OGP Supplementary Life-Saving Rules

Similar documents
A MESSAGE FROM THE MD

Lenzing Life Saving Rules

Safety is a priority at Vault Pipelines.

Safety at Work. Rules for Staying Alive

GOLDEN SAFETY RULES AFT DR

We also ask our subcontractors and partners to. At EHS Support we re passionate about safety. The. ensure the safey of themselves, their coworkers and

ELECTRICAL SAFETY. Unsafe work practices near electricity can kill you! You are responsible for protecting yourself from electrical shock.

We take safety very personally at Aurecon. Safety is everybody s business, every day. Health and safety incidents are not inevitable, they are

Policy Redesign Project. Plant Safety Policy. Table of Contents

CITB Construction site safety update

Code of Practice and Instructions to Contractors Working for Viridor

Contractor handbook. Purpose

TRENCH AND EXCAVATION COLLAPSE

ISS Safety Rules. Make safety second nature

List all key terms and acronyms used in the procedure, and their definitions.

PART 4 General requirements for all construction sites

Responsibilities / Accountability

Based on market capitalization (in U.S. dollars) at December 31, 2015.

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2

Confined Spaces. 1. Definition Permit/Non-Permit

Minimum Safety Requirements for Contractors Working on Railway Property

A Guide to working safely near Overhead Power Lines

LIFE SAVING RULES EXPLANATION GUIDE EDITION #1.0

GOLDEN TOTAL S RULES. total.com

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

Electric and Natural Gas Safety Slide Show Presenter s Notes

Safe Work Practices / Procedures / Instruction CONFINED SPACE

B S Glass Ltd Safety procedures- outsourced Workplaces

Safe work method statements

Instructions for assembly and use ZAP telescopic platform ladder Z600

New Hire Safety Orientation. Welcome to Flexicrew, our number one priority is you and your safety.

SafeLandUSA - Syllabus

Join t Op e ra tion s CHESM Fie ld I n s p e ction Ch e cklis t

OSHA Federal Standards October 1, 2016 September 30, 2017

Presenter s Notes. Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic:

Suitability of Work Equipment

6. Each mitigation was verified and individually documented

Surface exploration drilling

Pannier Corporation Health and Safety Handbook Marking System Group Aerial Lifts Original Date: Section: Revision date: Page: 12/5/ of 11

CONSTRUCTION SAFETY PROGRAM FOR. Golder Acoustics Inc.

EDITION. November 2007 WORK PERMITS HSEW. Health. Safety. Well-being. Environment HSEW A WAY OF LIVING. Standards for professionals, be aware!

We live by the Life Saving Rules so that everyone goes home safe, every day.

RISK ASSESSMENT. Bobcat Skid Steer Loader. Series F & G (incl. S Models) For. SSL Version 2

Electrical Safety. Hazard Awareness

Committee Input No. 35-NFPA [ Chapter 1 ] Submitter Information Verification. Committee Statement

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

Waste Industry Safety & Health

Contractor/Visitor Safety Orientation UNBC

Work Activity (e.g. Road Work): Work Location:.

Quiz. telescoping. designed to. established. 1 Pag. EWP Pre Reading

SASOL LIFE SAVING RULES (LSRs)


EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

Working Environment Safety Assessment

Health and Safety Program Inspections

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Key Technology, Inc. Confined Space Entry Program. July, 2017

ASTC210 (SQA Unit Code - F4PS 04) Clean confined spaces

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.

To comply with the OHS Act, the responsible manager must carry out and document the following:

CONFINED SPACES. American Galvanizers Association Phone: (720) Fax: (720) Scope

MEWP - Boom Note: It is recommended that you read the Supporting Information page before you read this factsheet.

CONTROL OF HAZARDOUS ENERGY

Our commitment to safety

This written Compressed Gas Plan is kept at the corporate office and in the written Safety & Health Program.

Safety Essentials. Mandatory rules for our high risk activities

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

Confined Spaces Guide

LOCKOUT/TAGOUT PROGRAM

Total s Golden rules

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

SAFE WORK METHOD STATEMENT

Isolating plant. Guidance Note. June 2011

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS

C-Consequence, P Probability, R-Risk Rating Value Page 2 of 2

Aerial Lift Safety Program

COOPERATION FOR A SAFE WORKSITE

Temporary load-bearing support for structural alterations or repairs

Lifting Beam. Introduction. Important Notes. Key Benefits. User Guide

Excavation and Trenching

LOCKOUT-TAGOUT PROGRAM

Control of Energy - Isolation Process

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

(Health, Safety, and Welfare)

Confined Space Entry Procedure

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary?

Isolation Lockout and Tagging

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

BSBWHS404A Contribute to WHS hazard identification, risk assessment and risk control Learning Guide

UNIVERSITY OF NOTRE DAME CONFINED SPACE ENTRY POLICY

Compressed Gasses Safety

Safety Manual Section 6 Confined Space

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

CONFINED SPACE ENTRY PROGRAM

This booklet is designed to provide clear information for young people as part of their preparation for Work Experience. The information highlights

Transcription:

OGP Supplementary Life-Saving Rules Prevent dropped objects Position yourself in a safe zone in relation to moving and energised equipment 9. 10. 14. 15. Do not work under or near overhead electric power lines No alcohol or drugs while working or driving Supervisors / Managers: Comply with the Life-Saving Rules Be a role model Set clear expectations Monitor compliance Obtain authorisation before starting excavation activities 11. 16. Do not smoke outside designated smoking areas You and I: Conduct gas tests when required 12. 17. Follow prescribed lift plan Comply with the Life-Saving Rules Intervene if you see an unsafe act If in doubt, ask your Supervisor Wear a personal flotation device when required 13. 18. Obtain authorisation before overriding or disabling safety critical equipment

9. Prevent dropped objects R Secure all tools and equipment to prevent them from falling/being dropped. R Put barriers around areas where there is a potential for dropped objects. R Always wear head protection where required. There is a significant risk of dropped objects when using tools and portable equipment at height. Preventing objects from falling keeps you and people working below you safe If you are the Supervisor or the Person in Charge of the work R Create awareness of the risk of falling objects and understanding of what actions need to be taken (for example during team/toolbox meetings). R Use secondary retention on equipment installed at height. R Regularly inspect the site to ensure that precautions are taken to prevent objects from falling from height (e.g. hand tools are tied off, no loose objects, no holes in grating, toe boards are in place,application and condition of secondary retention sytems, barriers are in place where necessary, head protection is worn where required, etc.).

10. Position yourself in a safe zone in relation to moving and energised equipment R Confirm the safety precautions with the Supervisor or the Person in Charge of the work when working near moving or energised equipment. R Follow the instructions of the Flagman or the Person in Charge for equipment movements. R Confirm with the Person in Charge that it is safe to enter and/ or work in the restricted zone. R Make sure that the driver of a moving vehicle sees you. Working in the line of fire of moving equipment (e.g. cranes and other vehicles) and energised equipment (e.g. rotating, electrical or pressurised machinery) is unsafe as this can impact you. If you are the Supervisor or the Person in Charge of the work R Confirm that access to areas posing danger is restricted and that barriers are put in place. R Ensure that only authorised personnel is working in a restricted zone. R Confirm that signaling methods and communications are agreed on and understood by everyone. R Ensure that the site is properly lit and/or that high-visibility clothing is worn.

11. Obtain authorisation before starting excavation activities R Confirm with the Supervisor or Person in Charge that it is safe to start work. R Follow applicable Work Permit requirements. R Stop work and notify your Supervisor if anything unexpected happens. Excavation activities may contain hazards such as electrical cables, confined space, collapse of walls or excavated material. Check that it is safe to start work. An excavation is any man-made cut, cavity, trench, or depression, formed by earth removal (e.g. digging). If you are the Supervisor or the Person in Charge of the work R All Work Permit requirements are in place (e.g. confined space, isolation, etc.). R Barriers and signs are in place to restrict access to excavation sites. R A work site risk assessment has been conducted by a competent person(s) including: identified hazards e.g. cable/pipeline route marking; soil classification and testing. R Soil movement is controlled to prevent collapse (e.g. shoring, sloping, soil placement). R Ground stability is inspected before work and after adverse weather conditions. R An emergency response plan is in place.

12. Conduct gas tests when required R Confirm with the Supervisor or the Person in Charge of the work that the air is tested. R Confirm with the Supervisor or the Person in Charge of the work it is safe to start work. R Stop work if you smell gas. If you are a Gas Tester R Understand which tests the Work Permit requires and how often. R Use certified equipment for the tests. Air is tested to stop explosions and/or make sure you can breathe the air safely. If you are the Supervisor or the Person in Charge of the work R Confirm that gas testing is carried out as per Work Permit. R Request more gas tests if necessary. R Confirm that it is safe to start work.

13. Wear a personal flotation device when required R Understand when it is required to wear a personal flotation device. R Always wear a personal flotation device when required. R Wear the personal flotation device properly and as intended (e.g. correct size, tied where required, etc.). R Check whether the personal flotation device is working properly and not damaged before use. If you are the Supervisor or Person in Charge of the work Personal flotation devices should always be worn when there is a danger of falling into water. When working near or on water, wearing a personal flotation device (e.g. life jackets or buoyancy aids) protects you from drowning. R Based on a risk assessment, confirm when and where a personal flotation device must be used and ensure your team is aware of this. R Ensure that personal flotation devices are regularly inspected.

14. Do not work under or near overhead electric power lines R Never work with equipment under or near overhead lines unless authorised to do so by your supervisor. Working with equipment immediately under or near overhead lines is unsafe as an electrical current or flashover can kill you. Maintain adequate distance to keep you safe. Be aware that a flashover can happen if you work within the clearance distance (e.g. 7 meters for 275kV line), even if you do not touch an overhead line. If you are the Supervisor or Person in Charge of the work R Not allow work under or near life overhead lines unless precautions have been taken. Examples of precautions: power lines are electrically switched off/isolated; work is outside the unsafe/ clearance distance; barriers are set to mark the clearance distance; and/or safe passageways are created. R Not allow equipment (e.g. cranes, tipping trucks, ground moving equipment, mobile weather towers) within the clearance distance of the overhead power lines. R Confirm that the correct precautions have been taken and that it is safe to start work.

15. No alcohol or drugs while working or driving R Always inform the Supervisor or the Person in Charge if you are taking medicine that may have an affect on your performance. R If in doubt always check with your Supervisor or the Person in Charge who may seek medical advice. R Not use, keep, sell or distribute illegal drugs. R Intervene if you see a case of alcohol or drugs abuse. If you are the Supervisor or Person in Charge R Only assign work to people who are fit to work. Using alcohol or illegal drugs, or misusing legal drugs or other substances, will reduce your ability to do your job safely.

16. Do not smoke outside designated smoking areas R Know where the designated smoking areas are. R Intervene if you see someone smoking outside a designated area. If you are the Supervisor or Person in Charge R Inform people about designated smoking areas. R Ensure that designated smoking areas are clearly marked. Smoking or use of matches or cigarette lighters could set on fire flammable materials. Designated smoking areas, such as a smoking hut or a smoking room, will keep you safe from causing fire and explosion.

17. Follow prescribed lift plan Lifting equipment operators should: R Understand the lift plan before starting the work and follow it. R Confirm that the load does not exceed the capacity of the lifting equipment. R Confirm that the crane is level and positioned on a solid surface. R Verify that safety devices on lifting equipment are installed and operational. If you are the Supervisor or Person in Charge of the work A Lift Plan describes how to lift and hoist safely. For routine lifts, there needs to be a general lift plan. For non-routine lifts, including complex and heavy lifts, the plan is specific. R Confirm that a general or specific lift plan is in place, depending on the type of lift. R Confirm that the lifting equipment operator understands and complies with the lift plan. R Confirm that people who supervise or perform lifting operations and who inspect and maintain lifting equipment are trained and competent. R Verify that equipment to be used for lifting and hoisting has been inspected, maintained and certified. R Confirm that the signaling methods and communications are agreed and clear.

18. Obtain authorisation before overriding or disabling safety critical equipment R Obtain authorisation from the Supervisor or Person in Charge before overriding or disabling safety-critical equipment. If you are the Supervisor or Person in Charge R Point out the safety-critical equipment in your work place. R Confirm the authorisation comes from the right level. Safety-critical equipment must work correctly to keep you safe. Examples of safety-critical equipment include isolation devices/ emergency shut down valves, lock out/tag out devices, trip systems, relief valves, fire and gas alarm systems, certain level controls, alarms, crane computers, In-Vehicle Monitoring Systems.