1 ROAD SAFETY AUDIT Route 135 at Route 30 January 2016 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780

2 Road Safety Audit Route 135 at Route 30 -, MA Table of Contents Background... 1 Project Data... 1 Project Location and Description... 2 Road Safety Audit Observations and Potential Improvements... 6 Recommendations List of Appendices Appendix A. Appendix B. Appendix C. RSA Meeting Agenda RSA Audit Team Contact List Detailed Crash Data List of Figures Figure 1: Location Map... 5 Figure 2: Adjacent Land Use Map... 6 List of Tables Table 1. Participating Audit Team Members... 2 Table 2. Estimated Time Frame and Costs Breakdown Table 3. Potential Safety Enhancement Summary... 16

3 Road Safety Audit Route 135 at Route 30 -, MA Background The Federal Highway Administration (FHWA) defines a Road Safety Audit (RSA) as the formal safety examination of an existing or future road or intersection by an independent, multidisciplinary team. The purpose of an RSA is to identify potential safety issues and possible opportunities for safety improvements considering all roadway users. This RSA evaluates the intersection of South Street/Milk Street (Route 135) at East Main Street/West Main Street (Route 30)/Brigham Street, as shown in Figure 1. A safety audit was scheduled for this high crash intersection at the request of ficials. The intersection of South Street/Milk Street (Route 135) at East Main Street/West Main Street (Route 30)/Brigham Street, which is configured as a rotary intersection, was identified as a Highway Safety Improvement Program (HSIP) intersection for A key objective of the RSA is to identify both short-term and long-term safety improvements that can be made at the subject intersection and incorporated in potential improvements of this intersection. Project Data A Road Safety Audit was completed for the intersection of South Street/Milk Street (Route 135) at East Main Street/West Main Street (Route 30)/Brigham Street in the on November 19, The agenda for the RSA meeting held at the Forbes Municipal Building is provided in Appendix A of this report. As shown below in Table 1, the audit team consisted of a multidisciplinary team with representatives from state, regional and local agencies providing expertise in the engineering, planning, maintenance and emergency response fields. Contact information for the RSA attendees is provided in Appendix B of this report. Page 1

4 Road Safety Audit Route 135 at Route 30 -, MA Table 1. Participating Audit Team Members Audit Team Member Agency/Affiliation John Mastera MassDOT Traffic Safety Joe Frawley MassDOT District 3 Lola Campbell MassDOT District 3 Dan Daniska CMRPC James Robbins Planner Carl Balduf Engineer John Walden DPW Francisco Torres Dept. of Economic Development Alan Gordon Police Chief Keith Lermond Fire Department Brian Bush Planning Board Charles Diamond Planning Board Mark Silverberg Planning Board Bruce Tretter Bicycle and Pedestrian Advisory Committee Glenn McCleod Bicycle and Pedestrian Advisory Committee Ellen Gugel Bicycle and Pedestrian Advisory Committee Philip Viveiros McMahon Associates Allison Luff McMahon Associates Within the invitation sent on October 28, 2015 to each participant in the RSA, background material was provided. This information included a collision diagram and MassDOT crash data summary for the intersection. During the RSA meeting, these materials were reviewed as a group prior to the field visit to the intersection. During the RSA field visit, various safety issues were observed and identified. Following the RSA field visit, the team returned to discuss additional concerns and potential solutions for the existing safety issues. Project Location and Description Study Area Roadways As shown in Figure 1, South Street (Route 135) is a two-way, two-lane roadway that extends in a northsouth direction through the. South Street (Route 135) is classified as an urban minor arterial under jurisdiction. At the study area intersection, South Street provides two multi-use lanes entering the rotary. South Street is primarily abutted by commercial land uses adjacent to the study area. Sidewalk is provided on both sides of the roadway and no bicycle amenities are provided. Angled on-street parking is also provided on both sides of South Street. Milk Street (Route 135) is a two-way, two-lane roadway that extends in an east-west direction through the. Milk Street (Route 135) is classified as an urban minor arterial under jurisdiction. At the study area intersection, Milk Street is median-divided by the Arcade Page 2

5 Road Safety Audit Route 135 at Route 30 -, MA building plaza and a BP gas station, and is primarily abutted by commercial land uses adjacent to the study area. Sidewalks are provided on both sides of the roadway; no bicycle amenities are provided. Angle parking is provided on a portion of the Milk Street receiving lanes. Parallel on-street parking is provided on the left side of the Milk Street approach to the rotary. Milk Street provides a single lane into the rotary as well as an exclusive right turn lane to West Main Street. East Main Street (Route 30) is a two-way, two-lane roadway that extends in a north-south direction through the, extending to Route 9 to the north. East Main Street (Route 30) is classified as an urban minor arterial under jurisdiction. At the study area intersection, East Main Street provides a through lane into the rotary as well as an exclusive right turn lane to Milk Street. Sidewalks are provided on both sides of East Main Street and angle parking is provided on the western side of the roadway. Bicycle amenities are not provided. West Main Street (Route 30) is a two-way, two-lane roadway that extends in a north-south direction through the. West Main Street (Route 30) is classified as an urban minor arterial under jurisdiction. At the study area intersection, East Main Street provides a single lane into the rotary. Sidewalks and angle parking are provided on both sides of West Main Street. Bicycle amenities are not provided. Brigham Street is a two-way, two-lane roadway that extends in an east-west direction connecting to Bay State Commons. Brigham Street is classified as a local roadway under jurisdiction. At the study area intersection, East Main Street provides a single lane into the rotary. Sidewalk and angle parking are provided on both sides of West Main Street. Bicycle amenities are not provided. Study Area Intersections The unsignalized intersection of South Street/Milk Street (Route 135) at East Main Street/West Main Street (Route 30)/Brigham Street is a five-legged rotary in the center of the. The Brigham Street and Milk Street approaches are under stop control while the remaining three approaches on East Main Street, West Main Street, and South Street are under yield control. South Street approaches from the southeast and provides two lanes entering the rotary. Brigham Street enters from the east, East Main Street enters from the north, Milk Street enters from the west, and West Main Street enters from the south, each providing a single lane of access to the rotary. The rotary has two circulating lanes between South Street and the Milk Street receiving lane, while the remainder of the rotary provides a single circulating lane. There is no signing or striping provided for this lane utilization within the rotary. There are sidewalks and crosswalks available around the rotary as well as two pedestrian crosswalks within the rotary (one adjacent to West Main Street and one adjacent to Brigham Street), as seen in Figure 1. Crash Data Crash data was received from the Police Department for the years Based on this data, there were a total of 69 crashes reported from the beginning of 2012 through the end Page 3

6 Road Safety Audit Route 135 at Route 30 -, MA of 2014 at the intersection of South Street/Milk Street (Route 135) at East Main Street/West Main Street (Route 30)/Brigham Street. Of the 69 crashes that occurred in the time period reviewed, 22 crashes are angle collisions between rotary traffic and vehicles entering from East Main Street (Route 30) from the north. Overall, 54% of the crashes that occurred at this location were angle collisions. A total of seven crashes were sideswipe collisions with parked vehicles adjacent to the intersection. A total of eight crashes were the result of rear-end collisions at various locations within the rotary, one of which occurred as a pedestrian crossed at the marked crossing spanning the rotary adjacent to Brigham Street. The pedestrian was not struck. The most commonly reported driver contributing factors in the reported crashes were either failure to yield the right of way or inattention. A detailed crash diagram is provided in Appendix C. Page 4

7

8

9 Road Safety Audit Route 135 at Route 30 -, MA Road Safety Audit Observations and Potential Improvements During the RSA meeting prior to the field visit, a brief introduction of the RSA process and a summary of traffic volumes and crash information were presented to the audit participants. Following this brief presentation, the members of the audit team were asked to discuss the existing issues that may affect safety at the intersection of South Street/Milk Street (Route 135) at East Main Street/West Main Street (Route 30)/Brigham Street. The audit team then visited the site as a group, at which time observations of various safety concerns and deficiencies were identified and documented. Provided below is a list of the safety concerns that were identified during the RSA for each intersection and for the corridor as a whole and the potential enhancements identified during the RSA. Safety Issue #1: Parking Observations: There are angle parking spaces present in several locations within and adjacent to the rotary. During the RSA meeting, audit participants noted that the angle spaces in these areas are in conflict with traffic circulating through the rotary and adjacent roadways. The most notable areas of concern were the parking space within the rotary (adjacent to the Arcade building) and the parking spaces along South Street. The Arcade building is adjacent to six parking spaces on the Angle parking adjacent to the Arcade Building within the rotary western side of the rotary, as shown in Figure 2, and restricts the rotary at this point to a single circulating lane. The parking along South Street is also angled parking and is along a horizontal curve, creating a sight distance problem for vehicles exiting the rotary to see vehicles exiting parking spaces. Sight distance was also noted at the Milk Street approach to the rotary and is obstructed by the spaces in front of the Arcade building. Angle parking along South Street In a review of the crash data, seven crashes reported were the result of a vehicle colliding with a parked car adjacent to the rotary. Additionally, two crashes were specifically due to vehicles backing out of angle spaces on South Page 7

10 Road Safety Audit Route 135 at Route 30 -, MA Street. Audit team members discussed potential issues with property owners within the rotary and the elimination of parking. It was also noted that the parking adjacent to the rotary helps slow traffic this intersection. Additionally, it was discussed that there is a municipal parking lot on South Street adjacent to the rotary that team members believe is underutilized. Enhancements: Consider eliminating parking within the rotary to allow for a reduction in conflict points for vehicles circulating though the rotary. Consider converting existing parking on South Street and West Main Street to parallel parking to eliminate angle parking conflicts between backing vehicles and vehicles in the travel lane. The conversion to parallel parking may allow for right of way to add additional streetscape elements such as wider sidewalks or bike lanes. Consider converting the parking on South Street to reverse angle parking where vehicles reverse into the parking spaces and then are able to pull out head first when exiting parking spaces. It should be noted that the median on South Street should be extended with the implementation of this improvement to restrict vehicles from pulling into a parking space on the opposite side of the roadway. Have a formal parking utilization study prepared to determine the parking utilization for on-street parking spaces and the municipal parking lot to determine potential reallocation of parking in the downtown area. Safety Issue #2: Pedestrian/Bicycle Operations Observations: Audit team members discussed the existing pedestrian and bicycle facilities and operations around the rotary. There are crosswalk connections at each rotary approach as well as in two locations within the rotary. It was noted that recently, curb extensions were installed at the crosswalk spanning the rotary to the east of West Main Street as well as at the South Street crosswalk to help protect pedestrians crossing adjacent to the angled on-street parking. Crosswalk within the rotary at West Main Street Audit team members noted major conflicts with pedestrians at the crosswalk within the rotary adjacent to Brigham Street. At this location, traffic from South Street and traffic from Brigham Street are entering the rotary, and there are two lanes of traffic circulating through the rotary. Less frequent conflicts were also noted at the second crosswalk within the rotary, between West Main Street and South Street. Page 8

11 Road Safety Audit Route 135 at Route 30 -, MA The crosswalk spanning the Milk Street receiving lane was also discussed. Currently, traffic from East Main Street has an exclusive right turn lane with a large turning radius into this crossing. The crossing is also very long, extending through angle parking on the northern side of the roadway. At several crosswalks around the rotary, it was also noted that there pedestrian warning signage was missing. Additionally, it was noted that all of the crossings occur at the stop line entering the rotary where vehicles are mainly focused on vehicular traffic and available gaps in traffic to enter the rotary. Providing crossings at these locations may be an additional conflict. Bicycle operations were also discussed by audit team members as members from the Town Bicycle and Pedestrian Advisory Committee were present. It was noted that the rotary has little direction for cyclists and that there is not a clear message to motorists that they must share the road with cyclists through the rotary. Vehicle speeds were also discussed as a hazard to cyclists. Cyclist operations through the rotary It was also noted that the two lanes on Milk Street entering the rotary are separated by a striped island measuring approximately five feet in width. While the function of this island may be to delineate the right turning traffic and discourage right turning traffic to enter the rotary, it is not functioning effectively. The inclusion of this striped island creates a longer crossing for pedestrians, and the additional space could be used to more effectively promote and alternative mode of travel, such as a bicycle lane. Enhancements: Consider eliminating existing crosswalks within the rotary, requiring pedestrians to circulate around the rotary rather than through it to reduce pedestrian conflicts with vehicles. Alternatively, consider eliminating only the crosswalk within the rotary at Brigham Street to reduce conflicts between pedestrians and vehicles while still maintaining the crossing spanning the rotary adjacent to West Main Street to provide access to the center island. Consider adding additional curb extensions to shorten the crossings around the rotary. This will also act as a traffic calming measure to slow traffic within the rotary, further improving pedestrian safety. Consider providing appropriate pedestrian crossing signage at all pedestrian crossings around the rotary to provide a clear message to motorists that there are pedestrian crossings within the rotary. Page 9

12 Road Safety Audit Route 135 at Route 30 -, MA Consider providing supplemental Rectangular Rapid Flashing Beacons (RRFBs) at the crossings to alert motorists of a crossing pedestrian. Evaluate providing a pedestrian curb extension on the northern side of the Milk Street receiving lane to shorten the crossing for pedestrians and reduce the turning radius for the southbound right turn. Evaluate relocating the crosswalks on each approach leg back from the stop line to allow motorists to focus solely on the crosswalk before entering the rotary. Consider providing right turns yield to pedestrians signage to help protect pedestrians in the crosswalk within the rotary from West Main Street. Consider widening sidewalks adjacent to the rotary to further encourage pedestrian usage. Consider providing a sidewalk on the northern side of the Arcade Plaza (Milk Street) to provide a continuous walking path adjacent to the rotary. Evaluate providing sharrows within the rotary and on adjacent approaches and departure lanes to indicate to motorists and cyclists that the road is shared by both users. Sharrows may be most helpful on West Main Street adjacent to Town Hall, South Street adjacent to Cottage Street, Milk Street exiting the rotary, and East Main Street adjacent to Union Street. Consider eliminating the striped island on Milk Street entering the rotary and evaluate the addition of a bicycle lane to further protect cyclists entering the rotary. Safety Issue #3: Lane Designation Observations: Audit team members noted that there is currently a lack of lane designation through the rotary. The rotary is supposed to allow two circulating lanes from South Street to the Milk Street receiving lanes. The rightmost lane entering from South Street is not intended to continue though the rotary past Milk Street, but there is no signage or striping to indicate this. Audit team members noted that there have been conflicts involving drivers who are Existing lane utilization markings on South Street unaware that the second circulating lane ends at Milk Street as they continue through the southern portion of the rotary. The missing lane designation signage and striping may be a contributing factor in the number of angle collisions that occurred in the rotary as vehicles entering the rotary are unsure where to go and to which street circulating vehicles are intending to travel. Page 10

13 Road Safety Audit Route 135 at Route 30 -, MA It was also noted that the South Street approach is often used as three lanes entering the rotary as the rightmost lane provides enough width for right turning vehicles destined to Brigham Street to bypass the two through lanes. Enhancements: Considers adding lane striping within the rotary to provide guidance for where vehicles should travel. Consider adding lane utilization pavement markings at each approach in advance of the rotary to provide guidance on lane utilization. Consider providing lane utilization signage at each approach in advance of the rotary to provide supplemental guidance on lane utilization. Consider decreasing the lane width of Typical lane utilization markings that provide direction through a modern roundabout the rightmost lane at South Street to prohibit right turning vehicles from bypassing the through movement queue entering the rotary. Safety Issue #4: Signage Observations: It was noted by audit participants that there is insufficient rotary signage approaching the rotary as well as within the rotary. Due to the unique geometry of this rotary, it should be clearly marked that vehicles must circulate to the right. There is also outdated signage for the rotary, specifically on the southbound approach from East Main Street, that does not comply with current standards. It was also noted that there are a significant number of signs that may be unnecessary or not optimally placed around the rotary. Existing signage within the rotary It was also noted that while there is on-street parking widely available in the downtown area surrounding the rotary, there is no direction to the off-street municipal lot located on South Street. Page 11

14 Road Safety Audit Route 135 at Route 30 -, MA Enhancements: Reduce sign clutter to provide a clear, concise message to motorists. Consider updating any outdated signs with signs conforming to current standards to help provide a clear message to motorists. Consider providing larger rotary signage to indicate to all approaches that they are entering a rotary. Consider providing advanced W2-6 (Circular Intersection) warning signage in advance of the rotary to provide additional guidance to motorists as they approach the intersection. Consider providing supplemental chevron signage (R6-4) to guide motorists through the rotary. Evaluate wayfinding signage to the off-street parking lot to reduce the amount of onstreet parking conflicts downtown. Safety Issue #5: Vehicle Speeds Observations: Vehicle speeds were noted by audit team members to be a major issue contributing to the large volume of crashes that were recorded between the East Main Street approach and rotary traffic. Vehicles entering the rotary are often continuing through to West Main Street and do not yield to rotary traffic. Additionally, there is an issue with the high speeds at which vehicles travel East Main Street approach entering the rotary from the South Street approach to Milk Street, which was noted by audit participants as a contributing factor to the high number of crashes at this location. In a review of the crash data, 24 of the 69 crashes were angle collisions between the East Main Street approach and rotary traffic, and an additional three crashes were due to the operations of the southbound right turn. Enhancements: Consider providing advanced warning signage for the upcoming rotary to warn motorists to yield at the rotary. Page 12

15 Road Safety Audit Route 135 at Route 30 -, MA Consider providing rumble strips on East Main Street to alert motorists that they should be reducing speeds approaching the rotary. Evaluate relocating the existing yield sign on East Main Street back to increase visibility. Consider modifying the right turn radius from East Main Street to Milk Street to reduce the vehicle speeds of right turning vehicles. Safety Issue #6: Roadway Geometry Observations: The existing rotary has a unique geometry which differs from a modern roundabout. The center island is off-center and approaches to the rotary do not have the typical deflection that is required in a modern roundabout, which is particularly an issue for the southbound approach from East Main Street where there are no visual cues for motorists due to the lack of deflection. It was also discussed that vehicles use the southbound right turn lane from East Main Street to continue through into the rotary to avoid the queue in the correct lane. This causes additional conflicts and potential for sideswipe collisions as vehicle enter the rotary at this location. Enhancements: Evaluate retrofitting the existing rotary to comply with existing geometric standards for a roundabout, including the installation of truck aprons at target locations (such as the East Main Street median) to help formalize the rotary travel lane and reduce vehicle speeds. Consider providing a channelizing island for the right turn from East Main Street to Milk Street to restrict vehicles from continuing into the roundabout. Safety Issue #7: Traffic Control Observations: Audit participants noted that the traffic control entering the rotary is unique to a typical rotary. The Milk Street and Brigham Street approaches are stop controlled while the remaining approaches are yield controlled. This creates confusion on which approach has the right of way, particularly at the West Main Street/Milk Street approach. West Main Street is under yield control; however, both the Milk Street and West Main Street approaches operate as stop controlled approaches as they must alternate right of way to allow the Milk Street approach into the rotary at peak times. The West Main Street traffic also cannot see that Milk Street is stop controlled as the stop sign is obscured by a Do Not Enter sign. Union Street to the north of the rotary connects East Main Street to Bay State Commons. The intersection provides a right turn only from Union Street to East Main Street. However, vehicles are making left turns from this approach to access the rotary instead of using the signalized Bay State Commons driveway to the north or Brigham Street to the south. Page 13

16 Road Safety Audit Route 135 at Route 30 -, MA Enhancements: Update the signage at the Milk Street approach to allow the stop sign to be seen from the West Main Street approach to convey a clear message of appropriate traffic operations to motorists. Evaluate changing West Main Street to a stop controlled approach to allow improved operations on Milk Street and reduce confusion between the two approaches. Evaluate extending the median on East Main Street to continue past the Union Street intersection to provide a physical barrier to restrict left turns from Union Street. Safety Issue #8: Commuter Rail Bridge Operations Observations: Audit participants discussed the impacts on the rotary of the commuter rail bridge to the north on East Main Street. The bridge provides a 12-6 clearance that is commonly struck by vehicles that do not meet those height requirements. If the bridge is struck, traffic at the roundabout is impacted as vehicles are not able to travel this critical leg. Recently, mitigation was installed in the form of a laser detector system. The laser detectors are installed in advance of the crossing and illuminate signage for vehicles that do not meet height requirements. While it is difficult to determine the effectiveness of this countermeasure, the audit participants generally agree that it has been a benefit, but that additional countermeasures may help deter larger vehicles from using East Main Street. Enhancements: Consider providing a physical warning obstacle such as chains or bars in advance of the bridge to warn motorists exceeding the height limits of the bridge. Consider providing additional warning signage in advance of the bridge to warn drivers of the low bridge. Safety Issue #9: Traffic Operations Observations: Audit participants discussed issues with traffic congestion due to the operations of the traffic signal at the intersection of East Main Street and the Bay State Commons driveway during the weekday morning peak hour. Traffic queues from the intersection in the northbound direction extend back to the rotary, creating traffic congestions problems within the rotary. Enhancements: Evaluate traffic operations at the intersection of East Main Street and the Bay State Commons driveway to provide for improved traffic flow on East Main Street and reduce the likelihood of northbound vehicle queues impacting the rotary. Page 14

17 Road Safety Audit Route 135 at Route 30 -, MA Recommendations After the site visit, audit participants returned to discuss the safety issues and consider various improvements. The audit participants were encouraged to consider both short and long-term improvements for each of the existing safety issues. Each improvement considered has been categorized as short-term, mid-term, or long-term based on the definitions shown in Table 2. Additionally, a cost category has been assigned to each improvement based on the parameters set forth in Table 2. Table 2. Estimated Time Frame and Costs Breakdown Time Frame Costs Short-Term <1 Year Low <$10,000 Mid-Term 1-3 Years Medium $10,001-$50,000 Long-Term >3 Years High >$50,000 Summary of Road Safety Audit A summary of the potential recommendations discussed by the RSA audit team are summarized in Table 3. The recommendations are summarized based on the potential safety payoff, time frame, approximate cost and responsible agency. The safety payoff is a subjective judgment of the potential effectiveness of the safety recommendations listed below. Page 15

18 Road Safety Audit Route 135 at Route 30 -, MA Table 3. Potential Safety Enhancement Summary Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Parking Consider eliminating parking within the rotary High Short-Term Low Parking Parking Consider converting Parking on South Street to parallel parking Consider converting parking on South Street to reverse angle parking Cost High Mid-Term Low Medium Long-Term Medium Parking Conduct a formal parking utilization study Medium Short-Term Low Pedestrian/Bicycle Operations Pedestrian/Bicycle Operations Pedestrian/Bicycle Operations Pedestrian/Bicycle Operations Pedestrian/Bicycle Operations Pedestrian/Bicycle Operations Pedestrian/Bicycle Operations Pedestrian/Bicycle Operations Pedestrian/Bicycle Operations Pedestrian/Bicycle Operations Pedestrian/Bicycle Operations Consider eliminating existing crosswalks spanning rotary Consider adding additional curb extensions to shorten crossings around the rotary Consider eliminating crosswalk adjacent to Brigham Street in rotary Consider providing appropriate pedestrian crossing signage Consider providing RRFB signage at rotary crossings Evaluate providing a pedestrian curb extension on Milk Street Evaluate relocating crosswalks back from stop lines Consider providing right turns yield to pedestrians signage Consider widening sidewalks adjacent to the rotary Consider providing a sidewalk on the northern side of the Arcade Plaza Evaluate providing sharrows in the rotary and adjacent approaches and departure lanes High Mid-Term Low Low Long-Term Medium High Mid-Term Low Low Short-Term Low Medium Mid-Term Medium Low Long-Term Medium Low Mid-Term Medium Low Short-Term Low Low Long-Term High Low Long-Term High Low Short-Term Low Responsible Agency Page 16

19 Road Safety Audit Route 135 at Route 30 -, MA Safety Issue Pedestrian/Bicycle Operations Lane Designation Lane Designation Potential Safety Enhancement Consider eliminating the striped island on Milk street and consider adding a bike lane Consider adding lane designation striping within the rotary Consider adding lane utilization pavement markings Safety Payoff Time Frame Cost Low Short-Term Low High Short-Term Low Medium Short-Term Low Lane Designation Consider providing lane utilization signage Medium Short-Term Low Lane Designation Consider decreasing the lane width of the rightmost lane at the South Street approach Medium Mid-Term Medium Signage Reduce sign clutter Low Short-Term Low Signage Consider updating any outdated signs with signs conforming to current standards Low Short-Term Low Signage Consider providing larger rotary signage Low Short-Term Low Signage Consider providing advanced W2-6 (Circular Intersection) warning signage Low Short-Term Low Signage Consider providing rotary chevron signage Low Short-Term Low Signage Vehicle Speeds Vehicle Speeds Vehicle Speeds Vehicle Speeds Evaluate wayfinding signage to municipal parking lot Consider providing advanced warning signage for the upcoming rotary Consider providing rumble strips on East Main Street Evaluate relocating the existing yield sign on E. Main Street back Consider modifying right turn radius from E. Main Street to Milk Street Low Short-Term Low Low Short-Term Low Medium Mid-Term Medium Low Short-Term Low Medium Long-Term Medium Roadway Geometry Evaluate retrofitting roundabout High Long-Term High Responsible Agency Page 17

20 Road Safety Audit Route 135 at Route 30 -, MA Safety Issue Roadway Geometry Potential Safety Enhancement Consider providing a channelizing island for the right turn from E. Main Street to Milk Street Safety Payoff Time Frame Cost Medium Mid-Term Medium Traffic Control Replace signage at Milk Street approach Low Short-Term Low Traffic Control Traffic Control Commuter Rail Bridge Operations Commuter Rail Bridge Operations Traffic Operations Evaluate changing West Main Street to a stop controlled approach Evaluate extending median on E. Main Street past Union Street Consider providing a physical warning obstacle in advance of the bridge Low Short-Term Low Low Short-Term Low Low Short-Term Low Consider providing additional warning signage Medium Long-Term Medium Evaluate traffic operations at the intersection of East Main Street at the Bay State Commons driveway Low Mid-Term Low Responsible Agency Page 18

21 Road Safety Audit Route 135 at Route 30 -, MA Appendix A. RSA Meeting Agenda

22

23 Road Safety Audit Route 135 at Route 30 -, MA Appendix B. RSA Audit Team Contact List

24 Road Safety Audit Route 135 at Route 30 -, MA Date: November 19, 2015 Participating Audit Team Members Location: Forbes Municipal Building,, MA Audit Team Phone Agency/ Affiliation Address Members Number John Mastera MassDOT Traffic John Safety Joe Frawley MassDOT District 3 Joseph.Frawley@dot.state.ma.us Lola Campbell MassDOT District 3 Alolade.Campbell@dot.state.ma.us Dan Daniska CMRPC ddaniska@cmrpc.org James Robbins jrobbins@town.westborough.ma.us Planner Carl Balduf cbalduf@town.westborough.ma.us Engineer John Walden jwalden@town.westborough.ma.us DPW ftorres@town.westborough.ma.us Francisco Torres Dept. of Economic Development Alan Gordon agordon@town.westborough.ma.us Police Chief Keith Lermond klermond@town.westborough.ma.us Fire Department Brian Bush bbush@heritageprop.net Planning Board Charles Diamond Cdiamond61@gmail.com Planning Board Mark Silverberg marksilverberg@verizon.net Planning Board Bruce Tretter BPAC brucetretter@gmail.com Glenn McCleod BPAC gmccloed@town.westborough.ma.us Ellen Gugel BPAC emgugel@gmail.com Philip Viveiros McMahon Associates pviveiros@mcmahonassociates.com Allison Luff McMahon Associates aluff@mcmahonassociates.com

25 Road Safety Audit Route 135 at Route 30 -, MA Appendix C. Detailed Crash Data

26

27 Crash Data Summary Table Route 135 at Route 30 - Rotary,, MA 1/1/ /31/2014 Crash Crash Weather Diagram Date Crash Day Time of Day Manner of Collision Light Condition Condition Road Surface Driver Contributing Code Ages Comments Ref # m/d/y Type Type Type Type Type D1 D2 D3 PARKED MV PULLING FROM CURB, STRUCK BY SB MV. PARKED M V 1 1/7/12 Saturday 2:08 PM Angle Daylight Cloudy Dry Inattention FAILED TO YIELD TO SB MV. MV TRAVELLING IN ROTARY NB. WB MV ENTERING ROTARY 2 2/24/12 Friday 11:39 AM Head on Daylight Cloudy Wet Failed to yield right of way WITHOUT YIELDING TO ROTARY TRAFFIC, STRIKES MV IN ROTARY. 2 WB MVs APPROACHING ROTARY. MV2 STEPPED ON GAS INSTEAD 3 3/13/12 Tuesday 4:31 PM Rear-end Daylight Clear Dry Inattention OF BRAKE. MV2 REAR-ENDED MV1. MV1 AND MV2 TRAVELLING IN ROTARY PASSING BRIGHAM TURN OFF. MV1 STOPPING FOR PEDESTRIAN IN CROSSWALK. MV2 4 4/11/12 Wednesday 8:41 PM Rear-end Dark - lighted roadway Rain Wet Followed too closely FOLLOWED TOO CLOSE REAR ENDS MV1. MV1 SB ON SOUTH ST. MV2 BACKING OUT OF PARKING SPOT ONTO 5 4/20/12 Friday 11:48 AM Angle Daylight Clear Dry Visibility Obstructed SOUTH ST. MV2 STRIKES MV1 AS MV1 TRIES TO PASS. MV1 EXITING PARKING LOT TURNING LEFT (WB) ONTO SOUTH ST. MV2 TRAVELING EB ON SOUTH ST. MV1 VISION OBSTRUCTION, 6 7/3/12 Tuesday 7:49 AM Angle Daylight Clear Dry Failed to yield right of way STRIKES MV2 WHILE PULLING OUT OF LOT. MV2 AND MV3 SB ON MILK ST STOPPED WAITING TO ENTER ROTARY. MV1, ALSO SB, FAILED TO STOP, REAR-ENDING MV2 7 9/4/12 Tuesday 4:38 PM Rear-end Daylight Rain Wet Inattention WHICH REAR-ENDS MV3. MV1 NB IN ROTARY. MV2 WB ON E. MAIN ST. MV2 FAILED TO YIEL D 8 10/7/12 Sunday 2:36 PM Angle Daylight Cloudy Dry Failed to yield right of way TO ROTARY TRAFFIC, STRIKES MV1. MV1 IN ROTARY EXITING AT MILK ST. MV2 WB ENTERING ROTARY 9 11/13/12 Tuesday 8:36 PM Angle Dark - lighted roadway Clear Dry Failed to yield right of way FROM E. MAIN ST. MV2 FAILED TO YIELD TO ROTARY TRAFFIC, MV TRAVELLING EB STRAIGHT INTO ROTARY. FAILED TO KEEP 10 11/15/12 Thursday 1:45 AM Single Vehicle Crash Dark - lighted roadway Clear Dry Inattention 75 RIGHT OF TRAFFIC CIRCLE /28/12 Friday 2:06 PM Unknown Daylight Clear Dry Unknown 62 PARKED MV, DAMAGE TO DRIVER'S SIDE DOOR. MV1 NB IN ROTARY TOWARDS RTE 135. MV2 ENTERING ROTARY 12 12/30/12 Sunday 6:45 PM Angle Dark - lighted roadway Cloudy Wet Failed to yield right of way FROM E MAIN ST, FAILED TO YIELD TO ROTARY TRAFFIC STRIKING MV1 AND MV2 ENTERING ROTARY FROM E MAIN ST. MV1 YIELDED 13 1/2/13 Wednesday 6:36 PM Rear-end Dark - lighted roadway Clear Dry Inattention TO ROTARY TRAFFIC, MV2 FAILED TO STOP, REAR-ENDING MV1. TRAVELLING FROM ROTARY ONTO SOUTH ST. MV1 DID NOT NOTICE 14 1/20/13 Sunday 10:24 AM Angle Daylight Clear Dry Visibility Obstructed MV /23/13 Wednesday 12:38 PM Sideswipe, same direction Daylight Clear Dry Unknown UNK MV1 SB ON MILK ST, SIDESWIPED PARKED MV MV2 TURNING FROM MILK ST ONTO W MAIN ST. MV1 TRAVELLING 16 2/10/13 Sunday 8:38 AM Angle Daylight Snow Snow Unknown THROUGH ROTARY, STRIKES MV2. POOR VISIBILITY FROM SNOW MV1 TRAVELLING THROUGH ROTARY ONTO MILK ST, NB. MV2 TRAVELLING WB ON E MAIN ST, ENTERING ROTARY. MV2 FAILED T O 17 3/9/13 Saturday 9:57 PM Angle Dark - lighted roadway Clear Wet Failed to yield right of way YIELD RIGHT OF WAY, STRIKING MV1. HEAVY TRAFFIC WHILE MV2 DID NOT PAY ATTENTION, REAR-ENDED 18 3/12/13 Tuesday 6:20 PM Rear-end Dusk Rain Wet Inattention MV1. Operating Vehicle in erratic, reckless, careless, negligent, or aggressive MV TRAVELLING NB ON W MAIN ST TOWARDS ROTARY. MV DRIVES 19 3/18/13 Monday 4:30 AM Single Vehicle Crash Dark - lighted roadway Clear Dry manner 60 STRAIGHT INTO ROTARY. OUI MV1 IN ROTARY NB EXITING AT MILK ST. MV2 ENTERING ROTARY FROM E MAIN ST. MV2 FAILED TO YIELD RIGHT TO ROTARY TRAFFIC, 20 4/9/13 Tuesday 1:32 PM Angle Daylight Clear Dry Failed to yield right of way STRIKING MV1 Disregarded traffic signs, signals, road MV1 IN PARKING SPACE ON W MAIN ST. MV2 WB ON W MAIN ST, 21 5/18/13 Saturday 4:24 PM Angle Daylight Clear Dry markings LEFT TURN TO PARK NEXT TO MV1, CRASHED INTO MV1. Operating Vehicle in erratic, reckless, careless, negligent, or aggressiv e MV1 WEST ON MILK ST, MV2 EAST ON MILK ST. MV1 CROSSED 22 6/7/13 Friday 10:56 PM Head on Dark - lighted roadway Rain Wet manner CENTER YELLOW, HEAD-ON WITH MV2. MV1 EXITING ROTARY ONTO MILK ST. MV2 FAILED TO STO P 23 8/1/13 Thursday 3:05 PM Sideswipe, same direction Daylight Rain Wet Inattention RESULTING IN CRASH. MV1 TRAVELLING IN ROTARY ATTEMPTING RIGHT TURN ONTO BRIGHAM ST. MV2 TRAVELLING IN ROTARY TRAVELLING STRAIGHT. 24 8/7/13 Wednesday 1:37 PM Angle Daylight Other Dry Failed to yield right of way MV1 FAILED TO YIELD RIGHT OF WAY TO MV2. MV1 ENTERING ROTARY FROM SOUTH ST. MV2 TRAVELLING I N 25 8/15/13 Thursday 3:49 PM Angle Daylight Clear Dry Failed to yield right of way ROTARY FROM MILK ST. MV1 FAILED TO YIELD RIGHT OF WAY TO 26 9/4/13 Wednesday 8:45 PM Single Vehicle Crash Daylight Clear Dry Other improper action 58 SIGN /1/13 Tuesday 6:56 PM Angle Dark - lighted roadway Clear Dry Inattention 44 MV1 EB ON W MAIN ST. MV1 STRUCK MV2 WHICH WAS PARKED.

28 Crash Diagram Ref # Crash Data Summary Table Route 135 at Route 30 - Rotary,, MA 1/1/ /31/2014 Crash Weather Date Crash Day Time of Day Manner of Collision Light Condition Condition Road Surface Driver Contributing Code Ages Comments m/d/y Type Type Type Type Type D1 D2 D3 MV1 IN PARKING SPACE ON MILK ST. MV2 TURN IN FRONT OF MV1 INTO PARKING LOT, TOO SHARP OF TURN. MV1 NB THROUGH ROTARY. MV2 ENTERING ROTARY FROM E MAIN ST, FAILED TO YIELD RIGHT OF WAY, STRIKES MV /25/13 Friday 12:15 PM Angle Daylight Cloudy Dry Inattention /28/13 Monday 8:43 PM Angle Dark - lighted roadway Clear Dry Failed to yield right of way /7/13 Thursday 10:10 PM Head on Dark - lighted roadway Clear Dry Operating Vehicle in erratic, reckless, careless, negligent, or aggressive manner /22/13 Friday 6:11 AM Angle Dawn Rain Wet Inattention MV1 STRAGHT THROUGH ROTARY WHEN MV2 ENTERED ROTARY FROM WRONG DIRECTION FROM W MAIN ST. MV2 COLLIDED WITH MV1 HEAD ON MV1 SB IN ROTARY FROM E MAIN ST. MV2 ENTERING ROTARY FROM W MAIN ST, FAILED TO YIELD TO ROTARY TRAFFIC 31 11/16/13 Saturday 9:09 AM Angle Daylight Cloudy Dry Failed to yield right of way /19/13 Tuesday 5:52 AM Sideswipe, same direction Dawn Cloudy Dry Inattention 50 MV1 SB ON MILK ST, SIDESWIPED PARKED MV 33 11/19/13 Tuesday 1:51 PM Sideswipe, same direction Daylight Clear Dry No Improper Driving MV1 EB ON W MAIN ST, FAILED TO YIELD TO ROTARY TRAFFIC. MV1 AND MV2 TURNING RIGHT ONTO MILK ST FROM E MAIN ST. BOTH OPERATORS CLAIM TO OCCUPY TURN LANE. UNCLEAR OF RIGHT OF WAY 35 11/28/13 Thursday 8:58 AM Angle Daylight Clear Dry Failed to yield right of way /16/13 Monday 12:18 PM Angle Daylight Clear Wet Failed to yield right of way /27/13 Friday 11:28 AM Angle Daylight Cloudy Wet Failed to yield right of way /28/13 Saturday 9:27 AM Angle Daylight Clear Dry Failed to yield right of way /30/13 Monday 5:00 PM Angle Dark - lighted roadway Clear Dry Failed to yield right of way /8/14 Wednesday 12:57 PM Angle Daylight Cloudy Dry Inattention /8/14 Wednesday 6:03 PM Rear-end Dark - lighted roadway Clear Dry Inattention /14/14 Tuesday 5:35 PM Angle Dark - lighted roadway Rain Wet Failed to yield right of way /19/14 Sunday 1:05 PM Rear-end Daylight Other Wet Inattention /12/14 Wednesday 4:40 PM Angle Daylight Clear Dry Failed to yield right of way /14/14 Friday 12:01 PM Rear-end Daylight Clear Wet Followed too closely Dark - roadway not 46 2/20/14 Thursday 6:13 PM Rear-end lighted Clear Dry Failed to yield right of way MV1 IN ROTARY FROM E MAIN ST TO W MAIN ST. MV2 ENTERED ROTARY FROM MILK ST AFTER STOP, FAILED TO YIELD RIGHT OF MV1 IN ROTARY. MV2 WB ON E MAIN ST. MV2 FAILED TO YIELD WHEN ENTERING ROTARY MV1 ENTERING ROTARY FROM W MAIN ST. MV2 IN ROTARY FROM E MAIN ST. MV1 FAILED TO YIELD RIGHT OF WAY TO ROTARY TRAFFIC MV1 NB IN ROTARY TOWARDS RTE 135. MV2 ENTERING ROTARY FROM E MAIN ST, FAILED TO YIELD TO ROTARY TRAFFIC STRIKING MV1 IN ROTARY NB TOWARDS MILK ST. MV2 ENTERED ROTARY FROM RIGHT TURN ONLY LANE, FAILED TO YIELD RIGHT OF WAY MV1 TRAVELLING THROUGH ROTARY ONTO MILK ST, MV1 FAILED TO YIELD RIGHT OF WAY FROM E MAIN ST. MV1 MAKING LEFT TURN OUT OF PARKING LOT. MV1 FAILED TO YIELD TO ONCOMING TRAFFIC AND COLLIDED WITH MV2 TRAVELLING SB ON SOUTH ST. MV1 AND MV2 SB ON MILK ST. APPROACHING W MAIN ST, MV2 FAILED TO STOP BEHIND MV1. REACHING FOR SUNGLASSES, TOOK EYES OFF ROAD, REAR-ENDED MV1. MV1 APPROACHING ROTARY FROM E MAIN ST. MV2 IN ROTARY EXITING AT MILK ST. MV1 FAILED TO YIELD TO ROTARY TRAFFIC. MV1 EB ONTO E MAIN ST SLOWED FOR TRAFFIC. MV2 DID NOT SLOW FOR TRAFFIC FOLLOWING MV1, REAR-ENDED MV1. MV1 IN ROTARY. MV2 WB ON E MAIN ST. MV2 FAILED TO YIELD WHEN ENTERING ROTARY 47 2/22/14 Saturday 7:30 PM Angle Dark - lighted roadway Cloudy Dry Inattention MV1 DID NOT SEE MV2 IN ROTARY FROM E MAIN ST MV1 AND MV2 WB ON E MAIN ST TURNING NB ONTO MILK ST. MV1 48 3/13/14 Thursday 4:29 PM Rear-end Daylight Clear Dry Followed too closely STOPPED TO LET OUT PASSENGER AND WAS STRUCK BY MV2 49 4/29/14 Tuesday 6:45 PM Unknown Unknown Cloudy Dry Inattention MV1 THROUGH ROTARY STRUCK BY MV2 FROM E MAIN ST. MV2 "MV IN RIGHT LANE CUT HER OFF/DISTRACTED. DIDN'T NOTICE MV1" 50 5/8/14 Thursday 8:36 AM Unknown Daylight Clear Dry Inattention MV1 THROUGH ROTARY, MV2 MADE RIGHT TURN IN FRONT OF MV1. MV2 CLAIMS RIGHT TURN ONTO BRIGHAM, MV1 HIT MV2 ON BACK 51 5/25/14 Sunday 2:52 PM Angle Daylight Clear Dry Inattention MV1 FROM ROTARY TOWARDS 135 WB. MV2 FROM 30 WB INTO ROTARY. MV2 DID NOT YIELD RIGHT OF WAY TO ROTARY TRAFFIC. 52 6/6/14 Friday 12:41 PM Rear-end Daylight Clear Dry Unknown MV1 WAS SLOWING FOR ROTARY TRAFFIC AS IT ENTERED MILK FROM E MAIN. MV2 REAR-ENDED MV /13/14 Friday 9:07 AM Angle Daylight Rain Wet Failed to yield right of way MV1TURNED LEFT FROM GROVE TO MILK. MV2 SB ON MILK TOWARDS ROTARY. MV1 DID NOT SEE MV /17/14 Tuesday 12:02 PM Head on Daylight Clear Dry Illness MV1 "WHITED OUT" WITH NOT MEMORY. MV1 ON SOUTH ST TOWARDS ROTARY. MV2 ON E MAIN ST TOWARDS ROTARY SAW MV1 AT HIGH RATE OF SPEED. 55 6/28/14 Saturday 1:07 PM Angle Daylight Clear Dry Inattention MV1 ENTERING MILK FROM ROTARY. MV2 ENTERING ROTARY CAUSED COLLISION DUE TO NOT YIELDING TO TRAFFIC

29 Crash Diagram Ref # Crash Data Summary Table Route 135 at Route 30 - Rotary,, MA 1/1/ /31/2014 Crash Weather Date Crash Day Time of Day Manner of Collision Light Condition Condition Road Surface Driver Contributing Code Ages Comments m/d/y Type Type Type Type Type D1 D2 D3 MV1 STOPPED AT MILK ST BEFORE ROTARY. MV2 FAILED TO STOP, REAR-ENDED V1 MV1 AROUND ROTARY, MV2 FAILED TO YIELD FROM E MAIN ST. MV2 DID NOT NOTICE MV1 IN ROTARY. MV (TTU) AROUND ROTARY DROVE OVER GRASSY AREA SIDE- SWIPING A TRAFFIC SIGN 56 6/29/14 Sunday 2:03 PM Rear-end Daylight Clear Dry Inattention /25/14 Friday 1:45 PM Unknown Daylight Clear Dry Inattention /29/14 Tuesday 2:25 PM Single Vehicle Crash Daylight Cloudy Dry Failure to keep in proper lane or running /30/14 Wednesday 1:50 PM Angle Daylight Clear Dry Inattention MV1 SB ON MILK. MV2 EXIT GAS STATION. MV2 DID NOT SEE MV1. MV1 AND MV2 NB ON SOUTH TOWARDS ROTARY. MV1 SLOWING 60 9/9/14 Tuesday 8:17 AM Rear-end Daylight Clear Dry Inattention FOR TRAFFIC AND MV2 REAR-ENDED MV1. MV1 STRAIGHT THROUGH ROTARY. MV2 FAILED TO YIELD FROM 61 9/17/14 Wednesday 12:41 PM Unknown Daylight Clear Dry Inattention MILK INTO ROTARY. MV1 IN ROTARY TOWARDS RTE 135. MV2 WB ON RTE 30. MV2 FAILED 62 10/2/14 Thursday 8:39 AM Angle Daylight Rain Wet Failed to yield right of way TO YIELD TO ROTARY TRAFFIC. MV1 WB ON E MAIN ST ENTERING ROTARY. MV2 IN ROTARY TRAFFIC 63 10/16/14 Thursday 5:58 PM Angle Daylight Rain Wet Failed to yield right of way EXITING AT MILK. MV1 FAILED TO YIELD TO ROTARY TRAFFIC V1 AROUND ROTARY MV2 ENTERING ROTARY FROM SOUTH ST, FAILED TO YIELD TO ROTARY TRAFFIC 64 11/3/14 Monday 10:46 AM Unknown Daylight Clear Dry Inattention /6/14 Thursday 8:10 PM Angle Dark - lighted roadway Rain Wet Failed to yield right of way /26/14 Wednesday 4:33 PM Angle Dark - lighted roadway Snow Snow Failed to yield right of way /9/14 Tuesday 11:42 AM Rear-end Daylight Rain Wet Inattention /9/14 Tuesday 6:17 PM Angle Dark - lighted roadway Rain Wet Failed to yield right of way 33 UNK 69 12/18/14 Thursday 1:28 PM Angle Daylight Cloudy Dry Inattention Summary based on Crash Reports obtained from the Local Police MV1 WB ON E MAIN ST ENTERING ROTARY. MV2 IN ROTARY TRAFFIC EXITING AT MILK. MV1 FAILED TO YIELD TO ROTARY TRAFFIC MV1 STRAIGHT ON RTE 30 ENTERED ROTARY WITHOUT YIELDING TO MV2 WHO WAS EXITING ROTARY AT MILK ST. MV1 AND MV2 APPROACHING ROTARY FROM W MAIN ST. MV1 SLOWING FOR ROTARY TRAFFIC, MV2 FAILED TO STOP, REAR- MV1 WB ENTERING ROTARY FROM E MAIN ST. MV2 IN ROTARY, STRUCK BY MV1. MV1 WB ON E MAIN ST ENTERING ROTARY. MV2 IN ROTARY TRAFFIC EXITING AT MILK. MV1 DID NOT SEE MV2 AND ENTERED ROTARY STRIKING MV2

30

31

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015 ROAD SAFETY AUDIT Route 114 at Interstate I-495 Northbound Ramps City of Lawrence July 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street,

More information

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT ROAD SAFETY AUDIT Route 16 at Interstate 395 Town of Webster October 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT ROAD SAFETY AUDIT State Road (Route 6) Corridor Town of Dartmouth March 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT ROAD SAFETY AUDIT East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton May 11, 2016 Prepared For: MassDOT Prepared By: 101 Walnut Street Watertown, MA Road Safety Audit

More information

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...

More information

ROAD SAFETY AUDIT. Santilli Circle and Sweetser Circle. Municipality of Everett. March 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. Santilli Circle and Sweetser Circle. Municipality of Everett. March 10, Prepared For: MassDOT ROAD SAFETY AUDIT Santilli Circle and Sweetser Circle Municipality of Everett Prepared For: MassDOT On Behalf Of: WYNN Design and Development Prepared By: AECOM 250 Apollo Drive Chelmsford, MA Road Safety

More information

ROAD SAFETY AUDIT. Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke

ROAD SAFETY AUDIT. Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke ROAD SAFETY AUDIT Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke April 29, 2016 Prepared For: MassDOT Highway Division

More information

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT County Street at Hart Street City of Taunton January 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street, 4 th Floor Boston,

More information

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville.

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville. ROAD SAFETY AUDIT South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville March 15, 2018 Prepared For: MassDOT On Behalf Of: Town of Plainville Prepared By: BETA

More information

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Washington Street (Route 53) at Pleasant Street Town of Pembroke June 26, 2014 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data... 1

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT ROAD SAFETY AUDIT Centre Street (Route 123) at Plymouth Street Municipality of Brockton November, 2017 Prepared For: MassDOT On Behalf Of: City of Brockton Prepared By: Old Colony Planning Council 70 School

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

ROAD SAFETY AUDIT. Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby

ROAD SAFETY AUDIT. Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby ROAD SAFETY AUDIT Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby March 2013 Prepared for: Massachusetts Department of Transportation

More information

ROAD SAFETY AUDIT. West Central Street (Route 140) at Franklin Village Drive. Town of Franklin. February 03, 2016

ROAD SAFETY AUDIT. West Central Street (Route 140) at Franklin Village Drive. Town of Franklin. February 03, 2016 ROAD SAFETY AUDIT West Central Street (Route 140) at Franklin Village Drive Town of Franklin February 03, 2016 Prepared for: Massachusetts Department of Transportation Prepared by: Howard Stein Hudson

More information

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio Road Safety Audit Course Participant Guidebook August 22 & 23, 2017 Cleveland Avenue Columbus, Ohio 1 2 Table of Contents Executive Summary... 5 Cleveland Avenue City of Columbus... 6 Road Location Details...

More information

ROAD SAFETY AUDIT. Russell Street (Route 9) at North and South Maple Streets Town of Hadley. March 2014

ROAD SAFETY AUDIT. Russell Street (Route 9) at North and South Maple Streets Town of Hadley. March 2014 ROAD SAFETY AUDIT Russell Street (Route 9) at North and South Maple Streets Town of Hadley March 2014 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates

More information

ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of:

ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of: ROAD SAFETY AUDIT Neponset Street Rotary/Pendergast Circle Town of Norwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings LLC Prepared By: 35 New England Business Center Drive

More information

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY 4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after

More information

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT ROAD SAFETY AUDIT Route 38 from Route 62 to Woburn Town Line Town of Wilmington April 10, 2017 Prepared For: MassDOT Prepared By: Green International Affiliates, Inc. 239 Littleton Road, Suite 3, Westford,

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

ROAD SAFETY AUDIT. Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road. Town of Tewksbury. April 5, Prepared For: MassDOT

ROAD SAFETY AUDIT. Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road. Town of Tewksbury. April 5, Prepared For: MassDOT ROAD SAFETY AUDIT Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road Town of Tewksbury April 5, 2017 Prepared For: MassDOT Prepared By: HNTB Corporation 31 St. James Ave Boston, MA

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

ROAD SAFETY AUDIT. Water Street (Route 129) at Vernon Street. Town of Wakefield. September Prepared For: MassDOT

ROAD SAFETY AUDIT. Water Street (Route 129) at Vernon Street. Town of Wakefield. September Prepared For: MassDOT ROAD SAFETY AUDIT Water Street (Route 129) at Vernon Street September 2017 Prepared For: MassDOT Massachusetts Department of Transportation Prepared By: WorldTech Engineering Road Safety Audit Water Street

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

ROAD SAFETY AUDIT. Auburn Street at Southbridge Street (Route 12) Town of Auburn. March Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Auburn Street at Southbridge Street (Route 12) Town of Auburn. March Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT Auburn Street at Southbridge Street (Route 12) Town of Auburn March 2017 Prepared For: Massachusetts Department of Transportation Prepared By: Vanasse Hangen Brustlin, Inc Union Station

More information

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy MEMORANDUM Date: 9/13/2016 Re: Citywide Crosswalk Policy Foreword Through the s Circulation Element and Complete Streets Policy, it is the City s goal to promote walking trips and provide safe facilities

More information

Appendix A: Crosswalk Policy

Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer 8 Toolbox of Countermeasures and Their to Make Intersections Safer Introduction Studies included in the NCHRP 17-18 (3), Guidance for Implementation of the AASHTO Strategic Highway Safety Plan, as well

More information

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016 ROAD SAFETY AUDIT Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston November 1, 2016 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents

More information

ROAD SAFETY AUDIT. Route 2/Taylor Road/Piper Road. Town of Acton. March 4, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Route 2/Taylor Road/Piper Road. Town of Acton. March 4, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT Route 2/Taylor Road/Piper Road Town of Acton March 4, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Tetra Tech, Inc. One Grant Street Framingham, MA 01702

More information

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

C. Best Practice Pedestrian Treatment Toolbox

C. Best Practice Pedestrian Treatment Toolbox C. Best Practice Pedestrian Toolbox The Best Practice Pedestrian Toolbox presents the recommended tools in striping, signalization, signage, geometry and other categories for improving both uncontrolled

More information

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction

More information

ROAD SAFETY AUDIT. Providence Street (Route 122A) at McKeon Road/Millbury Street. City of Worcester. July 14, Prepared For: MassDOT

ROAD SAFETY AUDIT. Providence Street (Route 122A) at McKeon Road/Millbury Street. City of Worcester. July 14, Prepared For: MassDOT ROAD SAFETY AUDIT Providence Street (Route 122A) at McKeon Road/Millbury Street City of Worcester July 14, 2016 Prepared For: MassDOT Prepared By: Stantec Consulting Services, Inc. Burlington, Massachusetts

More information

Design Public Hearing MassDOT Project # February 19, 2015 Chatham Town Hall Annex 7:00 P.M.

Design Public Hearing MassDOT Project # February 19, 2015 Chatham Town Hall Annex 7:00 P.M. Design Public Hearing MassDOT Project #606596 February 19, 2015 Chatham Town Hall Annex 7:00 P.M. Overview Process to date Project goals Data collection results Existing conditions Alternative analysis

More information

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions This treatment provides a transition from two-way separated bike lanes to one-way

More information

Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program

Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program 40 Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program OVERVIEW The City of Ottawa Pedestrian Crossover (PXO) Program provides the basis for PXO implementation in Ottawa. The program s processes

More information

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford ROAD SAFETY AUDIT East Main Street (Route 16) at Medway Road (Route 109), East Main Street (Route 16) at Quarry Square Driveways, East Main Street (Route 16) at Beaver Street/ Fortune Boulevard Town of

More information

Alternative Traffic Calming Methods

Alternative Traffic Calming Methods Alternative Traffic Calming Methods In-street Pedestrian Crossing Sign Cost: approximately $300 per sign not including the installation cost Advantages of in-street pedestrian crossing signs 1. Typically

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE

More information

Everyone is a Pedestrian

Everyone is a Pedestrian Everyone is a Pedestrian Improving Pedestrian Safety in Texas Transportation and Trinity River Project Committee 26 May 2015 Everyone is a Pedestrian Federal Highway Administration [ FHWA ] Programs to

More information

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department ROAD SAFETY AUDIT Falmouth Road (Route 28)/Bearses Way Town of Barnstable May 2009 Prepared for: Massachusetts Highway Department Prepared by: Howard/Stein-Hudson Associates 38 Chauncy Street Boston, MA

More information

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE Virginia Supplement to the 2009 MUTCD Revision 1 Page TC-3-1 PART 3. MARKINGS CHAPTER 3A. GENERAL PAGE Section 3A.01 Functions and Limitations Section 3A.02 Standardization of Application Section 3A.03

More information

From Mile Zero to Target Zero the Dawson Creek Case Study

From Mile Zero to Target Zero the Dawson Creek Case Study From Mile Zero to Target Zero the Dawson Creek Case Study Raheem Dilgir, President, TranSafe Consulting Ltd. and Kevin Henderson, Manager of Planning and Development, City of Dawson Creek Paper prepared

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

Falmouth Road Safety Audit

Falmouth Road Safety Audit Falmouth Road Safety Audit Sandwich Road: Carriage Shop Road to Hatchville Road September 2011 Prepared by the Cape Cod Commission in cooperation with the Town of Falmouth and Massachusetts Department

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

ROUNDABOUTS/TRAFFIC CIRCLES

ROUNDABOUTS/TRAFFIC CIRCLES GENERAL 1. Description This standard identifies minimum requirements that shall be met for Roundabouts and Neighborhood Traffic Circles in the design and construction of elements for Arlington County Horizontal

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS

PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS WHY THEY WORK FOR PEDESTRIANS IF DESIGNED CORRECTLY Separated sidewalks direct peds to crosswalks Splitter island Slow speed exit Truck apron Crosswalk

More information

Modern Roundabouts: a guide for application

Modern Roundabouts: a guide for application Modern Roundabouts: a guide for application Kentucky Community Transportation Innovation Academy 2005 The contents of this booklet reflect the views of the authors who are responsible for the facts and

More information

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Memorandum. Sunday, July 13, Saturday, July 19, 2014 Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

City of Vallejo Traffic Calming Toolbox

City of Vallejo Traffic Calming Toolbox City of Vallejo Traffic Calming Toolbox June 1, 2013 Final Table of Contents Introduction... 1 Non-Physical Devices... 3 High-Visibility Crosswalk... 3 In Pavement Lighted Crosswalk... 4 Rapid Flashing

More information

ROAD SAFETY AUDIT. Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater. May 14, 2014

ROAD SAFETY AUDIT. Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater. May 14, 2014 ROAD SAFETY AUDIT Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater May 14, 2014 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents

More information

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA 02630 (508) 362-3828 Fax (508) 362-3136 2006 Transportation Safety Report Bourne: Otis Rotary Harwich: Route 137/Route 39 Orleans: Route

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Sarah Rocchi, Vice-President, Projects, Opus International Consultants (Main Presenter) Catherine Mohoruk,

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Access Management in the Vicinity of Intersections

Access Management in the Vicinity of Intersections Access Management in the Vicinity of Intersections FHWA-SA-10-002 Technical Summary Photo: Ralph Bentley (used with permission) 0 Access Management is: The design, implementation and management of entry

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

CITY OF SARATOGA SPRINGS PEDESTRIAN CROSSING TOOLBOX

CITY OF SARATOGA SPRINGS PEDESTRIAN CROSSING TOOLBOX CITY OF SARATOGA SPRINGS PEDESTRIAN CROSSING TOOLBOX This toolbox is to be used to guide pedestrian crossing improvements within the City of Saratoga Springs. Details for each crossing type are provided.

More information

Pedestrian Safety at Roundabouts

Pedestrian Safety at Roundabouts Countermeasure Strategies for Pedestrian Safety Pedestrian Safety at Roundabouts Hillary Isebrands Federal Highway Administration January 6, 2016 Today s Presentation Introduction and housekeeping Audio

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

ROAD SAFETY AUDIT. Route 1 at Route 123 Route 1 at Route 1A Route 1 at May Street Route 1A and Route 123. City of Attleboro, MA. September 15, 2015

ROAD SAFETY AUDIT. Route 1 at Route 123 Route 1 at Route 1A Route 1 at May Street Route 1A and Route 123. City of Attleboro, MA. September 15, 2015 ROAD SAFETY AUDIT Route 1 at Route 123 Route 1 at Route 1A Route 1 at May Street Route 1A and Route 123 City of Attleboro, MA September 15, 2015 Prepared For: MassDOT On Behalf Of: Prepared By: Fay, Spofford

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

ROAD SAFETY AUDIT MDM. Columbia Road at Dorchester Avenue. Dorchester, MA 10/14/2016. Prepared For: MassDOT. On Behalf Of: Edens

ROAD SAFETY AUDIT MDM. Columbia Road at Dorchester Avenue. Dorchester, MA 10/14/2016. Prepared For: MassDOT. On Behalf Of: Edens ROAD SAFETY AUDIT Columbia Road at Dorchester Avenue Dorchester, MA 10/14/2016 Prepared For: MassDOT On Behalf Of: Edens Prepared By: MDM Transportation Consultants, Inc. 28 Lord Road Suite 280 Marlborough,

More information

Multi-Modal Traffic Analysis. Parisi and Associates

Multi-Modal Traffic Analysis. Parisi and Associates Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table

More information

Safety at Unsignalized Intersections. Unsignalized Intersections

Safety at Unsignalized Intersections. Unsignalized Intersections Safety at FHWA Safety Focus Areas 2 National Statistics 3 National Statistics There were 41,059 highway fatalities in 2007. Where did they occur? Non-Intersections 79% About half of all crashes and half

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

CHAPTER 1 STANDARD PRACTICES

CHAPTER 1 STANDARD PRACTICES CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles

More information

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH) Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC

More information

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07 25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE

More information

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016 Designing for Pedestrian Safety Alabama Department of Transportation Pre-Construction Conference May 2016 1 Designing for Pedestrians Marking Crosswalks at Signalized intersections High Visibility Markings

More information

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation

More information

Gateway Signs. Description: Sign reminding drivers of the need to drive slowly Issues addressed: speeding Cautions/Limitations: Application:

Gateway Signs. Description: Sign reminding drivers of the need to drive slowly Issues addressed: speeding Cautions/Limitations: Application: Level 1 Limited Application Gateway Signs Description: Sign reminding drivers of the need to drive slowly Issues addressed: speeding Increased motorist awareness of the neighborhood character Provides

More information

ROAD SAFETY AUDIT. Route 1 at Everett Street & University Avenue. Town of Norwood. September Prepared For: On Behalf Of:

ROAD SAFETY AUDIT. Route 1 at Everett Street & University Avenue. Town of Norwood. September Prepared For: On Behalf Of: ROAD SAFETY AUDIT Route 1 at Everett Street & University Avenue Town of Norwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings LLC Prepared By: 35 New England Business Center

More information

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Mass Pike Interchange 6, I-291 and Burnett Road City of Chicopee November 4, 2013 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data...

More information

As the Toronto Transit Commission (TTC) operates a transit service on Avenue Road, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Avenue Road, City Council approval of this report is required. REPORT FOR ACTION Corridor Safety Review - Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

EMPHASIS AREA 1: PEDESTRIANS

EMPHASIS AREA 1: PEDESTRIANS EMPHASIS AREA 1: PEDESTRIANS A pedestrian is seriously injured or killed every 3 days on Toronto s roads. Pedestrian collisions involve any person that is not riding in a vehicle or on a bicycle. 26% OF

More information

DRAFT FOR DISCUSSION PURPOSED ONLY, 10/26/13 MOBILITY PLAN UPDATE DESIGN TOOLBOX

DRAFT FOR DISCUSSION PURPOSED ONLY, 10/26/13 MOBILITY PLAN UPDATE DESIGN TOOLBOX DRAFT FOR DISCUSSION PURPOSED ONLY, 10/26/13 MOBILITY PLAN UPDATE DESIGN TOOLBOX Tool #1: Bike Lane Portion of the roadway designated for preferential use by bicyclists. One-way facilities that typically

More information

Traffic Control and Accidents at Rural High-Speed Intersections

Traffic Control and Accidents at Rural High-Speed Intersections 14 TRANSPORTATION RESEARCH RECORD 1160 Traffic Control and Accidents at Rural High-Speed Intersections KENNETH R. AGENT ln many Instances, when rural high-speed highways are constructed, there are a number

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

US Hwy. 64/264 Pedestrian Crossing at the Little Bridge Alternatives Analysis Public Meeting

US Hwy. 64/264 Pedestrian Crossing at the Little Bridge Alternatives Analysis Public Meeting Town of Nags Head US Hwy. 64/264 Pedestrian Crossing at the Little Bridge Alternatives Analysis Public Meeting Prepared by: Department of Public Works August 8, 2013 Where traffic-control signals are not

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space DEFINITIONS Activity Area - that part of a TTC zone activity area where the work actually takes place. It consists of the work space, traffic space and one or more buffer spaces. Advance Warning Area -

More information

Chapter 5: Crossing the Street

Chapter 5: Crossing the Street Chapter 5: Crossing the Street Whether walking or bicycling, a student s journey to school will more than likely require crossing one or more streets. Per the Safe Routes to School Guide, maintained by

More information

ROAD SAFETY AUDIT. Route 2/Route 68 Interchange Rotary City of Gardner. August 3, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 2/Route 68 Interchange Rotary City of Gardner. August 3, Prepared For: MassDOT ROAD SAFETY AUDIT Route 2/Route 68 Interchange Rotary City of Gardner August 3, 2016 Prepared For: MassDOT Prepared By: Tetra Tech 100 Nickerson Avenue Marlborough, MA 01752 Road Safety Audit Route 2/Route

More information