API SC 6 SUBCOMMITTEE ON VALVE AND WELLHEAD EQUIPMENT TASK/WORK GROUP STATUS REPORT. 6D/6DSS TG02 on Revisions & Corrections FEBRUARY 8, 2011

Similar documents
Annex G (normative) Requirements for Nondestructive Examination

Technical Standard. API6D Ball & Plug Valve. Inspection & Test Procedure

American Petroleum Institute Purchasing Guidelines Purchase API Spec 6DSS online at

PIP PNE00012 Piping Examination and Leak Test Guide

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1

Telefon (+45) Telefax (+45)

THE PROCESS OF JOINT INTEGRITY

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION

BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION

Pibiviesse High Performance Control Ball Valve

API-510 PRESSURE VESSEL INSPECTOR

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage

Valve Inspection & Testing

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

INTRODUCTION CONTENTS PAGE

ASME BOILER CODE WEEK AND PRESSURE VESSEL CODE WEEK May 5-10, 2019 Grand and Little America Hotels, Salt Lake City, Utah

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

Standard Pneumatic Test Procedure Requirements for Piping Systems

BALL VALVE ASSEMBLY AND MAINTENANCE PROCEDURE. REF. DOC.MMM900N Rev.1 March 2014 SERIES M DIN / ANSI. Page 1 of 17

Spring Loaded Safety Valves

Materials : Forged carbon steel A105N

High Pressure Iron (HPI) Recertification Guidelines & Procedures

FULL QUALITY ASSURANCE CERTIFICATE

LEAKAGE ACCEPTANCE RATES COMPARISON METAL & SOFT SEATED VALVES ISO 5208/API 598/API 6D/MSS SP-61/FCI 70-2

Event Time Event Name Meeting Room Sunday, January Monday, January

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

Pipeline Systems PIP PLSMV004 Carbon Steel Globe Valve Descriptions

Industrial valves Pressure testing of metallic valves

BALL VALVE ASSEMBLY AND MAINTENANCE PROCEDURE FOR LCV BALL VALVES REF. DOC. MMM LCVE Rev.0 July 2010 SERIES SFF & SFR.

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

WHEATLEY Series 500 Swing Check Valve

VALVE MANUFACTURERS ASSOCIATION API 622 API 624

MSC Guidelines for Independent Fuel Tanks

QUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7

CURI Pierside Stainless Diesel Tank

HYDROSTATIC LEAK TEST PROCEDURE

ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel

PIP PNSMV004 Carbon Steel Globe Valve Descriptions

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL

NBIC Committee Action Block

Contents. 1. Non Destructive Testing Requirements. 2. Non Destructive Testing Methods Magnetic Particle Examination

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - ISOLATION BALL VALVE

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - APPLIANCE BALL VALVE

ASSE International Product (Seal) Listing Program. ASSE Performance Requirements for Air Valve and Vent Inflow Preventer

This document is a preview generated by EVS

Ball Float Steam Trap UNA 43 PN 16/CL 125/JIS 10K UNA 46 PN 40/CL 150/CL 300/JIS 10K/JIS 20K DN 80, 100, 150, 3", 4", 6"

SECTION BUTTERFLY VALVES

SPECIFICATIONS - DETAILED PROVISIONS Section Butterfly Valves C O N T E N T S

ASYBCO 90 O ELBOW LONG RADIUS O.D. I.D.

Cast iron swing check valve. BS EN 12334:2001 PN16

MSS STANDARD PRACTICE SP-61 This MSS Standard Practice was developed under the consensus of the MSS Technical Committee 114 and the MSS Coordinating C

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

Notice for Pressure Special Equipment Manufacture Licensing

Welcome to the LESER Seminar, Taipei 28. June Design_of_safety_relief_valves_250804_Cal

Materials : Forged carbon steel A350 LF2

2018 Exploration & Production Winter Standards Meeting January 22-26, 2018 Hyatt Regency San Antonio San Antonio, Texas

Specification for Choke and Kill Equipment

Contents. LWN edition:

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)

Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

Installation, Operation and Maintenance Manual for Back Pressure Regulator

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

API 510: Pressure Vessel Inspection Code (API Exam Preparation Training)

MSC Guidelines for Pressure Vessels

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

SECTION PRESSURE TESTING OF PIPING

Type Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions

WELCOME to CAUx Local India 2018

Serie 06-M6. Swing wafer check valve. made in. Application fields. Check valves E U R O P E WATER CONDITIONING INDUSTRY

Guided Wave Testing (GWT)

6.6 Relief Devices. Introduction

Liquefied gas cargo tanks and process pressure vessels

Engineering Data Sheet

Process Industry Practices Pipeline Systems

Subpart E. Pressure Testing

Materials : Carbon steel ASTM A216 WCB

Industrial valves Isolating valves for low-temperature applications Part 1: Design, manufacturing and production testing

APPENDIX 1. PART 10: Leak Detection Inspector, Level 1, 2 and 3 CERTIFICATION SCHEME FOR PERSONNEL. 3 rd Edition, February 2016

SCA Series Inverted Bucket Steam Traps

ADVANTAGES DESCRIPTION MECHANICAL FITTINGS AND DIMENSIONS

Contents. 1. General information BROEN BALLOMAX Steel Ball Valves Approvals Quality Management...2

DUPLEX TECHNICAL INFORMATION FABRICATED DUPLEX STRAINERS

NAVSEA STANDARD ITEM. 2.2 T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

Outline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products

Specification for Choke and Kill Equipment

GREIG FILTERS, INC. OPERATION MANUAL

Materials : Forged carbon steel A105N

NOTICE REGARDING CODE CASES OF THE ASME B31 CODE FOR PRESSURE PIPING

ISO INTERNATIONAL STANDARD. Cryogenic vessels Pressure-relief accessories for cryogenic service Part 1: Reclosable pressure-relief valves

Installation, operation & maintenance manual - original version

PV4 and PV6 Piston Valves

Reply 2: See Reply 1.

Ball Float Steam Trap UNA 45 MAX, UNA 46 MAX, UNA 46A MAX PN 40/Class 300 DN 40, 50, 65

Transcription:

API SC 6 SUBCOMMITTEE ON VALVE AND WELLHEAD EQUIPMENT TASK/WORK GROUP STATUS REPORT 6D/6DSS TG02 on Revisions & Corrections FEBRUARY 8, 2011 TABLE OF CONTENTS 1. SCOPE OF WORK... 1-1 2. PREVIOUS STATUS REPORT DATE... 2-1 3. MEMBERSHIP... 3-1 4. MAJOR ISSUES AND DATES... 4-2 5. FUTURE WORK PROGRAM... 5-2 6. FUTURE MEETING DATES... 6-3 7. RESOURCE NEEDS... 7-3 1. SCOPE OF WORK Review and maintain API Spec 6D/6DSS for revisions and correction to meet industry needs. Also interface the mirror ISO documents ISO 14313/14723 to harmonize API Spec 6D/6DSS as much as possible. 2. PREVIOUS STATUS REPORT DATE Previous status report on 6D/6DSS TG was issue June 25, 2010 in Washinton, D.C. during the API 2010 Summer E&P Stanards Conference. TG meetings January 19th 7 20th, 2011. 3. MEMBERSHIP TABLE 3-1: TASK/WORK GROUP MEMBERS -25 Name Company E-mail Roy Benefield FMC Roy.benefield@embarqmail.com Morg Bruck Marathon mmbruck@marathonpetroleum.com -1-

John Fowler Online Resources fowlweolr@aol.com Roy Edwards Streamflo Roy.edwards@streamflo.com Rick Faircloth Cameron Rick.faircloth@c-a-m.com Austin Freeman Halliburton Austin.freeman@halliburton.com Engin Gulgun IS Valves egulgun@isvalve.com Mike Feeley ConocoPhillips Mike.feeley@concocphillips.com John Icenhower Flowserve joicenhower@flowserve.com Rodger L. Lawson ExxonMobil Rodger.L.Lawson@exxomobil.com Mark Lewandoski SPX Mark.Lewandoski@spx.com Mike Miller Dril-Quip Mike_miller@dril-quip.com Dave Mefford Cameron Dave.mefford@c-a-m.com Donald H. Monroe Consultant domonroe@windstream.com George A. Moran Consultant gmoranpe@aol.com Charles Partridge Hedwedge Valve charlespartridge@shumateinc.com Ed Pearson Cameron Ed.pearson@c-a-m.com G. Ravindran Audco-India gr@audcoindia.com Jean Michel Rivereau TOTAL Jean-michel.rivereau@total.com Bob Schmidt Hackney Ladish bschmidt@hackneyladish.com Larry Skoda Chevron Larry.skoda@chebron.com Tom Slimmon Alliance Pipeline slimmonconsulting@shaw.ca) Stephen Smith Aramco Services Stephen.smith@aramco.com Henry Wong FMC Henry.wong@fmcti.como Robert T.J Appleby ExxonMobil robert.j.appleby@exxonmobil.com 4. MAJOR ISSUES AND DATES API 6D Specification for pipeline valve issued the following Errata s. ERRATA 5, NOVEMEBR 10, 2010 includes Errata 1,2,3,4 see attached. API 6DSS Specification for pipeline valve issued the following Errata s. ERRATA 2, NOVEMEBR 10, 2010 includes Errata 1, see attached. 5. FUTURE WORK PROGRAM 6D has two new work items on their work plan at this time. -2-

Annex- I see attached. This annex provides the Requirements for Extended Hydrostatic Shell Test duration and Records Retention for Valves in Jurisdictional Pipeline Systems. This is an informative Annex and can be requested by the pipeline owner or operator to be performed in additional to the standard API 6D pressure testing activities. The 6D ballot was closed ballot was closed in November 2010 3 Negative votes. A TG meeting was held January 19 th, 2011 16 members of the 6DTG along (2) of voter who cast negative ballot. After lengthy discussion and contact the negative commenter s the entire 6D TG member it was agreed to draw the negative vote and re-ballot the annex-i as modified. Ballot # 2243 has been issue for a 6 week ballot. Annex J This annex provides for Quality Specification Level (QSL) for pipeline valves. The three (3) QSL address extended hydrostatic/pneumatic testing, NDE on selected components and required documentation to be provided. As special TG was formed from members of the 6D TG to work on this issue. 1 st meeting was held June 2010 to develop the 1 st draft and the final meeting was held January 20 th, 2011 to finalize the Annex. The 6D TG has recommended that the attached DRAFT Annex J be issued for formal ballot. 6. FUTURE MEETINGS DATES Next meeting planned for 6D TG will be in early April 2011 to review API RP6DR and API 6FA. Additionally we will hold a 6DTG meeting during the Summer Standards conference in San Francisco, Ca. June 29 th, 2011. 7. RESOURCE NEEDS No resource needs at this time. -3-

Date of Issue: November 2010 Affected Publication: API Specification 6D/ISO 14313, Specification for Pipeline Valves, 23rd Edition, April 2008 ERRATA 5 (Includes Errata 1, Errata 2, Errata 3, and Errata 4) These errata correct editorial errors in the 23rd Edition of API Spec 6D. Page 2, Section 3, Normative references, replace: ASME B16.5-1996, Pipe Flanges and Flanged Fittings : NPS 1/2 through 24 ASME B16.5-2003, Pipe Flanges and Flanged Fitting: NPS 1/2 through 24 and ASME B31.8-2003, Gas Transmission and Distribution Piping Systems ASME B31.8-2007, Gas Transmission and Distribution Piping Systems Page 3, Section 3, Normative references, replace: ASME Boiler and Pressure Vessel Code Section VIII: Rules for Construction of Pressure Vessels Division 2: Alternative Rules ASME Boiler and Pressure Vessel Code Section VIII: Rules for Construction of Pressure Vessels Division 2-2004: Alternative Rules Page 34, Table 4, under subheading PN 50 (class 300), for DN 150 (NPS 6): replace the value of 457 in the column Raised face (A) 403 such that the line reads: 150 6 403 457 419 Page 36, Table 4, under subheading PN 420 (class 2500), line for DN 65 (NPS 2 1 /2): replace the value of 540 in the column Ring joint 514 such that the line reads: 65 2 1 /2 508 508 514 1

Page 41, Section 7.7.2, replace: ASME B31.8-2003 ASME B31.8-2007 and Figures 14 and 15 Figures I-4 and I-5 Page 45, Section 7.20.2, second sentence, replace: ASME Code Section VIII, Division 2, Part AD-132 ASME Code Section VIII, Division 2-2004, Part AD-132 Page 49, Section 9.3, Note, delete: by agreement Page 49, Section 9.4, second paragraph, second sentence, add: pipe pups to valve after Repairs of fabrication welds On page 51, draw: Section 10.2.3.2 Gauge range Renumber: 10.2.3.3 (from Addendum 1) as 10.2.3.2 Page 63, Section B.3.3, replace: 0,55 MPa ± 00,7 MPa 0,55 MPa ± 0,07 MPa On page 64, add to the end of Section B.4.2 Acceptance criteria shall be per the requirements of 11.4.3 On page 66, add to the end of Section B.10 Acceptance criteria shall be per the requirements of 11.4.3 2

On page 66, add to the end of Section B.11 Acceptance criteria shall be per the requirements of 11.4.3 On page 66, add to the end of Section B.12 Acceptance criteria shall be per the requirements of 11.4.3 Page 71, Table D.1, beginning of last box, replace: Other requirements Other requirements Page 71, Table D.1, after ISO 15156 (all parts)? Yes No add the following line: If yes, specify % mass fraction of H 2 S ; ph ; % mass fraction of chlorides ; temperature 3

Date of Issue: November 2010 Affected Publication: API Specification 6DSS, Specification for Subsea Pipeline Valves, Second Edition, December 2009 ERRATA 2 (includes Errata 1) Page 56, Table A.2, the entry for in the Acceptance column should read: Forgings: ASME BPVC Section VIII, DIV. 1-2007 UF 55 (Angle-Beam) ASME B16.34-2009, Appendix IV (Straight -Beam) Plate: ASTM A578/A578M-07, acceptance standard level B Page 56, Table A.2, the entries for RT1 and RT3 in the Method column for casting should read: ASME BPVC 2007, Article 2

Annex I (informative) API Regional Annex Requirements for Extended Hydrostatic Shell Test duration and Records Retention for Valves in Jurisdictional Pipeline Systems. I.1 General: This annex provides a recommended practice pertaining to valves used in jurisdictional pipeline systems. Valves used in transportation of natural and other gas and hazardous liquids or carbon dioxide by pipeline are usually regulated by the national governments of the countries in which the pipeline is located. This annex specifies the requirements for extended hydrostatic shell testing that shall be performed by the manufacturer if specified by the purchaser. This annex also specifies the test records to be provided to the purchaser and record retention requirements. I.2. Hydrostatic shell testing requirements: The hydrostatic shell test shall be in accordance 11.1 and 11.3 of this specification a test duration of four (4) hours, unless otherwise agreed. I.2.1 Test record requirements: Test records shall contain the following as a minimum and be provided to the purchaser: I.2.1.1 I.2.1.2 I.2.1.3 I.2.1.4 I.2.1.5 The name of the manufacturer, name of the organization that performs testing (if other than the valve manufacturer), the identification of the individual responsible for performing the test, date, time and location of test. Serial number, size, class and end connection. Test medium (fluid) used. The beginning, ending, and actual test pressure and temperature readings, unless otherwise agreed. The test duration. I.2.1.6 A chart recording or digital record of the pressure. I.2.1.7 I.2.1.8 I.2.1.9 I.2.2 I.2.2.1 I.2.3 I.2.3.1 Any significant variations in pressure or temperature for the particular test. Any leaks or failures and their disposition. Certificates of calibration for all instrumentations used in the test, such as pressure transducers, pressure gauges, temperature devices and chart recorders: Minimum requirements for pressure transducers, pressure gauges, temperature devices and chart recorders: Pressure transducers, pressure gauges, temperature devices and chart recorders shall be calibrated in accordance section 10 of this specification, but at an interval not greater than 12 months. Record retention requirement: Test records in I.2.1 shall be shall be provided to the purchaser and maintained by the manufacturer in accordance section15 of this specification, unless otherwise agreed.

Annex J- DRAFT 1-REV-2 January 2011 (Infomative) Quality Specification Level (QSL) for pipeline valves. J.0 General This annex specifies three quality levels (QSL) for pipeline valves. The specific QSL shall be performed by the manufacturer when specified by the purchaser. J.1 Hydrostatic/Pneumatic testing Table J.1 defines the test requirements for QSL-1, QSL2 and QSL3. All QSL -3 hydrostatic test shall be chart recorded. Table J.1 Pressure testing requirements Quality Specification Level High Pressure Shell Test @ 1.5 times the rated pressure per 11.3 High pressure Seat Test@ 1.1 times the rated pressure per 11.4 Low pressure air seat test at 80psi per B.3.3 Type II QSL-1 Standard Test Standard Test 1 test required. QSL-2 2-tests required After 1st test reduce pressure to zero and repeat test. 2-tests each seat required After 1st test reduce pressure to zero and repeat test. 2 tests each seat required.reduce pressure to zero between each cycle QSL-3 3- tests are required.reduce pressure to zero between each test. 3 -tests each seat are required.reduce pressure to zero between each test. 3 tests each seat are required.reduce pressure to zero between each test. Test 1 & 3 shall have test duration as specified in Table 10 Test 1 & 3 shall have test duration as specified in Table 11 Test 1 & 3 shall have test duration as specified in Table 11 The 2nd-test shall have an extended duration of 4-times that stated in Table 10.. The 2nd-test shall have an extended duration of 4-times that stated in Table 11. The 2nd-test shall have an extended duration of 4-times that stated in Table 11. J.2 Specification of quality levels for NDE Table J.2 specifies the NDE requirements for QSL- 2 and QSL-3. MT = MAGNETIC PARTICLE TESTING (Surface NDE) / RT = X-RAY EXAMINATION (Volumetric NDE), PT = DYE PENETRANT TESTING (Surface NDE)/ UT = ULTRASONIC TESTING (Volumetric NDE)/ VT = VISUAL INSPECTION Note : No NDE requirements are specified for QSL-1

Table J.2 NDE requirements Part Body or,closures and end connections or Bonnet or cover or Gland housing QSL- 2 QSL-3 Cast Forged Plate Cast Forged Plate RT1 a RT1 a, f UT1 g Welding ends b RT3 or UT4 Stem or shaft c, g N/A RT3 or UT4 N/A N/A N/A Trunnion d, g Or Trunnion/bearing plates UT1 Bolting-pressure containing N/A N/A N/A Seals Gaskets VT4 VT4 N/A Pressure cap RT3 or UT4 RT3 or UT4 Ball or gate h MT1 or Plug or clapper disc c, g RT3 or UT4 MT1 or MT1 or Clapper disc arm UT4 Seat rings c, g Seat springs VT4 VT4 Pressure-containing welds VT3 RT2 or UT3 MT1 VT3 RT2 or UT3 Reinforcement and stiffening welds VT4 VT4 Fillet and attachment welds to pressure-containing parts Pipe pup to valve welds or Pipe pups e VT3 VT3 RT2 MT1 VT3 VT3 RT2 Corrosion resistannt over;ay VT4 VT4 UT3

Part QSL-2 QSL-3 Cast Forged Plate Cast Forged Plate Plating VT4 VT4 Hardfacing VT4 VT4 Sealing surfaces MT2 or PT2 MT2 or PT2 NOTE 1 See Table S.3 for specification of the examinations referred to in this table. NOTE 2 N/A means that the manufacturer is not allowed to use this material form for that specific part NOTE 3 ALL THE NDE ACTIVITIES LISTED ABOVE FOR A SPECIFIC PRODUCT FORM OR FORMS SHALL BE CONDUCTED a b c d e f g RT1 may be replaced by UT4 by agreement. NDE back 50 mm from weld end. MT/PT to be performed prior to coating, plating or overlay. Trunnion may be pressure-containing or pressure-controlling, depending on design type. If the trunnion is a pressurecontaining part then the requirements for body apply. NDE requirements of pipe pups shall be established by agreement. RT1 plus UT1 may be replaced by RT3. Requirements for examination of bar material shall be as for forgings J.3 Specification of tests Table J.3 specifies the extent, method and acceptance criteria for each of the tests referred to in Table J.2.

Table J.3 Extent, method and acceptance criteria of NDE examination Examination NDE Extent Method Acceptance RT1 RT casting Critical areas per ASME B16.34 RT2 RT weldments 100 % where practicable Article 2 Article 2 ASME Section VIII Div.1, Appendix 7 ASME Section VIII Div. 1, UW51 (linear indications); ASME Section VIII Div.1, Appendix 4 (round indications) RT3 RT casting 100 % Article 2 ASME Section VIII Div. 1, Appendix 7 UT1 UT casting Remaining areas not covered by RT1 Article 5 (direct and shear wave) ASTM A 609/A 609M, Table 2, Quality Level 2 UT forging and plate All surfaces Article 5 Forgings : ASME Section VIII Div. 1-UF 55 for angle bean & ASME B16.34 for straight beam. Plate: ASTM A578/A578M Acceptance standard level B UT3 UT weldments 100 % Article 5 (direct and shear wave); Article 23 ASME Section VIII Div. 1, Appendix 12; ASTM A 578/A 578M UT overlay 100 % ASTM A578/A 578M Acceptance standard level C UT4 casting 100 % Article 5 ASTM A 609/A 609M, Table 2, Quality Level 1 MT1 MT 100 % accessible surfaces MT2 MT 100 % sealing surfaces PT 100 % accessible surfaces PT2 PT 100 % sealing surfaces Article 7 Article 7 Article 6 Article 6 ASME Section VIII Div.1, Appendix 6 No rounded or linear indications ASME Section VIII Div. 1, Appendix 8 No rounded or linear indications VT casting All surfaces MSS SP-55 Type 1 none acceptable; Type 2 to 12 A and B VT forging and plate All surfaces As required by ASTM product specification VT3 VT weldments All surfaces Article 9 As required by ASTM product specification All pressure-containing welds shall have complete joint penetration. Undercut shall not reduce the thickness in the area (considering both sides) to below the minimum thickness. Surface porosity and exposed slag are not permitted on or in 45 mm of seating surfaces. VT4 VT weldments and others All surfaces Article 9 No visible defects

J.4 Documentation Table J.4 specifies the final assembly documentation requirements for QSL-1, QSL-2, and QSL-3. Table J.4 Documentation requirements Quality Specification Level Required documentation to be sent the valve(-s) QSL-1 Certificate of conformance to this specification and QSL Pressure test report, (including pressure, test duration, test medium and acceptance criteria) Material test reports on all pressure containing parts. For sour service valves, certificate of conformance to ANSI/NACE MR0175/ISO 15156 ; QSL-2 QSL-3 Hardness test report on pressure-containing parts for sour service valves Certificate of conformance to this specification and QSL Pressure test report, (including pressure, test duration, test medium and acceptance criteria) Material test reports on all pressure containing parts. For sour service valves, certificate of conformance to ANSI/NACE MR0175/ISO 15156 ; NDE records Installation, operation and maintenance instructions/manuals; General arrangements drawings; Cross-sectional assembly drawings parts/materials list Hardness test report on pressure-containing parts Hardness test report on pressure-controlling parts Heat treatment records including times and temperatures. Certificate of conformance to this specification and QSL Pressure test report, (including pressure, test duration, test medium, and acceptance criteria) including copy of chart recorder used on pressure test Calibration certificates on pressure test equipment used (e.g. pressure guages, transducers and chart recorders) Material test reports on all pressure containing and pressure controlling parts. For sour service valves, certificate of conformance ANSI/NACE MR0175/ISO 15156 NDE records General arrangements drawings; Cross-sectional assembly drawings parts list and materials list; ;Installation, operation and maintenance instructions/manuals;