INSTALLATION, OPERATION & MAINTENANCE MANUAL

Similar documents
KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

BUTTERFLY VALVES Series 800

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

KENNEDY VALVE RESILIENT WEDGE GATE VALVE MAINTENANCE MANUAL

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

Section GATE VALVES

Installation, Operation and Maintenance Manual for Back Pressure Regulator

MUELLER. Xp, & Lineseal 350 Butterfly Valves

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

Installation & Operation Manual Proven Quality since 1892

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

Engineering Data Sheet

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

WKM Model 320F Floating Ball Valve

WHEATLEY Series 822/820 Swing Check Valve

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

INSTALLATION, OPERATION and MAINTENANCE MANUAL

INSTRUCTION MANUAL. Anchor Darling 800 Globe Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Team Insert Valve Sample Specification The Insert Valve shall conform to the following:

KTM V-PORT CONTROL BALL VALVES INSTALLATION AND OPERATION MANUAL

TITAN FLOW CONTROL, INC.

Operating instruction

WHEATLEY Series 500 Swing Check Valve

VALVES & MEASUREMENT

Manual Actuated Boiler Blowdown Valves

KECKLEY. Installation, Operation, and Maintenance Manual. Style KGV - Knife Gate Valve

LARGE R/W GATE VALVES

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

SECTION BUTTERFLY VALVES

RAIMONDI. 3-way globe valve for feedwater heater outlet bypass Installation and Maintenance Instructions

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

Installation, operation & maintenance manual - original version

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

WW-720. Pressure Reducing Control Valve

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

WW-730. Pressure Sustaining/Relief Control Valve

FLANGED TWO-PIECE BALL VALVES

ARGUS MODEL C PIG VALVE

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

Installation Instructions For Flat Seated Bolted Type RAH Series Disk Holders

WW-720. Pressure Reducing Control Valve

VALVE GLOBE CAM TS OF 11 DOC NO REV. NO DATE PAGE NO. maximum life. DESIGN CONDITION 1g of force in. property damage.

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

DelVal Flow Controls Private limited

FLANGED TWO-PIECE BALL VALVES

Sempell High Pressure Forged Check Valves Forged steel, swing check and tilting disc configuration

Installation Troubleshooting Maintenance Instructions Installation / Start-up

Armored Gauge O S & Y Bolted Bonnet Valves Series BB-100

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

1.0 - OPENING AND CLOSING THE DOOR

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012

Telefon (+45) Telefax (+45)

AWWA C504 COMPLIANT VALVES FROM 3 THRU 108

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

Installation, Operation, and Maintenance Manual

Nextech. Trunnion - Mounted Ball Valve. Installation and Operations Maintenance Manual

MUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

MEGR-1627 Instruction Manual

Eaton Filtration, LLC

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

KTM 50 (DN ) Installation, maintenance and operating instructions

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing

INSTALLATION / OPERATION / MAINTENANCE INSTRUCTION

FLANGED MULTI-PORT BALL VALVES

Model: 43T. Bermad Pressure Relief Valve

TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Hydraulic Piston Accumulators

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

PC3_ and PC4_ Pipeline Connectors

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

Type CT88 Backpressure Regulator

INDUSTRIAL VALVES MODELS: C62-A; C62-D. INSTRUCTION MANUAL Installation Operation Parts Service DIAPHRAGM BYPASS PRESSURE REGULATING VALVES

4 IN. BALL LAUNCHER Engine Mounted / PTO Driven

6500 KNIFE GATE VALVES

1200B2 Series Service Regulators. Instruction Manual

SEries 29 Hydrant valves installation, operation & maintenance manual

Sterile Visual Flow Indicator

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

HIGH RATE BASKET STRAINER

COSASCO 3600 PSI SINGLE SERVICE VALVE MAINTENANCE

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

Bermad Model:

INSTALLATION OPERATION MAINTENANCE

Transcription:

INSTALLATION, OPERATION & MAINTENANCE MANUAL AWWA C500 SOLID WEDGE GATE VALVE 2 72 NRS and OS&Y Series 100 and Series 105 TABLE OF CONTENTS SECTION PAGE # Equipment List 2 General 3 Receipt and Inspection 3 Storage and Handlin 4 Installation 5-6 Operation 7-8 Testing Procedure 8 Safety 8-9 Maintenance and Inspection 10-12 Disassembly/Reassembly 12-14 Troubleshooting 14 Spare Parts 14 1

EQUIPMENT LIST 2

GENERAL American R/D This manual is issued as a recommendation to the customer concerning the proper use of gate valves. Valves should always be installed and operated by authorized personnel. For additional information on these valves, please reference the AWWA C500 standard. RECEIPT AND INSPECTION *Valves should be inspected for damage before being removed from the delivery vehicle or signing the delivery receipt* Care should be taken to ensure proper rigging of the valve for lifting and appropriate lifting equipment is being used. Valves should never be lifted by the stem, hand wheel, 2 operating nut, gearing, electric motor operator, and/or bypass valve. We recommend that you make the following checks before installing this valve: Recheck the valve for damage. Check all nuts and bolts to make sure they are properly tightened. Check direction of opening for compliance with other valves in the system. Check to see that the valve end-joints are clean. Check inside the valve to remove all contaminants that may affect water system purity, cause the valve to not operate properly or seal tightly. Open and close the valve to make sure it works properly. Keep the valve closed when placing it in the trench. Do not backfill around the valve prior to completion of the hydrostatic system test. Check to see that all valve joints and pressure containing bolting are tight. Leave the valve exposed while the pipeline is being pressurized. 3

GATE VALVE RECOMMENDED STORAGE AND HANDLING Whenever possible, American RD solid wedge gate valves should be stored inside. However, when this is not possible or feasible, some outdoor protection must be provided. The valves must be stored in such a manner to protect them from weather, blowing dirt and debris. A tarp covering will minimize exterior coating damage from these elements and reduce fading or chalking due to exposure to the sun. The valves should also be placed in a location where they will not be damaged by collision from vehicles, lift trucks or falling items. Valves should be stored with the end flanges vertical so that water does not stand on the wedge. If valves are received in crates with the flanges horizontal, they should be placed with the flanges vertical before storage. In cold climates, if water is allowed to freeze in the valve, severe damage to the valve components could result. The valves are shipped in the closed position and should remain in the closed position during long term storage. Any packaging removed for inspection of the valves should be replaced prior to placing the valves into long term storage. Proper slinging and handling methods should be used when moving valves. The valves should be handled only with apparatus that will safely support the full valve weight. Do not place slings or other devices around operating stem, around the actuator or through the valve port opening. 4

INSTALLATION Verify correct valve orientation prior to installation. Valves for horizontal installations in horizontal pipelines must be installed with rollers, tracks, and scrapers in the down location. Valves for horizontal installations in vertical pipelines must be installed with disc face tracking in the down location. Reference approved submittal drawings for verification. Contact American R/D immediately for clarification of proper installation orientation. Check all bolts for looseness. If loose, tighten. Open the valve and check the seats to make sure they are clean and not damaged. Remove any foreign material inside the valve body. Close the valve before installation. Clean all foreign material from the line such as cement, tools, sand, dirt, wire, etc. Handle the valve carefully into position. Make sure the valve and the line are adequately supported and in line to prevent strain on the valve. Do not use the valve as final joint to correct any error in alignment or spacing of piping. With flange end valves, tighten bolts uniformly in stages with a star pattern. Pull up bolts on diametrically opposite sides of the flange until all bolts are uniformly tight and the joint gaskets have sufficient compression to prevent leakage at test pressure. On flanged end valves, check and align pipe flanges. Use proper type and size fasteners. Use a proper type and size gasket, such as 1/8 thick full face rubber gasket. 5

Do not attempt to fit two flanges that are not alike together. Plain face with plain face or raised face with raised face is the proper procedure. Bolting together flanges of two different materials requires special consideration. With mechanical joint end valves, tighten the gland uniformly in stages with a star pattern against the rubber gasket. If a valve box is used over the valve, make sure the box does not transmit traffic load or other stress to the valve. Also make sure the box is centered over the valve stem and parallel to the valve stem axis. Be sure any valve installed at the end of the line or a stub is restrained to prevent blow off. Check for proper operating/maintenance clearance around the valve when it is installed. On valves with wrench nuts and valve boxes, be sure operating key is kept vertical during operation. Keep the valve closed when placing it in the trench. Do not backfill around the valve prior to completion of the hydrostatic system test. Leave the valve exposed while the pipeline is being pressurized. Check to see that all valve joints and pressure containing bolting are tight. We recommend that protection of some sort be utilized to protect the stem and keep debris from being packed against it on buried valves. Failure to do this may result in problems with operation. Refer to AWWA C500 and AWWA M44 for additional installation guidelines and information. 6

OPERATION START-UP AND BREAK-IN PROCEDURES Operate the valve from closed to full open and back to the closed position before applying pressure. Check and record number of turns to open. The direction to open valve is indicated by an arrow cast on the wrench nut or hand wheel. Slowly open and close valves against pressure to avoid damage from surge or water hammer. Never force a valve open or closed. If there is difficulty, contact the manufacturer. SHUTDOWN Close the valve in the proper direction based on indication on the wrench nut or the hand wheel. Slowly close the valve against pressure to avoid damage from surge or water hammer. Verify the valve is completely closed by counting number of turns as recorded during initial start-up. EMERGENCY OPERATION Not applicable. 7

SEASONAL OPERATION When valves are exposed to freezing temperatures, do not leave valves closed on water or sewage service. Freezing of line fluid in the valve may cause cracking of the iron. Under such conditions, open the valve slightly to allow a small flow to prevent freezing CALIBRATION Not Applicable TESTING PROCEDURE The trench may only be backfilled up to the area between joints, leaving the joints exposed so that leaks can be easily seen. Do this before testing to prevent pipe movement and permit joint inspection during test. The system should be stabilized for the test 24 hours prior to testing by filling it with water. The system shall have provisions to vent off all air and for pressurizing to test pressure. This should minimize losses due to entrapped air, changes in water temperature, distension of components under pressure, movement of gaskets, absorption of air by water or water by pipe wall and filling of gate valves. After stabilization and at the time of test, raise pressure in 50 PSI increments to the desired test pressure. After each pressure increment, observe stability of the joints looking for gasket extrusion, joint movement, gasket movement and leakage. Leakage shall be measured, while maintaining the specified test pressure, by pumping from a calibrated container. After the test is complete, hold for one hour and then decrease the pressure to zero PSI. 8

SAFETY The valve body is a rugged structure but is not intended to be a means of aligning pipe. Care must be taken to ensure that any stresses caused by improper alignment are relieved elsewhere in the piping system. Large valves should be independently supported. The following general rules should be followed when installing the valve in the pipeline. o Handle valve only with an apparatus that will adequately support it, using a safe and proper technique. o Install the valve using good piping practices as governed by the applicable code or specification. o The pipeline and valve must be cleaned of all foreign water. o Do not tighten bolts in sequence. They must be tightened in a crossover, star pattern to load the bolts evenly. o Prior to troubleshooting or disassembling, isolate valve and purge pressure. Personnel could be injured if valve is maintenance is performed while the valve is pressurized. 9

MAINTENANCE AND INSPECTION During inspection, the valve should be open and closed on a filled and pressurized pipeline. The valve should function freely with no binding or vibration. Count the number of turns to full closed, this will reveal an obstruction if correct number of turns are not achieved. Valve Size 2 2.5 3 4 6 8 10 12 14 16 18 20 24 30 36 42 48 54 60 66 72 Turns to Open 4-3/4 5-1/2 10 13 19 25 31 37 107(geared) 147(geared) 165(geared) 183(geared) 292(geared) 365(geared) 546(geared) 510(geared) 776(geared) Consult Factory Consult Factory Consult Factory Consult Factory Note: For valves with motors, refer to the actuator data sheet included with wiring diagrams. Attached actuators should be inspected per the manufacturers recommendations provided with those units. 10

RECOMMENDED MAINTENANCE AND INSPECTION Operate the gate valve from full open to full close at regular intervals. The length of time between operations depends on the service conditions. On OS&Y valves, lubricate the valve stem with food grade anti-seize lubricant. Stems should be wiped clean of any debris or particles prior to operation. On NRS valves with packing, check regularly for packing leakage and lubricate packing with food grade lubricant. If leakage is detected, tighten packing gland bolts evenly. If this does not stop leakage then replace the valve packing. When repacking valve, be sure to use proper packing for the service. To obtain proper packing that will fill the stuffing box, forward the valve identification cast on the side of the valve body, the service and the quantity of valves to be replaced to the factory. To repack a valve, either OS&Y or NRS, run the valve to the full open position. Apply excess torque to back seat the upper wedge tightly between the stem and the bonnet. It will then be possible to repack with only slight or no leakage even under pressure. If the downstream side of the wedge is damaged and the upstream side is still in good shape, reverse upstream and downstream sides to improve shut off. Periodic Inspections: End Flange Bolts and Bonnet Bolts should be inspected on a quarterly basis. For OS&Y valves, stem threads should be inspected for foreign matter, cleaned and then lubricated with food-based grease. Lubrication should be performed as required or per annum as a minimum. All valves should be operated on a quarterly basis at a minimum. Record any unusual conditions during cycling and maintain record of operation. Inspect packing or o-ring seals if exposed at a quarterly basis. 11

Recommended Maintenance Summary Form - A permanent inspection record should be kept for each valve 1. Equipment Item: 1a. Model Number: 2. Manufacturer: American R/D 2a. Address: 1800 Greenbrier Dear Rd. Tel: 256-831-2236 3. Tag Number(s): 4. Weight of Individual Components (over 100 lbs): 5. Nameplate Date: (hp, voltage, speed, etc): 6. Manufacturer s Local Representative: Name: Tel: Address: 7. Maintenance Requirements: DISASSMEBLY AND REASSEMBLY INSTRUCTIONS DISASSEMBLY INSTRUCTIONS FOR AMERICAN R/D OS&Y SOLID WEDGE GATE VALVE (2 12 ) Remove retaining nut and washer. Remove hand wheel or operating nut. Remove packing follower nuts and bolts. Remove packing follower. Remove bolts & nuts between yoke and bonnet. Lift off yoke. Remove bonnet flange bolts and nuts. Lift off bonnet. Grasp stem and lift out wedge. 12

DISASSEMBLY INSTRUCTIONS FOR AMERICAN R/D OS&Y SOLID WEDGE GATE VALVE (14 72 ) Remove bolts and nuts between gear and top of yoke. Unscrew gear by turning and lift off gear assembly. Retain key. Remove bolts & nuts between yoke and bonnet. Lift off yoke. Remove packing follower nuts and bolts. Remove packing follower. Remove bonnet flange bolts & nuts. Lift off bonnet. Grasp stem and lift out stem and wedge. DISASSEMBLY INSTRUCTIONS FOR AMERICAN R/D NRS SOLID WEDGE GATE VALVE (2 12 ) Remove retaining nut and washer. Remove hand wheel or operating nut. Remove packing follower nuts and bolts. Remove packing follower. Remove stem by turning stem in the opposite direction for valve opening. Remove bonnet flange bolts and nuts. Lift off bonnet. Grasp stem nut and lift out wedge. Note: Threading stem back into stem nut may make removal of wedge easier. DISASSEMBLY INSTRUCTIONS FOR AMERICAN R/D NRS SOLID WEDGE GATE VALVE (14 72 ) Remove bolts and nuts between adapter plate and gear. Lift off gear assembly. Retain key. Remove bolts & nuts between adapter and bonnet. Lift off adapter. Remove packing follower nuts and bolts. Remove packing follower. 13

Remove stem by turning the stem in the opposite direction of opening the valve. Remove bonnet flange bolts & nuts, and then remove the bonnet. Grasp stem nut and lift out wedge. Note: Threading stem back into stem nut may make removal of wedge easier. REASSEMBLY INSTRUCTIONS Reassemble in reverse order replacing bonnet gasket, stem o-rings or packing, follower plate o-ring and thrust washer if necessary. TROUBLESHOOTING SOLID WEDGE GATE VALVES Possible Malfunction Symptoms/Causes Corrective Action_ Joint Leakage Bolt tension relaxing Tighten bolts Seat Leakage Foreign material caught Operate valve to flush out in seat debris. Seats dirty/corroded Flush or disassemble and clean Seat damaged Inspect, repair or replace Leak Past Stem Packing Bolts loose Tighten bolts (NRS)O-Rings worn/damaged Inspect/Replace (OS&Y)Packing worn/damaged Inspect/Replace For service contact the local manufacturer s rep. SPARE PARTS In normal operating conditions, no spare parts are needed on hand. For parts contact the local manufacturer s rep. 14