PROPOSED BYLAW UPDATES AND FEES FOR SIDEWALK CAFÉS & MARKETING DISPLAYS

Similar documents
Toronto Sidewalk Café Manual

Toronto Sidewalk Café Manual

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Ann Arbor Downtown Street Plan

122 Avenue: 107 Street to Fort Road

Living Streets Policy

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Building sidewalks on local streets to reduce accessibility barriers

complete streets design and construction standards public primer City of Edmonton

Transportation Assessment

Highland Creek Village Transportation Master Plan

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Town of Beaumont Sidewalk Café Guidelines

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

PEDESTRIAN ACTION PLAN

Tonight is for you. Learn everything you can. Share all your ideas.

Omaha s Complete Streets Policy

TORONTO WALKING STRATEGY

STONY PLAIN ROAD STREETSCAPE

Environment and Public Works Committee Presentation

Appendix A-K Public Information Centre 2 Materials

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Complete Streets Policy Framework

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

WELCOME Public Information Centre

Complete Streets Successes, Opportunities, and Challenges

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

City of Waterloo Complete Streets Policy

Gardiner East. Gardiner Expressway & Lake Shore Boulevard Reconfiguration Environmental Assessment & Urban Design Study

Frequently Asked Questions (FAQ)

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

AMATS Complete Streets Policy

Welcome. Background. Goals. Vision

Richmond-Adelaide Cycle Tracks

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Public Works and Infrastructure Committee. General Manager, Transportation Services. P:\2016\Cluster B\TRA\TIM\pw16009tim.docx

Transportation Master Plan Advisory Task Force

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

VAN AKEN DISTRICT CONNECTIONS PLAN COMMUNITY MEETING #1 June 20, 2016 SMITHGROUP JJR WSP PARSONS BRINCKERHOFF STUDIO GRAPHIQUE

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

Building a Toronto that Moves

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Public Information Centre

Complete Streets for Niagara A working method to visualize the creation of a complete street June 20th, 2013

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 10, 2017

Richmond Street and Adelaide Street Cycle Tracks

Public Works and Infrastructure Committee. General Manager, Transportation Services

Bloor Street Design Feasibility Study and Bike Lane Pilot Project. Public Works and Infrastructure Committee

Classification Criteria

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Active Transportation Infrastructure Investment A Business Case

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Ajax: The Road to Complete Streets

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

We support the following: Tom Davies Square 200 Brady Street Sudbury, Ontario

Edenbrook Hill Drive Traffic Calming Study

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

PG29.6 REPORT FOR ACTION. Downtown Mobility Strategy SUMMARY

CITY OF CAMBRIDGE 2015 BICYCLE PLAN TOWARDS A BIKABLE FUTURE

Illustrated Principles of Good Planning

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

Toronto Complete Streets Guidelines

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Great Streets are Great for Business

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Evaluation and Changes to Pedestrian Priority Phase Signal (Scramble Crossing) at Bay Street and Bloor Street

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

June 2015 REGIONAL TRANSPORTATION SNAPSHOT

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

Welcome to the Open House

Lower Jarvis Street Pedestrian Promenade Plan, Front Street East to Queens Quay East

Two-Year Extension for Stationary Food Trucks (R55 Curb Lane Vending Permits)

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Appendix A Guiding Principles for Cycling Safety in Work Zones

Services Department A September 18, 2006 Region of Durham Recommended Arterial Corridor All Wards Guidelines Study

2. Context. Existing framework. The context. The challenge. Transport Strategy

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Bicycle Master Plan Goals, Strategies, and Policies

Monterey Road Complete Streets

83 AVENUE PRE-CONSTRUCTION MEETING

City of Toronto Complete Streets Guidelines

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Major Bike Routes 102 Avenue Workshop April 21, 2015

DEFINING THE STREETSCAPE DRAFT

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

Appendix 1 Transit Network Analysis

Public Workshop #2. September 14, 2016

Linking Transportation and Health in Nashville & Middle Tennessee

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Pre-Construction Meeting

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

REimagining Yonge (Sheppard to Finch) Municipal Class Environmental Assessment Study

Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016

PEDESTRIAN ACTION PLAN

Transcription:

Transportation Services Municipal Licensing and Standards PROPOSED BYLAW UPDATES AND FEES FOR SIDEWALK CAFÉS & MARKETING DISPLAYS PUBLIC CONSULTATIONS June 13, 2017 Toronto City Hall June 20, 2017 North York Civic Centre 1

SIDEWALK CAFÉS & DISPLAYS Toronto has vibrant streets with a growing café culture and local businesses. With Toronto s growth, our streets and sidewalks are facing increased demands as places for people to visit, dine and shop. Toronto s sidewalks must also support mobility for people of all ages and abilities, and other uses such as street furniture, trees, transit stops, and utilities. 2

BUILDING A SUCCESSFUL CITY: OFFICIAL PLAN City streets are important public open spaces which connect people and places and support the development of sustainable, economically vibrant and complete communities. A Complete Streets design approach balances the needs and priorities of various users and uses within the public right-of-way: Be safe and inviting for people of all ages and abilities and all modes of travel Consider space for utilities, trees, green infrastructure, snow storage, wayfinding, cafés, marketing and vending, and street furniture Reflect local context and serve as public places and destinations 3

VISION & GOALS FOR THE UPDATE Safety & Accessibility: provide safe, accessible and comfortable sidewalks for all regardless of age and ability Vibrancy : balance activity and animation with localized needs for liveability Economic Prosperity: Support local businesses and economic growth by providing more design options, and a balanced approach to implement new by-laws and fees. Design Excellence: encourage high quality, well-designed cafés that enhance the public realm and café experience 4

BENEFITS OF UPDATING THE BY-LAWS Allow more café design options to businesses, such as curbside cafés. Create an accessible, age-friendly Toronto and Ontario, as a result of population trends and new standards for safe, accessible mobility for all ages and abilities. Create one set of rules, city-wide. This will reduce confusion and improve consistency. Sidewalk cafes and displays will be permitted in Scarborough. 5

PROJECT TIMELINE WE ARE HERE ONE THREE FIVE Phase 1: Consultation, Analysis & Initial Directions 2014 Phase 2: Consultation, Principles, Fees & Governance Review 2015-2016 To Committees (Framework Report) April 2017 Additional Consultation Late Spring 2017 Final Report Fall 2017, date TBC Joint Meeting of PWIC and L&S TWO FOUR 6

WHAT WE HEARD SO FAR STAKEHOLDER 14 MEETINGS 12 PUBLIC CONSULTATIONS RESPONSES TO OUR 500 ONLINE SURVEY 850 PEOPLE PROVIDED FEEDBACK We love café patios & shopping locally Need wider sidewalks Want more design options Too many sidewalk obstacles & need to zig zag when walking Want more flexibility in designs Sidewalks are too crowded and unsafe when people step off the curb to walk in the roadway Businesses are worried about rule changes and large fee increases 7

KEY PRINCIPLES 1 2 3 SUPPORTING RESIDENTS AND PEDESTRIANS SUPPORTING LOCAL BUSINESSES A BALANCED IMPLEMENTATION PLAN 8

1. SUPPORTING RESIDENTS & PEDESTRIANS 2.1m Existing bylaw s minimum pedestrian clearway For local streets, café must be setback from the curb edge by the width of the sidewalk (varies) plus 0.46m For commercial frontage, 2.1m from the café to the curb Proposed minimum pedestrian clearway by street type: For local streets, 1.8m plus the curb For commercial frontage, 2.1m clear from the café to the curb CLEAR, STRAIGHT & WIDE ENOUGH SPACE FOR SAFETY & COMFORT OF ALL AGES & ABILITIES Greater than 2.1 m on specific Downtown streets where the block already has a greater clear space for its character and function 9

STREET BLOCKS WITH GREATER WIDTHS Specific streets in the Downtown that need and have greater than 2.1m clear space for walking on some sections: Adelaide Street Bay Street Bloor Street Carlton Street / College Street Dundas Street Front Street Jarvis Street John Street King Street Queen Street Richmond Street Spadina Ave St George Street Queens Quay Yonge Street University Avenue Wellington Street York Street Goal is to protect and maintain the street blocks that have this character and function. 3.0m Dundas St (Bay to Yonge) 10

2. SUPPORTING LOCAL BUSINESSES SENSITIVITY TO THE STREET TYPE EASIER OPTIONS SIMPLIFIED PROCESSES MORE OPTIONS GREATER FLEXIBILITY 11

EXPANDED CAFÉ DESIGN OPTIONS: BY-LAW & MANUAL New New New New 12

MORE OPTIONS: YEAR-ROUND CAFES New permission that would allow an approved café to operate yearround. Proposed criteria developed in consultation with Toronto Building and Fire Services: Permitted on Local (Residential) Roads only The enclosure must be made of fire-proof, temporary materials (canvas, sail cloth etc.) Sides must be removed/rolled-up during the regular café season (May 15 September 15) A building permit is required for the temporary café enclosure Minimum 2.5m pedestrian clearway (to provide for snow on sidewalk) The enclosure must be fully accessible and barrier-free; and The structure must be designed in a way that it can be removed for emergency street repairs or construction on 24-hours notice 13

3. IMPLEMENTATION PEDESTRIAN CLEARWAY For new applicants: The City s minimum requirements will be secured through new applications For existing permit-holders: 2018-2020, focus on locations with less than 1.5 metres (AODA provincial minimum) of clear space for walking Improvements will benefit all users Potential design services and support to relocate or modify some street elements (e.g., bike rings or resize street furniture) 14

BALANCING IMPACT ON LOCAL BUSINESSES For existing permit-holders Other locations that don t meet the proposed minimum pedestrian clearways will be allowed until: Change in ownership Redevelopment Street reconstruction Specific issues of safety or accessibility 2020 2025 plan for transition Further investigation needed (outside the scope of the bylaw): Some locations with less than 1.5m of clear space for walking are the result of patios on private property John St, north of Front. Credit: J. Fischer, Walk Toronto 15

ACCESSIBILITY: TOWARDS 2025 The harmonized Bylaw will go to Council in the fourth quarter, 2017 New Bylaw enactment is targeted for the 2 nd quarter, 2018 Staff will report back in 2020 on the progress and impacts on existing cafés and marketing areas and on walking conditions Better data and experience will inform a five year plan (2020 to 2025) for the rest of the existing cafés to meet current City standards. 16

GOVERNANCE ISSUES: PROCESS Councillors have asked for input on whether decisions on the pedestrian clearway be appealable to Community Council or delegated to City Staff? If a new application does not provide the minimum pedestrian clearway, the application will be refused. Currently, this decision can be appealed to Community Council. Issues include: Fairness Clarity Consistency Transparency 17

GOVERNANCE & REGULATORY ISSUES Public Notice, Proposed Approach for all new applications: Discontinue polling 14-day public notice Mailout to all residents within 60-metres of the proposed cafe BIA notification, if application Operating Hours / Noise Mitigation No changes to the existing operating hours are proposed Operating hours could be reviewed by Community Council if the café results in numerous noise complaints Amplified sound prohibited on a residential flankage café Amplified sound permitted on a commercial frontage only until 11:00p.m. 18

REVISED FEES: SIMPLIFIED FEE ZONES Two simplified fee zones are proposed: Central Zone Outer Zone - Delineated by the heavy blue line - Higher permit fees apply in the Central Zone - Everywhere else outside of the blue line - Lower permit fees in this zone - Majority (~65%) of cafes & displays are in this zone Q. Did we get this right? We want your feedback! 19

FEE STRUCTURE: PROPOSED PERMIT FEES Type of Permit Proposed Fee Zone Sidewalk Café ($/m2/year) Marketing Display ($/m2/year) Small Café or Marketing Display Year-round Enclosed Café ($/m2/year)** Parklet Café* ($/month) Central Zone $88.31 $62.65 $0 $133.00 $900 Outer Zone $44.14 $38.12 $0 $66.50 $565 * the proposed parklet café permit fees are based on the average size of a TPA parking stall, which is 14.3 m2 ** Higher permit fee reflect the ability to operate year-round Proposed Implementation: 1. Proposed fees would remain unchanged through to 2033 2. Any increase to existing permit holders would be phased in equally over this 15-year period 3. Any decreases would take effect immediately 20

ADMINISTRATIVE FEES & TREE FEE Sidewalk Café & Marketing Display (one-time) Small Frontage Café Small Marketing Display Proposed Application Fee $1331.45 $141.57 $141.57 Proposed Renewal Fee $0 (included in permit fee) $63.71 $63.71 Proposed Fee for Tree Planting: $1300 The tree planting fee is a one-time fee that would only be paid by new applicants when: a new permit is approved at a location where there is a soft, unpaved boulevard; Urban Forestry has determined that the proposed use (café or marketing display) would limit the ability to plant a tree there. The fee for tree planting would not be required if the application is for a small Frontage Café, Small Marketing Display, or Parklet Cafe 21

GIVE US YOUR FEEDBACK Meet with City Staff at our Public Meetings Visit our website and fill out the feedback form: www.toronto.ca/mlshaveyoursay Tell us your ideas by July 14 th, 2017 22