ROAD SAFETY AUDIT. Route 1 at Everett Street & University Avenue. Town of Norwood. September Prepared For: On Behalf Of:

Similar documents
ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of:

ROAD SAFETY AUDIT. Route 1A at Everett Street & Clapboardtree Street and Washington Street at Everett Street. Towns of Norwood & Westwood

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville.

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Russell Street (Route 9) at North and South Maple Streets Town of Hadley. March 2014

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Santilli Circle and Sweetser Circle. Municipality of Everett. March 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. West Central Street (Route 140) at Franklin Village Drive. Town of Franklin. February 03, 2016

ROAD SAFETY AUDIT. Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby

ROAD SAFETY AUDIT MDM. Columbia Road at Dorchester Avenue. Dorchester, MA 10/14/2016. Prepared For: MassDOT. On Behalf Of: Edens

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke

ROAD SAFETY AUDIT. Route 2/Route 68 Interchange Rotary City of Gardner. August 3, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 2/Taylor Road/Piper Road. Town of Acton. March 4, Prepared For: Massachusetts Department of Transportation

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

ROAD SAFETY AUDIT. Route 113 (Storey Avenue) at Woodman Way and Low Street. Newburyport, MA. May 27, Prepared For: MassDOT

Draft North Industrial Area-Wide Traffic Plan

ROAD SAFETY AUDIT. Boston Road (Route 20) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham.

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio

ROAD SAFETY AUDIT. Auburn Street at Southbridge Street (Route 12) Town of Auburn. March Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Providence Street (Route 122A) at McKeon Road/Millbury Street. City of Worcester. July 14, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater. May 14, 2014

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

ROAD SAFETY AUDIT. Needham Street and Highland Avenue Corridor. City of Newton and Town of Needham. March 2014

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report

ROAD SAFETY AUDIT. Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst. November 15, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard. City of Brockton. July 24,2013

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

ROAD SAFETY AUDIT. Water Street (Route 129) at Vernon Street. Town of Wakefield. September Prepared For: MassDOT

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department

ROAD SAFETY AUDIT. Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell. October 5, Prepared For: MassDOT.

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

ROAD SAFETY AUDIT. Route 1 at Route 123 Route 1 at Route 1A Route 1 at May Street Route 1A and Route 123. City of Attleboro, MA. September 15, 2015

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

ROAD SAFETY AUDIT. Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road. Town of Tewksbury. April 5, Prepared For: MassDOT

ROAD SAFETY AUDIT. Damon Road. City of Northampton. October Prepared for: Massachusetts Department of Transportation

A plan for improved motor vehicle access on Railroad Avenue in Provincetown

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

VT15 / Allen Martin Drive Intersection Scoping Study

ROAD SAFETY AUDIT. Route 3A from Evans Street to Abigail Adams State Park. Town of Weymouth. October 12, Prepared For: MassDOT

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer

Transportation Planning Division

MEMORANDUM. Layout Of Study Intersections And Traffic Control

ROAD SAFETY AUDIT. I 495/Route 117 Interchange. Town of Bolton. August Prepared for: Massachusetts Department of Transportation Highway Division

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

Truck Climbing Lane Traffic Justification Report

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Edgemont Village Traffic and Parking Technical Report January 2014

ROAD SAFETY AUDIT. Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield. June 9, 2017.

ALLEY 24 TRAFFIC STUDY

Road Safety Audit Report: Interstate 516

TRAFFIC IMPACT ANALYSIS

WELCOME Public Information Centre

Public Information Centre

CTDOT Pedestrian and Bicycle Safety Initiatives

ROAD SAFETY AUDIT. Route 114 (Winthrop Av. And Parker St.) at Andover St. City of Lawrence. October 14, Prepared For: MassDOT

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

Glenn Avenue Corridor Traffic Operational Evaluation

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

sm1 CDMth '}lf!j1i!~~!2q[ ROAD SAFETY AUDIT County Street City of New Bedford March 22, 2017 Prepared For: MassDOT

Windy Ridge Elementary School

Military Road Safety Improvements

Active Transportation Facility Glossary

Off-road Trails. Guidance

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

PEDESTRIAN SAFETY STUDY

Freeway ramp intersection study

Capital Region Council of Governments

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Final Report. Evaluation of Flashing Yellow Right Turn Arrow at Silverbell Rd and Cortaro Rd. FHWA Experimentation #4-329(E)

THIS PAGE LEFT BLANK INTENTIONALLY

LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

INTERSECTIONS AT GRADE INTERSECTIONS

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Traffic Control and Accidents at Rural High-Speed Intersections

INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z

5. RUNNINGWAY GUIDELINES

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Lee Highway Corridor Analysis

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Gateway Transportation Study

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Transcription:

ROAD SAFETY AUDIT Route 1 at Everett Street & University Avenue Town of Norwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings LLC Prepared By: 35 New England Business Center Drive Suite 140 Andover, MA 01810-1066

Table of Contents Background... 1 Project Data... 1 Project Location and Description...2 Audit Observations & Potential Safety Enhancements...5 Summary of Road Safety Audit...12 List of Appendices Appendix A. Appendix B. Appendix C. RSA Meeting Agenda RSA Audit Team Contact List Detailed Crash Data List of Figures Figure 1. Figure 2. Locus Map... 3 Route 1 at Everett Street/University Avenue Existing Conditions... 4 List of Tables Table 1. Table 2. Participating Audit Team Members... 1 Potential Safety Enhancements Summary... 13

Background The intersection of Route 1 at Everett Street and University Avenue was identified as a high crash location in the Metropolitan Area Planning Council (MAPC) based on the 2010 and 2011 Highway Safety Improvement Program (HSIP) cluster data. Improvements at this intersection, to be constructed as part of the off-site mitigation related to the University Station mixed-use transit-oriented development to be located off of University Avenue in Westwood, are currently under review by the MassDOT Highway Division at the 25% Design Level. The MassDOT Highway Division Traffic and Safety Engineering 25% Design Submission Guidelines require a Road Safety Audit (RSA) be performed for all project-related high crash locations to identify safety issues and enhancements that may be implemented in conjunction with the University Station off-site mitigation project, as well as other measures that could be programmed for implementation by others in the mid-term or long-term timeframes. Project Data The RSA for the subject location was conducted on September 8, 2014 at the Westwood Municipal Building. The RSA Meeting Agenda is provided in Appendix A. Participating audit team members and their affiliation are listed in Table 1; team member contact information is provided in Appendix B. For this modified RSA, team members were encouraged to visit the location prior to the meeting to observe operations and evaluate potential safety issues, using MassDOT s Safety Review Prompt list for guidance. At the meeting, team members were provided with an aerial photograph of the location, and a collision diagram, summary table, and various bar charts analyzing motor vehicle crashes reported within the three year review period (2010-2012). This material was reviewed by the team at the meeting in conjunction with street level views afforded by Google Earth. Table 1. Participating Audit Team Members Audit Team Member Mark Ryan Tony Greeley Bill Brooks Paul Sicard William Scoble Jeff Bina Lisa Schletzbaum Corey O Connor Thomas Rebello Alex Duggan Erin Kinahan Scott Thornton Steve Boudreau Jonathan Rockwell Agency/Affiliation Norwood DPW Norwood Fire Department Norwood Police Department Westwood Police Department Westwood Fire Department Westwood Town Engineer MassDOT Highway Division Safety Section MassDOT Highway Division Safety Section MassDOT Highway Division District 5 Traffic MassDOT Highway Division District 5 Projects MassDOT Highway Division District 6 Planning Vanasse & Associates, Inc. Vanasse & Associates, Inc. Vanasse & Associates, Inc. Page 1

Motor vehicle crash data was provided by the Norwood Police Department for the most recent three year review period available (2010-2012). The data provided includes 52 reported crashes, with sixteen (31%) resulting in personal injury, and no reported fatalities. Twenty-five (48%) of the crashes were rear-end crashes, fifteen (28%) were turning movement crashes, seven (13%) were sideswipe crashes, three (6%) were angle crashes, and two vehicles struck fixed objects. Eleven (21%) of the crashes occurred on wet pavement, and one in snowy conditions. Twenty (38%) of the crashes occurred during peak afternoon commuting hours (2 pm to 6 pm), and twelve (23%) occurred during the peak morning commute (6 am to 10 am). Project Location and Description Route 1 (Boston-Providence Turnpike) is typically a four-lane median-divided urban principal arterial under MassDOT Highway Division jurisdiction. Everett Street is a four-lane urban minor arterial under Town of Norwood jurisdiction. University Avenue is typically a three-lane urban minor arterial under Town of Norwood jurisdiction, with two travel lanes eastbound and one travel lane westbound. The posted speed limit on Route 1 is 45 miles per hour (mph); Everett Street and University Avenue are posted at 30 mph and 40 mph, respectively, approaching the intersection. Everett Street intersects Route 1 from the west and University Avenue intersects Route 1 from the east to form a four-way intersection under actuated traffic signal control. Each Route 1 approach consists of an exclusive left turn lane, two through travel lanes, and a channelized exclusive right turn lane. The Everett Street eastbound approach consists of two general purpose travel lanes. The University Avenue westbound approach consists of two general purpose travel lanes and an exclusive right turn lane. The existing traffic signal phasing provides for protected leading left turns on Route 1. The Everett Street and University Avenue phases run concurrently. Concurrent pedestrian phases for crossing Route 1 and University Avenue are activated upon pushbutton actuation. Bicycle detection is provided on the University Avenue approach only. Sidewalks currently exist along both sides of Everett Street and University Avenue, with curb ramps and crosswalks provided across the south, east and west legs of the intersection; the westerly crosswalk is currently unsignalized. A locus map and aerial photograph of the existing conditions are provided as Figure 1 and 2, respectively. Page 2

Source: Google Earth. 0 1000 2000 Scale in Feet

Source: Google Earth. 0 75 150 Scale in Feet BOSTON-PROVIDENCE UNIVERSITY TECHNOLOGY WAY AVENUE TURNPIKE EVERETT STREET Road Safety Audit - Route 1 at Everett Street & University Avenue - Norwood, Massachusetts GLACIER DRIVE

Audit Observations & Potential Safety Enhancements Observations: Congestion/Queuing Queues on Route 1 routinely extend south to the Neponset Street Rotary (1.5 miles) in the morning and north to the Route 1/I-95 interchange (1.25 miles) in the afternoon. This likely increases driver aggressiveness and leads to inattentiveness which, in turn, are likely contributing factors in many of the rear-end and turning movement crashes reported. Everett Street eastbound (to Route 1A) and University Avenue westbound also experience significant queues. Left-turning vehicles often do not yield to through vehicles, which can lead to turning movement and angle crashes. Vehicles have been observed to turn left from the center (through) lane on University Avenue and Everett Street. This is likely due to driver impatience because of the high volume of drivers turning left on a permissive phase through very heavy oncoming traffic. This could also be attributable to the lack of lane-use markings, as drivers may assume a double left is allowed, given the ample receiving width on Route 1 and no signs prohibiting it. This condition could contribute to turning movement or sideswipe crashes within the intersection, since drivers unfamiliar with the intersection would not expect it. Drivers who become impatient in the southbound queue sometimes use the median break at Lambert s, approximately 2,500 feet north of the intersection, to make a U-turn. Vehicles are observed to use the U-turn in all manners, staying to the left or staying to the right. It was observed that no striping exists at this median break to separate vehicles in either direction. No reported crashes were attributable to this condition, but it is a potential safety issue. Previous observations and worn paths in the grass indicate that motorists drive on the median to access the Route 1 southbound left turn lane when through queues extend beyond its entrance. No reported crashes were attributable to this condition. Signal Equipment & Operation The concurrent side street phasing and lack of exclusive left turn lanes were cited as likely causes of angle and turning movement crashes involving eastbound and westbound vehicles reported within the intersection. Red-light running was identified as a frequent occurrence. This could be attributed to a number of factors, including inadequate change and clearance intervals, aggressive driver behavior exacerbated by long delays, or vehicles becoming trapped in the intersection due to the concurrent side street phasing. It was observed that vehicles turning left from University Avenue attempt to beat Everett Street traffic at the start of the concurrent phase, with four to five cars getting through before Everett Street assumes the right of way. This aggressive behavior is likely a cause of turning movement crashes. Page 5

There is no emergency preemption system at the intersection. Emergency responders reported that they avoid this intersection and will not cross with lights and sirens on. Signal visibility is generally poor, given that the outdated short mast arms, supplemented by postmounted signals, do not locate signal heads over the lane to which they apply. Each Route 1 approach only has one overhead and one post mounted signal for the through movement. This signal is also isolated from adjacent signals on Route 1, allowing for high approach speeds in which drivers may not be expecting to stop. The mast arm mounted signal heads are mounted free-swinging, which has allowed the left-most signal head facing Everett Street to become misaligned, facing the Burger King driveway. This likely contributes to rear-end crashes, as drivers may not be aware if they have the right of way, then stop abruptly. Wrong Way Drivers Local police described occurrences of drivers that were neither elderly nor impaired turning left from Everett Street onto Route 1 southbound in the wrong direction. After review, it was observed that the lawn on the east side of Route 1 northbound visually blends with the grass median, obscuring the northbound roadway, due to the relative grades of the Everett Street approach and Route 1. The northern median nose also extends south into the intersection, exacerbating the issue by forcing eastbound left turning vehicles to maneuver around it. Abutter Access It was noted that vehicles turning left from Everett Street that intend to turn into Technology Way, approximately 300 feet north of the intersection, have a short distance to weave with vehicles turning right from University Avenue. No reported crashes were attributable to this condition; however, this is due to the proximity of the driveway to the intersection and also an indirect result of the concurrent side street phasing. Page 6

Vehicles from Route 1 southbound headed to Burger King often use the Everett Street driveway, cutting across the four lanes of Everett Street, rather than wait in the through queue and access the restaurant via the driveway on Route 1, immediately south of the intersection. This is likely the cause of two crossing maneuver crashes reported within the three-year review period. It was also noted that left turns out of Burger King to Everett Street are dangerous, given the number of lanes to cross, vehicles coming from various directions, and consistent queue of vehicles limiting a driver s visibility; though no reported crashes were directly attributable to this condition. Left turns into Burger King from Everett Street are also of concern. One reported turning movement crash of this manner may have been a courtesy crash, when one lane of traffic stops to allow the left turner through while a vehicle in another lane, unaware of the situation, hits the left turning vehicle. This is common where there are two lanes of traffic to cross. The McDonald s parking lot has the same concern. Three sideswipe crashes were reported on Everett Street westbound at the Burger King Driveway. One was due to a turning vehicle not signaling, and a second likely occurred when a vehicle switched lanes abruptly to bypass a stopped vehicle waiting to turn left into the business. This condition is worsened by the long eastbound queues which block driveways on Everett Street. Traffic sometimes queues onto Route 1 southbound from Irving Gas/Rojo Car Wash, south of the intersection. It was also speculated that short gap acceptance by drivers leaving this business causes traffic on Route 1 to merge to the left lane in this area. No reported crashes were attributable to this condition; however, these issues have been observed to impact Route 1 operations. It was noted that left turns out of the Central Auto dealership driveway to University Avenue are dangerous, given the number of lanes to cross, its proximity to the intersection, and limited sight lines due to cars parked on the corner by the dealership; though no reported crashes were directly attributable to this condition. Striping The intersection is very wide, due to the number of lanes on Route 1 and the width of the median. It was observed that there is no definition within the intersection to guide turning or through traffic, which may contribute to angle, turning movement, and sideswipe crashes. The shoulder striping on Route 1 southbound, north of the intersection, in the vicinity of Glacier Drive, was identified as a concern. Prior to Glacier Drive a shoulder taper is provided, while approximately 300 feet south of Glacier Drive, striping for the right turn lane to Everett Street begins. A right-in/rightout driveway for McDonald s is also located within this area, creating a no man s land that may be confusing to drivers. No reported crashes were located in this immediate vicinity. However, drivers also enter Route 1 in this area thinking that it is a third southbound through lane, which could be related to two sideswipe crashes reported at the intersection. Page 7

Pedestrian Accommodation Shrubs within the State Highway Layout, on the northwest corner of the intersection, restrict advance visibility to the pedestrian crossing between McDonald s and the median island within Everett Street. No sidewalks exist on Route 1, although there were no reported pedestrian crashes within the three-year review period. A number of nearby hotels and businesses were noted to generate pedestrian traffic. RSA members noted pedestrians using the paved shoulder and walking through abutting parking lots, which is a safety issue. It should be noted that any crash data in parking lots would not be included in this study. Pedestrians were observed crossing the northern leg of the intersection where there is no crosswalk. Bicycle Accommodation Limited bicycle accommodations exist at the intersection, consisting of bicycle detection on the University Avenue approach only. Maintenance A manhole on Route 1 southbound in the vicinity of Irving Gas/Rojo Car Wash is set too low and causes drivers to swerve to avoid, though no reported crashes were attributable to this. Illegal Turn One reported crash was the result of a vehicle making a left turn at the end of the channelized right turn lane from Route 1 northbound onto University Avenue westbound. There is currently no signage to prohibit this maneuver. Page 8

Potential Enhancements: 1. It is recommended that all traffic analysis at this location be calibrated to capture the demand volume rather than the volume processed by the intersection, given the significant peak hour queuing conditions. 2. Widen Route 1, Everett Street and University Avenue to provide additional lanes and/or turn lane storage to increase capacity and reduce queuing and delay. Consider utilizing a portion of the existing wide median on Route 1 for either a second left turn lane, a third through lane, or both, depending on traffic counts. This would reduce queuing which, in turn, should mitigate driver frustration, distracted driving, red-light running, and rear end crashes. This would also, improve accessibility to the left turn lane on Route 1 southbound. 3. Implement protected left turn phasing for the eastbound and westbound approaches. This could reduce angle, turning movement and rear end crashes. 4. Review feasibility of split-phasing eastbound and westbound movements, which would eliminate turning conflicts, but would likely increase already long queues. 5. Review change and clearance intervals to ensure that vehicles are afforded sufficient time to clear the intersection, which should reduce red-light running. 6. Install dilemma zone detection to reduce red-light running. 7. Install lane-use pavement markings and lane designation signs on all approaches to improve guidance and allow advance decision-making regarding lane assignment. 8. Restripe side street approaches to provide exclusive left turn lanes and allow protected left turn phasing to eliminate conflicting movements at the intersection, being careful not to design a lane trap. 9. Install striping at median break on Route 1 near Lambert s to clearly define intended operation. 10. Install advance street name ( Next Signal Ahead ) signs on Route 1 approaches to aid drivers in selecting the correct lane in advance of the intersection. 11. Install emergency preemption (Opticom) system to improve emergency response through the intersection. Provide detectors at a location on all approaches where the back of queue does not limit the timely activation of the system. 12. Replace existing mast arms and post-mounted signals with new mast arms to provide signal indications centered on each lane on the far side and improve signal visibility/recognition. Consider supplemental post mounted signals, given the isolation of this signal and approach speeds. Page 9

13. Install retroreflective borders on signal head back plates to improve signal visibility/recognition. 14. Realign eastbound signal head currently pointing at the Burger King driveway. 15. Consider installing concrete or other contrasting surface on the Route 1 median, immediately north of the intersection, to create a visual break between northbound and southbound travel lanes and reduce the occurrence of wrong-way vehicles. 16. Consider/install signs ( Do Not Enter and Wrong Way ) and pavement markings to discourage wrong way vehicles. It should be noted that MUTCD guidelines for signing intersections with divided highways with median widths less than 30 feet at the intersection do not include these signs. 17. Narrow Route 1 median to reduce travel distance for left turns from the side streets and minimize driver confusion regarding where to turn. 18. Pull back the northern median further north so that eastbound left turning vehicles have a clearer path to the northbound lanes. 19. Install larger Keep Right signs and/or delineators on Route 1 median to discourage wrongway turns from the side streets. 20. Consider installation of dotted extension lines to guide left turning vehicles through the intersection and reduce incidences of wrong way vehicles. 21. Review weaving distance between University Avenue and Technology Drive for possible conflict between vehicles having turned left from Everett Street and vehicles turning right from University Avenue. If warranted, revise signal phasing to prohibit those movements from occurring simultaneously. 22. Extend striping at the Everett Street channelized right turn median island to discourage access to Burger King and install No Left Turn or Right Turn Only sign at end of right turn lane. 23. Install signs to prohibit left turns to/from abutting driveways on Everett Street and University Avenue in the immediate vicinity of the intersection (Burger King/McDonald s/central Auto). 24. Install median on Everett Street and University Avenue approaches to prohibit turning movements to/from abutting driveways. 25. Modify the Burger King driveway on Everett Street to allow right-in/right-out only. 26. Evaluate the opportunity to construct an acceleration/deceleration lane or wider shoulder on Route 1 southbound, south of the intersection, to alleviate observed friction between through vehicles and vehicles turning to/from Burger King and Irving Gas/Rojo Car Wash. Page 10

27. Review striping and signing on Route 1 southbound in the vicinity of Glacier Road and consider modifying edge line, installation of additional right turn arrows and Right Lane Must Turn Right signs, and extension of the lane line. 28. Add dotted lane extension lines at exclusive turn lanes on all approaches to improve delineation. 29. Trim, remove or replace shrubs on the northwest corner to improve advance visibility to pedestrian crossing between McDonald s and the median island within Everett Street. 30. Install YIELD and pedestrian warning signs at pedestrian crossings of channelized right turn lanes on Route 1 northbound and southbound. 31. Install sidewalks on Route 1 to improve pedestrian accessibility. 32. Install crosswalk across northern leg of intersection to improve pedestrian accessibility. 33. Install and/or reconstruct curb ramps to improve pedestrian accessibility. 34. Install accessible pedestrian signals (APS) with countdown timers to improve pedestrian accessibility. 35. Provide bicycle detection and associated pavement markings. 36. Adjust manhole frame and cover to grade on Route 1 southbound in the vicinity of Irving Gas/Rojo Car Wash. 37. Install No Left Turn sign at end of channelized right turn lane from Route 1 northbound to University Avenue. 38. As part of long term planning and reconstruction efforts, provide grade separation between Route 1 and the two side streets. Page 11

Summary of Road Safety Audit Potential safety enhancements that were discussed during the RSA meeting and described in the previous section are summarized in Table 2. For each potential enhancement, an estimate of the safety benefit ( payoff ), approximate timeframe to implement, and cost are noted; the responsible party recommended to implement the enhancement is also identified. Safety payoff estimates are qualitative and categorized as low (<30%), medium (31% to 70%), or high (>71%). The time frame to implement each enhancement is categorized as short-term (<1 year), midterm (1 to 3 years), or long- term (>3 years). The cost estimates are categorized as low (<$10,000), medium ($10,001 to $50,000), or high (>$50,001). Enhancements where the developer is identified as the responsible agency and marked with an asterisk have already been incorporated into the 25% Design Plans for improvements at this intersection, to be constructed as part of the off-site mitigation related to the University Station mixed-use transit-oriented development to be located off of University Avenue in Westwood, which are currently under review by the MassDOT Highway Division. Page 12

Table 2. Potential Safety Enhancement Summary Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency Congestion; queuing 1. Calibrate traffic analysis N/A N/A Low MassDOT/Consultants Congestion; queuing 2. Widen Route 1, Everett St & University Ave to provide Medium Long-term High MassDOT additional lane capacity Congestion; queuing 3. Implement protected left turn Medium Short-term Medium Developer* phasing EB/WB Turning conflicts 4. Review split-phasing EB/WB Low Mid-term Low MassDOT Red-light running 5. Review change/clearance Low Short-term Low Developer* intervals Red-light running 6. Install dilemma zone detection Low Mid-term Medium MassDOT Driver guidance Congestion; queuing 7. Install lane-use pavement markings & lane designation signs on all approaches 8. Restripe side street approaches to provide exclusive LTL Low Short-term Low Developer Medium Short-term Medium Developer* Driver guidance 9. Install striping at median break Low Mid-term Low MassDOT near Lambert s Driver guidance 10. Install advance street name Low Short-term Low Developer signs on Route 1 approaches Signal operation 11. Install emergency preemption High Short-term Medium Developer Signal head visibility 12. Replace existing mast arms and post mounted signals Medium Long-term High MassDOT Page 13

Table 2. Potential Safety Enhancement Summary (continued) Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency Signal head visibility 13. Install retroreflective borders Low Short-term Low Developer on signal head backplates Signal head visibility 14. Realign EB signal head pointing Low Short-term Low Developer* at Burger King driveway Wrong-way vehicles 15. Consider installing concrete on Low Mid-term Medium MassDOT Route 1 median (north side) Wrong-way vehicles 16. Consider/install signs and pavement markings to Low Short-term Low MassDOT discourage wrong way vehicles Wrong-way vehicles 17. Narrow Route 1 median Low Long-term High MassDOT Wrong-way vehicles Wrong-way vehicles Wrong-way vehicles Abutter access Abutter access 18. Pull back northern median end 19. Install larger Keep Right signs and/or delineators on Route 1 medians 20. Consider installation of dotted extension lines for turning vehicles through intersection 21. Review weaving distance to Technology Dr and revise signal phasing, if warranted 22. Extend striping at Everett St channelized RT and install No Left Turn or Right Turn Only sign Low Long-term Medium MassDOT Low Short-term Low Developer Medium Short-term Low Developer Low Short-term Low Developer Low Short-term Low Developer Page 14

Table 2. Potential Safety Enhancement Summary (continued) Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency Abutter access 23. Install signs to prohibit left turns to/from abutting Low Mid-term Low Town driveways Abutter access Abutter access Abutter access Driver guidance Driver guidance Visibility of pedestrian crossings 24. Install median on Everett St & University Ave approaches 25. Modify Burger King driveway on Everett St to rightin/right/out 26. Construct accel/decel lane on Route 1 at Burger King/Irving Gas driveways 27. Modify striping/signing at Glacier Rd intersection 28. Add dotted extension lines at turn lanes 29. Trim, remove or replace shrubs on NW corner Medium Long-term High MassDOT/Town Low Mid-term Medium Town Low Long-term High MassDOT Low Mid-term Low MassDOT Low Short-term Low Developer Low Short-term Low Developer* Visibility of pedestrian crossings 30. Install YIELD and pedestrian warning signs at pedestrian crossings of channelized RT lanes Low Short-term Low Developer* Pedestrian accommodation 31. Install sidewalks on Route 1 Low Long-term High MassDOT Pedestrian accommodation 32. Install crosswalk across northern leg of intersection Low Short-term Medium Developer Page 15

Table 2. Potential Safety Enhancement Summary (continued) Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency Pedestrian accommodation 33. Install and/or reconstruct curb ramps Low Short-term Medium Developer Pedestrian accommodation 34. Install accessible pedestrian signals with countdown timers Low Short-term Medium Developer* Bicycle accommodation Maintenance Illegal turn Congestion; queuing 35. Provide bicycle detection and pavement markings 36. Adjust manhole to grade on Route 1 SB near Irving Gas/Rojo Car Wash 37. Install No Left Turn sign at channelized right turn lane from Rte 1 NB to University Ave 38. Provide grade separation at intersection Low Short-term Medium Developer* Low Short-term Low Developer Low Short-term Low Developer High Long-term High MassDOT Page 16

Appendix A. RSA Meeting Agenda

Modified Road Safety Audit Westwood and Norwood MEETING LOCATION: Champagne Meeting Room, Westwood Memorial Building 50 Carby Street, Westwood, MA DATE: 9/8/14 TIME : 9:00 AM 3:00 PM Type of meeting: Attendees: Modified Road Safety Audit Invited Participants to Comprise a Multidisciplinary Team Session I 9:00-10:30 East Street Rotary Westwood/District 6 Crash Summaries and Diagrams provided in advance Review aerial and on-the-ground images Design Plans Session II*10:30 1:30 Route 1 at Everett Street/University Ave & Route 1A at Everett Street/Clapboardtree Street and Washington Street/Everett Street Westwood/Norwood/District 5 Crash Summaries and Diagrams provided in advance Review aerial and on-the-ground images Design Plans *Lunch will be provided during this session* Session III 1:30 3:00 Neponset Rotary/Pendergast Circle Norwood/District 5 Crash Summaries and Diagrams provided in advance Review aerial and on-the-ground images Design Plans G:\6629 Westwood, MA\RSA Presentation Materials\Westwood Norwood\RSA agenda.docx 1

Instructions for Participants: Before attending the RSA meeting on 9/8/2014, participants are encouraged to drive through the intersection and complete/consider elements on the RSA Prompt List with a focus on safety. All participants will be actively involved in the process throughout. Participants are encouraged to come with thoughts and ideas, but are reminded that the synergy that develops and respect for others opinions are key elements to the success of the overall RSA process. G:\6629 Westwood, MA\RSA Presentation Materials\Westwood Norwood\RSA agenda.docx 2

Appendix B. RSA Audit Team Contact List

RSA AUDIT TEAM CONTACT LIST Project: Route 1 at Everett Street/University Ave Norwood Meeting Date: 9/8/14 Facilitator: VAI Place/Room: Name Title Company Phone E-Mail Scott Thornton Engineer VAI 978-474-8800 sthornton@rdva.com Westwood Municipal Building, Champagne Meeting Room Jonathan Rockwell Engineer VAI 978-474-8800 jrockwell@rdva.com Corey O Connor Traffic Safety Eng. MassDOT, Boston 857-368-9638 corey.oconnor@state.ma.us Lisa Schletzbaum Traffic Safety Eng. MassDOT Safety 857-368-9634 lisa.schletzbaum@state.ma.us Jeff Bina Town Eng./ Westwood Westwood 781-251-2591 jbina@townhall.westwood.ma.us Erin Kinahan MassDOT, Dist. 6 857-368-6154 erin.kinahan@state.ma.us Paul Sicard Sergeant Westwood PD 781-328-1054 psicard@westwoodpd.org William Scoble Fire Chief Westwood FD 781-320-1066 bscoble@townhall.westwood.ma.us Thomas Rebello District 5 Traffic Ops MassDOT Dist. 5 508-884-4247 thomas.rebello@state.ma.us Mark Ryan Dir. Public Works Norwood 781-760-8341 mryan@norwoodma.gov Tony Greeley Fire Chief Norwood 781-727-6236 tgreeley@norwoodma.gov Bill Brooks Police Chief Norwood PD 781-440-5150 wbrooks@norwoodma.gov Alex Duggan Engineer MassDOT 508-884-4396 alex.duggan@state.ma.us Steve Boudreau Engineer VAI 978-474-8800 sboudreau@rdva.com

Appendix C. Detailed Crash Data

Functional De.\if.:n /leport- Unh ersi~r Sftltion DeJ'e/opment- 1\'orwood, Ma\\aclul\etl\ 51 EVERErj McDONALDS 13,19,27,29 3G:;'i'. 8,9,15,24,30,33, 1 t ~9 ~1 8,42 _) ~ 21,39,52 /~ ~ 23 _;;;;---... ~ 21 0 38J-- 25 6 15,16 36_, :-n., 17 :=l 4~ l UNIVERSITYAVENUE BURGER KING 43l ll 11,31,49 r 4,15o CENTRAL DODGE JEEP CRASH TYPE Angle (A) Turning Movement (TM) s- Rear End (RE) Lone Change (LC) =--...7 Head On (HO) - - Out of Control (OC) ---'<JL-- 1 Fixed Object (FO)--o Pedest./Bicycle (P/B) Side Swipe (SS) 7 ~ Not Reported (U) -6 '\A.I Vanasse & Associates, Inc. Collision Diagram Everett Street/University Avenue and Route 1 ~ '5629' 66291J~(..21 d Ng. 8/1/2i)I.J. 12 45 42 Pt,l Copylght @ 2014 by VAl. All Rlghto R eerved.

Motor Vehicle Crashes Route 1 and Everett Street/University Avenue Crash # Crash Day and Date Crash Time Crash Type Severity R/S Weather Driver Contribution* Comments Manner of Collision Lighting #Vehicles Age of Driver 1 Age of Driver 2 1 Saturday, January 09, 2010 14:41 ANGLE/TURN.MVMT INJURY DRY CLEAR Confusion Malfuncitoning Light Angle DAYLIGHT 2 59 40 2 Thursday, January 28, 2010 6:44 ANGLE/TURN.MVMT NO INJURY DRY CLEAR Failure to Yield to oncoming traffic Left turn without right of way Angle DAYLIGHT 2 70 43 3 Tuesday, February 02, 2010 12:10 REAR-END NO INJURY DRY CLOUDY Malfunctioning brakes Rear-end DAYLIGHT 2 79 35 4 Thursday, February 04, 2010 11:15 REAR-END INJURY DRY CLEAR Inattention Rear-end DAYLIGHT 4 26 44/49/40 5 Wednesday, February 10, 2010 19:06 FIXED OBJECT NO INJURY SNOWY SNOW Struck Highway Sign Single Vehicle DARK, LIT. RD 1 34 -- 6 Tuesday, March 09, 2010 16:08 SIDESWIPE NO INJURY DRY CLEAR Illegal U-turn Sideswipe, same direction DAYLIGHT 2 18 52 7 Friday, March 19, 2010 6:03 ANGLE/TURN.MVMT INJURY DRY CLEAR Failure to Yield to oncoming traffic Left turn without right of way Angle DAWN 2 57 39 8 Sunday, May 02, 2010 15:17 REAR-END NO INJURY DRY CLEAR Following too close Rear-end DAYLIGHT 3 25 68 9 Saturday, May 15, 2010 15:25 REAR-END NO INJURY DRY CLEAR Following too close Rear-end DAYLIGHT 2 18 20 10 Monday, May 31, 2010 18:25 ANGLE/TURN.MVMT INJURY DRY CLEAR Failure to Yield to oncoming traffic Left turn without right of way Angle DAYLIGHT 2 17 38 11 Thursday, June 03, 2010 13:20 REAR-END NO INJURY DRY CLEAR Foot slipped on brake Rear-end DAYLIGHT 2 26 49/50 12 Thursday, June 24, 2010 12:05 ANGLE/TURN.MVMT NO INJURY DRY CLEAR Failure to Yield to oncoming traffic Illegal left turn from McDonalds Angle DAYLIGHT 2 30 18 13 Thursday, August 05, 2010 17:03 REAR-END NO INJURY WET RAIN Slippery Conditions Rear-end DAYLIGHT 3 24 33/61 14 Wednesday, August 18, 2010 13:43 ANGLE/TURN.MVMT NO INJURY DRY CLEAR Failure to Yield to oncoming traffic Illegal left turn from McDonalds Angle DAYLIGHT 2 20 69 15 Tuesday, August 24, 2010 17:52 ANGLE NO INJURY WET RAIN Blocked Vision Left turn into Burger King Angle DAYLIGHT 2 22 47 15a Saturday, September 18, 2010 14:46 REAR-END NO INJURY DRY CLEAR Left turn without right of way DAYLIGHT 4 39 58 16 Friday, September 24, 2010 7:15 ANGLE NO INJURY DRY CLEAR Failure to Yield to oncoming traffic Both turning to the same place from opposite directions Angle DAYLIGHT 2 33 70 17 Thursday, September 30, 2010 12:48 ANGLE/TURN.MVMT NO INJURY DRY CLOUDY Right turn/left turn conflict Angle DAYLIGHT 2 62 47 18 Saturday, October 09, 2010 16:36 SIDESWIPE NO INJURY DRY CLEAR Unsafe lane change Sideswipe, same direction DAYLIGHT 2 74 32 19 Saturday, October 16, 2010 16:36 REAR-END INJURY DRY CLEAR Driver Inattention Left turn without right of way Rear-end DAYLIGHT 3 35 27/38 20 Monday, October 25, 2010 16:42 ANGLE/TURN.MVMT INJURY DRY CLEAR Failure to Yield to oncoming traffic Angle DAYLIGHT 2 56 17 21 Friday, October 29, 2010 17:37 SIDESWIPE NO INJURY DRY CLEAR Inattention/ Unsafe lane change Sideswipe, same direction DAYLIGHT 2 38 28 22 Sunday, October 31, 2010 4:35 FIXED OBJECT NO INJURY DRY CLEAR Struck Deer Left turn without right of way Single Vehicle DUSK, RD. NOT LIT 1 36 -- 23 Wednesday, November 17, 2010 17:43 ANGLE/TURN.MVMT NO INJURY OTHER UNKNOWN Failure to Yield to oncoming traffic Angle DARK, LIT. RD 2 61 25 24 Wednesday, November 17, 2010 8:20 REAR-END NO INJURY DRY CLEAR Inattention Rear-end DARK, LIT. RD 2 N/A N/A 25 Monday, April 04, 2011 18:29 ANGLE NO INJURY WET RAIN Failure to Yield to oncoming traffic Rolled through stop light Angle DAWN 2 34 45 26 Sunday, April 24, 2011 18:12 ANGLE/TURN.MVMT NO INJURY WET CLOUDY Failure to Yield to oncoming traffic Angle DUSK 2 24 36 27 Wednesday, May 04, 2011 16:51 REAR-END NO INJURY WET RAIN Following too closely Rear-end DAYLIGHT 3 66 46/45 28 Thursday, May 05, 2011 19:21 REAR-END INJURY WET RAIN Inattention Rear-end DAYLIGHT 2 41 51 29 Tuesday, May 17, 2011 7:51 REAR-END/TURN.MVNT INJURY DRY RAIN Rear-end DAYLIGHT 3 57 55/38 30 Wednesday, June 15, 2011 13:31 REAR-END NO INJURY DRY CLEAR Inattention Rear-end DAYLIGHT 2 71 N/A 31 Wednesday, July 06, 2011 7:40 REAR-END INJURY DRY CLEAR Inattention Rear-end DAYLIGHT 3 27 41/22 32 Monday, August 29, 2011 20:22 ANGLE/TURN.MVMT INJURY DRY CLEAR Failure to Yield Angle DARK, LIT. RD 2 53 32 33 Friday, September 09, 2011 20:40 REAR-END NO INJURY DRY CLEAR Uncareful pasideswipeing Rear-end DARK, LIT. RD 2 85 47 34 Friday, October 14, 2011 21:49 REAR-END INJURY WET RAIN Following too closely Rear-end DARK, LIT. RD 2 17 64 35 Tuesday, October 18, 2011 8:14 REAR-END NO INJURY DRY CLEAR Following too closely Left turn into Burger King Rear-end DAYLIGHT 2 30 37 36 Thursday, November 10, 2011 12:14 ANGLE/TURN.MVMT NO INJURY WET RAIN Failure to Yield Angle DAYLIGHT 2 23 64 37 Wednesday, December 07, 2011 16:46 REAR-END NO INJURY WET RAIN Inattention Left turn without right of way Rear-end DARK, LIT. RD 2 66 23 38 Wednesday, January 04, 2012 23:17 ANGLE/TURN.MVMT INJURY DRY CLEAR Failure to Yield Passing on right where prohibited Angle DARK, LIT. RD 2 25 58 39 Sunday, January 22, 2012 20:31 SIDESWIPE NO INJURY DRY CLEAR Driver did not signal turn, other car unable to stop Sideswipe DARK, LIT. RD 2 27 34 40 Tuesday, February 14, 2012 12:57 ANGLE/TURN.MVMT NO INJURY DRY CLEAR Illegal U-turn Angle DAYLIGHT 2 28 53 41 Thursday, March 08, 2012 13:05 REAR-END NO INJURY DRY CLEAR Inattention Rear-end DAYLIGHT 2 45 47 S:\Jobs\6629\rt1-eve-uni2 Formatted Table 8/21/2014

Motor Vehicle Crashes Route 1 and Everett Street/University Avenue Crash # Crash Day and Date Crash Time Crash Type Severity R/S Weather Driver Contribution* Comments Manner of Collision Lighting #Vehicles Age of Driver 1 Age of Driver 2 42 Tuesday, April 24, 2012 17:28 SIDESWIPE NO INJURY DRY CLOUDY Unsafe lane change Sideswipe, same DAYLIGHT 2 71 30 43 Friday, May 11, 2012 14:14 SIDESWIPE INJURY DRY CLOUDY Overturned and slid to aviod another vehicle's unsafe lane change Single vehicle crash DAYLIGHT 2 32 48 44 Saturday, May 12, 2012 8:11 REAR-END INJURY DRY CLEAR Inattention Sudden pedestrian conflict Rear-end DAYLIGHT 2 52 26 45 Friday, June 29, 2012 15:44 REAR-END NO INJURY DRY CLEAR Sudden stop because pedestrian was in the road U-turn vehicle avoided the accident Rear-end DAYLIGHT 2 54 28 46 Wednesday, July 04, 2012 14:21 ANGLE/TURN.MVMT INJURY DRY CLOUDY Sudden stop to avoid vehicle which made illegal Uturn Angle DAYLIGHT 2 23 39 47 Monday, August 13, 2012 17:45 REAR-END NO INJURY DRY CLEAR following too closely Sudden stop due to fire truck Rear-end DAYLIGHT 2 43 23 48 Friday, September 07, 2012 8:50 REAR-END NO INJURY DRY CLEAR Following too closely Rear-end DAYLIGHT 2 35 23 49 Wednesday, September 12, 2012 6:23 REAR-END NO INJURY DRY CLEAR following too closely Rear-end DAYLIGHT 3 26 53/22 50 Tuesday, September 25, 2012 7:08 REAR-END INJURY DRY CLEAR following too closely Rear-end DAYLIGHT 3 42 39 51 Saturday, December 08, 2012 17:08 REAR-END NO INJURY WET CLEAR Inattention Rear-end DARK, LIT. RD 5 85 39/51/50/42 Sideswipe, same 52 Friday, December 21, 2012 9:31 SIDESWIPE NO INJURY WET RAIN Cut off other driver direction DAYLIGHT 2 48 49 S:\Jobs\6629\rt1-eve-uni2 Formatted Table 8/21/2014

Count of Month Crashes by Month 16.00% 15.09% 14.00% 13.21% 13.21% 12.00% 10.00% 9.43% 7.55% 7.55% 7.55% 8.00% 5.66% 5.66% 5.66% 5.66% 6.00% 3.77% 4.00% 2.00% 0.00% JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Month Total Count of Day Crashes by Day 25.00% 20.00% 15.00% 15.09% 20.75% 16.98% 16.98% 13.21% 10.00% 9.43% 7.55% Total 5.00% 0.00% Day Monday Tuesday Wednesday Thursday Friday Saturday Sunday 45% 40% Crashes by Time of Day 38% 35% 30% 25% 20% 23% 19% 17% Series1 15% 10% 5% 0% 2% 2 6am 6 10am 10 2pm 2 6pm 6 10pm 10 2am 0% S:\Jobs\6629\rt1-eve-uni2 Charts 8/21/2014

Count of Crash Type Crash Type 50.00% 45.00% 40.00% 35.00% 30.00% 25.00% 20.00% 15.00% 10.00% 5.00% 0.00% 5.66% 28.30% 3.77% 47.17% 1.89% 13.21% Total Crash Type Count of Lighting 80.00% 70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% Lighting Lighting Conditions 73.58% 18.87% 3.77% 1.89% 1.89% DAYLIGHT DARK, LIT. RD DAWN DUSK, RD. NOT LIT DUSK Total Count of Weather Crash Weather 70.00% 66.04% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% Weather 18.87% 11.32% 1.89% 1.89% CLEAR CLOUDY RAIN SNOW UNKNOWN Total S:\Jobs\6629\rt1-eve-uni2 Charts 8/21/2014

Count of R/S 80.00% 70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% R/S Crash Road Surface 75.47% 20.75% 1.89% 1.89% DRY OTHER SNOWY WET Total 30% 25% 24% 24% Crash Driver Ages 20% 15% 15% 13% Series1 10% 7% 9% 7% 5% 2% 0% 15 19 20 29 30 39 40 49 50 59 60 69 70 79 80+ S:\Jobs\6629\rt1-eve-uni2 Charts 8/21/2014