Attachment A: Traffic Mitigation Measures

Similar documents
TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

WHANGAREI IMPROVEMENTS

Auckland Transport s responses to feedback on proposed upgrades to the intersection of Mercari way and Don Mckinnon Drive

Frome Street Bicycle Route

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #2

About AMETI. Features and benefits. Stage One Panmure complete

Chelmsford City Growth Package

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

MARKHOUSE ROAD IMPROVEMENTS

1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

Chapter 5 Future Transportation

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

Memorandum. Sunday, July 13, Saturday, July 19, 2014

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

TRANSPORT AND MOVEMENT

Figure 7.6 Indicative site layout for Northcote Street tunnel site (C7), eastern ventilation facility site (C8) and Wattle Street and Walker Avenue

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

Appendix 5 Traffic Assessment

MILTON ROAD LLF PROJECT UPDATE

Boroondara Bicycle Users Group Response to: Monash Alliance M1 update plans 5 May 2008

1 st and 2 nd Street Couplet FAQ s

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

PROPOSED RESIDENTIAL SUBDIVISION

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

Eastern PA Trail Summit October 1, 2018

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

HISTON ROAD Have your say on better public transport, cycling and walking journeys

Welcome 78 Ave S.E. Underpass and Road Widening Project Update

Ministry of Education Notice of Requirement, North City High School. Transportation Assessment Report. July 2010

3.9 Recreational Trails and Natural Areas

Bicycle Network Submission

Key operating rules relating to all Brisbane Ranks

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Appendix B Option 1 Design, Plans and Estimates

Guildwood Village Traffic Response Prepared by City of Toronto Transportation Department

CHAPTER 3. Transportation and Circulation

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

CIRCULATION, PARKING AND ALTERNATIVE TRANSPORTATION PLANS

WDA response to O'Brien summary of recommendations dated 4 September 2017

DYNAMIC LANES FOR AUCKLAND

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

Frequently Asked Questions (FAQ)

102 Avenue Corridor Review

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

TRAC. March 2, Mayor Gayle McLaughlin and City Councilors City of Richmond P.O. Box 4046 Richmond, CA 94804

CUERDEN TRANSPORT PROPOSALS

5 CIRCULATION AND STREET DESIGN

2017 Temporary traffic control guidelines for pedestrians. v.2

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

EXHIBIT R1. Neighborhood Cul-de-Sac Implementation

Terwillegar Drive Expressway Draft Concept Plan

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

Manukau City Council Plan Change 20 - Flatbush Stage 2. Integrated Transport Assessment (ITA)

Statement of Rebuttal Evidence of Anthony Thomas Penny on Behalf of Danne Mora Holdings (#1134)

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

Design and Installation of Low Level Cycle Signals

San Rafael School District. Task Force Meeting Notes. November 5, 2012

Green Streets and Urban Greenways

TRAFFIC MANAGEMENT PLAN

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Diagonal cycle crossing for signalised intersection. Axel Wilke ViaStrada Matthew Hinton Maunsell Daniel Newcombe Auckland City Council

Great Bentley Parish Level Crossing Closure Proposal E45 Great Bentley Station

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

b. executing legal agreements with respect to the above.

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

5 Transit & Traffic. Overview

Richmond-Adelaide Cycle Tracks

4.0 transport requirements

Red Rocks Pari-whero. Red Rocks/Pari-Whero. Quarry. Owhiro Bay Quarry. Owhiro Bay Parade. Taputeranga Marine Reserve ISSUES AND OPPORTUNITIES ANALYSIS

The Wincheap Society

Proposed Residential & Retail Development at Geelong Rd Portarlington

PEDESTRIAN SAFETY INITIATIVE

Developing a Safer Cycling Strategy for the ACT ACRS Conference August 2012

to the Public Information Centre for the Downtown Traffic Study

Christchurch City Council Assets & Network Unit Transport Technical Services & Design

Duwamish Way-finding and CTR Report

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

City Rail Link Designation Alteration: Mt Eden. Draft Integrated Transport Assessment

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Hewson Planning 35 Corbett Road RD2 Whangarei 082. Attachment 5. Traffic Assessment

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

SANTA MONICA BOULEVARD CORRIDOR

Transcription:

Attachment A: Traffic Mitigation Measures Central Interceptor Main Project Works Watercare Services Limited This appendix outlines examples of detailed mitigation measures that could be implemented for the proposed works at 18 construction sites as part of the Project. These may be amended subject to the outcome of detailed design, but are provided as examples of the types of appropriate mitigation that may eventuate from consideration of the Proposed Designation Conditions 17, 18 and 19 in respect to traffic. 1.1 Western Springs Site (Plan 2 on page 34 of the Hearing Drawing Set) All construction vehicles should enter / exit the site via left in / left out movements only. Western Springs Stadium, e.g. which may involve limiting construction vehicle movements at certain times. Upgrade of Stadium Road to ensure that school pedestrians getting dropped off travel safely to the MOTAT entrance on Stadium Road. In particular, this includes: (i) (ii) (iii) a 2m footpath on the western side of Stadium Road; a bus drop-off area on the western kerb; and widening of Stadium Road on the eastern side by reducing the existing 4.5m footpath to 2.5m (thus resulting in no additional encroachment to the eastern trees). 1.2 Mount Albert War Memorial Reserve Reserve site (Plan 4 on page 45 of the Hearing Drawing Set) Install fencing around the site and access road to isolate pedestrians from the site. Closure of the northern access for public vehicles during construction (ie: truck access route only). PO Box 2592, Shortland Street, Auckland 1140 New Zealand P: +64 9 531 5006 www.tdg.co.nz 2576426(1) Page 1

Maintain pedestrian access to the reserve outside the works area and maintain linkages between the Mt Albert Recreation Centre and surrounding streets through the reserve (Asquith Avenue, Selcourt Road, Wairere Avenue.) 1.3 Mount Albert War Memorial Reserve - Car Park site (Plan 1a on page 56 of the Hearing Drawing Set) (d) (e) Install fencing around the site and access road to isolate pedestrians from the site. Closure of the northern access for public vehicles during construction (ie: truck access route only). Maintain pedestrian access to the reserve outside the works area and maintain linkages between the Mt Albert Recreation Centre and surrounding streets through the reserve (Asquith Avenue, Selcourt Road, Wairere Avenue.) Identify parking areas around Mount Albert War Memorial Reserve to accommodate the possible parking shortfall of up to 25 spaces during the weekends. Alternative car parks can be provided within the reserve subject to approval from Auckland Council Parks and Local Boards. Mount Albert War Memorial Reserve, e.g. which may involve limiting construction vehicle movements at certain times. 1.4 Lyon Avenue (Plan 6 on page 68 of the Hearing Drawing Set) Maintain or provide alternative pedestrian access through the Roy Clements Treeway. Incorporate measures to minimise and manage effects on residents and visitors to the St Lukes Garden Apartments. These measures could potentially include: (i) (ii) Temporarily adding additional green time in the morning peak to the phasing of the Morning Star Place leg of the signalised intersection with St Lukes Road, provided this was acceptable to Auckland Transport; Providing additional traffic calming measures on Morning Star Place at the construction site driveway where pedestrians and cyclists are 2576426(1) Page 2

present. Enforce truck speed restrictions along Morning Star Place to reinforce the existing internal speed limit of 10kph, to make sure trucks travel at appropriate speeds; (iii) (iv) Providing a monitoring programme relating to any effects created by heavy trucks on the existing road surface; and Ensuring representatives of the St Lukes Gardens Apartments are involved in the development of the detailed Traffic Management Plan for the site. 1.5 Walmsley Park (Plan 10 on page 87 of the Hearing Drawing Set) Restrict site access to left in / left out only. Provide parking restrictions either side of the proposed access on Sandringham Road. 1.6 May Road (Plan 12 on page 98 of the Hearing Drawing Set) Provide a 23m parking restriction east of the construction access point on Roma Road. Of note, I undertook further analysis at this site (as part of the December S 92 response) and identified that this length of parking restriction would be required for heavy vehicles to safely access the site (rather than the 10m length noted in the original Traffic Report to include appropriate truck waiting area). 1.7 Keith Hay Park (for the micro tunnelling works parallel to the creek only) (Plan 14a on page 109 of the Hearing Drawing Set) Strengthen and/or widen the access bridge at the end of Rainford Street. Widen the existing pedestrian / cyclist path in Keith Hay Park to create a two way construction access road; or install temporary traffic signals to direct site traffic. Establish temporary alternate pedestrian / cycle routes between Cameron Pool Leisure Centre and Mt Roskill Grammar School. 1.8 Pump Station 23 (Plan 16 (v2) on page 122 of the Hearing Drawing Set) Ensure the detailed CTMP includes ways to ensure queuing of vehicles does not occur on Frederick Street, such as providing a dedicated waiting area in 2576426(1) Page 3

place of existing parking to ensure vehicles do not restrict through traffic on Frederick Street. 1.9 Motions Road (Plan 20 (v2) on page 153 of the Hearing Drawing Set) Establish temporary alternate pedestrian and cycle routes for both Motions Road and the nearby footbridge. Restrict heavy vehicles to turn left only onto Great South Road. 1.10 Western Springs Depot (Plan 22 on page 160 of the Hearing Drawing Set) Install traffic controls such as convex mirrors to direct opposing traffic accessing the single access-way between the construction site and the Depot car park. Western Springs Stadium, e.g. which may involve limiting construction vehicle movements at certain times. Upgrade Stadium Road as discussed previously for the Western Springs site. 1.11 Rawalpindi Reserve (Plan 24 (v2) on page 170 of the Hearing Drawing Set) Establish a temporary alternate pedestrian path to the playground that is to be fully separated / fenced from the site. 1.12 Norgrove Avenue (Plan 26 on page 179 of the Hearing Drawing Set) Make arrangements with residents regarding temporary access. Relocate the access to existing properties at No.14 and No.16 Norgrove Avenue at the north-western end of the street. Figure 26 of the Traffic Report shows an indicative access arrangement whereby vehicles at No. 14 and No.16 Norgrove Avenue could use a temporary access driveway over the existing berm. Produce and implement a detailed CTMP (generally as per (Plan 77 on page 180 of the Hearing Drawing Set) given the site's location in the road reserve. 1.13 Miranda Reserve (Plan 31 on page 201 of the Hearing Drawing Set) Relocate the bus stop at 337 Blockhouse Bay Road to 40m south of its existing location. 2576426(1) Page 4

Provide 16m of no stopping parking restrictions north of the site access by means of broken yellow lines to enable safe access for heavy vehicles. 1.14 Whitney Street (Plan 33 (v2) on page 210 of the Hearing Drawing Set) Establish a temporary alternate pedestrian route. Produce and implement a detailed CTMP (generally as per (Plan 34 (v2) on page 212 of the Hearing Drawing Set) given the site's location in the road reserve. 1.15 Dundale Avenue (Plan 36 on page 220 of the Hearing Drawing Set) Limit truck movements around the opening and closing hours of the Blockhouse Bay Christian Kindergarten adjacent to the site. Temporarily remove 15m of on-street parking on the northern side of Dundale Avenue to establish a temporary site access accommodating truck swept paths. 1.16 Haycock Avenue (Plan 38 (v2) on page 230 of the Hearing Drawing Set) Install temporary traffic signals on Haycock Avenue to direct site traffic during the excavation works where the works site extends onto the road carriageway or, alternatively, complete closure of Haycock Avenue. Establish temporary alternate pedestrian routes to be established. Produce and implement a detailed CTMP (generally as per (Plan 39 (v2) on page 232 of the Hearing Drawing Set) given the site's location in the road reserve. 1.17 Other sites: I consider that the following sites do not require additional mitigation measures other than the Proposed Designation Conditions 17, 18 and 19. Haverstock Road (Plan 8 on page 79 of the Hearing Drawing Set); Kiwi Esplanade (Plan 18 on page 135 of the Hearing Drawing Set) Pump Station 25 (Plan 29 on page 192 of the Hearing Drawing Set) 2576426(1) Page 5