Multimodal Accommodations Structures Drainage Right of Way Needs Utility Coordination Construction Costs Financial Feasibility Environmental Socio-Cultural Environment Land Use Social Considerations Community Services / Facilities Economic Relocation Archaeological & Historic Natural Impacts Wetlands Water Quality Floodplains Wildlife and Habitat Farmlands Comprehensive Everglades Restoration Physical Impacts Air / Noise Contamination Public Involvement Stakeholder Input Public Homeowners Federal, State & Local Agencies Environmental Groups Others Opportunities for Input Kickoff Meetings Corridor Workshop Alternatives Public Workshop Public Hearing Citizens Advisory Committee Environmental Forum Presentations / Meetings As requested Homeowner s Association Federal, State & Local Agencies Industry 6

KROME AVENUE / SW 177 TH AVE. SW 167 TH ST. SW 157 TH ST. Corridors 1 and 2 LEGEND 2020 Urban Development Boundary 2030 Urban Expansion Area CORRIDOR 1 Note: Refined Corridors renumbered in Phase 2 CORRIDOR 2 CORRIDOR 1 AND 2 OVERLAP 7

Six Lane Typical Section Typical Section Notes * 12-ft Inside Paved Shoulder and Peak Hour Express Transit/Technology Lane 8

Four Lane Typical Section Typical Section Notes * 12-ft Inside Paved Shoulder and Peak Hour Express Transit/Technology Lane 9

SW 167 th Avenue SR 836 Southwest Extension Potential Shared use path with landscape buffer 10

SR 836 Southwest Extension Potential Shared use path SW 167 th Avenue Proximity of Four Lane Typical Section 50 270 FT 11

Elevated Typical Section Typical Section Notes * 12-ft Inside Paved Shoulder and Peak Hour Express Transit/Technology Lane Under consideration for use in sensitive areas as appropriate 12

Proposed Transit Lanes and Potential Transit Envelope Legend 12-ft Inside Paved Shoulder and Peak Hour Express Transit / Technology Lane Potential Transit Envelope 13

TAMIAMI TRAIL / SW 8 TH ST. Overview of Corridor 1 Connect to Krome Ave. / SW 177th Ave. Interchange at Kendall Dr. / SW 88th St. Interchange at Bird Road / SW 42ND St. Interchange at Tamiami Trail/SW 8th St. and SW 157th Ave. Ties into existing SW 136th St. Tie into existing SR 836 NW 137TH AVE. LEGEND 2020 Urban Development Boundary 2030 Urban Expansion Area 14

SW 167 TH ST. SW 157 TH ST. KROME AVENUE / SW 177 TH AVE. Corridor 1 LEGEND 2020 Urban Development Boundary 2030 Urban Expansion Area Corridor 1 Potential Interchange Locations Year 2050 Projected Average Daily Traffic* *Source: Southeast Regional Planning Model Version 6.5.4G 15

NW 6TH ST. CORRIDOR 1 Tie into Existing SR 836 SB ON RAMP FROM NW 6TH ST. PROPOSED SHARED USE PATH NB OFF RAMP TO NW 6TH ST. TIE INTO EXISTING SR 836 NW 137TH AVE. 16

SW 157TH AVE. CORRIDOR 1 Interchange at Tamiami Trail / SW 8th Street and SW 157th Avenue SR 836 SB ON RAMP FROM SW 8TH ST. AND SW 157TH AVE. SR 836 SB OFF RAMP AT SW 8TH ST. AND SW 157TH AVE. TAMIAMI TRAIL / SW 8TH ST. SR 836 NB OFF RAMP TO SW 8TH ST. SR 836 NB OFF RAMP AT SW 8TH ST. AND SW 157TH AVE. SR 836 NB ON RAMP FROM SW 8TH ST. AND SW 157TH AVE. PROPOSED SHARED USE PATH 17

CORRIDOR 1 Interchange at Bird Road/SW 42ND Street SR 836 SB ON RAMP FROM BIRD ROAD/SW 42ND ST. SR 836 SB OFF RAMP TO BIRD ROAD/SW 42ND ST. SW 167TH AVE. SR 836 NB ON RAMP FROM BIRD ROAD/SW 42ND ST. SR 836 NB OFF RAMP TO BIRD ROAD/SW 42ND ST. PROPOSED SHARED USE PATH 18

CORRIDOR 1 Interchange at Kendall Drive/SW 88th Street KROME AVE/SW 177TH AVE SR 836 SB OFF RAMP TO KENDALL DR/SW 88TH ST. SR 836 SB ON RAMP FROM KENDALL DR/SW 88TH ST. PROPOSED SHARED USE PATH SR 836 NB OFF RAMP TO KENDALL DR/SW 88TH ST. SR 836 NB ON RAMP FROM KENDALL DR/SW 88TH ST. 19

CORRIDOR 1 Connect to Krome Avenue/SW 177th Avenue SR 836 SB OFF RAMP TO KROME AVE./SW 177TH AVE. KROME AVE/SW 177TH AVE SR 836 NB ON RAMP FROM KROME AVE./SW 177TH AVE. PROPOSED SHARED USE PATH 20

SW 162ND AVE. SW 157TH AVE. CORRIDOR 1 Tie into Existing SW 136th Street TIE SB SR 836 TO EB 136TH ST. PROPOSED SHARED USE PATH TIE WB 136TH ST. TO SR 836 NB SW 136TH ST. 21

TAMIAMI TRAIL / SW 8 TH ST. Overview of Corridor 2 Two Interchange Options at Killian Pkwy/SW 104TH St. (Option 2 shown) Interchange at Miller Dr./SW 56TH St. Interchange at Bird Road/SW 42TH St. Ties into existing SW 136TH St. Interchange at SW 120TH St. Two Interchange Options at Kendall Dr./ SW 88TH St. (Option 2 shown) Interchange at Tamiami Trail/SW 8TH St. and SW 157TH Ave. Tie into existing SR 836 NW 137TH AVE. LEGEND 2020 Urban Development Boundary 2030 Urban Expansion Area 22

SW 167 TH ST. SW 157 TH ST. KROME AVENUE / SW 177 TH AVE. Corridor 2 LEGEND 2020 Urban Development Boundary 2030 Urban Expansion Area Corridor 2 Potential Interchange Locations Year 2050 Projected Average Daily Traffic* *Source: Southeast Regional Planning Model Version 6.5.4G 23

NW 6TH ST. CORRIDOR 2 Tie into Existing SR 836 PROPOSED SHARED USE PATH SR 836 SB ON RAMP TO NW 137TH AVE. SR 836 SB OFF RAMP TO NW 137TH AVE. SR 836 NB OFF RAMP TO NW 137TH AVE. SR 836 EB ON RAMP FROM SB 137TH AVE. NW 137TH AVE. SR 836 EB ON RAMP FROM NB 137TH AVE. 24

SW 157TH AVE. CORRIDOR 2 Interchange at Tamiami Trail / SW 8th Street and SW 157th Avenue SR 836 SB ON RAMP FROM SW 8TH ST. AND SW 157TH AVE. SR 836 SB OFF RAMP AT SW 8TH ST. AND SW 157TH AVE. TAMIAMI TRAIL / SW 8TH ST. SR 836 NB OFF RAMP TO SW 8TH ST. SR 836 NB OFF RAMP AT SW 8TH ST. AND SW 157TH AVE. SR 836 NB ON RAMP FROM SW 8TH ST. AND SW 157TH AVE. PROPOSED SHARED USE PATH 25

CORRIDOR 2 Interchange at Bird Road/SW 42ND Street SR 836 SB ON RAMP FROM BIRD ROAD/SW 42ND ST. SR 836 SB OFF RAMP TO BIRD ROAD/SW 42ND ST. SW 167TH AVE. SR 836 NB OFF RAMP TO BIRD ROAD/SW 42ND ST. SR 836 NB ON RAMP FROM BIRD ROAD/SW SW 42ND ST. PROPOSED SHARED USE PATH 26

CORRIDOR Corridor 2 Miller Drive/SW 56th Street 2 Interchange at Miller Drive/SW 56th Street SR 836 SB ON RAMP FROM MILLER DR./SW 56TH ST. SR 836 SB OFF RAMP TO MILLER DR./SW 56TH ST. SW 167TH AVE. PROPOSED SHARED USE PATH SR 836 NB OFF RAMP TO MILLER DR./SW 56TH ST. SR 836 NB ON RAMP FROM MILLER DR./SW 56TH ST. 27

KENDALL DR/SW 88TH ST. CORRIDOR Corridor 2 Miller Drive/SW 56th Street 2 Option 1: Interchange at Kendall Drive/SW 88th Street SW 172ND AVE. SR 836 NB OFF RAMP TO SW 172ND AVE. AND KENDALL DR/SW 88TH ST. SR 836 SB ON RAMP FROM SW 172ND AVE. AND KENDALL DR/SW 88TH ST. PROPOSED SHARED USE PATH SR 836 SB OFF RAMP TO SW 172ND AVE. AND KENDALL DR/SW 88TH ST. SR 836 NB ON RAMP FROM SW 172ND AVE. AND KENDALL DR/SW 88TH ST. 28

KENDALL DR/SW 88TH ST. CORRIDOR Corridor 2 Miller Drive/SW 56th Street 2 Option 2: Interchange at Kendall Drive/SW 88th Street SW 172ND AVE. SR 836 SB ON RAMP FROM KENDALL DR/SW 88TH ST. SR 836 NB OFF RAMP TO KENDALL DR/SW 88TH ST. SR 836 SB OFF RAMP TO KENDALL DR/SW 88TH ST. SR 836 NB ON RAMP FROM KENDALL DR/SW 88TH ST. PROPOSED SHARED USE PATH 29

Option 1: Interchange at Killian Parkway / SW 104th Street Corridor CORRIDOR 2 Killian Parkway/SW 104th Street Option 2 2 Corridor 2 Miller Drive/SW 56th Street SR 836 SB OFF RAMP TO KILLIAN PKWY/SW 104TH ST. SR 836 NB ON RAMP FROM KILLIAN PKWY/SW 104TH ST. SR 836 SB ON RAMP FROM KILLIAN PKWY/SW 104TH ST. SR 836 NB OFF RAMP TO KILLIAN PKWY/SW 104TH ST. PROPOSED SHARED USE PATH SW 167TH AVE. 30

CORRIDOR Corridor 2 Miller Drive/SW 56th Street 2 Option 2: Interchange at Killian Parkway/SW 104th Street SR 836 SB OFF RAMP to SW 167TH AVE. SR 836 NB ON RAMP FROM SW 167TH AVE. SW 167TH AVE. SR 836 SB ON RAMP FROM SW 167TH AVE. SR 836 NB OFF RAMP to SW 167TH AVE. PROPOSED SHARED USE PATH 31

SW 120TH AVE. CORRIDOR 2 Interchange at 120th Street SR 836 SB ON RAMP FROM SW 120TH AVE. SR 836 SB OFF RAMP TO SW 120TH AVE. PROPOSED SHARED USE PATH SR 836 NB OFF RAMP TO SW 120TH AVE. SR 836 NB ON RAMP FROM SW 120TH AVE. 32

SW 136TH ST. CORRIDOR Corridor 2 SW 136th Street 2 Tie into Existing SW 136th Street CONNECT TO EXISTING SW 136TH ST. PROPOSED SHARED USE PATH SW 162ND AVE. 33

Comprehensive Development Master Plan (CDMP) Process Application filed by County upon request from Mayor Gimenez Evaluating policies that recommend on site mitigation for unavoidable wetland impacts to the maximum extent practical Confirming provisions for mass transit through XT lanes and future rapid transit envelope Confirming provisions for proposed shared use path with connectivity to the County s existing and planned Greenways network Coordinating Park and Ride facilities with County Evaluating policies to prohibit use of facility to meet concurrency 34

CDMP Key Meetings Wednesday, March 21, 7:00 pm Lawton Chiles Middle School 8190 NW 197 Street Thursday, March 22, 6:30 pm Ruben Dario Middle School 350 NW 97th Avenue Tuesday, April 3, 7:00 pm Kendall Village Center Civic Pavilion 8625 SW 124 Avenue Monday, April 9 Stephen P. Clark Government Center 111 NW 1 st Street Wednesday, April 25 Stephen P. Clark Government Center 111 NW 1 st Street Community Council 5 Country Club Application 8 (SR 836 Extension) Community Council 10 Westchester Application 8 (SR 836 Extension) Community Council 11 Kendall Application 8 (SR 836 Extension) Planning Advisory Board Board of County Commissioners Public Hearing Transmittal of Application to State 35

Wednesday, April 18 Mayor Gimenez Town Hall Meeting John A. Ferguson High School 15900 SW 56 Street Miami, Florida 33183 6:30 pm 36

THANK YOU 37