1 OBJ/148/W 003 H05 PATTENS CROSSING THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION BY THE RAMBLERS TO CLOSURE OF H05 PATTENS CROSSING, PARISH OF THORLEY PROOF OF EVIDENCE OF DAVID GLASS OF 4 DOLPHIN WAY, BISHOP S STORTFORD, HERTS, CM23 2AH Introduction 1. My name is David Glass and I am the Ramblers Footpath Secretary covering the parishes of Bishop s Stortford and Thorley. I have held this post for 6 years. I have been a keen walker for most of my life, and a member of the Ramblers for 9 years. I have lived in Bishop s Stortford for 40 years and have regularly walked the local footpath network. 2. Hertfordshire County Council and district councils regularly consult the Ramblers about proposals to alter the rights of way network. Hertfordshire and North Middlesex Area of the Ramblers have a Footpath Secretaries Committee, which I attend regularly and have discussed the Network Rail Level Crossing closure proposals on many occasions, and as the local Footpath Secretary I am responding on their behalf. 3. I would like to add that this is the only proposed diversion in Hertfordshire under the order that the Ramblers is objecting to. Additionally East Herts Ramblers have been consulted on 5 other diversion orders in our area since 1 August 2016, and we have not objected to any of them. We only object if we feel there is a significant detrimental impact on the rights of way network. In our view, there will be a OBJ/148/W 003 H05 PATTENS CROSSING 1

2 significant detrimental impact on the rights of way network if this crossing closure is authorised. 4. The Ramblers objects to the proposal to close H05 Pattens crossing because of the adverse effect the closure will have on the local footpath network. In the Ramblers view, the proposed alternative route is inadequate and unsuitable. The Existing Route 5. Footpath 022 (proposed to be diverted) across H05 Pattens level crossing is the main access to the Thorley Wash Nature Reserve from the south and west of Bishop s Stortford. It is a direct, short, convenient and open route linking Bridleway 010 to the Essex path network on the opposite side of the level crossing to the east. 6. From the west there is a clear line of sight from the A1184 (point A in Annex A) and the elevated level crossing. To the west there is clear line of sight from the elevated level crossing to point B in Annex A. 7. The East Herts District Plan identifies a further 4000 homes will be built in Bishop s Stortford, with 750 of those on the opposite side of the road to the Nature Reserve, so the crossing is likely to become all the more important and used by the residents of these new developments to take advantage of this direct route. 8. The Bishop s Stortford Neighbourhood Plan for All Saints, Central, South & part of Thorley states The character of existing public rights of way (PROWs) must be protected in terms of safety, directness, attractiveness and convenience. Although the TWAO does not come under development, it is clear that the desire of the local plan, and users of the PROWs, is protection and enjoyment of the current route. The Proposed Scheme 9. The whole area is in a designated flood plain. See the Environment Agency Flood Map for the area with annotated current footpath and proposed diversion, Annex OBJ/148/W 003 H05 PATTENS CROSSING 2

3 A. The current direct route over the crossing is about 100 metres long, with its height increasing at the level crossing. The proposed diversion is in the region of 1 kilometre long over an indirect and meandering path subject to several changes of direction. The current direct route takes 1.5 minutes to walk, whilst the proposed 1 km diversion takes 15 minutes. An unacceptable length of diversion. 10. New research by the Met Office highlights an increased risk of unprecedented rainfall. A News Release by The Met Office on 24 July 2017 entitled High Risk of Unprecedented Rainfall states Analysing these simulated events showed there is a 7% risk of record monthly rainfall in south east England in any given winter. 1 See Appendix A for the full news release. This would indicate that the likelihood of a path being impaired due to severe weather is higher than previously considered. 11. The chances of a path being rejected as unusable by a walker in severe, boggy or wet weather is far higher over a path ten times as long. 12. The proposed diversion will cross the railway line via a reduced height underpass, measured by myself at 1.9 M (6ft 3 inches). (See photo in Annex B). The NR proposal is to fit a mesh to the underside of the bridge via angle brackets to prevent access to the sleepers and debris from falling on walkers. In their proposals they provide no dimensions, however this will clearly reduce the height of the underpass. Additionally they propose to increase the ground level with a 2.5 % fall towards an existing drainage ditch. (Left to right in the photo). Again NR do not provide any dimensions but this must also reduce the height of the underpass. 13. Both these proposals will reduce the height of an already reduced height underpass. What will be the height of the underpass with the proposals implemented? Currently anyone under 6ft 3 inches will need to duck. After the proposals are implemented will this be reduced to 6 ft; or 5ft 11 inches or maybe lower? It is unacceptable to provide a diversion when so many people will be required to duck to get through. The risk of someone hurting themselves (head or 1 See OBJ/148 APPENDIX 5 for full news release. OBJ/148/W 003 H05 PATTENS CROSSING 3

4 back) whilst manoeuvring under the reduced height underpass must be considered. 14. NR state that According to the Environment Agency s (EA) Flood Map the existing underpass is at risk of flooding during a 1 in 1000 year flood event.. According to EA definitions this would put the underpass in Flood Zone A. (See Annex E). As can be seen from the Environment Agency Flood Maps in Annex A, to the west there is a finger of Flood Zone 2 and to the east a finger of Flood Zone 3 in and around the reduced height underpass. It is not clear which applies but from the Environment Agency definitions in Annex E, in the best case there is a 1 in 100 to 1 in 1000 risk of flooding, or worst case there is a 1 in 100 or greater annual probability of flooding within the underpass. 15. In August 2017 (at the time of writing this submission) the side of the underpass at its present level had water flowing in a side channel. (See Photo in Annex C). It is difficult to see how the reduced height underpass can be prevented from flooding and preventing use of the diverted route by walkers. 16. The proposed underpass is unacceptable as it is height restricted, (possibly less than 6 feet although this is not clear as NR have not provided any details), in permanent shade, in a damp environment and more likely to flood than the current path. The height restricted underpass could be intimidating to some users, particularly due to an abrupt unsighted left turn after passing through it from the west. 17. Once through the underpass the proposed path is about 700 metres in length in the Flood Plain. At the time of writing (August 2017), there are open drains and other watercourses flowing with water. This was the same in April, and because there was less overhanging vegetation then a photo taken in April is included as this shows the reduced height underpass more clearly. (See Annex D). In a normal winter, or after any heavy rain, this could all easily become flooded, waterlogged or miry. OBJ/148/W 003 H05 PATTENS CROSSING 4

5 18. It does not have to fully flood to make the route unusable or unattractive to users. If, with heavy rain, the path becomes significantly boggy or waterlogged users will be deterred, particularly as they will be required to walk 1 km on a meandering path, with several changes of direction, in uncertain conditions, with no sight lines of what is in front. In contrast, the existing path from the west is about 80 metres to the elevated railway crossing, which is in full view. To the east there is less than 20 metres to where the proposed diversion re-joins the current path. 19. If (as would appear to be highly likely) flooding or high rain fall resulting in a water logged or boggy surface prevents use of the proposed diversion, users will have to go an extra 2.3 kilometres to gain access to the Essex footpaths on the other side of the crossing. (Via a footbridge to the north of Pattens on Footpath 05.) This will include more than 900 metres along a major road. At normal walking speed this will take almost 35 minutes. See Annex F. The loss of amenity, exposure to noise and fumes of vehicles, and the extra distance on a major road makes that unacceptable. Conclusion 20. The Ramblers believes that the deleterious effect on the path network is not justified by the increase train journey speeds Network Rail hope to achieve by the crossing closure. It would be open to Network Rail to make the crossing safer in some other way (audible / visual warnings or a stepped bridge) which would not have such adverse effects on pedestrians in the parish of Bishop s Stortford and Thorley. 21. For the reasons detailed above, the Ramblers does not consider that the proposed alternative route for this crossing is suitable or adequate. The Inspector cannot, therefore, be satisfied that a proper alternative right of way has been provided by this scheme, as is required by section 5(6) of the Transport and Works Act Consequently, we ask the Inspector to recommend the retention of this crossing and of the local rights of way network. I believe that the facts stated in this witness statement are true. DAVID GLASS 18 SEPTEMBER 2017 OBJ/148/W 003 H05 PATTENS CROSSING 5

6 Annex A. Environment Agency Flood Map with Annotated Paths OBJ/148/W 003 H05 PATTENS CROSSING 6

7 Annex B. Reduced height underpass Annex C. Flowing water in reduced height underpass OBJ/148/W 003 H05 PATTENS CROSSING 7

8 Annex D. Water course adjacent to proposed diverted path with view towards reduced height underpass. OBJ/148/W 003 H05 PATTENS CROSSING 8

9 Annex E. Environment Agency Flood Zone definitions Flood Zone 1 Low Probability Land having a less than 1 in 1,000 annual probability of river flooding. (Shown as clear on the Flood Map all land outside Zones 2 and 3) Flood Zone 2 Medium Probability Land having between a 1 in 100 and 1 in 1,000 annual probability of river flooding. (Land shown in light blue on the Flood Map). Flood Zone 3a High Probability Land having a 1 in 100 or greater annual probability of river flooding. (Land shown in dark blue on the Flood Map). Flood Zone 3b The Functional Floodplain. This zone comprises land where water has to flow or be stored in times of flood. Local planning authorities should identify in their Strategic Flood Risk Assessments areas of functional floodplain and its boundaries accordingly, in agreement with the Environment Agency. (Not separately distinguished from Zone 3a on the Flood Map) Annex F. Alternative route linking Hertfordshire to Essex PRoWs if proposed NR diversion unavailable OBJ/148/W 003 H05 PATTENS CROSSING 9

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJ/148/W 005 E05 CROSSING, FULLERS END THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION

More information

Great Bentley Parish Level Crossing Closure Proposal E45 Great Bentley Station

Great Bentley Parish Level Crossing Closure Proposal E45 Great Bentley Station Great Bentley Parish Level Crossing Closure Proposal E45 Great Bentley Station 1. This crossing is convenient to the residents of the hamlet of Aingers Green (to the south) where the footpath starts (or

More information

APPLICATION FOR THE PROPOSED NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER SUFFOLK COUNTY COUNCIL PROOF OF EVIDENCE:

APPLICATION FOR THE PROPOSED NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER SUFFOLK COUNTY COUNCIL PROOF OF EVIDENCE: OBJ/29/W2/S25 APPLICATION FOR THE PROPOSED NETWORK RAIL (SUFFOLK LEVEL CROSSING REDUCTION) ORDER SUFFOLK COUNTY COUNCIL PROOF OF EVIDENCE: ANDREW WOODIN RIGHTS OF WAY AND ACCESS MANAGER Bachelor of Sciences

More information

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJ/148/026 Rebuttal THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 REBUTTAL PROOF BY MR PAUL

More information

Re The Network Rail (Cambridgeshire Level Crossing Reduction) Order. Opening Statement on Behalf of the Ramblers Association

Re The Network Rail (Cambridgeshire Level Crossing Reduction) Order. Opening Statement on Behalf of the Ramblers Association Re The Network Rail (Cambridgeshire Level Crossing Reduction) Order Opening Statement on Behalf of the Ramblers Association INTRODUCTION 1. This opening statement sets out a number of the Ramblers Association

More information

THE WIVENHOE SOCIETY

THE WIVENHOE SOCIETY THE WIVENHOE SOCIETY 4th July 2017 To: The Secretary of State for Transport, Transport and Works Act Orders Unit, Department for Transport, Zone 1/14, Great Minster House, 33 Horseferry Road. London SW1P

More information

DEPARTMENT FOR TRANSPORT 2012 Transport and Works Act 1992

DEPARTMENT FOR TRANSPORT 2012 Transport and Works Act 1992 Page 1 DEPARTMENT FOR TRANSPORT 2012 Transport and Works Act 1992 Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 Transport and Works (Inquiries Procedure) Rules

More information

Roads and public rights of way

Roads and public rights of way Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:

More information

Our Approach to Managing Level Crossing Safety Our Policy

Our Approach to Managing Level Crossing Safety Our Policy Our Approach to Managing Level Crossing Safety Our Policy Our policy towards managing level crossing risk is: that we are committed to reducing the risk at level crossings where reasonably practicable

More information

LEVEL CROSSING SIGHTING DISTANCES

LEVEL CROSSING SIGHTING DISTANCES Ref No: HGR-A0458 Issue No: 01 Issue Date: September 2012 HERITAGE RAILWAY ASSOCIATION GUIDANCE NOTE LEVEL CROSSING SIGHTING DISTANCES for Footpath and Vehicular User-Worked Crossings Purpose This document

More information

SUFFOLK COUNTY COUNCIL RESPONSE TO PHASE I OF NETWORK RAIL S LEVEL CROSSING REDUCTION STRATEGY

SUFFOLK COUNTY COUNCIL RESPONSE TO PHASE I OF NETWORK RAIL S LEVEL CROSSING REDUCTION STRATEGY LAF LAF17/02 Appendix Appendix A A Your Ref: Our Ref: Date: 22 December 2016 Enquiries to: Steve Kerr Tel: 01473 264745 Email: Steve.Kerr@suffolk.gov.uk Richard Schofield Route Managing Director (Anglia)

More information

Local Highway Panels Members Guide. 9 Public Rights of Way

Local Highway Panels Members Guide. 9 Public Rights of Way Local Highway Panels Members Guide 9 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction There are 3927km of (PROW) in Essex, and it is one of the most extensive networks in the country.

More information

Warfield Neighbourhood Plan: 4.4 Infrastructure

Warfield Neighbourhood Plan: 4.4 Infrastructure Warfield Neighbourhood Plan: 4.4 Infrastructure Previously decided Policy headings: Policy WNP16 Transport Impact of Development Policy WNP17 Transport Proposals Policy WNP18 New School Buildings Policy

More information

Adjustment of the Night Time Quiet Period (NTQP) - Dec 2016

Adjustment of the Night Time Quiet Period (NTQP) - Dec 2016 Adjustment of the Night Time Quiet Period (NTQP) - Dec 2016 Frequently Asked Questions Background Level crossings are the main interface between the rail network and road, footpath and bridleway networks.

More information

4.1 Introduction. 4.2 Aspects of walkable communities

4.1 Introduction. 4.2 Aspects of walkable communities 4 Community walkability Community walkability Making communities walkable Urban form Feeling secure 4.1 Introduction Walkability describes the extent to which the built environment is walking-friendly.

More information

Meeting between British Transport Police and Kirknewton Residents 3 rd January

Meeting between British Transport Police and Kirknewton Residents 3 rd January Kirknewton Level Crossing EH27 8DE Meeting between British Transport Police and Kirknewton Residents 3 rd January 7 th February2017 1. Objective- To address concerns at the repeated obstruction of the

More information

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout

More information

Collision Site Investigation - Bodenham By-Pass Background

Collision Site Investigation - Bodenham By-Pass Background Collision Site Investigation - Bodenham By-Pass Background The junction of the C12 and A338 was the subject of a Local Safety Scheme (LSS) in 2011. Analysation of the collisions at the time revealed the

More information

APPELLANT S STATEMENT OF CASE

APPELLANT S STATEMENT OF CASE TOWN & COUNTRY PLANNING ACT 1990 (AS AMENDED) APPEAL BY FOCUS INTERNATIONAL CHRISTIAN CENTRE (FICC) AGAINST REFUSAL OF PLANNING PERMISSION BY THE LONDON BOROUGH OF HILLINGDON PLANNING PERMISSION IS SOUGHT

More information

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas GLEN EIRA CITY COUNCIL MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas 1 WHAT HAVE WE HEARD? WHAT NOW? Stage one Tell us what you love about your shopping strip November

More information

London Cycle Network Annual Report 2000

London Cycle Network Annual Report 2000 London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway

More information

16.1 Introduction Pedestrian. signage strategies

16.1 Introduction Pedestrian. signage strategies 16 Measures to guide pedestrians Measures to guide pedestrians Types of pedestrian signage and design Other methods to guide or channel pedestrians 16.1 Introduction All road users need helpful guidance

More information

Dodder Greenway Emerging Preferred Route Consultation - October 2018

Dodder Greenway Emerging Preferred Route Consultation - October 2018 Dodder Greenway Emerging Preferred Route Consultation - October 2018 1.0 Introduction Dublin Cycling Campaign is the advocacy group for cycling in Dublin. Dublin Cycling Campaign is the leading member

More information

Appendix A Photo Set

Appendix A Photo Set Appendix A Photo Set Fish Habitat Inventory, Mattamy Richmond Lands, Spring 2009 Submitted To: Susan Murphy Mattamy Homes 123 Huntmar Drive Ottawa, Ontario K2S 1B9 KILGOUR & ASSOCIATES LTD. 1500 Bank Street,

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

North Somerset Council

North Somerset Council North Somerset Council REPORT TO PUBLIC RIGHTS OF WAY SUB COMMITTEE Date of Meeting : 19 November 2013 Subject of Report : Part of Footpath AX 6/12, AX 6/14 and AX 6/15 South Hill Farm Bleadon Town or

More information

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000 National Cycle Network Funding Scheme 2012/2012 Application Form Section 1:Project Outline Name and Address of Local Authority Contact person/proposed project manager Waterford City Council Paul Cleary,

More information

COUNT ME IN PEDESTRIAN COUNTERS CASE STUDY ABOUT THIS CASE STUDY:

COUNT ME IN PEDESTRIAN COUNTERS CASE STUDY ABOUT THIS CASE STUDY: COUNT ME IN PEDESTRIAN COUNTERS CASE STUDY ABOUT THIS CASE STUDY: Getting hold of good data on the number of pedestrians is invaluable to plan and prioritise walking-friendly streets. This case study explains

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Rail Traffic Whistles Rule Number: 4007 Version 1.0, 31 March 2016 Rail Traffic Whistles Rule Number: 4007 Document Control Identification Document title Number

More information

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to

More information

The Hundred Parishes

The Hundred Parishes The Hundred Parishes Walks from railway stations number 9 6.4 miles (10kms) from Bishop s Stortford to Stansted Mountfitchet Start: Bishop s Stortford station (Grid Reference TL492209) (ample parking and

More information

A5.1 Permitted activities

A5.1 Permitted activities Section A5 Transportation A5.1 Permitted activities A5.1.1 Activities within roads Note: Refer to Section D for the definition of road (a) Any activity associated with the movement of traffic and the functioning

More information

Cycle Routes. Traffic Advisory Leaflet 3/95 March Introduction. Implementation. Project aims. Design

Cycle Routes. Traffic Advisory Leaflet 3/95 March Introduction. Implementation. Project aims. Design Traffic Advisory Leaflet 3/95 March 1995 Cycle Routes Introduction The leaflet summarises the findings of the Cycle Routes Programme. This research was undertaken for the Department of Transport by the

More information

28 November Joanna Vincent Inquiry Manager. By only to: Dear Joanna

28 November Joanna Vincent Inquiry Manager. By  only to: Dear Joanna 25 Main Street Lyddington Oakham Rutland LE15 9LR 28 November 2018 Tel: 07885 643341 Email: mike.holland@hollandlp.co.uk Joanna Vincent Inquiry Manager By email only to: joannavincent@personaassociates.co.uk

More information

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link Overview of project: The Ladygrove Link will provide a modern, direct, off-road, active travel route from the new Didcot North East development and new leisure centre to the strategic Cow Lane Tunnel.

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards Replacement Project Community Connections Phase 2 Consultation Appendix 3: Open House Display Boards November 2016 Welcome! Welcome to the Replacement Project Public Open House We Want to Hear from You

More information

NEASHAM PARISH COUNCIL Risk Assessment relating to Neasham Village Green (approved by Council on 6 November 2017)

NEASHAM PARISH COUNCIL Risk Assessment relating to Neasham Village Green (approved by Council on 6 November 2017) SEVERITY Risk matrix Definitions LIKELIHOOD 1 2 3 4 5 1 1 2 3 4 5 2 2 4 6 8 10 3 3 6 9 12 15 4 4 8 12 16 20 5 5 10 15 20 25 Site description: Neasham Village Green is an open area of grassland in the middle

More information

Phone: Ref No: 06/2018/0884

Phone: Ref No: 06/2018/0884 Development Directorate Preston City Council Town Hall Lancaster Road Preston PR1 2RL FAO Ben Sandover Phone: 01772 533855 Email: david.allen@lancashire.gov.uk Ref No: 06/2018/0884 Date: 20 September 2018

More information

SCHEME DESIGN AND ENGINEERING

SCHEME DESIGN AND ENGINEERING THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL

More information

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 The following amendments to the wording of the maintenance strategy apply following the revised maintenance

More information

Group photo at the Nags Head before setting off on the anniversary walk.

Group photo at the Nags Head before setting off on the anniversary walk. Welcome to our autumn newsletter. The summer has flown by and it s hard to believe that it s six months since we held our 60th anniversary AGM at the Rhodes Centre. It was a special day and we were delighted

More information

ADDITIONAL EVIDENCE: OTTERS. Evidence of Eurasian Otter (Lutra lutra) population connectivity across the M4 Corridor around Newport Proposed Motorway

ADDITIONAL EVIDENCE: OTTERS. Evidence of Eurasian Otter (Lutra lutra) population connectivity across the M4 Corridor around Newport Proposed Motorway ADDITIONAL EVIDENCE: OTTERS Evidence of Eurasian Otter (Lutra lutra) population connectivity across the M4 Corridor around Newport Proposed Motorway Cardiff University Presented to the Inquiry with a supplementary

More information

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

Community engagement guide May 2018

Community engagement guide May 2018 Community engagement guide May 2018 Greater Wellington Regional Council (GWRC), Hutt City Council (HCC) and the New Zealand Transport Agency (NZTA) are working together to achieve some big improvements

More information

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group Guide to the Cycle Enfield Public Consultation on Enfield Town Produced by the Save Our Enfield Town Campaign Group What s in this guide? Introduction Page 3 What Enfield Council says about Option 1 Page

More information

North Diversion Channel Physical Modeling:

North Diversion Channel Physical Modeling: North Diversion Channel Physical Modeling: Bike Notch Implementation Between Vineyard Arroyo Confluence to Osuna Bridge August 29, 2011 Prepared for Albuquerque Metropolitan Arroyo Flood Control Authority

More information

Closing statement. I have chosen not to object in principle to the proposal to close S08.

Closing statement. I have chosen not to object in principle to the proposal to close S08. Closing statement In drafting the order being considered by this Inquiry Network Rail have set out plans to close many at grade pedestrian crossings in Suffolk and have been quite open that they will seek

More information

C.A.R.S. Project Design Report.

C.A.R.S. Project Design Report. C.A.R.S. Project Design Report. PRODUCED BY: Browne, A. Kennedy, M. Dolan, N. Selman, C. STUDENT NO: DATE DUE: COURSE: LECTURER: C09365788-C09686908-D11125480-C08868352 20-April-2012 Dt004/3 Civil Engineering

More information

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE

NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE The City of Vaughan 2141 Major Mackenzie Drive Vaughan, Ontario Canada L6A 1T1 Tel (905) 832-2281 NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE REVISED JUNE 2010 APPLICABILITY The Neighbourhood

More information

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING BBAG BRIEFING NOTE EMAIL: BERMUDABRIDGEAGP@BTINTERNET.COM WWW.FACEBOOK.COM/GROUPS/BERMUDABRIDGEAG TWITTER @BERMUDABRIDGEAG CYCLING BBAG BRIEFING NOTE

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

DRAFT. DRAFT Transport. Chapter 7 - Transport

DRAFT. DRAFT Transport. Chapter 7 - Transport Transport Contents 7.1 Objectives and policies 7.1.1 Objective 1 Integrated transport system 7.1.2 Objective 2 Adverse effects from the transport network 7.2 Rules All zones outside the Central City 7.2.1

More information

The Council can make a public path extinguishment order if it is expedient to do so on the ground that it is not needed for public use.

The Council can make a public path extinguishment order if it is expedient to do so on the ground that it is not needed for public use. Appendix B Legal and Policy Considerations B.1. Section 118 of the Highways Act 1980 ( the 1980 Act ) empowers the Council, as Highway Authority, to make and confirm an order to extinguish a public footpath

More information

PUBLIC RIGHTS OF WAY ISSUES

PUBLIC RIGHTS OF WAY ISSUES PUBLIC RIGHTS OF WAY ISSUES ANIMALS Aggressive animals: section 2 of the Animals Act 1971 makes the keeper of an animal liable for damages if it injures another person, provided that the keeper was aware

More information

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction COUNCIL POLICY Road Reserve and Footpath Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction Approved By: Council Review Date: 31 December 2013 Responsible Officer: Version No: 02 General Manager

More information

POLICY: TRAFFIC CALMING

POLICY: TRAFFIC CALMING 2006 MAY REFERENCE: COUNCIL APPROVED BY COUNCIL MAY 23, 2006 CITY OPERATIONS - NO. 608 POLICY: TRAFFIC CALMING A. All requests for traffic calming within the City shall be considered in accordance with

More information

connectivity through walking and cycling

connectivity through walking and cycling active design case study the national forest: connectivity through walking and cycling active design principles in action: 1. ACTIVITY FOR ALL 2. WALKABLE COMMUNITIES 3. CONNECTED WALKING & CYCLING ROUTES

More information

A guide to level crossings Making sure everyone gets across safely

A guide to level crossings Making sure everyone gets across safely A guide to level crossings Making sure everyone gets across safely Contents About this guide and our safety measures 04 For BSL and audio content, download Signly Network Rail for free from the Apple App

More information

Walking Audit Supporting Information

Walking Audit Supporting Information Walking Audit Supporting Information Planning to do a walking audit of your streets? Here s some helpful suggestions to help get you started. 1. Preparing for your audit Decide where you want to walk.

More information

Neighbourhood Walkability Checklist How walkable is your community?

Neighbourhood Walkability Checklist How walkable is your community? Template letter This template is a guide to writing to your local council. You can change it in any way you feel necessary. Don t forget to attach the checklist and any photographs, maps or sketches you

More information

Works Approval Application. G.2 Traffic

Works Approval Application. G.2 Traffic Works Approval Application G.2 Traffic RO097400.WAA.23.04.2018 Floor 11, 452 Flinders Street Melbourne VIC 3000 PO Box 312, Flinders Lane Melbourne VIC 8009 Australia T +61 3 8668 3000 F +61 3 8668 3001

More information

Styal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169

Styal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169 Styal Golf Course Accommodation Works Non-Technical Summary 1007/6.15.2/169 September 2013 Document Control Sheet Project Title: Styal Golf Course Report Title: Non Technical Summary Document No: 1032775.014.001

More information

1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street

1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street 1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street Understanding City Road West City Road West (between Clarendon Street and ower Street) is a local street, and can be significantly enhanced

More information

CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September Adoption of Land Drainage Byelaws.

CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September Adoption of Land Drainage Byelaws. CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September 2018 REPORT AUTHOR: SUBJECT: County Councillor Phyl Davies Portfolio Holder for Highways, Recycling and Assets Adoption of Land Drainage

More information

Traffic Calming Policy

Traffic Calming Policy City of Friendswood Traffic Calming Policy May 2012 Community Development Department Table of Contents Title Page Table of contents... 1 Background and History... 2 Purpose and Goals... 2 City Procedure

More information

FAQ s Walsh Road / Ferguson Road Pilot Scheme

FAQ s Walsh Road / Ferguson Road Pilot Scheme FAQ s Walsh Road / Ferguson Road Pilot Scheme What is happening? Traffic calming measures are being installed as a pilot. Temporary Bollards will be installed to the east of 1 Ferguson Road and a Temporary

More information

ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL

ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL Clerk to the Council: Mrs M Rousseau, West View, West Bagborough, TA4 3EG Phone: 01823 432 658 Email: clerk@bishopslydeard.org http://www.bishopslydeard.org.uk/

More information

QLDC Council 29 October Report for Agenda Item: 3

QLDC Council 29 October Report for Agenda Item: 3 QLDC Council 29 October 2015 Department: Infrastructure Beach Street Pedestrianisation Purpose Report for Agenda Item: 3 1 The purpose of this report is to obtain Council approval to consult over options

More information

James Bateman's Sprink 'Tunnel', Biddulph (Grid Reference SJ )

James Bateman's Sprink 'Tunnel', Biddulph (Grid Reference SJ ) Origins James Bateman's development of his Grange Estate around the middle of the Nineteenth Century included a new private woodland walk giving more convenient access towards the settlement of Biddulph

More information

Entry Treatments. Traffic Advisory Leaflet 2/94 August Introduction. Design. Vertical Deflections. Locations

Entry Treatments. Traffic Advisory Leaflet 2/94 August Introduction. Design. Vertical Deflections. Locations Traffic Advisory Leaflet 2/94 August 1994 Entry Treatments Introduction Entry treatments have been developed for use at side roads so that drivers leaving a major road are in no doubt that they are entering

More information

Harriet Fraser Traffic Engineering & Transportation Planning

Harriet Fraser Traffic Engineering & Transportation Planning Appendix 5: Traffic Assessment 71 26 February 2015 Mr James Beban Senior Resource Consents Planner Cuttriss Consultants Ltd PO Box 30429 Lower Hutt PO Box 40170 Upper Hutt 5140 P 04 526 2979 M 027 668

More information

Rights of Way Enforcement Procedure for Land Managers

Rights of Way Enforcement Procedure for Land Managers Rights of Way Enforcement Procedure for Land Managers November 2006 Contents 1. Introduction 2. Infringements 2.1 Disturbance to the surface of a right of way 2.2 Obstructions 2.3 Structures 3. Enforcement

More information

High 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High

High 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High Hurworth Parish Plan 2010 Actions In this action plan cost ranges are: Low up to 499 Med - 500 to 4,999 High 5,000+ Very - Over 20,000 Hurworth Parish Council Darlington Borough Council MSG Middleton St

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure 18 Maintaining the pedestrian network Maintaining the pedestrian network Maintenance in the short and long term Planning for pedestrians during maintenance works 18.1 Introduction Both pedestrian-related

More information

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network Need for a strategy 1. The government s aim is to double cycling levels nationally by 2025 [note 1]. This would bring significant health, environmental, economic and traffic benefits [note 2]. It is widely

More information

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign E4 Cycle Route Exeter University to Redhayes Bridge - Recommendations from Exeter Cycling Campaign 1.0 Introduction Exeter Cycling Campaign has prepared this report to provide recommendations for Devon

More information

TRAFFIC ADVISORY LEAFLET

TRAFFIC ADVISORY LEAFLET TRAFFIC ADVISORY LEAFLET 2/04 Rural traffic calming: Bird Lane, Essex INTRODUCTION Many rural communities are concerned about traffic growth and high vehicle speeds. Local authorities have to balance the

More information

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria, 1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology

More information

DRAFT for a State Policy for Healthy Spaces and Places

DRAFT for a State Policy for Healthy Spaces and Places DRAFT for a State Policy for Healthy Spaces and Places 1 DRAFT State Policy for Healthy spaces and Places 1. Purpose To encourage the use and development of land that builds healthy communities through

More information

Guidance Notes for Parish Footpath Wardens

Guidance Notes for Parish Footpath Wardens Ramblers Kent Area Guidance Notes for Parish Footpath Wardens Definitions of Public Right of Way: Footpath (FP) For walkers only. Prams, pushchairs or wheelchairs are allowed along a public footpath but

More information

Watford Health Campus LLP. Watford Fields Residents Association. Re: Wiggenhall Road Junction

Watford Health Campus LLP. Watford Fields Residents Association. Re: Wiggenhall Road Junction Watford Health Campus Partnership LLP Watford Health Campus LLP Watford Fields Residents Association C/o Jags Shah Tempsford Hall Sandy Beds SG19 2BD 27 th January 2016 Re: Wiggenhall Road Junction Dear

More information

The Legal Record of Rights of Way

The Legal Record of Rights of Way Cranborne Chase and West Wiltshire Downs Area of Outstanding Natural Beauty The Legal Record of Rights of Way www.ccwwdaonb.org.uk Who records and manages Rights of Way (RoW)? County Councils have the

More information

CYCLING TIME TRIALS The national governing body for CYCLING time trials

CYCLING TIME TRIALS The national governing body for CYCLING time trials CYCLING TIME TRIALS The national governing body for CYCLING time trials www.ctt.org.uk SOUTH DISTRICT COUNCIL COURSE DETAILS FOR START SHEETS & RISK ASSESSMENT INDEX Guidance Notes for Event Promoters

More information

Buggy Policy Document Date: 10 November 2017

Buggy Policy Document Date: 10 November 2017 Buggy Policy Document Date: 10 November 2017 Cavendish Golf Club recognises that it has a duty of care to the staff, members and guest users of the golf course. The topography and nature of the course

More information

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan Response to Draft Glen Eira Community Plan We would like to take this opportunity to thank Glen Eira City Council for the opportunity to comment on the Glen Eira Draft Community Plan. Below is an outline

More information

TGSI Tactile Ground Surface Indicators

TGSI Tactile Ground Surface Indicators TGSI Tactile Ground Surface Indicators Introduction: This Design Note, No 11, provides guidelines and requirements for the use and installation of Tactile Ground Surface Indicators (TGSI s). References

More information

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services Transport - 128 - Road Network KEY FACTS Council operates and maintains a network of some 2,53 km which includes: o 864 km of sealed roads o 1,666 km of unsealed roads o 7 bridges and large culverts o

More information

Parish Council s Comments Planning Reference Land at Ledbury Road, Wellington Heath November 2018

Parish Council s Comments Planning Reference Land at Ledbury Road, Wellington Heath November 2018 2018 Planning Reference 184105 - Land at Ledbury Road, Wellington Heath 183936 - Treetops, Horse Road, Wellington Heath 183920 - The Beck, The Common, Wellington Heath 183143/F - Variation to Permission

More information

CITY OF SASKATOON COUNCIL POLICY

CITY OF SASKATOON COUNCIL POLICY ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,

More information

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division Southside Road Prepared for: City of St. John s Police & Traffic Committee Prepared by: City of St. John s Traffic Division January 2007 Southside Road - Traffic Report Page 1 of 9 BACKGROUND: th At the

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.

More information

Traffic calming regulations (Scotland)

Traffic calming regulations (Scotland) Traffic Advisory Leaflet 11/94 December 1994 Traffic calming regulations (Scotland) Introduction Traffic calming can help drivers to make their speeds appropriate to local conditions, through measures

More information

Heartwood Forest, in Sandridge, Hertfordshire, is a place where everyone can find space, peace, wildlife and miles of beautiful woodland to explore.

Heartwood Forest, in Sandridge, Hertfordshire, is a place where everyone can find space, peace, wildlife and miles of beautiful woodland to explore. Heartwood Forest Accessibility Statement September 2016 Purpose: This accessibility statement outlines the available facilities and access information for Heartwood Forest. Welcome We, the Woodland Trust,

More information

72 Crossrail Amendment of Provisions

72 Crossrail Amendment of Provisions 72 Crossrail Amendment of Provisions Manhattan Shaft Worksite 5.4.36 This new worksite is adjacent to the Tumbling Bay worksite and will occupy an area of land between the Manhattan Building and the Great

More information

A27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised

A27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised A27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised users (NMUs)] Introduction This note describes our understanding of the needs of Non-Motorised Users (NMUs) as

More information

9. Parking Supporting Statement

9. Parking Supporting Statement 9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.

More information

Queen s Park Golf Course Queen s Park West Drive Bournemouth BH8 9BY Tel:

Queen s Park Golf Course Queen s Park West Drive Bournemouth BH8 9BY Tel: Queen s Park Golf Course Queen s Park West Drive Bournemouth BH8 9BY Tel: 01202 451675 Email: queenspark@bournemouth.gov.uk www.queensparkgolfcourse.com RIDE-ON BUGGY SAFETY POLICY USE OF RIDE-ON BUGGIES

More information