1 North Diversion Channel Physical Modeling: Bike Notch Implementation Between Vineyard Arroyo Confluence to Osuna Bridge August 29, 2011 Prepared for Albuquerque Metropolitan Arroyo Flood Control Authority (AMAFCA) By UNM Hydraulics Laboratory Julie Coonrod, Ph.D., Professor Emile Kareem Saint-Lot & Tyler Gillihan, Research Assistants Department of Civil Engineering University of New Mexico 1
2 Introduction: The North Diversion Channel (NDC), built by the Corps of Engineers and maintained by Albuquerque Metropolitan Arroyo Flood Control Authority (AMAFCA), intercepts storm water from multiple open channels and carries the water north for discharge into the Rio Grande. Albuquerque utilizes the open channel storm drainage system as a transportation corridor for pedestrians and cyclists. In particular, the NDC serves as a popular north-south bike trail for Albuquerque residents (Figure 1). To accommodate cyclists, recessed bike paths (or bike notches ), have been placed in the channel at various bridge locations to allow for continuous cycling uninterrupted by motor vehicles. Figure 1: North Diversion Channel Map 2
3 The Corps requires that channel modifications not jeopardize necessary storm water conveyance at the bridges. The University of New Mexico Hydraulics Lab was utilized in 1992 to investigate such bike notches in the NDC and again in 1997 for the South Diversion Channel. The 1992 report concluded that recessed bike paths do not adversely impact flow for subcritical reaches. Furthermore, if the channel is substantially subcritical, physical modeling is not needed. The 1997 report, for a channel with a Froude number of 1.92, also showed the recess bike path did not adversely impact flow. The subjects of this study are two proposed bike notches in the NDC near Osuna Road (Figure 2). The hydraulics near both proposed bike notches are complicated by upstream tributary flows. Upstream of the proposed Singer bike notch is tributary flow from the Vineyard Arroyo. However, the tributary flow is far enough upstream that any surface wave effects of the confluence will be diminished before reaching the bike notch. Just upstream of the proposed Osuna bike notch is tributary flow from the Bear Canyon Arroyo. Osuna Bridge abutments extend into the NDC channel, further complicating hydraulics associated with this proposed bike notch. Osuna Storm Drain Actual Length: 5500 ft. Model Length: 66 ft. Model Scales: 1:84 & 1:36 Bear Canyon Arroyo Singer Osuna Bike Notch Vineyard Arroyo Singer Bike Notch Figure 2: North Diversion Channel near Osuna Road To simulate a total flow of 24,000 ft. 3 /s in the NDC, models of two scales were constructed simultaneously. First, a 1:84 scale model was used to capture both a bike notch at Osuna and Singer bridges. Second, a 1:36 scale model was used to improve effects of scale for examination of the Osuna bike notch in conjunction with Bear Canyon Arroyo confluence and Osuna Bridge 3
4 abutments. Both models were constructed primarily of ¼ inch corrugated plastic and aluminum tape. AMAFCA crews assisted in building wooden frames to support the channel. 1:84 Model: The 1:84 model includes bike notches at both Singer and Osuna bridges. Using Froude Similitude, 180 gal/min is required to simulate the NDC 24,000 ft 3 /s. A garden hose connected to a sump pump provides flow through the Bear Canyon Arroyo. This model captures both bike notches and shows the complete construction of the bike notches in the NDC. The modeled notch underneath Singer Bridge stretches 14 ft. (almost 1200 ft. in the NDC) (Figure 3). Figure 3: 1:84 Scale Singer Bike Notch The actual bridge sits above the channel and is not shown in the model. In contrast, Osuna Bridge abutments extend into the channel flow. AMAFCA provided measurements of the abutments that were used to construct the bridges. The Osuna bike notch stretches approximately 21 ft. (almost 1800 ft. in the NDC) (Figure 4). 4
5 Figure 4: 1:84 Scale Osuna Bike Notch This notch runs a greater length through the channel because of future plans for a second bridge over the NDC. Each of the two bike notches have a scaled bottom width of 1.7 in. and a scaled side length of 1.3 in (12 ft. bottom width and 9 ft. side length in the NDC). Construction of this model was completed on August 10, 2011 (Figure 5). Figure 5: 1:84 Scale Model 5
6 1:36 Model: The 1:36 scale model includes only the Osuna bike notch to allow UNM s Hydraulics Lab to quantify the results. Using Froude Similitude, 1390 gal/min would be required to simulate the NDC s 24,000 ft. 3 /s. A four inch hose connected to the main pump provides 81 gal/min, 1400 ft. 3 /s in the NDC, for the Bear Canyon Arroyo (Figure 6). Figure 6: 1:36 Bear Canyon Confluence The scaled bottom width of this bike notch is 4 in. (12 ft. on the NDC) and it has a scaled side length of 3 in. (12 ft. bottom width and 9 ft. side length in the NDC). Osuna Bridge abutments extend into the channel and can be seen in Figure 7. Any standing waves created by the Bear Canyon Arroyo confluence will be clearly visible. The black line on either side of the model marks the top of the channel. This model was completed August 10, 2011 (Figure 7). 6
7 Figure 7: 1:36 Bike Notch & Osuna Bridge Modeling: Testing of the 1:84 model showed both bike notches to have no apparent adverse hydraulic effects (Figure 8). The Bear Canyon Arroyo confluence had minor effects on the flow within the NDC and as a result no standing waves were observed. Velocity and water depth measurements are displayed in Table 1 to allow for comparison between the two scale models. Figure 8: 1:84 Bear Canyon Arroyo confluence Modeling at the 1:36 scale produced similar results to that of the 1:84 scale. The bike notch had no effect on the channel s hydraulics, additionally the results solidified conclusions of the 1:84 scale model, as there were no standing waves or adverse hydraulic effects near the Bear Canyon confluence. 7
8 Concerns: Although no issues were detected with the bike notches on the 1:84 scale model, it was discovered this model lacked detail in the area of interest where the bike notch passes underneath Osuna Bridge. This small scale inhibited, due to size, the observations of standing waves or adverse hydraulic effects; thus no further testing was necessary. During testing of the 1:36 scale model engineers from AMAFCA and City of Albuquerque (COA) noticed non-uniform flow upstream of the drop (Figure 9). This non-uniform flow would increase velocity and would diminish any effects of standing waves from the Bear Confluence. Engineers suggested introducing channel bottom roughness, to imitate sediment and test flow stability, in the NDC. Bike notch designs also include hand rails which engineers suggested could cause hydraulic effects if they became blocked. Figure 9: 1:36 Non-Uniform Flow 8
9 Addressing Concerns: A barrier was installed on the 1:36 scale bike notch to create a no flow zone and imitate a blocked hand rail (Figure 10). Figure 10: 1:36 Blocked Hand Rail To create a more uniform flow and decrease velocity makeshift cylindrical bridge piers (woodpiles) were placed into the channel. Table 2 shows data relating the velocities and water depths of four different scenarios: 1. Bike notch covered with woodpiles in the channel, 2. Bike notch covered without woodpiles, 3. Bike notch uncovered with woodpiles in the channel, and 4. Bike notch uncovered without woodpiles. Scenario one resulted in the storm water reaching the Osuna Bridge abutments (Figure 11), whereas all other scenarios showed normal flow without reaching the abutments. Figure 11: 1:36 Water reaching Osuna Bridge abutment 9
10 Table 1: Four Scenarios of 1:36 Model 1:36 Without Wood Piles 1:36 With Wood Piles Bike Notch Covered Bike Notch Covered Velocity* (ft/sec.) 5.11 Velocity* (ft/sec.) *Right before Osuna Bridge 4.56 *Right before Osuna Bridge Velocity (ft/sec.) 5.01 Velocity (ft/sec.) 4.05 Pro. Velocity (ft/sec.) Pro. Velocity (ft/sec.) Water Depth (in.) 4.4 Water Depth (in.) 5.7 Water Depth (in.) 4.7 Water Depth (in.) 6 Flow Lower (gpm) 1215 Flow Lower (gpm) 1304 Flow Upper (gpm) 1307 Flow Upper (gpm) 1379 Flow Median (gpm) 1261 Flow Median (gpm) :36 Without Wood Piles 1:36 With Wood Piles Bike Notch Uncovered Bike Notch Uncovered Velocity* (ft/sec.) 5.71 Velocity* (ft/sec.) *Right before Osuna Bridge 5.08 *Right before Osuna Bridge Velocity (ft/sec.) 5.35 Velocity (ft/sec.) 4.39 Pro. Velocity (ft/sec.) Pro. Velocity (ft/sec.) Water Depth (in.) 4.2 Water Depth (in.) 4.9 Water Depth (in.) 4.5 Water Depth (in.) 5.2 Flow Lower (gpm) 1350 Flow Lower (gpm) 1398 Flow Upper (gpm) 1499 Flow Upper (gpm) 1528 Flow Median (gpm) 1424 Flow Median (gpm) 1462 Conclusion: A 1:84 scale model and a 1:36 scale model were used to simulate 24,000 ft. 3 /s of flow through the North Diversion Channel. After running the models it was determined that the placement of the Singer and Osuna bike notches into the North Diversion Channel do not affect the channel hydraulics nor create standing waves. If the bike notch underneath the Osuna Bridge were to become blocked storm waters flowing through the NDC would reach the Osuna Bridge abutments. 10
HYDRAULIC JUMP AND WEIR FLOW
HYDRAULIC JUMP AND WEIR FLOW 1 Condition for formation of hydraulic jump When depth of flow is forced to change from a supercritical depth to a subcritical depth Or Froude number decreases from greater
More informationPennsylvania Avenue (CR 484) Design Alternatives Study
MEMORANDUM Pennsylvania Avenue (CR 484) Design Alternatives Study Prepared for: APRIL 2016 Prepared By TABLE OF CONTENTS Project Background... 2 Previous Concept... 2 Existing Conditions... 4 New Alternatives...
More informationAgenda Item # Page # RECOMMENDATION
TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON FEBRUARY 2, 2016 JOHN BRAAM, P. ENG. MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER FIELD MARSHAL WOLSELEY
More informationTechnical Report Culvert A Hydraulic Analysis
DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design
More informationChadbourne Dam Repair and Fish Barrier
Chadbourne Dam Repair and Fish Barrier Final Report for the Western Native Trout Initiative Prepared by: Carol Endicott Yellowstone Cutthroat Trout Conservation Biologist Montana Fish, Wildlife & Parks
More informationRequest Number IR1-12: Flow Passage. Information Request
Request Number IR1-12: Flow Passage Information Request Provide additional information about the 100 metre flow passage channel scenario between the Westshore Terminals and the proposed Project terminal
More informationHY-8 Version 7.2 Build Date January 17, Federal Highway Administration.
HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges
More informationHuntington District. For More Information Contact (304)
Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation
More informationChapter 11. Culverts and Bridges Design Checklist for Culvert Design
Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional
More informationImproving Cyclist Safety at the Dundas Street West and Sterling Road Intersection
STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More informationAnnex E Bridge Pier Protection Plan
Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central
More informationAPPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY
APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose
More informationCity of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS
SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable
More informationBroad Street Bicycle Boulevard Design Guidelines
Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified
More informationSuperstreet Concepts & Application. Prepared by: PAPE-DAWSON ENGINEERS, INC. October 16, 2012
Superstreet Concepts & Application Prepared by: PAPE-DAWSON ENGINEERS, INC. October 16, 2012 1 Purpose of a Superstreet Improve Traffic Flow Increased Safety Economical Solution What is a Superstreet?
More informationUSING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1
USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently
More informationIllinois State Water Survey
Illinois State Water Survey HYDROLOGY DIVISION SWS Contract Report 508 COMPARISON OF 1987 AND 1989 BED PROFILE SURVEYS OF THE LOWER CACHE RIVER by Richard Allgire Office of Sediment and Wetland Studies
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More informationSimulation Analysis of Intersection Treatments for Cycle Tracks
Abstract Simulation Analysis of Intersection Treatments for Cycle Tracks The increased use of cycle tracks also known as protected bike lanes has led to investigations of how to accommodate them at intersections.
More informationWELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017
WELCOME FM 2818 (Harvey Mitchell Parkway) Open House Tuesday, Nov. 14, 2017 Why am I here? Review the planned improvements Provide comments on the proposed project The environmental review, consultation,
More informationCycle Track Design Best Practices Cycle Track Sections
Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide
More informationFEDERAL HIGHWAY ADMINISTRATION APPLICATION
FEDERAL HIGHWAY ADMINISTRATION APPLICATION REQUEST FOR PERMISSION TO EXPERIMENT WITH A BICYCLE BOX INTERSECTION TREATMENT Submitted by: City of Columbus Department of Public Service Date: June 26, 2009
More informationHospital Link Project Project Update September 2017
Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationGreenup Lock Filling and Emptying System Study
Fourth LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCET 2006) Breaking Frontiers and Barriers in Engineering: Education, Research and Practice 21-23 June
More informationTHE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05
OBJ/148/W 003 H05 PATTENS CROSSING THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION
More informationJAP Additional Information Sheet
JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide
More informationRio Intersection Traffic Restrictions Begin Monday
May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September
More informationBlair/Williamson Intersection Expressed Needs
Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson
More information10.0 CURB EXTENSIONS GUIDELINE
10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services
More informationComments EXECUTIVE SUMMARY
Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal
More informationExperimental Investigation of Clear-Water Local Scour at Pile Groups
Experimental Investigation of Clear-Water Local Scour at Pile Groups B. Ataie-Ashtiani 1 and A. A. Beheshti 2 Abstract: Experiments of local scour around pile groups are carried out under steady clear-water
More informationo n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.
N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation
More informationExperimental Investigation on Changes of Water Surface Profile with Gaussian Shaped Bottom and Side Roughness
Experimental Investigation on Changes of Water Surface Profile with Gaussian Shaped Bottom and Side Md. Rafiue Islam a, Shariful Islam b*, Md. Abdul Qaiyum Talukder c, S. M. Rezwan Hossain d Abstract Bed
More informationSTRUCTURE S-65 PURPOSE SPILLWAY OPERATION
STRUCTURE S-65 This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated, vertical lift gates, and a reinforced concrete lock structure with two pairs of
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationInformation for File # SEW
Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street
More informationMeeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018
Meeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018 The first public information meeting for the Warren County Pathway Corridor Project was held on Thursday,
More informationCALCASIEU SALINITY STRUCTURES. HYDRODYNAMIC MODELING (To Support Design of Salinity Barriers)
CALCASIEU SALINITY STRUCTURES HYDRODYNAMIC MODELING (To Support Design of Salinity Barriers) Presentation Overview 1 2 3 4 5 Project Overview and CEA Circulation Modeling Vessel Hydrodynamics Modeling
More information2.0 Existing Conditions
20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationWave Transmission Testing of the Martin Ecosystems BioHaven Floating Breakwater
Wave Transmission Testing of the Martin Ecosystems BioHaven Floating Breakwater March 14, 2014 Submitted by: Bret M. Webb, Ph.D., P.E. Assistant Professor Department of Civil Engineering University of
More informationPattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards
Replacement Project Community Connections Phase 2 Consultation Appendix 3: Open House Display Boards November 2016 Welcome! Welcome to the Replacement Project Public Open House We Want to Hear from You
More informationI-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.
RIDGELAND AVE OAK PARK AVE AUSTIN BLVD UP-RR BRC-RR ASHLAND AVE Study Area Map I-290 Phase I Study Area 294 UP RR Metra UP-W Illinois Prairie Path 38 Berkeley WOLF RD Hillside MANNHEIM RD Bellwood 290
More informationConstruction Specifications Manual
Isle of Wight County Pedestrian and Bicycle Master Plan Construction Specifications Manual Adopted August 20, 2009 Introduction The Isle of Wight County Pedestrian and Bicycle Facilities Master Plan was
More informationChapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT
Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT OVERVIEW This chapter describes a cohesive set of strategies to create a bicycle boulevard, namely to make streets safer and more efficient for bicycle
More informationModule 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions
Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions CONTENTS (MODULE 3) Introduction...1 Purpose...1 Goals and Learning Outcomes...1 Organization
More informationCVEN 311 Fluid Dynamics Fall Semester 2011 Dr. Kelly Brumbelow, Texas A&M University. Final Exam
CVEN 311 Fluid Dynamics Fall Semester 2011 Dr. Kelly Brumbelow, Texas A&M University Final Exam 8 pages, front & back, not including reference sheets; 21 questions An excerpt from the NCEES Fundamentals
More informationHospital Link Project Project Update November 2017
Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationPHASE 1 WIND STUDIES REPORT
PHASE 1 WIND STUDIES REPORT ENVIRONMENTAL STUDIES AND PRELIMINARY DESIGN FOR A SUICIDE DETERRENT SYSTEM Contract 2006-B-17 24 MAY 2007 Golden Gate Bridge Highway and Transportation District Introduction
More informationDesigning Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions
Module 3 & Other Purpose: Allow pedestrians to transition between the street and sidewalks, islands, etc. Typically installed at: Intersections (1 ramp at each end of each crosswalk) Mid-block crossings
More informationPhysical Modeling of Nearshore Placed Dredged Material Rusty Permenter, Ernie Smith, Michael C. Mohr, Shanon Chader
Physical Modeling of Nearshore Placed Dredged Material Rusty Permenter, Ernie Smith, Michael C. Mohr, Shanon Chader Research Hydraulic Engineer ERDC-Coastal Hydraulics Laboratory October 25,2012 Study
More informationMEPS Report Reina Doi
MEPS Report 21.06.2010 0925866 Reina Doi 1. Task Survey at the bikeway network with respect to weaknesses/ gaps including elaboration of measures to enhance the situation. The bikeway network of Wiener
More informationAUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS
AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS BACKGROUND: This study is a collaboration between Urban Circus (Visualisation) and Ethos Urban (Urban Design) Ideas were workshopped
More informationOffset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico
Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico INSTITUTE OF TRANSPORTATION ENGINEERS 2016 WESTERN DISTRICT MEETING JULY 11, 2016 7/11/2016 1 Project Vicinity Map 7/11/2016
More informationGovernance and Priorities Committee Report For the July 2, 2015 Meeting
CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton
More informationLiving Streets Policy
Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create
More informationFigure 1: East West Connector Alignment Alternatives Concept Drawing
Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road
More informationRLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN
AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN DESIGN DETAILS 135 AREA CHARACTER East Grand Forks a city of 7,501 people is located across the
More informationComponents of a Barrage
Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier
More informationDesigning Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods
Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Blake Tullis, Ph.D., Utah Water Research
More informationSt. Francis Drive through the City of Santa Fe Corridor Study
VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City
More informationA Tracer Investigation of. Aerated Water Dispersion and Tidal Exchange in. the San Joaquin River and Stockton Ship Channel
A Tracer Investigation of Aerated Water Dispersion and Tidal Exchange in the San Joaquin River and Stockton Ship Channel Prepared for: Jones & Stokes Sacramento, California Contact: Russ Grimes Prepared
More informationAPPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011
APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE
More informationMunicipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018
Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge
More informationRhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Providence County
Rhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Providence County www.planri.com PlanRI2040@gmail.com Municipal Roundtable Meeting Summary Date/time: Location: Tuesday,
More informationTransactions on Ecology and the Environment vol 12, 1996 WIT Press, ISSN
Open boundary condition for unsteady open-channel flow K. Mizumura Civil Engineering Department, Kanazawa Institute of Technology, 7-1 Ogigaoka, Nonoichimachi, Ishikawa Pref. 921, Japan Abstract Initial
More informationSuitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationRiver. Dynamics Canoeing: This section focuses on rivers; how they flow and on some basic maneuvers which you can execute on the river.
This section focuses on rivers; how they flow and on some basic maneuvers which you can execute on the river. Dynamics Canoeing: By Robert B. Kauffman, Ph.D. 1 Topics - Laminar and shore to center flows
More informationInjuries and Costs from Motor Vehicle Crashes into Fixed Objects
Injuries and Costs from Motor Vehicle Crashes into Fixed Objects Wayne Bigelow, M.S. Trudy Karlson, Ph.D. Patricia Beutel Center for Health Systems Research & Analysis University of Wisconsin Madison January,
More informationModelling of Pressurised Pipes within InfoWorks ICM and CS
Modelling of Pressurised Pipes within InfoWorks ICM and CS 1. Introduction Correctly modelling pressurised pipes, variously described as forcemains or rising mains, can be one of the more difficult aspects
More informationAn Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs
An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs A Thesis Proposal By XIAOHAN LI Submitted to the Office of Graduate Studies of Texas A&M University In partial fulfillment
More informationRoute 79/Davol Street Corridor Study
Route 79/Davol Street Corridor Study Fall River, MA Public Information Meeting #2 November 21, 2013 Fall River Heritage State Park Fall River, MA Agenda Welcome and Introductions Overview of Study Process
More informationAppendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING
Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G Alternative Solutions Details TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Krosno Creek Flood Reduction Project PROJECT
More informationReview of Guidelines for Cycleway Safety Fencing
Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared
More informationFINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:
FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project
More informationDRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.
TECHNICAL MEMORANDUM Albany - Washington Avenue Traffic Calming Evaluation Matrix of Conceptual Alternatives Date: May 17, 2017 Project #: 17356 To: Aleida Andrino-Chavez From: Laurence Lewis, Sara Muse,
More information2.0 LANE WIDTHS GUIDELINE
2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated
More informationOff-Road Facilities Part 1: Shared Use Path Design
Off-Road Facilities Part 1: Shared Use Path Design Presentation by: Eric Mongelli, P.E. Tom Huber October 9, 2012 FOLLOW THE CONVERSATION ON TWITTER Toole Design Group is live tweeting this webinar @tooledesign
More informationFIRE & LIFE SAFETY STANDARD
Title: Effective Date: 08/01/2006 Revised Date:01/01/2014 Code References: California Fire Code Note: This standard is a summary of Fire Department clarifications of City and State Codes. Information contained
More informationAppendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD
Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that
More informationSouth Carolina Department of Transportation. Engineering Directive
South Carolina Department of Transportation Engineering Directive Directive Number: ED-22 Effective: December 16, 2009 Subject: References: Purpose: This Directive Applies to: Considerations for Bicycle
More informationPublic Information Meeting. Warren County Pathway Corridor Project September 27, 2018
Public Information Meeting Warren County Pathway Corridor Project September 27, 2018 Why are we here? Introduce Study Hear concerns and Ideas Obtain input on preliminary Alternatives Previous Study (2008)
More informationMemorandum. Purpose: To update the MPO CTAC on the status of the LRTP scenario evaluation process.
Charlottesville-Albemarle Metropolitan Planning Organization POB 1505, 401 E. Water St, Charlottesville, VA 22902 www.tjpdc.org (434) 979-7310 phone info@tjpdc.org email Memorandum To: MPO CTAC From: Wood
More informationOutlet Structures T-12
Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed
More informationPre-Application Document Kaweah Project (FERC Project No. 298)
TABLE OF CONTENTS Page 3.12 Aesthetic Resources... 3.12-1 3.12.1 Information Sources... 3.12-1 3.12.2 Setting... 3.12-1 3.12.3 Project Facilities... 3.12-2 3.12.4 Previous Visual Resources Assessment...
More informationCITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study
CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final
More informationSHOALING PREVENTION: AN ALTERNATIVE TO DREDGING
SHOALING PREVENTION: AN ALTERNATIVE TO DREDGING AAPA DREDGING FOCUS GROUP Ponce, Puerto Rico December 4, 2008 About SedCon Technologies Inc. Leading provider of shoaling prevention systems Based in California
More informationCITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION
CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION June 2015 CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION Introduction The Alpharetta Downtown Master Plan was developed in the fall
More informationPublic Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022
US Army Corps of Engineers Detroit District Public Notice Corps File No. LRE-2016-00006-100 Date: March 19, 2017 Expires: March 18, 2022 PUBLIC NOTICE ANNOUNCING REGIONAL CONDITIONS AND WATER QUALITY CERTIFICATIONS
More informationCommunity engagement guide May 2018
Community engagement guide May 2018 Greater Wellington Regional Council (GWRC), Hutt City Council (HCC) and the New Zealand Transport Agency (NZTA) are working together to achieve some big improvements
More informationAppendix 3 Roadway and Bike/Ped Design Standards
Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.
More informationsection 4 Existing Conditions, Issues, and Options
section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationMassachusetts Stream Crossing Case Studies
Massachusetts Stream Crossing Case Studies Amy Singler Associate Director, River Restoration Program Carrie Banks River Continuity Coordinator Case Studies: Public Benefits: Movement of goods and people
More informationScarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017
Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active
More informationGRAND RAPIDS RESTORATION GRAND RAPIDS REVITALIZATION
GRAND RAPIDS RESTORATION RETURNING THE RAPIDS TO THE GRAND WHY IS THIS PLACE CALLED GRAND RAPIDS? We have been asking for over 100- years, where are the rapids? WHY IS THIS PLACE CALLED GRAND RAPIDS? compare
More informationDesign of Spillway Upgrades
USACE Dam Safety Program Design of Spillway Upgrades Sal Todaro, P.E. Senior Hydraulic Structures Engineer U.S. Army Corps of Engineers Risk Management Center 1 Presentation Overview 1. USACE (RMC) approach
More information2017 Annual Report: Survey pf American Alligators (Alligator mississippiensis) in the Big Thicket National Preserve. Summary.
2017 Annual Report: Survey pf American Alligators (Alligator mississippiensis) in the Big Thicket National Preserve Matthew I. Pyne Assistant Professor, Department of Biology, Lamar University, P.O. Box
More information