STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

Similar documents
FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road.

Proposed Action, Purpose and Need Technical Memorandum

DRAFT INVESTMENT CORRIDORS

The Transportation Improvement Program

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Proposed Project I 35 from Denton to Cooke County Line

APPENDIX B: FUNDING MATRIX

2017 (FY 21,22,23) Ohio CMAQ Project Selection

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

LOOP 360 IMPROVEMENT STUDY

BICYCLE PUBLIC HEARING INTRODUCTION. Kathy Kleinschmidt, P.E. Bicycle and Pedestrian Coordinator Dallas District

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

GENERAL DESCRIPTION. Page 1 of 5

CHAPTER 1 INTRODUCTION

2016 MOBILITY BOND PROGRAM

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

2017 (FY 21,22,23) Ohio CMAQ Prioritization

Welcome to Laredo Metropolitan Transportation Plan First Public Meeting. February 27 th, :30 PM to 7:30 PM. We value your opinion!

Section 1 - North Lamar: Tech Ridge to US 183

Public Hearing Tarrant County. October 11 th, 2012

FY Regional Transportation Improvement Program

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Basalt Creek Transportation Refinement Plan Recommendations

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

MULTIMODAL NEEDS ASSESSMENT

Welcome to the Sellwood Bridge Project Open House!

BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM)

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

2012 PRIORITY TRANSPORTATION PROJECTS

Linking Transportation and Health in Nashville & Middle Tennessee

VIII. Project Prioritization & Implementation

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon

WALKABLE + BIKEABLE REGIONS TxAPA Conference Alex Carroll Andrew Pompei, AICP Kelly Porter, AICP

Bicycle and Pedestrian Plans and Improvements

183 North Mobility Project Community Survey Report

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

6/14/2013. Welcome. to the US 75 Corridor Study. Public Meeting. US 75 Corridor Study Area

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

FUNDING SOURCES CHAPTER 6

STUDY LOCATION February 26, 2015

Washington DC Section of ITE Project Briefing

Bus Rapid Transit Plans

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

I-10 AT SCENIC LOOP RD. Open House

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Chapter 5 Future Transportation

Clackamas County Comprehensive Plan

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATIONS FEBRUARY 2009 REVISIONS

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

A. LETTERS OF SUPPORT ON THE WYTHE CREEK ROAD WIDENING PROJECT

Alamo RMA VRF Project Update June 2016

Memorandum. Purpose: To update the MPO CTAC on the status of the LRTP scenario evaluation process.

AVAILABLE AVAILABILITY OVERVIEW

Complete Streets Training. Georgia Municipal Association June 27, 2016

Hennepin County Bicycle and Pedestrian Planning

Request for Authorization to Open Public Comment Period

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

connections 2040 the waco metropolitan transportation plan amendment 2

County of Fairfax, Virginia. Department of Transportation

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

Rio Mills Rd/Berkmar Dr Extended Connection

Annual Listing of Obligated MPO Projects

MINUTES FOR ADOPTION Bicycle Advisory Committee Teleconference Meeting 200 E. Riverside Drive, Austin TX, Classroom E May 1, 2015

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Project Description Form 8EE

TECHNICAL ADVISORY COMMITTEE MEETING Monday, March 26, 2018 University Park, Suite N. IH 35, Austin, Texas :00 p.m.

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

We believe the following comments and suggestions can help the department meet those goals.

ENERGY CORRIDOR DISTRICT UNIFIED TRANSPORTATION PLAN ACHIEVE MOBILITY THROUGH ENERGY

BICYCLE FACILITIES & PROGRAMS

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Bikeway Plan for the Roanoke Valley Area MPO Update ACKWOWLEDGEMENTS

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Developing a Regional Complete Streets Policy Statement for North Central Texas. Bicycle and Pedestrian Advisory Committee August 17, 2011

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

Managed Lanes: A National Perspective Managed Lane Strategies

North Central Texas Council of Governments

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Frequently Asked Questions

Transcription:

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions

CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District Engineer Texas Department of Transportation - Austin District PO Drawer 546 Austin, TX 7876 Subject: Approval of amendments to CAMPO s FY 008 0 Transportation Improvement Program (TIP) Dear Mr. Daigh: On October 8, 007, the CAMPO Policy Board adopted the amendments to the FYs 008 0 TIP. We are attaching four copies of the amendments to the TIP with this letter. We ask that the State Transportation Improvement Program be updated with the approved amendments. Finally, the Board approved amendments to the CAMPO Mobility 030 Plan, which will follow next week. Please call me at 974-644 or Art Zamorano at 974-748 if you have questions regarding the TIP amendments or Stevie Greathouse, 974-975, if you have questions regarding the Plan amendments. Sincerely, Michael R. Aulick Executive Director cc: Darcie Schipull, TxDOT - Austin District Tammy Stone, TxDOT - TPP Jose Campos, FHWA ( copies) 505 Barton Springs Road Suite 700 Austin Texas 78704 P.O. Box 088 Austin Texas 78767-088 5.974.75 (voice) 5.974.6385 (fax) campo@campotexas.org

CAMPO FY 008-0 TIP Amendments Adopted October 8, 007 3 4 5 6 7 A B C D E F G H I J K L Sponsor FY CSJ Project ID Project Name Project Limits Work Description Bike/Ped Funding Cat. Federal Non-Federal State Local Total Project Cost (New in Bold) Share A. TxDOT: Major Highway Projects TxDOT 0 05-09-036 Tx-83-3 US 83 (S) Springdale Rd. - N. of Boggy Creek (segment ) 0 06-0-080 Tx-83-3 Tx-83-4 Tx-83-5 Tx-83-0 009 04-0-053 Tx-90E-3 Tx-90E-4 Tx-90E-5 Tx-90E-6 00 03-08-060 Tx-90W- Tx-90W-3 Tx-90W-4 Tx-90W-5 US 83 (S) US 90 (E) US 90 (W) ("Y" at Oak Hill) N. of Boggy Creek - Patton Ave. (segment ) East of US 83 to east of FM 734 (Parmer Lane) West of Scenic Brook to east of Williamson Creek construction of initial phase consisting of 4 tolled mainlanes and 4 discontinuous, non-tolled access road lanes. Continuous non-tolled access will be maintained. construction of initial phase consisting of 4 tolled mainlanes and 4/6 discontinuous, non-tolled access road lanes. Continuous non-tolled access will be maintained. construction of 6 tolled mainlanes and 6 continuous, non-tolled access road lanes and multi-level interchange at US 83. Continuous nontolled access will be maintained. 009 00-06-004 Tx-45S- SH 45 (SW) Loop FM 66 construction of 4 tolled mainlanes and continuous non-tolled access road lanes. 0 0700-03-077 Tx-7W-4 Tx-7W-5 0 03-3-093 Tx-7E- Tx-7E-3 Tx-7E-4 Tx-7E-5 SH 7 (W) ("Y" at Oak Hill) SH 7 (E) US 90 W. to Silvermine West of Riverside - E. of Presidential Blvd. With ultimate project accommodation will be on wide outer lanes or shoulders on the access roads and pedestrians will be accommodated on With ultimate project accommodation will be on wide outer lanes or shoulders on the access roads and pedestrians will be accommodated on,7 Bicycle accommodation will be on wide outer lanes or shoulders on the access roads and pedestrians will be accommodated on With ultimate project construction of 6 tolled accommodation will be on wide mainlanes and 4 continuous, outer lanes or shoulders on the non-tolled access roads lanes. access roads and pedestrians Continuous non-tolled access will be accommodated on will be maintained. and construction of tolled direct connector bridges /from US 90 (W) and 4/6 continuous non-tolled access road lanes. construction of initial phase consisting of 4 tolled mainlanes and 4 discontinuous, non-tolled access road lanes. Continuous non-tolled access will be maintained. Bicycle accommodation will be on wide outer lanes or shoulders on the access roads and pedestrian accommodations will be through construction of sidewalks, where appropiate With ultimate project accommodation will be on wide outer lanes or shoulders on the access roads and pedestrians will be accommodated on With ultimate project accommodation will be on wide outer lanes or shoulders on the access roads and pedestrians will be accommodated on,,7,0,,7 0% Match of Federal Funding Texas Mobility Funds, Bonds, & other State funding Counties and Cities $ 8,440,000 $,0,000 $ 54,60,000 $ 6,849,000 $ 7,000,000 $ 8,400,800 $ 7,00,00 $ 83,399,000 $ 4,00,000 $ 33,000,000 $,000,000 $ 8,000,000 $ 364,000,000 $ - $ 504,000,000 $ 86,400,000 $,600,000 $ 68,000,000 $,000,000 $ 78,000,000 $ - $ - $ 76,000,000 $ - $ 76,000,000 $ 3,600,000 $ 8, $ 9, $ - $ 33,000,000 $ 56,000,000 $ 4,000,000 $ 83,000,000 $ - $ 53,000,000 TOTAL $ 33,840,800 $ 80,960,00 $,0, $,949,000 $,449,000,000

CAMPO FY 008-0 TIP Amendments Adopted October 8, 007 A B C D E F G H I J K L Sponsor FY CSJ Project ID Project Name Project Limits Work Description Bike/Ped (New in Bold) Funding Cat. Federal Non-Federal Share State Local Total Project Cost B. City of Pflugerville Projects 0% Match 008 094-04-95 PFL-0- Pflugerville Parkway Greenlawn Blvd to Great Basin Construct 4-lane Divided (Pfluger Lane / Pflugerville Avenue Roadway Loop) 3 4 City of Pflugerville (Carryover from FY 006-008 TIP) C. Capital Metro Projects Capital Metro (New Projects) 5 6 008 McNeil Park & Ride McNeil/Wells Branch & MoPac Replace/Expand/Add Park and Ride/Transit Facilities 008 Rails and Trails (Phase I) Highland Mall, Airport, & IH 35 Bicycle and Pedestrian access to facilities 008 South IH 35 Transit Center Slaughter & IH 35 Replace/Expand/Add Park and Ride/Transit Facilities 008 Bus purchase Capital Metro Service Area Purchase thirteen 40ft buses for expanded service 008 Rail Safety Project (Quad Gates) 008 Rail Access Roads (Signal Detection) 45th, 46th, 5st, 53rd, Koenig, Denson and Guadalupe access/frontage road crossings along 4th & IH-35, 4st & IH 35 and RM-60 Installation of quad-gate systems at 45th, 46th, 5st, 53rd, Koenig, Denson and Guadalupe Streets to improve safety at railroad crossings where Airport Blvd. Upgrade railroad signal detection systems at congested access/frontage road crossings along IH-35 and RM-60 for purposes of shortening traffic delays due to crossing trains. 009 South IH 35 Transit Center Slaughter & IH 35 Replace/Expand/Add Park and Ride/Transit Facilities 7 D. City of Austin Projects City of Austin 0 Barton Creek Bridge @ Mopac Loop 360 to Southwest Construct a separated bicycle (New Parkway bridge facility cantilevered to Regionally the existing Mopac bridge Significant) structures. E. TxDOT: Local-Funded, Regionally Significant Projects - Pass Through Financing & Stat Infrastructure Bank Capital Metro (New Projects) Williamson County A ten-foot wide off-street bike/pedestrian trail will be provided on the North side of the road and a six-foot sidewalk will be on the South side. 7 7,68,000,907,000 0 $9,535,000 facility projects 5307 960,000 40,000 0 $,00,000 facility projects 5309 3,600,000 900,000 0 $4,500,000 facility projects 5309 6,400,000,600,000 0 $8,000,000 facility projects 5309 4,6,6,500 0 $5,8,500 facility projects facility projects Anticipated FHWA TCSP funding 960,000 40,000 0 $,00,000 Anticipated FHWA TCSP funding 600,000 0 $7 facility projects 5309,400,000 600,000 0 $3,000,000 See Work Description. 008 05-04-063 Tx-83-4 US 83 (N) 83A - SH 9 Construct 4 lane divided Bike - wide outer lane or shoulder; Ped - to be determined with local Officials Local 0 4,000,000 $ 4,000,000 Pass Through Finance 0 8,009,90 $ 8,009,90

CAMPO FY 008-0 TIP Amendments Adopted October 8, 007 A B C D E F G H I J K L Sponsor FY CSJ Project ID Project Name Project Limits Work Description Bike/Ped Funding Cat. Federal Non-Federal State Local Total Project Cost (New in Bold) Share F. CAMPO 0% Match CAMPO 009 094-00-93 Air Quality Program Asst. CAMPO Area Salary, program design and evaluation, air quality research and data analysis 7 40,000 0,000 $ 009 094-00-904 Ozone Action Day CAMPO Area Supports regional voluntary initiatives among government, environmental, and business organizations as well as educational institutions in order to reduce ground-level ozone. 7 40,000 0,000 $ 009 094-00-905 Commute Solution CAMPO Area Planning and promotion of commute alternatives to reduce congestion & emissions including Commute Solutions website training 3 7 48,000,000 $ 60,000 009 094-00-906 Digital Aerial Photos CAMPO Area Contributes to the purchase of aerial photos in the five county 4 area 7 40,000 0,000 $ 009 094-00-93 Modeling Best Practices CAMPO Area Review of the 005 base year model: model steps, roles of 5 involved parties, etc 7 6,000 4,000 $ 0,000 009 094-00-94 Model Improvements CAMPO Area Implement necessary changes discovered during peer review process and continual updates from technological 6 improvements. 7 80,000 0,000 $ 00,000 009 094-00-96 Public Outreach Program CAMPO Area Improve public outreach and visualization throughout the 7 CAMPO region. 7 96,000 4,000 $ 0,000 FY 009 TOTAL 360,000 90,000 $ 4 8 9 0 CAMPO 00 094-00- 97 Congestion Management Process CAMPO Area Quantify levels of congestion, analyize critical corridors and tintersections 00 094-00-9 Air Quality Program Asst. CAMPO Area Salary, program design and evaluation, air quality research and data analysis 00 094-00-98 Commute Solution CAMPO Area Planning and promotion of commute alternatives to reduce congestion & emissions including Commute Solutions website training 00 094-00-99 Ozone Action Day CAMPO Area Supports regional voluntary initiatives among government, environmental, and business organizations as well as educational institutions in order to reduce ground-level ozone. 00 094-00-930 Travel Survey CAMPO Area External Station Survey 7,000 8,000 $ 40,000 7 40,000 0,000 $ 7 48,000,000 $ 60,000 7 40,000 0,000 $ 7 60,000 40,000 $ 00,000 FY 00 TOTAL 400,000 00,000 $ 500,000 JARC / New Freedom Capital Metro 008 Job Access Reverse Commute Program Austin Urbanized Area Various Projects and Programs Supporting FTA Job Access Reverse Commute Program. Projects TBD through competitive selection process overseen by CAMPO. (SAFETEA-LU, FY 006-009) Capital Metro 008 New Freedom Program Austin Urbanized Area Various Projects and Programs Supporting FTA New Freedom Program. Projects TBD through competitive selection process overseen by CAMPO. (SAFETEA-LU, FY 006-009) FTA 536,786,78 TBD 0 TBD FTA 537 877,789 TBD 0 TBD FY 008 TOTAL,664,570 0 0 $ -

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM TIP FY 008-0 TXDOT DISTRICTS - FY 008 FEDERAL SHARE STATE SHARE LOCAL SHARE OTHER PART TOTAL FUNDING ESTIMATED COST AUSTIN 008 TOTAL DISTRICT TOTAL STATE TOTAL

THURSDAY, NOVEMBER 0, 007 :0:3 AM STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM TIP FY 008-0 TXDOT AUSTIN DISTRICT FY 008 PAGE: OF 4 TXDOT DISTRICT: COUNTY: HIGHWAY NUM: CSJ: EST LETTING DATE: PHASE: DESCRIPTION: REMARKS: AUSTIN CALDWELL CITY: LIMITS FROM: LOCKHART AT HISTORIC JAIL IN CITY OF LOCKHAR VA LIMITS TO:. 094--07 MPO PROJECT NUM: 08/008 REVISION DATE: /007 C,E,R PROJECT SPONSOR: RESTORATION OF HISTORIC CALDWELL COUNTY JAIL OF 909 TXDOT AUSTIN DISTRICT FY 008 TOTAL: PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

THURSDAY, NOVEMBER 0, 007 :0:3 AM STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM TIP FY 008-0 TXDOT AUSTIN DISTRICT PAGE: 3 OF 4 TXDOT AUSTIN DISTRICT TOTAL: PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

THURSDAY, NOVEMBER 0, 007 :0:3 AM STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM TIP FY 008-0 PAGE: 4 OF 4 STATE TXDOT DISTRICT TOTAL: STATE TOTAL: