Osceola County Expressway Authority. Alternatives Public Meeting

Similar documents
SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida

Public Involvement Kickoff Meeting. April 29, 2015

PRFSC Feb 2017 Meeting Minutes

Malabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

TRANSPORTATION COMMISSION Agenda Staff Report

State Road (S.R.) 61 (U.S. 319) FPID s and

PRESENTATION OUTLINE

DIRECTIONS ARE FROM DISNEY S WIDE WORLD OF SPORTS TM COMPLEX

Florida Department of Transportation

Sent via Addition of fence standards. If I can be of assistance, please contact me at

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Frequently Asked Questions

For sale 20 ACRE PASTURE/HOME SITE

Diamond Springs Parkway Project

3.0 Future Conditions

CFI TEAM AVAILABLE PROPERTIES

Board of Supervisors February 27, 2017

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

2012 PRIORITY TRANSPORTATION PROJECTS

LIST OF PRIORITY PROJECTS 2020/ /35

CFI TEAM AVAILABLE PROPERTIES

Roundabout Feasibility Memorandum

7.0 Preferred Alternative with Service Road Concept

UNFUNDED PRIORITY PROJECTS

DIRECTIONS ARE FROM ESPN S WIDE WORLD OF SPORTS TM COMPLEX

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

12/13/2018 VIA

FM #: ETDM #: 11241

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

DeLand. DeBary. Sanford/SR 46. Lake Mary. Longwood Altamonte Springs. Maitland. Winter Park/Park Avenue

LIST OF PRIORITY PROJECTS

This chapter describes the proposed circulation system and transportation alternatives associated with

Public Hearing October 21, 2014 University of North Florida Adam W. Herbert University Center Alumni Drive Jacksonville, FL 32224

SW Citrus Boulevard and SW 69 th Street Palm City, FL Located just South of the I-95 Overpass on the West side of SW Citrus Boulevard

Joshua Jester, E.I., Florida Department of Transportation, District One

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Exit 13/Golden Triangle Study FREQUENTLY ASKED QUESTIONS

US 1 Express Lanes Public Kick-Off Meeting

Preliminary Engineering Study

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

San Tomas Expressway

McLEAN CITIZENS ASSOCIATION

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

City of Moorhead Committee of the Whole Meeting

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Reams Road RCA Study. Board of County Commissioners Public Hearing

Central Avenue Corridor Study FPID Number:

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Planning & Zoning Commission

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

St. Francis Drive through the City of Santa Fe Corridor Study

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

Chapter 7 Nonmotorized Facilities

Clackamas County Comprehensive Plan

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Orange County s Transportation Planning and Multimodal Corridor Plan

Orange County, Florida Public Works Department's 10-Year Roadway Program

Appendix B. Transportation Analysis. B.1 Summary. East Nassau Employment Center DSAP

Alternatives Public Workshop

Sliding Hill Road - Widening (UPC )

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

Plant City Walk-Bike Plan

Meeting Notes. PIM Meeting #1 CTH D Reconstruction Nenno Road to Canadian National Railroad Town of Wayne Washington County

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

BULL CREEK RANCH 1,129± acres Osceola County, FL

US Route 4 Traffic and Pedestrian Improvement Project

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL WORK SESSION AUGUST 8, 2017

3.9 Recreational Trails and Natural Areas

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

APPENDIX D COST SUMMARY TABLES

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

Public Hearing Tarrant County. October 11 th, 2012

4.0 Recommended Transportation Plan

Introduction Parks Open Space Standards Recreation & Open Space Land Use Design Principles

4.0 Recommended Transportation Plan

Donald Ballanti, Certified Consulting Meteorologist, Wind Impact Evaluation for the Menlo Park Facebook Campus Project, August 26, 2011.

APPENDIX 9: TOP 25 PROJECT AREAS INFORMATION SHEETS

SECTION 3 STREET DESIGN

TRANSPORTATION ELEMENT. (Section 9J-5.019) GOALS, OBJECTIVES POLICIES

Technical Report 3: Plan Development & Cost Feasible Projects Adopted -January 2016 Updated August 2016

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

FY Candidate Sidewalk Projects. Sidewalk Advisory Committee

Chapter 4.3 Enterprise Elementary. Volusia County MPO. March Page 7.0

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

North Avenue Corridor Study

Trail Feasibility. 1. Introduction FINAL. October What s inside?

Transcription:

Osceola County Expressway Authority Alternatives Public Meeting

Alternatives Public Meeting

Alternatives Public Meeting

Wheelchair-Accessible Walkway this Way

Wheelchair-Accessible Walkway this Way

Contact Information Paul Cherry, P.E. Consultant Project Manager Kimley-Horn and Associates, Inc. 1920 Wekiva Way, Suite 200 West Palm Beach, FL 33411 Ph: (561) 840-0803 paul.cherry@kimley-horn.com Jeff Jones, AICP Executive Director Osceola County Expressway Authority 1 Courthouse Square Kissimmee, FL 34741 Ph: (407) 742-0200 osceolaxway@osceola.org

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. To express concern(s), please contact the following: Vianed Aldebol Osceola County Expressway Authority 1 Courthouse Square, Suite 100 Kissimmee, FL 34741 Ph: (407) 742-0200 vianed.aldebol@osceola.org

PD&E Study Proposed Schedule ACTIVITY 2012 2013 2014 2015 Begin Study Kickoff Meeting Public Input Develop Build Alternatives Alternatives Public Meeting Public Hearing No-Build and Build Alternatives Presented Recommended Alternative No-Build or Build Alternative is Recommended Study Complete Final Decision by OCX

2040 OCX Master Plan Osceola Parkway Extension O sceola Parkw ay 27 Poinciana Parkway I-4 Segment 192 4 92 Poinciana Parkway NE Connector Expressway Southport Connector Expressway

BOGGY CREEK RD (NORTH) Alternatives Public Meeting 2012 Feasibility Study Corridors CORRIDOR A 0 1,000 2,000 Feet Orange County Osceola County BUENAVENTURA BLVD E OSCEOLA PKWY BOGGY CREEK RD (WEST) CORRIDOR C-1 GREAT OAKS BLVD MORNINGSIDE DR LAKE VISTA DR BOGGY CREEK RD (EAST) EAST LAKE RD FISH CAMP RD CORRIDOR B CORRIDOR C-2 CORRIDOR C TINDALL ACRES RD HILLIARD ISLE RD

No. Western Alternatives Alt. 1 Alt. 2 Alt. 3 Alt. 4 Alt. 5 1 Meets Purpose and Need of the project YES YES YES YES YES Provides a transportation system for future 2 development YES YES YES YES YES Directly impacts homes within Wyndham Lakes, 3 requiring relocations YES NO YES NO NO Directly impacts the Boggy Creek Enclave and 4 Ward Road PD (under construction) and homes on Ward Road YES YES NO NO YES Provides direct access to the Orlando Airport 5 from SR 417 Connector YES YES NO NO YES Requires service road on both sides of OPE to 6 provide property access NO NO YES YES NO 7 Community impacts HIGH HIGH HIGH HIGH LOW Wetland impacts HIGH HIGH HIGH HIGH HIGH Impacts to Boggy Creek waterway HIGH HIGH HIGH HIGH MODERATE 8 9 10 11 12 13 14 15 16 Western Alternatives Matrix Conservation easement impacts HIGH HIGH HIGH HIGH HIGH Number of potential relocations 51 6 54 14 5 Requires Ward Road intersection relocation YES YES YES YES NO Requires relocation and reconstruction of Boggy Creek Road NO NO YES YES NO Estimated construction/engineering cost $254,720,000 $279,380,000 $327,180,000 $339,870,000 $232,440,000 Estimated right of way cost $115,618,000 $69,165,000 $128,360,000 $91,265,000 $67,670,000 TOTAL WESTERN PROJECT COST $370,338,000 $348,545,000 $455,540,000 $431,135,000 $300,110,000

Central Alternative Matrix No. Consideration Central Alternative 1 1 Meets Purpose and Need of the project YES 2 Provides a transportation system for future development YES 3 Provides an interchange with Medical City Drive YES 4 Utilities available in the R/W within the Poitras property owned by City of Orlando and GOAA YES 5 Community Impacts MEDIUM 6 Scrub impacts MEDIUM 7 Number of residential relocations 1 8 Conservation easement impacts HIGH 9 10 Estimated construction/engineering cost $69,380,000 Estimated right of way cost $22,360,000 11 TOTAL CENTRAL PROJECT COST $91,740,000

Eastern Alternatives Matrix No. Eastern Alternatives Alt. 1 Alt. 2 Alt. 3 Alt. 4 Alt. 5 1 Meets Purpose and Need of the project YES YES YES YES YES 2 Provides a transportation system for future development YES YES YES YES YES 3 Desirable geometric alignment POOR POOR GOOD GOOD GOOD 4 Compatibility with Northeast District Master Plan POOR POOR GOOD GOOD GOOD 5 6 7 8 9 10 11 12 Connectivity to Northeast Connector Expressway and eastern extension of Osceola Parkway POOR POOR GOOD GOOD GOOD Community impacts HIGH MEDIUM MEDIUM MEDIUM MEDIUM Wetland impacts within Split Oak NONE LOW LOW LOW MODERATE Wetland impacts outside of Split Oak HIGH HIGH MODERATE HIGH HIGH Scrub impacts LOW LOW MODERATE MODERATE HIGH Number of residential relocations 10 0 0 0 0 Conservation easement impacts HIGH HIGH HIGH HIGH HIGH Passes through south portion of Eagle Creek Village currently zoned for conservation. YES YES YES YES YES 13 14 15 Estimated construction/engineering cost $164,710,000 $156,850,000 $137,150,000 $158,570,000 Estimated right of way & mitigation cost $84,730,000 $84,550,000 $64,485,000 $64,200,000 TOTAL EASTERN PROJECT COST $249,440,000 $241,400,000 $201,635,000 $222,770,000 $158,960,000 $44,565,000 $203,525,000

190'± Typical Sec on Alterna ve Osceola Parkway Extension from Exis ng Osceola Parkway to the SR 417 Connector (Not a Tolled Facility) Proposed R/W 12' Shoulder 10' Paved 8' Shoulders 4' Paved 49' 24' 44' 24' 49' 190'± 12' Shoulder 10' Paved Proposed R/W

260 ± Typical Sec on Alterna ve Osceola Parkway Extension from SR 417 Connector to Narcoossee Road with Noise Barrier/Privacy Wall (Tolled Facility) Privacy Wall Option Noise Wall Option 15 Landscape Buffer Proposed L/A R/W 12 Shoulder 10 Paved 8 Shoulders 4 Paved 8 Shoulders 4 Paved 60 24 84 24 65 260 +/- 12 Shoulder 10 Paved 5 Proposed L/A R/W

400 ± Typical Sec on Alterna ve Osceola Parkway Extension from Narcoossee Road to Future Northeast Connector (Tolled Facility) Fence Fence Proposed R/W 26' 50' Multiuse Trail Transit Corridor Proposed L/A R/W 12' Shoulder 10' Paved 94' 24' 88' 24' 94' 400' +/- 8' Shoulders 4' Paved 12' Shoulder 10' Paved Proposed L/A R/W

250 ± Typical Sec on Alterna ve SR 417 Connector from Osceola Parkway Extension to SR 417 Within Ward Road Corridor (Tolled Facility) Fence Fence Proposed L/A R/W 12' Shoulder 10' Paved 8' Shoulders 4' Paved 8' Shoulders 4' Paved 60' 24' 84' 24' 60' 250'± 12' Shoulder 10' Paved Proposed L/A R/W

450 ± Typical Sec on Alterna ve SR 417 Connector from Osceola Parkway Extension to SR 417 (within Boggy Creek Road Corridor) Fence Fence Proposed R/W 12' Shoulder 5' Paved 12' Shoulder 10' Paved 102' 60' 24' 84' 24' 60' 102' Proposed Boggy Creek Frontage Road (Non-tolled) 36' 14' Proposed L/A R/W 8' Shoulders 4' Paved 8' Shoulders 4' Paved Expressway Connector (Tolled) 450'± 12' Shoulder 10' Paved Proposed L/A R/W 14' 36' Proposed Boggy Creek Frontage Road (Non-tolled) 12' Shoulder 5' Paved Proposed R/W