Reef Ball Designed Reefs Beaches, Turks and Caicos Final Report

Similar documents
Junior Park Warden Reef Discovery Site

6/19/2006 The Reef Ball Foundation 1

Investigations and Recommendations for Solutions to the Beach Erosion Problems in the City of Herzliya, Israel

The Maho Beach Resort and Casino. By The. Submitted to. With Contributions From. ?? Lee E. Harris, Ph.D., P.E. Consulting Coastal/Ocean/Engineer

Lee E. Harris, Ph.D., P.E. Assoc. Professor of Ocean Engineering. Doug Bowlus and Ashley Naimaster Ocean Engineering Graduate Students

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

IF YOU BUILD IT THEY WILL COME

Kuwait Reef Ball Licensed Reef Ball Contractors Gulf and Middle East Region

Turks & Caicos Islands Dive Boat Mooring Atlas

UMass Boston Waterfront at a glance

WALTON COUNTY NRDA ARTIFICIAL REEF PROGRAM

SAILROCK RESORT. Resort Excursions

ARTIFICIAL REEF CONSTRUCTION: AN ENGINEERED APPROACH. Timothy K. Blankenship, P.E. R. Harvey Sasso, P.E.

APPLICANT: Pacific Northwest National Laboratory Attention: Mr. Charles Brandt 1529 West Sequim Bay Road Sequim, Washington 98382

Shoreline Studies Program, Department of Physical Sciences, VIMS

Turks & Caicos Islands Dive Boat Mooring Atlas

Focus Benthic habitats found at Gray s Reef National Marine Sanctuary

MIRABAY PILOT PROJECT REPORT

Geographic Response Plan Map: VI-7 Inset Map A567 TRUNK AND HAWKSNEST BAYS XXX. St. John. qxxxa551 - V.I. WAPA WATERINTAKE, Acropora Priority Sites

Objectives. Demonstrate proper first responder swiftwater PPE and safety. Demonstrate proper floating throw bag throwing technique.

we can design a swimming pool that fits your exact specifications

EFFECTIVENESS OF FLOATING WAVE ATTENUATORS FOR RESTORING AND PROTECTING COASTAL MARSH

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

A PHYSICAL AND BIOLOGICAL SURVEY OF THE MID-REACH MITIGATION REEF SET NUMBER 1

Special projects are mainly capital equipment purchases and improvements to the inlet. Most improvements are cost shared with FDEP and FIND.

{ } Jack Holland Page 1 of DOC

Pioneer Array Micro-siting Public Input Process Frequently Asked Questions

CB-40 Data Buoy Quick Start Guide

REVISED SILT CURTAIN DEPLOYMENT PLAN

For more information or permission to reprint slides, please contact Donna Milligan at 1

Discover Scuba Diving

MILE POINT TRAINING WALL JACKSONVILLE, FL. Geotextile Tube Installation

I. Monitoring and Adaptive Management Approach. Potential Effects, Monitoring Studies & Mitigation

29 National Estuarine Research Reserves

GLOBAL CORAL REEF ALLIANCE A non-profit organization for protection and sustainable management of coral reefs

Rescue Services Life Raft Manual

NATIVE OYSTER RESTORATION AT ELKHORN SLOUGH, CALIFORNIA Summary of Elkhorn Slough National Estuarine Research Reserve and Elkhorn Slough Foundation

PRICE REDUCED! SANDPINES GOLF COURSE & DEVELOPMENT PARCELS FOR SALE SALE PRICE REDUCED! th Street Florence OR PROPERTY SPECS

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION

Navarre Beach & Dune Restoration Project Status Report to be regularly updated June 17, 2016 Report

Volunteering in the Virgin Islands. 7 Days

Cruising Aboard Roam to Florida and The Bahamas Rich and Cheryll Odendahl Here is our route.

2018 Beach Preservation Project Information

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

Ballast. Stability Lab Experiment. Have you ever been in a boat at sea in large waves? The boat moves up and down as the waves pass under the boat.

O U T D O O R E D U C A T I O N :

Reaching new heights in Fall Protection Solutions.

2012 Susitna River Water Temperature and Meteorological Field Study

Charter Boats. Boat Diving. Being a Responsible, Safe Boat Diver

STAGE 1 PD1 PD3 PD2. START POSITION: Seated on seat in car. Hands holding steel bar. Handgun loaded and placed flat on table.

Hope Mills Lake Recreational Improvement Plan. Lake Advisory Committee

Canoe/Kayak Launch Sites and Accessibility

Day 1. Staniel Cay/Compass Cay, Exumas, Bahamas

SECTION PRESSURE TESTING OF PIPING

Tamarindo, Flamingo & Conchal Tours & Activities 2019

Tamarindo, Flamingo & Conchal Tours & Activities 2018

Resort and Dive Operation Management, Marine Biology Support, Programmes and Training.

National Oceanic and Atmospheric Administration (NOAA)/ Mulberry Phosphate Trustee Council September 12, 2013

Manta Tour Operator Standards Kona, Hawaii Drafted by Manta Tour Operators as a Voluntary Standards Finalized March 2013

satellite image Penjalin (30th Nov - 2nd Dec 2006) N E

CHAPTER 6 10/29/2018 Clean Version REGULATING PIERS, WHARVES, MOORING BUOYS, SWIMMING RAFTS AND INFLATABLES ON ROCK LAKE

Marine Aquaculture Opportunities for NC. Chuck Weirich NC Sea Grant

TECHNICAL MEMORANDUM 002 EMORANNO. 001

Build a Boat for Scientific Research

BOAT HANDLING METHODS FOR YARD SPACE EFFICIENCY

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions

Break in the Bahamas. Cutters Head to the Caribbean to Wire Saw Sunken Pier. A 25-foot by 25-foot steel pier section had sunk into the water.

High Aspect Itinerary 10 day Charter in Fiji

National Report of China

IRTBA 31 st Annual Convention Optional Events

Main Building and raft building viewed from the south side of the Oklahoma River. The white water Main Building anchors the development.

Friends of the Detroit River Habitat Restoration Project Update

MS/AL Living Shoreline Workshop

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 5 of 14 Water Rescue Procedures Revised

Mitigation Plan for Broward County Beach Erosion Control Project Broward County, Florida

I would like to welcome Parish President VJ St. Pierre, Councilwoman Carolyn Schexnaydre and Councilman Terry Authement who are here.

2012 International Swimming Pool and Spa Code Errata

Finger Lakes Open Water Swim Festival SOP # 010 Revision: 1 Prepared by: B Hobart Effective Date: September 2017

Public Notice of Application for Permit

Why Choose A Polymer Wall Swimming Pool?

Discover Scuba Diving

Bioerosion Monitoring Unit (BMU) SOP

A FRESH APPROACH TO ACCESSIBILITY. A Proud Inclusive Canadian Company. Presents ACCESS REC. AccessMa J AccessDeck.

MISSOURI-MADISON RIVER FUND RECREATION PROJECT APPLICATION FORM FY2019

NORMAL MEAN WATER LEVEL

Day 1 - Departure from Batangas International Port Embarkation time is between 2-4 pm

Certified Professionals in Hydrographic Solutions

Update from Port Metro Vancouver Deltaport Third Berth Project Community Liaison Group. Meeting Date: August 28, Construction Update

Boulder Island Coral Survey. Project Manaia. Phase one - Final Report

APPENDIX A. F107 & 380 Lines OYSTER RIVER DURHAM, NH

Fiji Surf Tours. Mana Island Jetski - Sandbar Xtasea (3 Hours) Hours) Mana Island Jetski - Lagoon Triangle. Main Street Nadi Town Nadi Fiji Islands

CHILDREN S ACTIVITIES

F I E L D T R I P CHAPERONE GUIDE

VLH Ltd, Nereide Ltd, Saltlake Resorts Ltd Proposed Beach Erosion Protection Works at Bel Ombre Environmental Impact Assessment

Inflatable Pontoons Listing ID:

East Central Florida Region Matt Culver, Brevard County James Gray, Indian River County Jim Oppenbourn, St. Lucie County Kathy Fitzpatrick, Martin

Label the diagram below with long fetch and short fetch:

STReSS Laboratory Safety Training Memorandum

Managing the coral reef - The Great Barrier Reef Marine Park Authority Great Barrier Reef Coral Sea World Heritage Site Zoning

Planning Considerations for Nearshore Placement of Mixed Dredged Sediments

Transcription:

Reef Ball Designed Reefs Beaches, Turks and Caicos Final Report The Beaches Reef Ball Designed Reef Project has now been completed and being utilized by Beaches clients. As per the proposal submitted, two designed reefs of approximately 100 units each were fabricated and deployed off the shoreline of the Beaches Resort. The first reef area is centered within the swim zone of the resort confines, with the second reef located to the east of their dock, within the buoyed swim zone. Both reefs are demarcated with buoys to indicate their approximate location. Aerial of site 1. Center of Beaches property Figure 1.

Figure 2. Aerial of site 2. Located east of the dock. The floating platform is in the center of the surrounding pods. The reef modules were constructed July 22 nd thru August 5 th 2007 at the Treasure Beach lot located to the South of the hotel. The construction process was performed by 6 people, 3 persons from Reef Innovations, Inc. and 3 local laborers. Concrete and sand was purchased from Butterfield Concrete, forklift by a local contractor and shells and rock from local sources. Local coordination and transportation was provided by Beaches and expertly directed by Michael Clarke, the Water Sports Manager. Figure 3. Early fabrication stages.

Figure 4. Modules prior to deployment. The fabricated units were deployed and transplants added the week of August 25 September 2, 2007. A total of 205 reef units were placed, with approximately 124 balls on the eastern site and 91 balls on the western site (5 balls were broken in process and counted as two). Of the 205 units, there were 20 pallet balls, 60 bay balls, 60 mini bay balls, 30 lo pro balls, and 30 oyster balls with 50% of those being fabricated in the layer cake design. Figure 5. Transporting modules to site.

The coral transplants were taken from 2 different sites; the Third Turtle Beach Nourishment Project area and the sunken barge off of Water Cay. A total of 712 transplants were accomplished in the 7 day period, not including small corals (single finger corals divided from larger colonies) and red algal clumps (Amphiroa and Neogoniolython spp.) that were added. The western site (Site 1) received a total of 314 hard corals, 27 soft corals, and 65 live rocks with associated invertebrates. The eastern site (Site 2) received 243 hard corals, 16 soft corals, and 47 live rock formations. All transplants have been photo documented for further monitoring, and as of 1 week post construction, are all in good health. The following photos show examples of the work. Figure 6. An array with hard and soft corals and live rock.. Two different techniques were used to attach the corals to the Reef Ball modules. The first utilizes a non toxic type of putty that hardens within 24 hours. The second technique uses a special blend of Hydraulic cement which hardens within just a couple minutes. Utilizing the cement requires a team of people to mix, swim and apply, but is necessary for larger transplants that are not completely stable with surrounding water movements

Figure 7. More attachments of coral. Anchoring of the units was accomplished by inserting Helical sand anchors at each pod, then attaching stainless steel cable that ran thru each of the reef structures. The cable was ran low on the units and buried in the sand as much as possible to be less visible. We intend to incorporate other anchoring techniques in future projects to better facilitate the aesthetics of the anchoring process. Figure 8. Turtle on reef and anchoring cable through units.

Figure 9. Marine life at home. A total of 16 people worked on the fabrication and deployment teams, with five of those being volunteers and half of the team being locally based in Provo. Beaches staff also assisted in many ways as needed. The hospitality provided by the Beaches Resort was exemplary and much appreciated by all team members. We recommend that the two reefs be demarcated with a different color buoy system to facilitate users finding the sites. We also recommend that an in house publication or flyer be produced to introduce guests to the reefs and to also highlight the rules of reef etiquette. As per the proposal, Phase 3 trail markers and maps are still an option to complete the reef. A final recommendation is to continue the monitoring, initially on a quarterly basis as the corals begin to stabilize and overgrow, and bi annually thereafter to document the progress as well as to assess and repair any damages caused by heavy snorkeling activity. We appreciate the opportunity given the Reef Ball teams to provide our services and we hope to assist you again at other Beaches/ Sandals Resorts.