SR 2108-A12/SR 2308-A02 Forbes Avenue Betterment and SR 2108-A13 Forbes Avenue Corridor Improvements. July 17, 2017

Similar documents
SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Major Bike Routes 102 Avenue Workshop April 21, 2015

CITY OF PITTSBURGH. City of Pittsburgh Active Transportation Profile REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA

Road Diets FDOT Process

February 11, 2016 TPO Board Presentation

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Meade Street Bridge Design Alternative Study

Pedestrian and Bicycle Conditions

122 Avenue: 107 Street to Fort Road

Henderson Ave. Complete Streets Project

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

PROJECT FACT SHEET March 21, 2018

Duwamish Way-finding and CTR Report

Derby Street. Project Updates. Salem, Massachusetts

City Avenue Projects

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

KEARNY MESA COMMUNITY PLAN UPDATE

F L E T C H E R A V E N U E

Fulton Market Streetscape

PROJECT FACT SHEET May 25, 2018

City Avenue Projects

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Long Island Rail Road Expansion Project Floral Park to Hicksville

42nd Ave N Reconstruction

NJDOT Complete Streets Checklist

C Line Rapid Bus Preliminary Station Design

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

5. RUNNINGWAY GUIDELINES

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018


North Avenue Corridor Study

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

CITY OF LANCASTER PROPOSED NEW PROJECTS

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

Bay to Bay Boulevard Complete Streets Project

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Transportation and General Civil Engineering Projects

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

photos above are courtesy of the University of Pittsburgh Archives Service Center ABOVE: Fifth Avenue (1910) BELOW: Forbes Avenue (1937)

Roosevelt Estates Neighborhood Improvements

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Montclair s Complete Streets Experience

Taylor Road Resurfacing Project

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

MT. LEBANON COMPREHENSIVE PLAN UPDATE ELEVATING CONNECTIVITY FOR PEDESTRIANS AND CYCLISTS

San Jose Transportation Policy

Pedestrian Road Safety Audit

Lawrence Avenue Streetscape Concepts August 30, 2011

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

CTDOT Pedestrian and Bicycle Safety Initiatives

Geary Corridor Bus Rapid Transit

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

Pavement Rehabilitation & Buffered Bike Lane

Broadway Complete Streets Project

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

ADA PRESENTATION (CURB RAMPS)

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

Morristown, NJ Complete Streets Policy

Draft North Industrial Area-Wide Traffic Plan

City of Scotts Valley CITY COUNCIL STAFF REPORT

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!

ACTION TRANSMITTAL No

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

Complete Streets Funding Program Project Prioritization Plan

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

PRESS RELEASE San Joaquin Council of Governments

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Bicycle + Pedestrian Connectivity Gap Analysis

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

North Avenue Corridor Study

Active Transportation Facility Glossary

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

City of Tacoma Transportation Commission MINUTES

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

LANE ELIMINATION PROJECTS

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Hennepin County Pedestrian Plan Public Comment Report

Central Avenue Corridor Study FPID Number:

PEDESTRIAN CROSSING TREATMENTS

Cycle Track Design Best Practices Cycle Track Sections

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Transcription:

SR 2108-A12/SR 2308-A02 Forbes Avenue Betterment and SR 2108-A13 Forbes Avenue Corridor Improvements July 17, 2017

Agenda Welcome Ralph Horgan, CMU Overview of Projects Feedback and Proposed Improvements Oakland Projects Forbes Corridor Overview Birmingham Bridge to Bigelow Boulevard Bigelow Boulevard to Craig Street Craig Street to Beeler Street Beeler Street to Margaret Morrison Street Maintenance and Protection of Traffic & Schedule Q and A 2

Introductions Project Team PENNDOT Cheryl Moon-Sirianni, PE; Assistant District Executive, Design John J. Zelesnak, PE; Project Manager Todd Kravits, PE; District Traffic Engineer Mark Young; District Environmental Manager Tyler Mercer, PE, Assistant Environmental Manager City of Pittsburgh Karina Ricks; Director, Department of Mobility and Infrastructure Amanda Purcell, PE; Municipal Traffic Engineer Kristin Saunders, RA; Bicycle & Pedestrian Coordinator Katy Sawyer, PE; Mobility Engineer WRA Eric C. Meyer, PE; Project Manager Daniel Fritz, PE; Senior Project Engineer Tyler Steele, PE; Project Engineer CMU Ralph Horgan, Associate Vice President Bob Reppe; Director of Design OTMA Mavis Rainey; Executive Director University of Pittsburgh Paul Supowitz; Vice Chancellor for Community & Governmental Relations Ron Leibow; Senior Manager of Planning & Design Port Authority of Allegheny County David Wohlwill, AICP; Program Manager, Long-Range Planning 3

Project Description SR 2108-A12/SR 2308-A02 Forbes Avenue Betterment Birmingham Bridge to Margaret Morrison Street (Federal and State funds) Resurfacing (mill/overlay) of the corridor Five (5) New Traffic Signals with full pedestrian and Americans with Disabilities Act (ADA) compliant upgrades Traffic Signal Upgrades at existing traffic signals SR 2108-A13 - Forbes Avenue Corridor Improvements Traffic Signal Replacement and Safety Improvements from South Craig Street to Margaret Morrison Street (Federal funds with CMU providing the local match) Six (6) New Traffic Signals with full pedestrian and Americans with Disabilities Act (ADA) compliant upgrades Converting existing four lanes to two lanes w/ center turn lane and bike lanes in each direction 4

Public Feedback 8/24/16 Meeting There is a need for traffic calming through the corridor Safety improvements at intersections All walk phases need kept at Craig and Morewood A pedestrian crossing is needed between South Bouquet St. and Bigelow Blvd. How will the Bus Rapid Transit (BRT) project impact this project Bike connectivity is needed to connect the CMU section (Craig St.) to the Bigelow Blvd./Schenley Drive intersection. Maximize bike lane widths Left turn movements for bikes specifically at Morewood and Beeler How will bike conflict areas be handled Driveways Intersections Pull-offs 5

Pedestrian Improvements Physical Improvements Upgraded ADA curb ramps High visibility crosswalks (piano keys) New Stop Bars New Pedestrian countdown heads Audible signals/push buttons Operational Improvements Leading/advance pedestrian walk phase at all intersections except Forbes Ave/Morewood Ave and Forbes Ave/S. Craig St, which will remain an all-walk phase New signalized pedestrian crossing between Bouquet St and Bigelow Blvd/Schenley Dr 6

Bicycle Improvements New bike lanes between Bigelow Blvd/Schenley Dr and Margaret Morrison St Completes connectivity to existing bike facilities Two-stage left turns (Curb Cuts at T intersections) Minimum 5 width bike lanes with a 2-4 painted buffer where space permits New bicycle safe inlet grates New and updated signing and signals for bike infrastructure Improvements won t negatively impact BRT 7

Oakland Projects Additional upcoming projects in Oakland City of Pittsburgh 2017 Bike Lanes Bigelow Boulevard BRT 8

9

UPCOMING PROJECTS 2017 Forbes and Bigelow Interim Improvements 10

UPCOMING PROJECTS 2017 Forbes and Bigelow Interim Improvements 2018/19 Forbes Ave Betterment Project 11

UPCOMING PROJECTS 2017 Forbes and Bigelow Interim Improvements 2018/19 Forbes Ave Betterment Project 2018/19 Bigelow Blvd Redesign 12

UPCOMING PROJECTS 2017 Forbes and Bigelow Interim Improvements 2018/19 Forbes Ave Betterment Project 2018/19 Bigelow Blvd Redesign 2020/21 Bus Rapid Transit 13

UPCOMING PROJECTS 2017 Forbes and Bigelow Interim Improvements 2018/19 Forbes Ave Betterment Project 2018/19 Bigelow Blvd Redesign 2020/21 Bus Rapid Transit Smart Spines / Smart Signals 14

Project Overview SR 2108- A12/SR 2308-A02/ SR 2108-A13 Forbes Avenue Projects Forbes at Margaret Morrison St Forbes at Birmingham Br Existing Signal minor upgrades Replaced Signal New Signal 15

Birmingham Bridge to Craft Avenue Forbes at Birmingham Br Existing Signal Replaced Signal Existing Bus stop Forbes at Craft Ave 16

Craft Avenue to Bouquet Street Forbes at Bouquet St Forbes at Craft Ave Existing Signal minor upgrades Replaced Signal Existing Bus stop 17

Bouquet Street to Bigelow Blvd Forbes at Bigelow Blvd Forbes at Bouquet St Existing Signal minor upgrades New Pedestrian Signal Existing Bus stop 18

New Traffic Signal 19

Bigelow Blvd to Craig Street Forbes at Bigelow Blvd Existing Signal minor upgrades Forbes at Craig St Replaced Signal Existing Bus stop 20

2017 Forbes Ave Interim Improvements 21

2017 Forbes Ave Interim Improvements 22

2017 Forbes Ave Interim Improvements 23

Existing Intersection Configurations Forbes Avenue at Bigelow Blvd/Schenley Drive & Schenley Drive Extension Existing Signal minor upgrades Replaced Signal Existing Bus stop 24

Proposed Intersection Configurations Forbes Avenue at Bigelow Blvd/Schenley Drive & Schenley Drive Extension Existing Signal minor upgrades Replaced Signal Existing Bus stop 25

Existing Intersection Configurations Forbes Avenue at Bellefield Avenue Pull Off Replaced Signal Existing Bus stop Schenley Dr. Ext to Bellefield Ave Bellefield Avenue to Craig Street 26

Proposed Intersection Configurations Forbes Avenue at Bellefield Avenue Pull Off Replaced Signal Existing Bus stop Schenley Dr. Ext to Bellefield Ave Bellefield Avenue to Craig Street 27

Craig Street to Beeler Street Replaced Signal Forbes at Craig St Forbes at Beeler St New Signal Existing Bus stop 28

Project Overview SR 2108-A13 Forbes Avenue Corridor Improvements Forbes at Craig St Signal Replacement Forbes at Morewood Ave Signal Replacement Forbes at Beeler St Signal Replacement Forbes at CIC Dr and Tepper Garage New Signal Forbes at Cyert Dr Relocated Signal Replaced Signal New Signal Existing Bus stop Forbes at Margaret Morrison St Signal Replacement 29

Corridor Improvements Tepper Quadrangle Replaced Signal New Signal Existing Bus stop Pull Offs 30

Existing Intersection Configurations Forbes Avenue at Craig Street Existing Bus stop Pull Off 31

Proposed Intersection Configurations Forbes Avenue at Craig Street Replaced Signal Pull Off Existing Bus stop 32

Proposed Intersection Configurations Forbes Avenue at CIC Drive and Tepper Garage Ramp New Signal Pull Off 33

Proposed Intersection Configurations Forbes Avenue at Cyert Drive Relocated and Replaced Signal 34

Existing Intersection Configurations Forbes Avenue at Morewood Avenue Pull Off Existing Bus stop Pull Off 35

Proposed Intersection Configurations Forbes Avenue at Morewood Avenue Replaced Signal Pull Off Existing Bus stop Pull Off 36

Proposed Roadway Configuration Morewood Avenue to Beeler Street Existing Bus stop 37

Existing Intersection Configurations Forbes Avenue at Beeler Street Existing Bus stop 38

Proposed Intersection Configurations Forbes Avenue at Beeler Street Replaced Signal Existing Bus stop 39

Proposed Roadway Configurations Beeler Street to Margaret Morrison Street Existing Bus stop 40

Existing Intersection Configurations Forbes Avenue at Margaret Morrison Street Existing Bus stop 41

Proposed Intersection Configurations Forbes Avenue at Margaret Morrison Street Replaced Signal Existing Bus stop 42

Maintenance and Protection of Traffic Milling/Paving Operations Combination of Daytime and Nighttime Work currently evaluating work hours and type of work to be done Potential Weekend Closures Will not be along the entire corridor Will be limited to a block-by-block approach Sidewalk and Signal Construction Maintain Pedestrian Access at all times ADA Accessible Contractor to hold a meeting prior to construction with the Universities, Hospitals, Emergency Providers, etc. An additional Public Meeting to be held with the Contractor at the start of construction. 43

Construction Schedule Open Bids Late Fall 2017 Notice to Proceed Winter 2018 Anticipated Completion Late Fall 2018 44

Questions? This presentation will be made available within 10 days on the OTMA website http://www.otma-pgh.org/.