E Lightband Compression Tool Operating Procedure

Similar documents
Assembly Guide ST200 FUNCTIONAL TRAINER

Marine 6-Boat Free-Standing Racks SKU: Updated November 2011

INSTRUCTION GUIDE S-WORKS ROAD CARBON CRANKSET (Carbon and Alloy OSBB cups)

09/17/2007 Copy VISIT THE LIFETIME WEB SITE:

ORNAMENTAL CANTILEVER GATE INSTRUCTIONS

Falcon 3 145, 170, 195 and Tandem Owner / Service Manual

INSTRUCTION GUIDE S-WORKS ROAD CARBON CRANKSET (Carbon and Alloy OSBB cups)

Big Ride ASSEMBLY AND INSTALLATION INSTRUCTIONS * * C A U T I O N * *

Tripod Setup Guide (M-TPx)

U.S. Patent No. 7,922,246. Patents Pending

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Soccer Goal. Model: SG20 Series. Installation, Operation and Maintenance Instructions

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

1.0 - OPENING AND CLOSING THE DOOR

ZIPP VUMAQUAD INSTALLATION INSTRUCTIONS

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

42 inch Mower for TimeCutter Z Riding Mowers. Note: Determine the left and right sides of the machine from the normal operating position.

GRAVITY BIKE RACK ASSEMBLY & OPERATING INSTRUCTIONS

CHAPTER 5 REWIND STARTERS

MUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

User Instruction Manual Fixed Beam Anchor

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Engineering Data Sheet

Fiber Cable Puller with Tuf-Lugger lite

Fisher Lever Lock Handlever Actuators for POSI SEAL A81 Rotary Valves

Model: 5100 OmniSteel Volleyball System

CHAINLESS ANCHORING SYSTEM USER MANUAL

2019 MADONE ASSEMBLY MANUAL

DP Spare parts list. Demolition pulverizer. DP 2800 s/n DEQ Construction Tools GmbH No

VERSA BIKE RACK INSTRUCTIONS

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

BALL STOP INSTALLTION GUIDE

PRO1030 Bi-Directional Assembly Replacement

Fisher Lever-Lock Handlever Actuators for POSI-SEAL A81 Rotary Valves

Low Wind High Yields Series

222 Schwinn Recumbent Exercise Bike Parts List Full Size Hardware Chart Product Illustration Assembly Instructions

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

VISIT THE LIFETIME WEB SITE: **U.S. and Canada customers ONLY** IF ASSISTANCE IS NEEDED, COPY

Supplementary instructions. Rod and cable components. for VEGAFLEX series 80. Document ID: 44968

MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

MUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

VL 2K LIFT D-L WINCH INSTRUCTIONS (Applies to P/Ns , , , , , )

Operating instruction

IMPORTANT: If you have questions on the use, care, or suitability of this equipment for your application, contact DBI/SALA.

ELECTRON PRO 245A: ASSEMBLY GUIDE. Revision Valid for MY2017 Electron Pro

Powder Measure. Care & Usage Instructions. Instructions # Product # Revision: A

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Only. Gives You the TechLock. System Advantage ASSEMBLY, DISASSEMBLY AND TROUBLESHOOTING INSTRUCTIONS FOR 3000 SERIES FONTAINE

SOTR Special Operations Tactical Respirator

DM-RD (English) Dealer s Manual. ROAD Rear Derailleur RD-9000 RD-6800 RD-5800 RD-4700

Model: 7200 Collegiate Volleyball System

600 / 600FC OWNER'S MANUAL

Installation Instructions For Flat Seated Bolted Type RAH Series Disk Holders

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

E-trike Li Assembly Guide

3/8" Dr. Air Butterfly Impact Wrench

ELECTRON PRO: ASSEMBLY GUIDE. Revision Valid for MY2017 Electron Pro

VERTICAL SURFBOARD CARRIER READ ME! IMPORTANT WARNING!

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

Import Bike Rack OEM INSTALLATION MANUAL

Service Bulletin. Service Bulletin No.: SB Issue: A.00

S Surge Arresters

Pressure Dump Valve Service Kit for Series 2300 Units

Air Intake Snorkel Kit

PR4 Installation, Operation & Maintenance Instructions (DOT Certification Included)

1700ESL Kamvalok Coupler

Gurney Flap for WRX and STI w/low Profile Trunk Spoiler

Assembly Instructions And User Guide

Ladies Shopper Bike Assembly Manual 28C03

k valve 2 (50)HF 2½ (65)SF installation guide aylesbury For valve sizes (DN): tel fax

Bike Rack and Tire Carrier

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Design Based Anchoring 2009 FORD F-150

Booster Pump PB4-60 Replacement Kits

FALLTECH FALL PROTECTION ANCHOR BRACKETS MODEL 7432, Dual Truss/ Ridge Line Roof Anchor Bracket

BICYCLE ACCESS RAMP INSTALLATION INSTRUCTIONS. Customer Service all4cycling.com.au

Media-Isolated Mag Plus Probe Low Pressure-ISO Kit

MANUAL SEALLESS STEEL STRAPPING TOOL MODEL A

Important Note: Tighten lock nuts so the support tubes still swing freely see figure 2. There must be 1 2 threads of bolt past end of lock nuts.

THE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning

Backboard and Rim Owners Manual

Page 1 of 1 04/19/13 SBR

DH-9downhill nine. TECHNICAL guide. Table of Contents. Assembly Instructions. Exploded Views

For ANCHOR WINCH Model: T Big Water 45 T sw Salt Water Series Big Water 45

Installation and Operation Instruction Manual

RADROVER REAR RACK INSTALLATION MANUAL

Butler Tactical Parachute Systems, LLC

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

INSTRUCTION MANUAL Pressure Relief Device LPT

TABLE OF CONTENTS FRAME FEATURES INTRODUCTION

Retractable Hose Reel with 3/8" x 50' PVC Hose

HOLLISTER-WHITNEY ROPE GRIPPER

User Instruction Manual Fixed Beam Anchor

602 STRINGING MACHINE OWNER'S MANUAL

Installation Operation Maintenance

Transcription:

2002159E Lightband Compression Tool Operating Procedure Organization Name MLB Diameter MLB Assembly Number MLB Assembly Revision MLB Serial Number Instructions: IF LCTS ARE NOT YET INSTALLED ON LIGHTBAND: Read Sections 2 and 3, and proceed to Section 4 of this procedure. IF LCTS ARE ALREADY INSTALLED ON LIGHTBAND: Read Sections 2 and 3, and proceed to Section 5 of this procedure.

TABLE OF CONTENTS 1. REVISION HISTORY... 3 2. INTRODUCTION... 4 3. REQUIRED EQUIPMENT... 5 4. LCT INSTALLATION AND COMPRESSION PROCEDURE... 7 5. LCT COMPRESSION PROCEDURE... 9 6. REFERENCE LCT MEASUREMENT TABLE TEMPLATE... 11 PSC Proprietary 2002159E Lightband Compression Tool Operating Procedure Page 2 of 11

1. Revision History Revision Issued Written By Released By Change Description - N/A SS N/A Initial document. A 27-Nov- 12 SS WH Format changed to match current PSC templates, procedure updated. B 28-Nov- 12 SS RW Added figure 3-1 for clarification, reordered steps in compression procedure, removed draft remnants. C 20-Aug- SS AZ Added alternate equipment, simplified procedure. 13 D 11-Sep- 13 AZ RW Modified format, added required equipment table, clarified procedure. E 5-May-16 HM AZ 1. Section 4 & 5: Updated procedure. 2. Section 4 & 5: Removed use of staking, added use of locking patch screws. 3. Section 6: New. 4. Figure 3-1: Updated. 5. Removed inventory table. PSC Proprietary 2002159E Lightband Compression Tool Operating Procedure Page 3 of 11

2. Introduction This document describes the materials and procedure required to prepare the MkII Motorized Lightband (MLB) for stowing using PSC part number 4000637 Lightband Compression Tools (LCT). The LCTs are instruments used to properly compress the Lightband so that the Motors may be used to stow. LCTs are ideal for situations in which the Lightband must be stowed horizontally or when the required compressive weight cannot be applied to the Upper Ring payload in a vertical configuration. The following procedure should be used in conjunction with the latest revision of PSC document 2000781 MKII MLB Operating Procedure. Terminology note: One Lightband Compression Tool Assembly consists of an aluminum mount, a bearing, and mounting hardware. For each Assembly installed on either Lightband Ring, an identical Assembly must be installed on the opposite Ring. In this way, the LCTs are often referred to in pairs as two are required at every Separation Spring Location. 2.1 Warnings Violating any of the below shall void PSC Document 1001015 MLB Warranty. 1. ALL technicians completing this procedure shall be trained directly by PSC and given authority to operate their specific Lightband(s) via PSC Document 2000750 Lightband Training Record. 2. The Lightband shall only be operated using this procedure. This procedure shall be filled out for every operation of the Lightband. Steps shall not be skipped or modified. 3. If a Lightband ever fails to operate correctly, PSC shall be contacted immediately for recommendations and troubleshooting techniques. Another operation shall not be attempted without first understanding the cause of the initial failure. 4. ALL bolts shall be used when attaching the Lightband to adjoining structures. Bolts shall not be omitted from any bolt hole in the Lightband. 5. With the Upper Ring not present, the Lightband shall never be powered in the stow direction. This would cause damage by repeatedly slamming the ball nut against a hard stop at high speed and force. 6. During operations, objects shall not be placed and left in-between the Lightband flanges which may inhibit the Lightband from properly stowing. The tolerance on the pre-stowed Lightband height is NOT the same as the stowed tolerance. Common potential objects include wiring harnesses and height gages. 7. The Upper Ring shall be physically separated from the Lower Ring after every deployment. A stow operation shall not be attempted without first inspecting the Lightband. 8. BOTH motors shall always be powered when operating the Lightband. 9. The Lightband shall only be stowed within the temperature range of 10-32 C (50-90 F) PSC Proprietary 2002159E Lightband Compression Tool Operating Procedure Page 4 of 11

3. Required Equipment Qty. Item Make and Model Typically Used by PSC 1 Lightband attached to adjoining structures IAW 2000781 - AR 4000637 Lightband Compression Tool - AR Nylon Cable Tie (must have minimum 50 lbf tensile force limit) MS 3367-1-0 7 1 Cable Tie Tool (must have adjustable force) Ty-Rap ERG 50 1 Calipers with inside jaws Mitutoyo 500-196-30 1 Torque Wrench (capable of measuring min 8 in*lb) Precision Instruments 1050 1 ¼ inch Open-Ended Wrench - OPTIONAL IF LIGHTBAND FLANGES CANNOT BE ACCESSED WITH CALIPERS 1 Bore gage or parallel (both with 1.2 to 2.1 inch range) Figure 3-1: A: Lightband Upper Ring Flange, B: Lightband Lower Ring Flange, C: Ty-Rap ERG 50 Cable Tie Tool, D: LCT Pair with Cable Tie Installed, E: MS 3367-1-0 7 Nylon Cable Ties (Before Installation), F: Cable Ties (Removed After Stowing), G: Single LCT Assembly, H: Lower Assembly of LCT, I: Attachment Screw and Washer of LCT, J: Correct LCT attachment points, K: Incorrect LCT Attachment Points PSC Proprietary 2002159E Lightband Compression Tool Operating Procedure Page 5 of 11

3.1 Referenced Documents Name Document No. Note Lightband Operating Procedure 2000781 To operate Lightband PSC Standards 3000100 For fastener torque values Lightband Compression Tool Assembly 4000637 Production drawing for reference PSC Proprietary 2002159E Lightband Compression Tool Operating Procedure Page 6 of 11

4. LCT Installation and Compression Procedure This procedure shall be followed if LCTs ARE NOT yet installed on the Lightband. LCT Assemblies are installed in pairs as close as possible to Separation Springs. This procedure assumes the use of the materials shown in Figure 3-1. Consult PSC before substituting any tools. This procedure is to be performed only by individuals who have been formally trained on the use of LCTs by a PSC engineer. Contact PSC to setup training. Step Procedure LCT Installation 1.1 Ensure the SN on the Upper Ring corresponds to the SN on the Lower Ring. Record all MLB info on the cover page. (This can be found on both the Upper and Lower Ring, typically adjacent to the Motor Bracket Assembly.) 1.2 Complete the stowing procedure of PSC Document 2000781 up to the point where force is applied to compress the Lightband. 1.3 Calculate the number of LCT pairs required using the equation below rounding up to the nearest integer: Technician Date & Initials QA Date & Initials Minimum number of LCT pairs: Nmin Maximum number of LCT pairs: Nmax Number of Separation Springs installed on Lightband: Nsprings Stack weight above Lightband in lbf: W (Note: W = 0 if in horizontal configuration) N springs = W = N N N W 20lbf 1.5 min = springs = max = N min = 1.4 Attach half of the LCTs onto the corners of the Lightband Upper Ring flange. Orient each LCT as shown in Figure 3-1 and ensure LCTs are placed as close to a Separation Spring as possible. Torque attachment screws 5-6 in*lb above running torque (8 in*lb max). 1.5 Attach the remaining half of the LCTs onto the corners of the Lightband Lower Ring flange. Orient each LCT as shown in Figure 3-1 and ensure LCTs are placed directly below an LCT on the Upper Ring. Ensure that the pairs of LCTs are visually aligned with each other to allow rotation of the cable ties over the bearings. Torque attachment screws 5-6 in*lb above running torque (8 in*lb max). PSC Proprietary 2002159E Lightband Compression Tool Operating Procedure Page 7 of 11

Lightband Compression and Stow 2.1 If not already performed, bring the Upper and Lower Rings together and verify alignment via the following: 1. Cutout in the Upper Ring lines up over the Motor Bracket on the Lower Ring. 2. ALL Separation Connector/Switch cutouts align. 3. ALL Separation Spring tips protrude through appropriate holes in the Upper Ring. 2.2 Place one cable tie around each LCT Pair and pull until hand-tight. Do not allow the Lightband to compress yet. 2.3 If applicable, disable the cut-off feature of the Cable Tie Tool. 2.4 Ensure that the force setting on the Cable Tie Tool does not exceed the tensile strength of the cable ties. If using the PSC-recommended hardware, the Ty-Rap Erg 50 Cable Tie Tool should be set at 8. 2.5 Measure the distance between Upper and Lower Ring flanges next to each LCT. Ensure distance between flanges is uniform to within 0.020 inches at each location. It is often helpful to record measurements in a table as it may require multiple measurement iterations; see Section 6. Use the minimum measured distance as a reference and tighten the remaining cable ties with the Cable Tie Tool until all are within 0.020 inches of the minimum. Note: Failure to evenly compress Lightband increases chance of breaking cable ties. 2.6 Tighten the cable tie nearest to the Motor Bracket using the Cable Tie Tool by 5 to 6 notches of the cable tie or until the safety mechanism of the Cable Tie Tool releases the cable tie. Do this for all cable ties, working in a circle. Stop once all cable ties have been tightened once. 2.7 Measure the distance between Upper and Lower Ring flanges next to each LCT. Ensure distance between flanges is uniform to within 0.020 inches at each location. Use the minimum measured distance as a reference and tighten the remaining cable ties with the Cable Tie Tool until all are within 0.020 inches of the minimum. If the distance between the flanges is IAW the stowing procedure directed in PSC Document 2000781 proceed to step 2.8, otherwise repeat steps 2.5 through 2.7 always working around the Lightband in the same direction. Note: If a cable tie is over-tightened or broken, remove cable tie from LCT, place new cable tie around LCT and follow steps 2.5 2.7 until the distance between the Upper and Lower Ring flange is uniform within 0.020 inches. 2.8 Stow the Lightband IAW with PSC Document 2000781 within 10 minutes of final flange distance measurement as cable ties will creep if kept under stress. If more than 10 minutes pass before stowing, re-verify that the distance between flanges is IAW the requirement defined in PSC Document 2000781 before stowing. Post-Stow 3.1 Remove the cable ties by cutting or manually sliding each one outward over the bearings. 3.2 Return to the PSC Document 2000781 and continue with the Set-For-Flight portion of the procedure. PSC Proprietary 2002159E Lightband Compression Tool Operating Procedure Page 8 of 11

5. LCT Compression Procedure This procedure shall be followed if LCTs ARE installed on the Lightband. This procedure assumes the use of the materials shown in Figure 3-1. Consult PSC before substituting any tools. This procedure is to be performed only by individuals who have been formally trained on the use of LCTs by a PSC engineer. Contact PSC to setup training. Step Procedure Lightband Compression and Stow 1.1 Ensure the SN on the Upper Ring corresponds to the SN on the Lower Ring. Record all MLB info on the cover page. (This can be found on both the Upper and Lower Rings, typically adjacent to the Motor Bracket Assembly.) 1.2 Complete the stowing procedure of PSC Document 2000781 up to the point where force is applied to compress the Lightband. 1.3 If not already performed, bring the Upper and Lower Rings together and verify alignment via the following: 1. Cutout in the Upper Ring lines up over the Motor Bracket on the Lower Ring. 2. ALL Separation Connector/Switch cutouts align. 3. ALL Separation Spring tips protrude through appropriate holes in the Upper Ring. 1.4 Place one cable tie around each LCT Pair and pull until hand-tight. Do not allow the Lightband to compress yet. 1.5 If applicable, disable the cut-off feature of the Cable Tie Tool. 1.6 Ensure that the force setting on the Cable Tie Tool does not exceed the tensile strength of the cable ties. If using the PSC-recommended hardware, the Ty-Rap Erg 50 Cable Tie Tool should be set at 8. 1.7 Measure the distance between Upper and Lower Ring flanges next to each LCT. Ensure distance between flanges is uniform to within 0.020 inches at each location. It is often helpful to record measurements in a table as it may require multiple measurement iterations; see Section 6. Use the minimum measured distance as a reference and tighten the remaining cable ties with the Cable Tie Tool until all are within 0.020 inches of the minimum. Note: Failure to evenly compress Lightband increases chance of breaking cable ties. 1.8 Tighten the cable tie nearest to the Motor Bracket using the Cable Tie Tool by 5 to 6 notches of the cable tie or until the safety mechanism of the Cable Tie Tool releases the cable tie. Do this for all cable ties, working in a circle. Stop once all cable ties have been tightened once. 1.9 Measure the distance between Upper and Lower Ring flanges next to each LCT. Ensure distance between flanges is uniform to within 0.020 inches at each location. Use the minimum measured distance as a reference and tighten the remaining cable ties with the Cable Tie Tool until all are within 0.020 inches of the minimum. If the distance between the flanges is IAW the stowing procedure directed in PSC Document 2000781 proceed to step 2.8, otherwise repeat steps 2.5 through 2.7 always working around the Lightband in the same direction. Technician Date & Initials QA Date & Initials PSC Proprietary 2002159E Lightband Compression Tool Operating Procedure Page 9 of 11

Note: If a cable tie is over tightened or broken, remove cable tie from LCT, place new cable tie around LCT and follow steps 2.5 2.7 until the distance between the Upper and Lower Ring flange is uniform within 0.020 inches. 1.10 Stow the Lightband IAW with PSC Document 2000781 within 10 minutes of final flange distance measurement as cable ties will creep if kept under stress. If more than 10 minutes pass before stowing, re-verify that the distance between flanges is IAW the requirement defined in PSC Document 2000781 before stowing. Post-Stow 2.1 Remove the cable ties by cutting or manually sliding each one outward over the bearings. 2.2 Return to the PSC Document 2000781 and continue with the Set-For-Flight portion of the procedure. PSC Proprietary 2002159E Lightband Compression Tool Operating Procedure Page 10 of 11

6. Reference LCT Measurement Table Template The following table template shall be used as a reference when gradually compressing the cable ties on the LCTs and measuring the distance between flanges at corresponding locations. The table may have to be expanded depending on actual quantity of LCTs installed. Measurement No. Distance Between Upper and Lower Ring Flanges [in] LCT 1 LCT 2 LCT 3 LCT 4 LCT 5 LCT 6 LCT 7 LCT 8 1 2 3 4 5 6 7 8 9 10 PSC Proprietary 2002159E Lightband Compression Tool Operating Procedure Page 11 of 11