We want to hear from you!

Similar documents
Standing Committee on Policy and Strategic Priorities. Potential Granville Bridge Connector Public Engagement

RICHARDS STREET BIKE LANE

Implementation Report # False Creek Bridges

Tonight is for you. Learn everything you can. Share all your ideas.

1 ALEXANDER STREET BIKEWAY

Polk Streetscape Project

Transportation Master Plan Advisory Task Force

WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES:

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Draft North Industrial Area-Wide Traffic Plan

PEDESTRIAN ACTION PLAN

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Governance and Priorities Committee Report For the July 2, 2015 Meeting

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Report Date: July 16, 2013 Contact: Jerry Dobrovolny Contact No.: RTS No.: VanRIMS No.: Meeting Date: July 23, 2013

Terwillegar Drive Expressway Draft Concept Plan

Living Streets Policy

Major Bike Routes 102 Avenue Workshop April 21, 2015

TRANSPORTATION NEEDS ASSESSMENT

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Dowling/Beaty Cycling Route

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

ECONOMY PEOPLE ENVIRONMENT

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Welcome! San Jose Avenue Open House August 25, 2015

Building Great Neighbourhoods BONNIE DOON

41st Avenue B-Line Kerrisdale Village Street Improvements

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Transportation Assessment

York Region Population and Employment Growth

CITY OF ABBOTSFORD TRANSPORTATION AND TRANSIT MASTER PLAN

Having held a public hearing, that Council approve:

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Frequently Asked Questions (FAQ)

Building Great Neighbourhoods QUEEN ALEXANDRA

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Bicycle Master Plan Goals, Strategies, and Policies

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

WELCOME TO OPEN HOUSE # 1 June 14, 2017

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

STONY PLAIN ROAD STREETSCAPE

Mission Bay Loop (MBL) Public Meeting

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Welcome. If you have any questions or comments on the project, please contact:

Public Event 1 Community Workshops

North Shore Transportation Improvement Strategy

Eliminate on-street parking where it will allow for a dedicated bus only lane %

122 Avenue: 107 Street to Fort Road

Safer Cycling: How the City of Vancouver is Proactively Improving Cycling Safety

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Bellevue Downtown Association Downtown Bike Series

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Public Information Centre

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Richmond-Adelaide Cycle Tracks

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

We want to hear from you!

Fulton Market Streetscape

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

102 Avenue Corridor Review

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

Arterial Transitway Corridors Study. Ave

Welcome. Welcome to the second open house on the Downtown Transportation Study.

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Welcome to the McKenzie Interchange Project Open House!

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Engineering - Bicycle and Pedestrian

ICBC invests $1.175 million to help make Surrey, Delta and White Rock s roads safer in 2013

Downtown Public Spaces

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018

Bay to Bay Boulevard Complete Streets Project

Building Great Neighbourhoods LANSDOWNE

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM

South False Creek Seawall Park Upgrades & Tree Replacements

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Cycle Track Design Best Practices Cycle Track Sections

Perryville TOD and Greenway Plan

Completing the Street: Denning Drive

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements

Appendix A-K Public Information Centre 2 Materials

North Coast Corridor:

Route 29 Solutions Projects

TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031

Transcription:

1 Welcome We want hear from you! The City of Vancouver will carry out necessary structural repairs and maintenance the Burrard Bridge in 2016/17. In coordination with this work, we are proposing safety improvements at the Burrard and Pacific intersection, improved connections that enable people walk on both sides of the bridge, and replacement of aging sewer and water infrastructure. We are sharing information about construction impacts, and would like input on the design details as we finalize the plan. N Hornby Howe reet Granville reet H Bridge repairs and intersection improvements include: Cornwall Avenue York Avenue 1 st Avenue Burrard Bridge Granville Bridge Beach Avenue Pacific reet Drake reet Davie reet Replace bridge railings and light fixtures, and repair sidewalks 2 nd Avenue 3 rd Avenue 4 th Avenue 6 th Avenue Improve safety for all users at the Burrard-Pacific intersection Maple reet Broadway Cypress reet Burrard reet Pine reet Fir reet Granville reet Hemlock reet Enable walking on both sides of the bridge 12 th Avenue 14 th Avenue 16 th Avenue Legend Intersection Safety Improvement Burrard Bridge ructural Repairs/Maintenance Replacement Water, Sewer Infrastructure Improve walking and biking connections at the Burrard- Pacific intersection Your feedback will help us refine the final design. aff will report City Council this summer on what was heard, along with a recommended design and implementation plan. All the information shown day is available on our website at: vancouver.ca/burrardbridgenorth.

2 Project Overview Project Goals The project will deliver needed repairs ensure the Burrard Bridge is in good condition for many years come. We also propose safety improvements at the Burrard-Pacific intersection and improved connections that allow people walk on both sides of the bridge. Doing this work at the same time will reduce overall disruption and is more cost-effective. Key Objectives Make necessary repairs on the Burrard Bridge, including replacement of the railings, sidewalks and light fixtures Make the intersection of Burrard reet and Pacific Avenue safer for everyone, including people walking, cycling, and driving Enable walking on both sides of the bridge (currently not permitted on east side) Improve walking and biking connections Maintain mor vehicle capacity across the bridge Minimize construction impacts by coordinating required repairs with safety improvements and utility work Respect the heritage value of the bridge Maintain access nearby businesses and residents during and after construction 1. Make Critical Repairs 2. Improve Safety 3. Improve Connections Figure A Figure C Figure E Figure B The Burrard Bridge is more than 80 years old, and critical repairs are needed keep it in safe condition. The first round of repairs ok place in 2013-14 and included replacement of bearings and expansion joints This round includes replacement of the crumbling railings (Figure A) and more. Figure D The Burrard-Pacific intersection (Figure C) is the second highest collision location in the city, and can be uncomfortable access on foot or by bike. The proposed design would make it safer and more comfortable by making it more like the new protected intersection at Burrard-Cornwall (Figure D). Figure F At present, people are not allowed walk on the east side of the bridge. The proposed design would allow walking on both sides of the bridge by making the east side (Figure E) more like the west side (Figure F).

3 In a Nutshell 10 things know 1. The Burrard Bridge is more than 80 years old and major repairs are needed keep it in good condition 2. Major safety upgrades are required the Burrard-Pacific intersection, the second highest collision location in the city 3. Aging sewer and water infrastructure on Burrard between 1 st & 16 th Ave and between Pacific & Davie needs replacement 4. To minimize overall disruption and reduce costs, we will coordinate all this work 5. Mor vehicle flow will be maintained by adding right turn lanes at the Pacific intersection and by widening about 100 metres of the bridge at the the intersection 6. People will again be able walk on both sides of the bridge. This will be achieved by converting a northbound travel lane on the centre portion of the bridge and by widening the bridge at the Pacific intersection 7. All changes will respect the heritage value of the bridge 8. Parking will generally be maintained 9. During construction, access will be maintained across the bridge for all road users, but delays should be expected 10. The work will begin in early 2016 and will take up 20 months complete

4 Context The western gateway Downwn Vancouver The Burrard Bridge is a major gateway between Downwn Vancouver and the western part of the city. Tens of thousands of people walk, bike, take transit, and drive across the bridge every day. The bridge is also important for moving goods and services, and is designated as a truck route. A typical summer weekday can see over: 55,000 mor vehicles 13,000 people using transit 10,000 people walking or biking 500 trucks Pho: Conrad Olson, Flickr Transportation 2040 Plan Overview Improvements the Burrard Bridge were approved in principle as part of the Transportation 2040 Plan, which was adopted by Council in 2012. Directions include Improve safety: eliminate transportation related fatalities Increase green transportation: make at least two-thirds of all trips on foot, bike, or transit by 2040 Make walking and cycling safe, convenient, and comfortable for people of all ages and abilities Manage the road network efficiently for all road users Pho: Gord McKenna, Flickr Improvements the Burrard Bridge are timely since: The Burrard-Pacific intersection is the second highest collision location in the city There is a major gap in the walking network, as walking is currently not permitted on the east side of the bridge Required maintenance creates an opportunity improve safety and enhance walking and cycling connections while accommodating existing mor vehicle demand

5 Process Timeline We Listen The Policy We Deliver Public Meetings aff consult with stakeholders and the public on a wide variety of transportation issues as part of Transportation 2040. Improving safety and active transportation connections on the Burrard Bridge is identified as a high priority. Transportation 2040 Supports a network of walking and cycling routes that are safe, convenient, and comfortable for people of all ages and abilities Sets a zero transportation fatality goal Identifies improving safety and active transportation connectivity on the Burrard Bridge as a high priority Recommends coordinating improvements with required maintenance minimize disruption and maximize cost-efficiency Prioritizes keeping vital city assets like the Burrard Bridge in good condition First Round of Bridge Rehabilitation Major repairs and maintenance are completed on the bridge, including replacement of bearings and expansion joints. Burrard-Cornwall Intersection Upgrade After extensive consultation, the south intersection is made safer and more comfortable for everyone, while maintaining mor vehicle capacity. During construction, road capacity is reduced maintain a safe working environment, but access is maintained for all road users. 2011 2012 2012 2013 2014 We Research We Propose and Listen Council Decision City staff carry out detailed analysis develop the Burrard Bridge North design. Key areas: Transportation 2040 Plan ICBC collision data Traffic counts and speed data Traffic modelling Parking and circulation Emergency access Heritage A design improve safety for everyone while maintaining mor vehicle flows is presented through community open houses. Members of the public are invited provide feedback. City staff will report Vancouver City Council this summer with a recommended design and implementation plan, based on data analysis, technical transportation review, and public feedback. Council will decide how the project will proceed. 2013 2014 We are here July 2015

6 Recent Changes An abridged hisry 1932-2009 Burrard Bridge opens in 1932, featuring six mor vehicle travel lanes, plus shared sidewalks for walking and biking Mor vehicle volumes begin decline in the mid-1990s Conflicts on the shared sidewalks increase as more people choose walk and cycle The Burrard-Pacific intersection is a major collision hotspot for all modes of travel Burrard Bridge looking north, circa 1940 2009 - Protected Bike Lanes Implemented Protected bike lanes created in both directions by reallocating one southbound mor vehicle lane, and by restricting walking from the east sidewalk Bike ridership grows significantly, jumping over one million trips per year Safety of vulnerable road users is improved because people walking and biking have their own space Mor vehicle traffic continues decline despite overall trip growth as more people choose other travel modes 2011/12 - Transportation 2040 akeholders and the public identify improving the False Creek bridges for both walking and cycling as a high priority 2013/14 Bridge Repair & Burrard-Cornwall Intersection Upgrade Initial round of repairs completed, including replacement of bearings and expansion joints, removal of xic materials, and various concrete repairs Additional walking, cycling, and general traffic safety improvements are made at the Burrard reet and Cornwall Ave intersection, while maintaining mor vehicle capacity Bike ridership across the bridge grows over 1.3 million trips per year North America s first fully protected intersection. Walking and cycling connections are greatly simplified. All modes have dedicated space and time safely clear the intersection, increasing safety. 2016/17 Bridge Repair & Burrard-Pacific Intersection Upgrade (planned) Pho: Kathleen Corey, Flickr Complete repairs initiated in 2013, including replacement of railings and light fixtures, and repairs sidewalks Coordinate with other work including sewer, water and pavement replacement on Burrard reet Implement safety improvements for all modes of travel and improve walking and cycling connections

7 Rehabilitating the Bridge Maintaining a valuable asset Why are we doing this? The Burrard Bridge is more than 80 years old and showing signs of wear and tear Major repairs and maintenance are critical ensure safety and keep the bridge in good condition 2013/14 Work completed Replaced bearings Replaced expansion joints Removed xic materials Repaired and strengthened concrete 2016/17 Replace concrete handrails Repair sidewalks Replace street lighting and allow for future electrical upgrades Replace barriers between driving and cycling lanes

8 Improving Safety Addressing a Collision Hotspot The Burrard-Pacific intersection is the second highest collision location in the city. Comparing Nearby Intersections Total Collisions 2009-2013 700 While tal number of collisions has fallen somewhat since protected bike lanes were added in 2009, it remains a high collision location. 716 Total Collisions at Burrard-Pacific Intersection 2003-2013 600 200 500 400 194 163 150 398 300 210 100 0 BurrardCornwall BurrardDavie BurrardRobson 150 147 127 112 102 146 132 BurrardPacific 181 166 131 100 200 156 50 74 79 PacificThurlow PacificHornby PacificDavie 0 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Source: ICBC Designing for Improved Safety Frequent types of collisions N Bu rra rd Pa ci fic We ve already made some safety improvements the Burrard-Pacific intersection. The proposed design will greatly improve safety by creating a protected intersection, similar in concept the recently rebuilt Burrard-Cornwall intersection. Eastbound drivers turning right from Pacific on the bridge and rear-ending other vehicles in the slip lane N Pa ci fic Reported bicycle-mor vehicle collisions at the intersection fell from 13 in 2011 4 in 2013 with the help of changes like this. Bu rra rd One issue has been southbound drivers illegally turning right from Burrard on Pacific, colliding with people cycling straight who have the right-of-way. In 2012 we extended the nose of the median make illegal right hand turns more difficult. Key features include: Removing the slip lanes Creating protected signal phases for different road users and turn movements Increasing separation between people walking, biking, and driving Eastbound drivers turning right from Pacific on the bridge and sideswiping other vehicles N N Pa cif ic age 3 Pa cif ic N Bu rra rd age 2 Bu rra rd Pa cif ic Bu rra rd age 1 The traffic signal phasing could be as follows:

9 Water and Sewer The City will coordinate the bridge repairs and safety improvements with nearby sewer, water, and street rehabilitation work. Doing this work gether will minimize overall disruptions and save money. The sewer work includes: Replace an existing combined srm/sanitary sewer on Burrard between 1 st and 16 th Ave with separate srm and sanitary sewer lines Replace an existing srm sewer on Burrard from Beach Ave north of Davie with a larger srm sewer line The water work includes: Replace an existing watermain on Burrard between 1 st Ave and Broadway Replace an existing watermain on Burrard between Pacific Ave and Harwood Replace watermain on Drake between Burrard and Hornby (scheduled with the Burrard Gateway development works) The street rehabilitation includes: Replace aging concrete curb, gutter and sidewalk on Burrard between 1 st and 16 th Ave Install new wheelchair accessible ramps on Burrard between 1 st Ave and 16 th Ave Replace the pavement on Burrard between 1 st Ave and 16 th Ave Replace the pavement on Burrard between Pacific Ave and Drake Replace the pavement on Pacific Ave between Thurlow and Howe Keeping our waterways clean by separating sewage from rainwater The City continues work ward a Provincial goal eliminate sewage overflows by 2050 We are doing so by systematically replacing combined sewer systems with separated ones as the pipes need be replaced due wear and tear, or because of opportunities created by other roadwork Separated systems prevent untreated sewage from emptying in our waterways, resulting in cleaner water and healthier habitat

10 Heritage Value Respecting a heritage landmark The Burrard Bridge opened on July 1, 1932 and is one of Vancouver s most iconic structures City staff worked with the heritage community ensure the proposed design achieves the needed safety and structural improvements while also respecting the bridge s heritage significance Hisry, importance, and heritage features A gateway False Creek and a key connection downwn Vancouver s first high-level bridge, allowing uninterrupted flow of both marine and road traffic Features rivetted steel trusses both above and below the bridge deck An important landmark One of Vancouver s most important examples of Art Deco style A defining skyline element from both the land and water Masonary piers extend in massive concrete wers connected by elaborate overhead galleries Character-defining elements Shuttered concrete handrails offer panoramic views at roadspeeds at around 50 km/h Pylons at each end of the bridge feature neon-lit flaming rches, a memorial the First World War Rehabilitation will allow for future reintroduction of heritage lighting poles and fixtures

11 Traffic and Parking Maintaining Traffic traffic flow Flow The completed project will have minimal impacts on mor vehicle travel times During the busiest time of the day, average travel times for mor vehicles travelling through the Burrard-Pacific intersection are predicted be about the same Travel times through the intersection will become more reliable, since each movement will have dedicated signal time Projected impacts travel times for various routes are highlighted below Before & After Travel Times for Select Routes (PM Peak) English Bay Davie Pacific Jervis Thurlow Burrard English Bay Davie Pacific Jervis Thurlow Burrard English Bay Davie Pacific Jervis Thurlow Burrard Howe Howe Howe Cornwall Ave Burrard Bridge Cornwall Ave Burrard Bridge Cornwall Ave Burrard Bridge Macdonald W 4th Ave Broadway Burrard Macdonald W 4th Ave Broadway Burrard Macdonald W 4th Ave Broadway Burrard Travel Time in Minutes 8 7 6 5 5.6 4.8 4 3 3.7 2 1 6.4 5.6 5.3 4.9 7.3 0 Thurlow-Pacific Thurlow-Davie Burrard-Davie W.4th-Macdonald Chestnut-Cornwall Chestnut-Cornwall W.4th-Macdonald Burrard-Davie Travel Time in Minutes 8 7 6 5 4 3 2 1 0 6.8 6.9 6.6 5.8 3.8 3.0 2.4 2.6 Burrard-Pacific Chestnut-Cornwall Pacific-Howe Burrard-Broadway Chestnut-Cornwall Burrard-Pacific Burrard-Broadway Pacific-Howe Travel Time in Minutes 8 7 6 5 4 3 2 1 0 3.0 2.3 Pacific-Jervis Pacific-Howe 3.8 3.4 Davie-Thurlow Pacific-Howe Solid bars indicate current travel time. Dotted bars indicate projected travel times once the project is complete. Travel times are for the PM peak period, which is the busiest time of day for the bridge. Projected travel times are based on modelling completed by independent consultants. Preserving access and parking Access all businesses, residences, and other destinations will be maintained Laneway access south of Pacific reet between Hornby and Howe will be modified due changes the street slope About 5 parking spots will be removed over the entire 6-block project area During and after construction, the City will monir parking occupancy and adjust regulations if necessary help maintain access for cusmers and deliveries

12 Walking & Biking Safer and more convenient walking connections The bridge is a busy walking corridor. Between 2,000 and 3,000 people cross each day on foot. Prior 2009, people walking and biking were forced share a busy sidewalk, resulting in many conflicts. Safety and comfort improved after 2009 when people cycling were provided separate space; however people are no longer permitted walk on the east side, making the bridge less convenient for some trips. Re-opening the east sidewalk Walking is not permitted on the east side day The proposed design will enable people comfortably walk on both sides of the bridge, with fewer road crossings for trips beginning or ending east of the bridge. A safer and more connected bike network The bridge is one of the busiest bike corridors in the region, seeing around 7,000 cycling trips on a typical summer weekday in 2014. The proposed design includes separate walking and biking paths on both sides of the bridge At present, people are not allowed walk on the east side of the bridge, adding a lot of inconvenience some trips. A walking trip from from the southwest corner of Hornby-Pacific Granville Island requires six road crossings, for example. By allowing walking on both sides of the bridge, and by creating a protected intersection, the new design would reduce the number of road crossings for the same trip zero. Pho: Kathleen Corey, Flickr Major improvements for cycling have been made in recent years. With each improvement, the number of people riding across the bridge grew significantly. The proposed design will further enhance cycling by making the Burrard-Pacific intersection safer and more convenient, and by improving connections existing routes in the downwn. In the first full year after the 2014 Burrard-Cornwall intersection improvements were made, the number of cycling trips across the bridge grew more than 25% over 1.3 million annually. Looking south from the north end of the bridge

13 Construction What expect during construction Construction will begin in early 2016 The project is expected take 14 20 months complete aff are exploring options expedite the work Access will be maintained During construction, people will still be able walk, cycle, drive, and take transit across the bridge During construction, travel impacts may be similar when the previous round of Burrard Bridge repairs were made in 2014. Typically, three mor vehicle lanes, two bike lanes, and one sidewalk were kept open. Capacity will be temporarily reduced Road capacity on the bridge will be reduced in order provide a safe working environment, and delays should be expected Drivers will be encouraged use alternate routes or consider other transportation modes during the construction period We are currently developing a detailed construction traffic management plan. Our base assumption is a configuration similar when the previous round of bridge repairs were made in 2014: Three mor vehicle lanes (two northbound, one southbound) Two protected bike lanes (one in each direction) One sidewalk for walking in both directions Public and stakeholder input will be taken in consideration as we finalize the traffic management plan Other measures reduce impacts Provide temporary intersections and adjust traffic signal operations limit walking, biking, transit and driving delays during construction Maintain access homes and businesses throughout the construction period Implement measures prevent mor vehicles from shortcutting on the Cypress bike route Coordinate with other construction work around the downwn minimize overall congestion and help keep our streets moving

14 Next eps Have your say We re looking for input as we finalize the design presented day. Share your thoughts and let us know if we ve missed anything. Talk with staff and fill out the questionnaire here or online by June 23rd. This summer, we ll be reporting back Council on what we heard, and a decision will be made on the final design. We re also committed working with impacted stakeholders ensure access homes, businesses, and other destinations is maintained during construction. Construction is expected begin in early 2016. ay informed: online: vancouver.ca/burrardbridgenorth email: burrardbridgenorth@vancouver.ca Looking south from the east sidewalk Looking north from the east side Looking south from the north end of the bridge