Design of Spillway Upgrades

Similar documents
The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

Applying Engineering Solutions to the Science of Protection and Enhancement of Aquatic Environments. Bill Holman, P.E. Stanley Consultants

STRUCTURAL STABILITY ASSESSMENT

NUMERICAL AND PHYSICAL MODELING

Stability of Concrete Macro-Roughness Linings for Overflow Protection of Earth Embankment Dams ( 1 ) - Discussion

Exercise (3): Open Channel Flow Rapidly Varied Flow

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

Plan B Dam Breach Assessment

Hydraulic Modeling to Aid TDG Abatement at Boundary and Cabinet Gorge Dams

OPERATION OF SPILLWAY GATES HOW TO AVOID THE PROBLEMS AND PITFALLS. Peter Allen. DERM Qld

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

Historic dam failures and recent incidents. Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman

Northwest Hydro Association Dam Safety Impacts of 2017

Huntington District. For More Information Contact (304)

Innovative spillways. PK-weirs. Franska exempel 10/04/2018. Speaker : A. Chapuis,

Effect of Fluid Density and Temperature on Discharge Coefficient of Ogee Spillways Using Physical Models

Structure Failure Modes

Managing Dam Safety Risks Related to Hydraulic Structures

PKWeir and flap gate spillway for the Gage II Dam

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Interlake Tunnel WRA Board Workshop. August 25, 2014

Chapter 4 EM THE COASTAL ENGINEERING MANUAL (Part I) 1 August 2008 (Change 2) Table of Contents. Page. I-4-1. Background...

JAP Additional Information Sheet

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

Township of Springwater

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

IMPACT OF MAKING THE CREST OF WEIR MULTIFACETED ON DISCHARGE COEFFICIENT OF MORNING GLORY SPILLWAY

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Scott Dam Spillway Comparing Physical Model Study Results

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT

St. Mary Diversion Dam Case Study of a 100 year Old Diversion

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

Guidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass?

HERBERT HOOVER DIKE REHABILITATION PROJECT

Annex E Bridge Pier Protection Plan

U.S. ARMY CORPS OF ENGINEERS INSTITUTE FOR WATER RESOURCES RISK MANAGEMENT CENTER PRELIMINARY LESSONS LEARNED FROM OROVILLE INCIDENT

A LOOK AT EARTH SPILLWAY DESIGN AND EVALUATION AFTER MORE THAN 50 YEARS OF EXPERIENCE

Outlet Structures T-12

Rock Ramp Design Guidelines. David Mooney MS Chris Holmquist-Johnson MS Drew Baird Ph.D. P.E. Kent Collins P.E.

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

Greenup Lock Filling and Emptying System Study

Session C9: Priest Rapids Fish Bypass: A Case Study from Start to Finish

Fish Friendly Crossings- Examples from Nash Stream

HISTORY OF CONSTRUCTION

FERC Division of Dam Safety & Inspections

T o validate the proposed design of

Boston s Pilot Project to Measure CSO Flows Relies on New Technology and Scattergraphs to Detect Overflows

MF ER

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

TDLP INC. The Dam & Levee Professionals. Kevin Chancey Sarah Edens. Monica Murie Jason Unruh

THE EFFECT OF VARIOUS DIKE REINFORCEMENT ALTERNATIVES ON THE FLOOD SAFETY ASPECTS OF THE DELTADIKE CONCEPT

DAM SAFETY GUIDELINES 2007

Applying Engineering Solutions to the Science of Invasive Aquatic Species Control Asian Carp and Sea Lamprey. Bill Holman, P.E. Stanley Consultants

Ellis Y. Byeon, PE Bryan VanderGheynst, PE 1

Kentucky Lock Project Update Inland Waterways Users Board

Components of a Barrage

What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows

GENERALIZED PROGRAMMATIC FRAMEWORK FOR SPILLWAY INSPECTION AND POTENTIAL FAILURE MODES ASSESSMENT

The RCM Analyst - Beyond RCM

REMR Management System for Emptying and Filling Valves

Hours / 100 Marks Seat No.

North Diversion Channel Physical Modeling:

Project Incorporation of Sea Level Rise City of Newport Beach Approach for Balboa Islands, City of Newport Beach, California

Displacement-based calculation method on soil-pile interaction of PHC pipe-piles

Integrated Pest Management: Application in the Sea Lamprey Control Program

HYDRAULIC JUMP AND WEIR FLOW

Fremont Weir Fish Passage Proof of Concept. Final Engineering Report

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

OPEN CHANNEL FLOW WORKSHEET 3 WATER SURFACE PROFILES

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

Ceiling Lift. Arm Extension OWNER S MANUAL

Request Number IR1-12: Flow Passage. Information Request

North Shore of Long Island, Feasibility Study

Mouth of the Columbia River North Jetty Erosion Stabilization

J.A. and Kathryn Albertson Family Foundation Boise Whitewater Park Ph II User Group Meeting 01/23/2018 Presented by: John Tensen P.E.

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Broadly speaking, there are four different types of structures, each with its own particular function:

Evaluation of step s slope on energy dissipation in stepped spillway

Dams as Systems. Pat Regan Federal Energy Regulatory Commission (FERC)

The Masterplan Coastal Safety: a wave of opportunities

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

PROVING THAT BLADDER SURGE TANKS CURED EXCESSIVE SURGE CONDITIONS IN A 30 FORCE MAIN

Comparison of stepped and smooth spillway effects on stream reaeration

Inner Harbor Navigation Canal (IHNC) Basin 1% (100-yr) and 0.2% (500-yr) Surge and Wave Event Water Levels

ASSESSMENT OF THE HAWKINSVILLE DAM ON THE BLACK RIVER BOONVILLE, NEW YORK. March 12, 2012 MMI #

Experimental Investigation on Changes of Water Surface Profile with Gaussian Shaped Bottom and Side Roughness

Highway 17 Transportation Improvement Study

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

Utilizing Vessel Based Mobile LiDAR & Bathymetry Survey Techniques for Survey of Four Southern California Breakwaters

Firth Creek Habitat Enhancement Project 1993

Transcription:

USACE Dam Safety Program Design of Spillway Upgrades Sal Todaro, P.E. Senior Hydraulic Structures Engineer U.S. Army Corps of Engineers Risk Management Center 1

Presentation Overview 1. USACE (RMC) approach to design of spillways 2. Isabella Arced Labyrinth Weir (An ongoing spillway design and optimization) 3. USACE need for passive spillways (such as PK Weirs) to reduce our need for spillway gates 2

Who is the US Army Corps of Engineers (USACE)? Staff of more than 35,000 Have built and operate more than 700 dams Many of our dams built from 1940s through 1970s We have a Major National Dam Safety (Evaluation and Upgrade) Program. Annual Dam Safety Construction Budget exceeding $500,000,000 3

Role of the Risk Management Center in USACE Dam Safety Upgrades Nationally Prioritize USACE Dams Repair based upon Probability of Failure and Risk to Loss of Life Provide expert assistance and support to design teams Provide Project oversight from concept design through construction 4

Our Approach to Spillway Design Includes: Emphasize the importance of conceptual design Early use of (world class experts) for design support Coordination of hydraulic design and modeling with other (design and construction) disciplines to meet overall project needs. Leverage site opportunities and manage site constraints. 5

Important Non- Hydraulic Requirements that Influence Spillway Design include: Non hydraulic requirements often pose the greatest challenge to spillway design. These include: Overall dam safety and risk reduction Influence of foundation geology on spillway design Construction related risks Long term operation, maintenance and reliability Efficient and effective use of USACE dam safety construction budget. 6

Existing Spillway Emergency Spillway Project Plan Dam Safety Deficiencies: 1. Dam overtopping and breach - inadequate spillway capacity 2. Major earthquake - fault through abutment in high seismic area Dam is Located Upstream of Bakersfield California (very high potential for loss of life) 7

Labyrinth Weir Slab Concrete Existing Exposed Granite Spillway Channel SPILLWAY PLAN 8

Comparison - Linear and Arced Labyrinth Weir Designs Linear Labyrinth Weir Capacity 11,400 cms Width = 236 m Depth = 43 m 16 cycles α = 7.9 degrees Weir Length = 1,420 m Arced Labyrinth Weir: Capacity= 11,400 cms Width = 241 m Depth = 37 m 12 cycles α = 16 degrees Weir Length = 960 m 9

Critical Design Insights (Based Upon the Initial Linear Labyrinth Weir) Goal - Reduce Spillway Cost Goal Design the spillway for infrequent use. Labyrinth Spillway begins to operate at 1/4500 year flood. Goal - Tailor spillway excavation to meet rock borrow requirements. Initial straight design required 2.7M m 3 rock excavation, but borrow required for dam modifications estimated to be 1.9M m 3. Goal Optimize hydraulic and structural design of labyrinth to reduce concrete volume and cost. 10

Critical Design Insights Arced Labyrinth Savings to date from spillway optimization: Rock Excavation Reduced rock excavation - from 2,750,000 m 3 to 1,900,000 m 3. Reduced Length of Labyrinth Weir - Reduced weir length from 1420 meters to 960 meters and reduced upsteam slab. 11

Conclusions A robust conceptual design is CRITICAL to successful hydraulic structure design Coordinate Hydraulic Design with other project requirements and design disciplines Use expert advisors to supplement design team Communication and coordination between disciplines is crucial! 12

Ideas for increasing use of PK Weirs at USACE Dams PK WEIRS TO INCREASE SPILLWAY CAPACITY USACE prefers ungated spillways, when increasing discharge capacity at existing dams. The labyrinth weir is commonly considered for upgrading spillways. The PK Weir not often considered, primarily because of the staff s unfamiliarity with this design. Increased USACE awareness of the PK weir s unique ability to increase passive discharge over concrete gravity dams could result in more frequent consideration. 13

Ideas for Replacing Aged Gates Existing gates function to maximize flood storage and provide ability to discharge large flood releases Challenge Replacement of some existing mechanical gates (with passive weirs) could reduce maintenance. Opportunity - USACE has a large inventory of dams and may have opportunities for : full (or partial) mechanical gate replacement. Solution- Investigate replacement of full and partial gate replacement at selected facilities Also investigate adding PK Weirs to increase capacity at existing passive spillways. 14

Ideas to Increase USACE Knowledge (and use) of PK Weirs: Continued active USACE attendance at PK Weir Workshops and Working Groups Conduct USACE Webinar on Design of PK Weirs Identify USACE Spillway Modification PK Weir Project as a stated goal. 15

Questions & Discussion Sal Todaro, P.E. Senior Hydraulic Structures Engineer U.S. Army Corps of Engineers Risk Management Center 16