NON-MOTORIZED TRANSPORTATION MONITORING PROGRAM

Similar documents
Annual Metro Regional Trail Count and Why Local Extrapolation Factors Matter

National Bicycle and Pedestrian Documentation Project INSTRUCTIONS

2017 Northwest Arkansas Trail Usage Monitoring Report

Instructions for Counting Pedestrians at Intersections. September 2014

The Traffic Monitoring Guide: Counting Bicyclists and Pedestrians. APBP 2017 June 28: 11:15am-12:45pm

Ben Timerson, MnDOT Erik Minge, SRF Consulting Group Greg Lindsey, University of Minnesota

Four Approaches to Starting a Successful Bike / Ped Counting Program

Summary of NWA Trail Usage Report November 2, 2015

National Bicycle and Pedestrian Documentation Project INSTRUCTIONS

MASTER BICYCLE AND PEDESTRIAN PLAN

Chapter PERFORMANCE MEASURES AND ACCOUNTABILITY. Introduction

TABLE OF CONTENTS. Executive Summary

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Safety Impacts: Presentation Overview

Bike Counter Correlation

Speed Management Action Plan

Florida s Intersection Safety Implementation Plan (ISIP)

PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN

Planning Guidance in the 2012 AASHTO Bike Guide

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

Building a bike friendly Chicago

Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay

Highway 111 Corridor Study

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study

Bicycle and Pedestrian Data Collection Manual Draft

Bicyclist Signing Guidelines

Highway School, Ithaca NY

Physical Implications of Complete Streets Policies

Transforming Traffic Signals to Support Sustainability: Applications, Ideas, & Research

Active Transportation Facility Glossary

We believe the following comments and suggestions can help the department meet those goals.

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

CTDOT Pedestrian and Bicycle Safety Initiatives

Parks, Open Space, Trails and Recreation Master Plan

FINAL PLAN APPENDIX D CITY OF BERKELEY BIKE PLAN D-1

Multimodal Analysis in the 2010 Highway Capacity Manual

Effects of Traffic Signal Retiming on Safety. Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc.

TRAFFIC IMPACT ANALYSIS

Brian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Perryville TOD and Greenway Plan

Bicycling & Walking in the Twin Cities TPP Bike/Ped Chapter Overview. Land Use Advisory Committee September 21, 2017

FHWA Bicycle-Pedestrian Count

Appendix C. Corridor Spacing Research

RAISED MEDIAN EFFECTIVENESS

This page intentionally left blank.

Conducting Bicycle and Pedestrian Counts in Your Community: Count Manager Training. MnDOT and MDH Bicycle and Pedestrian Counting Initiative 2015

Lisa Austin and Jasna Hadzic MnDOT; Greg Lindsey - UMN

Route 7/15 Norwalk. Route 7/15 Norwalk Project Project Advisory Committee Meeting #2. Tuesday, May 23 rd, Norwalk City Hall

Performance-Based Planning for Safety in a Vision Zero World. AMPO September 27, 2018

Transportation Safety Planning at DVRPC

MASTER BICYCLE AND PEDESTRIAN PLAN

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

Bike/Multipurpose Trail Study for Glynn County, Georgia MAY 16, 2016

URL:

BIKE ON ROAD NETWORKS: URBAN & RURAL. Non-motorized Transportation Networks. Madison County Council of Governments

Space Coast Transportation Planning Organization. Agenda

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Iowa Corridor Management Pilot Project Overview. Recommendations For A Corridor Management Program August 2004

Proposed White Flint Separated Bike Lane Network September 2015

Linking Transportation and Health in Nashville & Middle Tennessee

MassDOT s Transportation Choice and Healthy Transportation Policy Initiatives

2010 Pedestrian and Bicyclist Special Districts Study Update

APPENDIX C. Systems Performance Report C-1

Designing a Bicycle and Pedestrian Count Program in Blacksburg, VA

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

Walking and Biking: Collaborative Analysis to Improve the Non-Motorized Built Environment. Kelly Corbin MDH Michael Petesch MNDOT

Moving Towards Complete Streets MMLOS Applications

Strategies for Making Multimodal Environments Safer. Kim Kolody Silverman, CH2M

BICYCLE AND PEDESTRIAN DATA COLLECTION MANUAL

Bicycle and Pedestrian Counts in Carson: Results from Automated Counts in Herbie Huff, Madeline Brozen, Norman Wong and Diana Benitez

City of Ottawa s Complete Streets Approach to Transportation Projects

Bicycle and Pedestrian Planning in a Historically Car-Centric Culture: A Focus on Connectivity, Safety, & Accessibility

Orange County s Transportation Planning and Multimodal Corridor Plan

TOWN OF PARADISE VALLEY

Plant City Walk-Bike Plan

The Florida Bicycle and Pedestrian Partnership Council

Goals, Objectives, and Policies

Relationship of Road Lane Width to Safety for Urban and Suburban Arterials

USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets. Barbara McCann, USDOT Office of Policy

Click to edit Master title style

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

9/17/2014. Accessing and Using Data for Planning Complete Streets Projects. Welcome! Webinar Guidelines

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project

Methods and Technologies for Pedestrian and Bicycle Volume Data Collection NCHRP 7-19

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Access Management in the Vicinity of Intersections

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Comparison of Turning Movement Count Data Collection Methods for a Signal Optimization Study. White Paper

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

Castro Valley Municipal Advisory Council March 19, 2018

Chapter 7: Bicycle And Pedestrian Investment Direction

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete.

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona

SAFETY PERFORMANCE MEASURES AND TARGET SETTING. Transportation Subcommittee September 15, 2017

Transcription:

NON-MOTORIZED TRANSPORTATION MONITORING PROGRAM Ohio Transportation Engineering Conference October 28 th, 2015

Presentation Content: Program Overview Manual Counts Automatic Counts Data storage Information Next Steps

PROGRAM OVERVIEW

Regional Partners:

Program Motivation Overall, why is non-motorized count data collected in the central Ohio Region? For the same reasons we collect motorized count data Support policy decisions/changes Plan for cost-effective investments Design safe facilities and infrastructure Measure performance and progress toward goals If you can t quantify it, you can t fund it.

Applications for Non-Motorized Counts Tracking changes in pedestrian and bicycle activity over time Evaluating the effects of new infrastructure on pedestrian and bicycle activity Prioritizing pedestrian and bicycle projects Determining operational requirements Conducting risk or exposure analyses

Monitoring cycle SOURCE: Texas A&M Transportation Institute

Resources for Non-Motorized Collection

MANUAL COUNTS

Manual Counts Most accurate method, but can only cover shorter time spans Can record details that automatic counters can t capture Follow National Bicycle and Pedestrian Documentation Project (NBPD) methodology Occur twice a year Mainly a volunteer effort

Manual count come in two varieties: Screen line Intersection Manual Counts SOURCE: NCHRP Report 797

Site Selection Criteria (Manual) Pedestrian and bicycle activity areas or corridors Representative locations in urban, suburban, and rural locations Key corridors that can be used to gauge the impacts of future improvements Locations where counts have been conducted historically

AUTOMATIC COUNTS

Automatic Counters Provide the ability to collect bicyclists and pedestrians at select locations 24-hours per day, 365-days per year MORPC owns 10 automatic counters MORPC doesn t own or operate any of the permanent count facilities in the region City of Columbus Recreation & Parks Department Metro Parks

Automatic Counts Three types of automatic counters are used with central Ohio: Infrared Counters Passive Active Pneumatic Tube Counters

Trafx Counters (Passive infrared) The most common type of counter around the region Around 30 Do not differentiate between pedestrians and bicyclists

TrailMaster Counters (Active Infrared) MORPC owns 8 as part of the CS Equipment Library 16k Event limit Do not differentiate between pedestrians and bicyclists

ECO-Counter Tube Counters MORPC owns 2 as part of the CS Equipment Library Only counts bicyclists (Selective tubes allow for bicycle counts even in mixed traffic)

Site Selection (Automatic)

Site Selection (Automatic)

CS Equipment Library MORPC maintains an equipment library where members can check out equipment designed to collect pedestrian and bicycle volumes, roadway operating speeds and project geometries. Available equipment includes: 8 active infrared Trailmaster pedestrian/bicycle counters 2 Eco-Counter on-road bicycle counters 1 Stalker Radar Gun 5 professional measuring wheels

Automatic Counts Automatic counters serve a number of proposes: Complete Streets Equipment Library Trail monitoring Special Studies

DATA STORAGE

Current Practice

Statewide NMDS

INFORMATION

Data Uses (Manual)

Data Uses (Manual)

Top Pedestrian High-Crash Clusters (2010-2014)

Complete Streets Reviews:

2012 Downtown Columbus Pedestrian Count Report

NEXT STEPS

Next Steps: Work with members to strategically collect data to support trend analysis. Look into the relationship between count volumes and land use or other factors that influence trail use. Move towards a common, consistent system to measure volume to understand: Understand current trends Model future Usage Evaluate at different levels (site, corridor, region)

JORDAN WHISLER jwhisler@morpc.org 111 Liberty Street, Suite 100 Columbus, Ohio 43215 Phone: 614.233.4148 www.morpc.org