Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

Similar documents
Engineering Data Sheet

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

Cast iron swing check valve. BS EN 12334:2001 PN16

INSTALLATION, OPERATION & MAINTENANCE MANUAL

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

Installation, Operation and Maintenance Manual for Back Pressure Regulator

WKM Model 320F Floating Ball Valve

WW-730. Pressure Sustaining/Relief Control Valve

Installation & Operation Manual Proven Quality since 1892

WW-720. Pressure Reducing Control Valve

MUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

BUTTERFLY VALVES Series 800

WW-720. Pressure Reducing Control Valve

KENNEDY VALVE RESILIENT WEDGE GATE VALVE MAINTENANCE MANUAL

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

INDUSTRIAL VALVES MODELS: C62-A; C62-D. INSTRUCTION MANUAL Installation Operation Parts Service DIAPHRAGM BYPASS PRESSURE REGULATING VALVES

KTM V-PORT CONTROL BALL VALVES INSTALLATION AND OPERATION MANUAL

MUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

TITAN FLOW CONTROL, INC.

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

Section GATE VALVES

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

Ductile iron gate valve PN16. BS EN 1171:2002 PN16

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

1.0 - OPENING AND CLOSING THE DOOR

FLANGED TWO-PIECE BALL VALVES

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

FLANGED TWO-PIECE BALL VALVES

VALVES & MEASUREMENT

WHEATLEY Series 500 Swing Check Valve

LARGE R/W GATE VALVES

Operating instruction

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012

Installation, operation & maintenance manual - original version

Telefon (+45) Telefax (+45)

Pure-Flo Handwheel Operated Valves (903, 913, 963) Instruction Manual

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Pure-Flo Handwheel Operated Valves (970) Instruction Manual

DelVal Flow Controls Private limited

Team Insert Valve Sample Specification The Insert Valve shall conform to the following:

1800C and 1800C-HC Series Service Regulators

FLANGED MULTI-PORT BALL VALVES

Armored Gauge O S & Y Bolted Bonnet Valves Series BB-100

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

Eaton Filtration, LLC

Covered Task 007OP Training Guide Operate Valves

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

Manual Actuated Boiler Blowdown Valves

INSTALLATION, OPERATION and MAINTENANCE MANUAL

641/01 AVK SWING CHECK VALVE OPERATION & MAINTENANCE MANUAL. AVK UK Limited OM270710

RAIMONDI. 3-way globe valve for feedwater heater outlet bypass Installation and Maintenance Instructions

SECTION BUTTERFLY VALVES

KECKLEY. Installation, Operation, and Maintenance Manual. Style KGV - Knife Gate Valve

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

1200B2 Series Service Regulators. Instruction Manual

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

Model: 43T. Bermad Pressure Relief Valve

TITAN FLOW CONTROL, INC.

Mounting and operating instructions EB 2530 EN. Self-operated Pressure Regulator. Pressure Reducing Valve Type M 44-2

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Eaton Filtration, LLC

6500 KNIFE GATE VALVES

INSTRUCTION MANUAL. Anchor Darling 800 Globe Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Contents. 1. General information BROEN BALLOMAX Steel Ball Valves Approvals Quality Management...2

Regulator from 1800 B series

PC3_ and PC4_ Pipeline Connectors

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

Caution: Safety Precautions: Installation, Operation & Maintenance Manual. For Modentic Needle Valves with Threaded Ends

Models: C62/63/64-A/D

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

Installation Troubleshooting Maintenance Instructions Installation / Start-up

RS(H)20, 25 USER MANUAL

THE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401

Types S108K and S109K Pressure Reducing Regulators with Integral Slam-Shut Device

Model 420-HY Pressure Regulating Hydrant Valve

INSTALLATION / OPERATION / MAINTENANCE INSTRUCTION

MUELLER. Xp, & Lineseal 350 Butterfly Valves

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Bermad Pressure Reducing. Model: 42T

Declaration of Conformity as per Directive 97/23/EC

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25

Control Valve with ZK Radial Stage Nozzle ZK 210. Original Installation Instructions English

Atmospheric relief valve type 1100 Installation and maintenance instructions

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

Installation Instructions For Flat Seated Bolted Type RAH Series Disk Holders

FPD175 Compact orifice carrier assembly

Installation, Operation, and Maintenance Manual

Transcription:

Model 2010 -PIV UL/FM Post Indicator Valve Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

2

LAYOUT AND SITING At the design stage, it should be considered where valves will be located in order to allow access for operation, adjustment, maintenance and repair. Outside screw-andyoke valves (OS&Y) require space above the valve to accommodate the rising stem. Valves must be provided with adequate support. Adjoining pipe-work must be supported to avoid the imposition of pipeline strains on the valve body, which would impair its performance or crack the valve body. Heavy valves may need independent support or anchorage. Gate valves may be installed in: a) Horizontal pipe-work with stem in the vertical position. b) Vertical pipe-work with stem in the horizontal position. The valve should not be installed in horizontal pipe-work with the stem in the horizontal position, because shut-off performance may be impaired. In the best interest of safety concerns, valves installed for end-of-line service and opened infrequently should be fitted with a locking device on the operating mechanism. Otherwise, they should be fitted with a UNITED Blind Flange on the downstream flange of the valve. INSTALLATION (See AWWA C600: Figure 3, for mechanical-joint assembly). Prior to installation, a check of the identification plate and body marking must be made to ensure that the correct valve is being installed. Valves should not be subjected to misuse such as careless handling, allowing dirt to enter the valve through the end ports, lack of cleaning both the valves and system before operation, and using excessive force during bolting and hand-wheel operation. All special packaging material must be removed before beginning the installation process. Valves must be provided with adequate support. Adjoining pipe-work must be supported to avoid the imposition of pipeline strains on the valve body, which would impair its performance or crack the valve body. Valves should not be lifted by means of the hand-wheel or the stem. 3

Immediately prior to valve installation, the pipe-work to which the valve is to be fastened should be inspected to ensure that it is clean and free of debris. Valve end caps should only be permanently removed just before installation. Each valve interior should be inspected through the end ports to determine that it is clean and free from foreign matter. The mating flange (both valve and pipe-work flanges) should be examined for correct gasket contact face, surface finish, and condition. If a condition is found which would potentially cause leakage, final assembly should not be attempted until the condition is corrected. The gaskets should be suitable for operating conditions and maximum pressure/temperature ratings. The gaskets should be inspected to ensure freedom from defects or damage. The following steps should be taken to ensure correct alignment of the flanges being assembled. First, the installer should ensure that the initial contact of flange and gasket is parallel and that the faces are uniform. Then, the bolts should be tightened progressively by means of a crisscrossed pattern and should be repeated until all bolts are adequately tightened. Parallel alignment and concentricity of flanges are especially important in the event of assembling a valve into an existing system; misalignment could cause damage to the valve body. Flanged joints depend on compressive deformation of the gasket material between the flange surfaces. Thus, the bolting must be checked for correct size, length, material and that all connection flange bolt holes have been utilized. At the conclusion of installation and before operating, all deposits or foreign material shall be removed from the equipment. OPERATING The valve is opened by counterclockwise rotation of the UNITED Model 5400 Ground Post Indicator to a positive stop without further effort. When fully open, it is advantageous to rotate Ground Post Indicator clockwise 1/2 turn. To close the valve, the Ground Post Indicator is rotated clockwise to a positive stop. Note: When the valve is closed at extreme high temperature and then cooled, the wedge may become tight in the valve and found difficult to open. Conversely, a valve closed at room temperature can be difficult to open if there is an increase in fluid temperature causing a linear expansion of the stem, which may tighten the wedge further into the body seat. The operator should use suitable hand protection at extreme temperature conditions. 4

The valve should only be used in the open or closed position. Regulating or throttling service should be avoided. MAINTENANCE The valve should be at zero pressure and ambient temperature prior to any maintenance. Maintenance personnel must use tools and equipment applicable for resilient-seated gate valves. Tools causing sparks are only permissible as long as no volatile conditions are present. A full risk assessment must be undertaken prior to any maintenance. The assessment must take into account the possibility of exceeding the limits of use whereby a potential hazard could result. A maintenance program should therefore include checks on the development of unforeseen conditions, which could lead to failure. In systems where corrosion is a potential hazard, wall thickness checks on the body and bonnet should be made. This requires either the removal of the valve from the pipeline or removal of the bonnet from the system at zero pressure. If the wall thickness has reduced by 25%, the valve must be replaced. 5 United Water Products 2113 West 30 th Street Jacksonville, FL 32209 Tel: 877-766-4459 Fax: 877-766-4458 www.unitedwaterproducts.com