Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Similar documents
TRAFFIC IMPACT STUDY CRITERIA

Transportation Impact Study for Abington Terrace

TRAFFIC IMPACT ANALYSIS

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Figure 1: Vicinity Map of the Study Area

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Shockoe Bottom Preliminary Traffic and Parking Analysis

Road Diets FDOT Process

4.0 TRANSPORTATION SYSTEMS

P HA Transportation Consultants

Bridge Street Corridor Study Report

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Henderson Avenue Mixed-Use Development

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

CITY OF LOMITA CITY COUNCIL REPORT

THIS PAGE LEFT BLANK INTENTIONALLY

ALLEY 24 TRAFFIC STUDY

Chapter 16: Traffic and Parking A. INTRODUCTION

Access Management Regulations and Standards

Grant Avenue Streetscape

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

MEMORANDUM. Our project study area included the following locations:

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Traffic Study North Shore School District 112

Chapter 2: Standards for Access, Non-Motorized, and Transit

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

Glenn Avenue Corridor Traffic Operational Evaluation

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

TRAFFIC ASSESSMENT River Edge Colorado

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Angie Silva Kitsap County Commissioners Office Stef Herzstein, PE, PTOE Transpo Group Jessica Lambert Transpo Group

Figure 1: East West Connector Alignment Alternatives Concept Drawing

TRAFFIC STUDY GUIDELINES Clarksville Street Department

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018

C C C

PUBLIC HEARING. for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida. Financial Project ID No.

Michael A. Werthmann, PE, PTOE Principal

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Conversion of One-Way Couplet Streets to Two-Way

6060 North Central Expressway Mixed-Use Site Dallas, Texas

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Highway 111 Corridor Study

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

Chapter 3 BUS IMPROVEMENT CONCEPTS

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

Bay to Bay Boulevard Complete Streets Project

Walton Acres at Riverwood Athletic Club Clayton, North Carolina

REDEVELOPMENT TRAFFIC IMPACT STUDY

CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

#!! "$% ##! &! # '#! % $ #!

CITY OF SASKATOON COUNCIL POLICY

D.13 Transportation and Traffic

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS

Lake Whitney Elementary School

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Orange Center Elementary School

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Traffic Impact Study for Rolling Ridge Redevelopment

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

Hidden Oaks Elementary School

Marina Loft (DRC 51-R-12)

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

3.9 - Transportation and Traffic

Donahue Drive Corridor Traffic Operational Evaluation

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TRANSPORTATION IMPACT STUDY

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

Transcription:

Appendix B Environmental Resource Technical Memorandum Assessment on Travel Pattern and Access Impacts

TECHNICAL MEMORANDUM ENVIRONMENTAL RE-EVALUATION FOR UNION STATION TO OAK CLIFF DALLAS STREETCAR To: Jay Kline, AICP DART Project Manager From: Reggie Herman, AICP Deputy Project Manager Scott A. Feldman, PE, PTOE and Derek Benedict, PE (CA) Date: January 30, 2012 RE: Assessment of Travel Patterns and Access Impacts General Planning Consultant Services - Dallas Area Rapid Transit (DART) Contract ID C-1017751-01 Task Order #14: Reassessed Traffic Analysis of TIGER Streetcar EA/PE INTRODUCTION AND METHODOLOGY This technical memorandum revisits the traffic analysis conducted in the Environmental Assessment (EA), Appendix C Design Considerations Technical Memoranda, C-6: Roadway Capacity Analysis prepared for the Union Station to Oak Cliff Dallas Streetcar Project. This project was environmentally cleared on July 21, 2011 with a Finding of No Significant Impact (FONSI). This memorandum reassesses the intersection capacities as a result of the addition of the passing track (proposed action) to the environmentally cleared streetcar project known as Union Station to Oak Cliff Dallas Streetcar. The proposed action is known as the Passing Track for Union Station to Oak Cliff Dallas Streetcar. The passing track would be placed in the median of Zang Boulevard at the Oakenwald Street stop adjacent to the Zang and Oakenwald intersection. The purpose of the proposed action is to provide an area where disabled streetcar vehicles can be removed from service. The need of the proposed action is to have the ability to maintain headways. The reassessment of intersection capacities includes an analysis of the proposed action s impact on motorized traffic flow and operations for both existing and future conditions. EXISTING CONDITIONS Existing Zang Boulevard is currently a six-lane roadway in the vicinity of the Oakenwald intersection. For the purposes of this memorandum, analysis conditions were taken as those conditions analyzed as part of the initial EA for the Streetcar project. In the initial EA, Zang Boulevard at Oakenwald Street has two southbound lanes and three northbound (two through and a turn bay) lanes, and six-to-eight foot sidewalks. Schematic sketches of the conditions analyzed are provided in Figures 1-4 at the end of this document. Dedicated bicycle facilities do not exist on the corridor. The proposed alignment is along a designated City of Dallas bicycle route.

Existing Vehicular Operations Data collection efforts in support of the Union Station to Oak Cliff Dallas Streetcar Project occurred in January 2011, and included: 1) 24-hour volumes on the Oak Cliff end of the Houston Street Viaduct; 2) 24-hour volumes on Zang Boulevard between Oakenwald Street and Plowman Avenue; and 3) AM and PM peak turning movement counts at the intersections of Houston and Young streets and Zang and Colorado boulevards. This data was supplemented in December of 2011 to include peak period turning movement counts at the intersection of Zang Boulevard and Oakenwald Street to account for the proposed action. The speed limit on Zang Boulevard in the immediate vicinity of the intersection at Oakenwald is 35 miles per hour. To establish a baseline condition, intersection levels of service (LOS) have been evaluated based on procedures contained in the Highway Capacity Manual (HCM). Generally accepted practices define LOS E as unacceptable operations which would require mitigation. For this analysis, LOS D is the minimum acceptable LOS. Using the supplemental data collected, intersection analysis has been performed at the intersection of Zang Boulevard and Oakenwald Street. This intersection is currently operating under unsignalized, minor-street stop control. The results of the existing conditions (six-lane) analysis are provided in Table 1. A lane reduction is proposed on Zang Boulevard to accommodate the streetcar alignment with the passing track. The intersection has also been analyzed under the analysis geometry (four-lane), and these results are also provided in Table 1. Intersection Zang/Oakenwald (Original Geometry) Zang/Oakenwald (Analysis Geometry) Table 1 Existing Conditions Intersections AM Peak PM Peak Delay Delay LOS (sec/veh) (sec/veh) LOS 0.3 A 1.0 A 0.3 A 1.1 A Based on the results shown above, this intersection is currently operating at acceptable levels, and is projected to do so with the implementation of the streetcar alignment with the passing track. FUTURE CONDITIONS The future conditions analysis for vehicular traffic consists of projected volumes with proposed geometry. Future year (2014 opening year) conditions include full build-out trip generation estimates for the recently completed Zang Triangle Apartments, a multi-family residential development. Future Vehicular Operations The previous EA included the impact of reducing Zang Boulevard to two travel lanes between Greenbriar Lane and Colorado Boulevard. Oakenwald Street is a local collector roadway with one travel lane in each direction. There is a driveway at the Zang and Oakenwald intersection serving the Oak Cliff Founder s Park parking lot. It should be noted that during the data collection peak periods in December 2011, no Environmental Re-evaluation of Union Station to Oak Cliff Dallas Streetcar TM: Assessment of Travel Patterns and Access Impacts 2

vehicles were observed entering this parking lot. The inclusion of the proposed passing track in the project would remove the northbound turn bay for left turning traffic onto Oakenwald Street. Thus, the future analysis considers that northbound left-turns at the intersection would have to be made from a general purpose traffic lane. The original traffic analysis detailed in the EA (Appendix C Design Considerations Technical Memoranda, C-6: Roadway Capacity Analysis) stated the left-turning movements through the median opening at Zang and Oakenwald intersection resulted in traffic conflicts with the streetcar alignment. To mitigate traffic conflicts a traffic signal at the intersection was proposed as part of the original environmentally cleared action. The traffic analysis conducted for the proposed passing track examined potential traffic impacts with signalized and unsignalized operation at the Zang and Oakenwald intersection. The analysis determined an unsignalized Zang and Oakenwald intersection would temporarily experience poor sight distance for left-turn movements (from Oakenwald Street and from Zang Boulevard into Oak Cliff Founder s Park parking area) if the passing track is utilized for the removal and storage of the disabled streetcar vehicle. However, the original proposed mitigation (installation of the traffic signal) would alleviate the temporary poor sight distance and further enhance pedestrian access to the streetcar stop from Oak Cliff Founder s Park and the apartment complexes to the north and west. The intersection has been analyzed under future year conditions and under signalized control. The results of this analysis are provided in Table 2. Table 2 Future Conditions Signalized AM Peak PM Peak Intersection Delay Delay LOS LOS (sec/veh) (sec/veh) Zang/Oakenwald 16.4 B 15.5 B As indicated in Table 2, under signalized control, the intersection is projected to operate at LOS B under future conditions. Due to the obstruction caused by queuing left-turns in the northbound lane, the signal has been assumed to operate split-phase, with protected-only left turns onto Oakenwald Street. This would also allow for left-turns into Oak Cliff Founder s Park. Traffic signalization installed at this intersection should comply with guidelines contained in the Texas Manual on Uniform Traffic Control Devices (TMUTCD). Oak Cliff Founder s Park has driveways providing access to Zang Boulevard and the Zang and Oakenwald intersection. The park driveways currently provide one-way circulation with inbound traffic at the intersection, and outbound traffic near the median opening serving the Grand Estates at Founders Park Apartments (formerly Kessler Park apartment complex). The City of Dallas would reverse circulation to facilitate efficient automobile movements in relation to the streetcar operations in Zang Boulevard. This would entail inbound (ingress) traffic accessing the driveway at the existing median opening at the apartment complex, and outbound (egress) traffic accessing the driveway at the intersection. Coordination has occurred with the City of Dallas Parks and Traffic Operations departments, which do concur with the proposed circulation modification. Additional Operational Considerations With the reduction in lanes for northbound traffic on Zang Boulevard, a potential lane alignment issue is created. Currently, the right-hand lane of Zang is channelized onto southbound Marsalis Avenue just north of Oakenwald Street with the two left lanes continuing onto the Jefferson Street Viaduct. Given Environmental Re-evaluation of Union Station to Oak Cliff Dallas Streetcar TM: Assessment of Travel Patterns and Access Impacts 3

that queing left turns may block a through lane at Oakenwald Street, the major northbound traffic movement from Zang Boulevard to Jefferson Boulevard could be forced to make two lane changes between Colorado and Jefferson boulevards. This would be mitigated by re-striping Zang Boulevard between Oakenwald Street and Marsalis Avenue to have both lanes at Oakenwald Street continue as through lanes onto the Jefferson Viaduct with a right-turn lane pocket introduced at Marsalis Avenue. The re-striping of the Zang Boulevard lanes is currently reflected in the 10 percent Design Plan Set for the passing track dated January 13, 2012. SUMMARY The Passing Track for the Union Station to Oak Cliff Dallas Streetcar has been evaluated with respect to future operations at the intersection of Zang Boulevard and Oakenwald Street. Table 3 provides a comparison of existing and proposed operations. Table 3 Comparison of Intersection Operation Existing Geometry Unsignalized Signalized AM Peak PM Peak AM Peak PM Peak AM Peak PM Peak Intersection Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Zang/Oakenwald 0.3 A 1.1 A 1.5 A 1.4 A 16.4 B 15.5 B As indicated in the summary tables, the proposed action would not result in unacceptable vehicular traffic operations, which is consistent with the traffic analysis determination as detailed in the EA (Appendix C Design Considerations Technical Memoranda, C-6: Roadway Capacity Analysis). No new mitigation is proposed; however, due to an oversight in the original EA the traffic signal at the Zang and Oakenwald intersection had not been included in the Mitigation and Monitoring Plan. In conjunction with the Environmental Re-evaluation the Mitigation and Monitoring Plan has been modified to include the original mitigation measure and is reflected in Appendix H. Environmental Re-evaluation of Union Station to Oak Cliff Dallas Streetcar TM: Assessment of Travel Patterns and Access Impacts 4