TULSA PARKS POOL FACILITY IMPROVEMENTS AND REPAIRS

Similar documents
Honey Lake Valley Recreation Authority Pool Community Workshop Presentation

City of Harrisburg, PA Swimming Pool Feasibility Study Harrisburg, PA

KINDERSLEY AQUATICS CENTRE Town of Kindersley. Public Consultation #2 July

KINDERSLEY AQUATICS CENTRE DESIGN Town of Kindersley. Public Consultation #1 May

Q1 In your household, who would come to the Long Bridge Aquatics & Fitness Center?

Discussion on Super Splash USA. December 14, 2015

Outdoor Pool Public Forum University of New Hampshire. July 1, 2014

Aquatic Concepts. July 23, 2018

Manatee County Parks & Natural Resources. John H. Marble Community Pool Revitalization & Marketing Plan Summer 2014

FITNESS AND RECREATION

Times vary, look below for daily lap lane availability. Monday and Wednesday 6:45-7:45pm Our Wellness Department offers a variety of water classes

NEEDS ASSESSMENT STUDY HIDDLESON POOL

Reserve Study Navigation Options

GRIDLEY SWIMMING POOL Gridley, California REHABILITATION / RENOVATION FEASIBILITY REPORT. February 22, 2016

CITY OF MERRIAM PARKS AND RECREATION FACILITIES MASTER PLAN

North Liberty, Iowa. Aquatic Master Plan

FGM ARCHITECTS Estimate of Probable Construction Cost Jun 14, 2016 PADDLE TENNIS HUT CONCEPTUAL PLAN / OPTION 1 FGM#:

Tampa: Davis Islands Recreation Area

Big Sky Recreation Center Big Sky Event Center

PROJECTS STREETS

4 GENERIC COST ESTIMATING TOOL

22'-9 1/2" 6.94 m. 48'-10" m TEACH TOT POOL. POOL AREA = ±3845 ft². 35'-1 1/2" m BEACH ENTRY MINI SPLASH PAD = ± 475 SF. 16'-0 1/2" 4.

APPENDIX L: COST ESTIMATING TOOLS

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Program Offerings. General Information

Facility Assessment and Project Study. New Prague Municipal Swimming Pool New Prague, MN

For information on locations and hours of operation, call 311. Toronto & East York (PDF) Etobicoke (PDF)

Facility Usage Rules & Contract

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate

SWIM POOL MANAGEMENT City of Blue Springs, Missouri

Aquatic Facility Feasibility Study Falmouth, MA. Presented By: James Preisig: Falmouth Aquatics Kevin Post: Counsilman-Hunsaker

Sincerely, SUMMER CAVE STAFF

REQUEST FOR PROPOSAL SUMMER AQUATIC FACILITIES MANAGEMENT CITY OF DECATUR, GEORGIA

THERAPY POOL Specifics

Vashon Parks District, Washington April 2016

Town of Carbondale John M. Fleet Municipal Pool

John W. Black Aquatic Center

Pleasant Valley Aquatic Center

Swift Current Aquatic Centre Fall and Winter Aquatic Guide 2016/ ~ th Ave. NE, Swift Current, SK,

Lincoln County Environmental Health Department 302 North Academy Street, Suite B Lincolnton, NC Phone: Fax:

A Comparison for Ames, Iowa

GUIDE FOR CHILDREN S GROUP CHAPERONES AQUATIC COMPLEX

Bowie Indoor Sports Facility - Summary (Bowie, MD) Five-Year Operating Pro Forma

Cordova Community Pool Replacement Cordova Recreation and Park District Community Workshop #2 October 23, 2018

FLUSHING YMCA SUMMER 2014 SWIM SCHEDULE

2018 Lawndale Swim & Tennis Club Handbook

INSTRUCTIONAL SWIM CLASSES

SRTS IMPLEMENTATION COSTS

COMMUNITY AQUATIC FACILITY

PROPOSAL. PROPOSAL OF, a corporation a

ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

APPENDIX E Activity Defect Assignment

Ordinance No Exhibit A. Application

2018 Meet Date: July 31st, through August 4th, 2018

The Public Schedule 2017 Panama City Beach

GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST

Monday. Public Swimming - Term Time. Grange Paddocks Leisure Centre. TIME SESSION NO. OF LANES Time SESSION HALF/FULL POOL

Aquatics 420-SWIM (7946) Enjoy one of three excellent HRM Aquatic facilities. Needham Community Pool. Northcliffe Pool. Outdoor Aquatics/Beaches

General Pool Rules Decisions of the lifeguards on duty will be final based on potential and preventable hazards and accidents.

Have your say. Aquatic AND Leisure Facility. Aquatic AND Leisure Facility ON THE NEW. Information Booklet

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

Aquatic Center Feasibility Study

CITY COUNCIL AGENDA REPORT

Please take into consideration how your child is feeling before coming to their lesson. DROP-IN PROGRAM AQUATIC ADMISSION STANDARD

Spring Lake Country Club Pool Season

Summerfield North Wycombe Manor Swim & Racquet Club 2012 Guidelines

The Public Schedule 2018 Panama City Beach Aquatics Center

University Park, Texas

A Better Plan Operational Success for Aquatic Facilities Through Proper Business Planning Presented By: Scott W. Hester & Darren Bevard

Aquatic Facility Needs Assessment Study

Aquatic Contact Information: Aquatic Coordinator: Nathan Garcia Office:

The Public Schedule 2017 Panama City Beach Aquatics Center

MAIN POOL TEACHING POOL CAFÉ TIME SESSION NO. OF LANES SESSION HALF/FULL POOL. 06:30-09:00 Swim 4 Fitness 2 Open. 06:30-09:00 Swim 4 Everyone 2 Open

ORRVILLE YMCA. Natatorium Project

City of Baytown Aquatic Facilities Master Plan

Student Recreation Facility (SRF) 737 S. Halsted St Sports & Fitness Center (SFC) 828 S. Wolcott Ave

102 E. Michigan, Urbana Green/Grey/Bronze Questions: Register: Closure Dates Closed all day - No public activities

Aquatic Contact Information: Aquatic Director: Hector Velez Office:

LAKE BLUFF PARK DISTRICT BLAIR PARK SWIMMING POOL Questions and Answers OVERVIEW

The Public Schedule 2018 Panama City Beach Aquatics Center

Splashville Open Water Challenge June 17 th, 2018

STARTING PLATFORMS SERIOUS EQUIPMENT SERIOUS FUN ACCESS FOR ALL

Reston Community Center Terry L. Smith Aquatics Center. Preliminary Assessment

Student Recreation Facility (SRF) 737 S. Halsted St Sports & Fitness Center (SFC) 828 S. Wolcott Ave

MEMBER HANDBOOK JEAN LENOX WEST POOLS AT BAKER PARK. Summer Version 1.0

Guide SPLASH SUMMER. June - August 2016 PROGRAM INFO

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012

MEMBER HANDBOOK BAKER PARK OUTDOOR POOLS. Summer Version 4.0

BAINBRIDGE ISLAND AQUATICS FEASIBILITY STUDY 01/17/2019

Public Swim Hours Regular Hours (Jan 3-end of USD116 school year) Lap Swim Hours Regular Hours (Jan 3-end of USD116

PROPERTY EVALUATION AND RESERVE FUND STUDY ~UPDATE~

aquatics general information

MIDLOTHIAN FAMILY YMCA OUTDOOR POOL Member Information Packet

JOHN RHODES COMMUNITY CENTRE POOL A

Riverside County Transportation Department Summary of Bids

MANCHESTER SWIM & RACQUET CLUB

FY 2019 CAPITAL BUDGET CODES BY VILLAGE ADDRESSES

MIDLOTHIAN FAMILY YMCA OUTDOOR POOL Member Information Packet

aquatics general information

Transcription:

TULSA PARKS POOL FACILITY IMPROVEMENTS AND REPAIRS 06.25.13 A. McCLURE PARK POOL FACILITY: A preliminary cost estimate (attached) has been prepared to provide preliminary estimated costs, in today s dollars, for the removal and replacement of the existing McClure Pool Facility with a modernized aquatic facility. The estimate is based on the following: mechanical building, and the existing concrete decks and walks. The existing slides / pool are intended to remain. 3. The new aquatic facility may include fitness lap lanes, a zero beach entry, a floatable walk, a participatory play structure, a tot pool, multiple shade structures, and 2 existing water slides. same location. The existing McClure pool is approximately 12,100 square feet in pool surface area. 5. Estimated 2013 replacement cost = $4,372,081.00 B. REED PARK POOL FACILITY: A preliminary cost estimate (attached) has been prepared to provide preliminary estimated costs, in today s dollars, for the removal and replacement of the existing Reed Pool Facility with a modernized aquatic facility. The estimate is based on the following: mechanical building, and the existing concrete decks and walks. 3. The new aquatic facility may include fitness lap lanes, a zero beach entry, a floatable walk, a participatory play structure, 2 water slides, a tot pool, and multiple shade structures. same location. The existing Reed pool is approximately 5,600 square feet in pool surface area. 5. Estimated 2013 replacement cost = $2,226,979.00 C. LACY PARK POOL FACILITY: A preliminary cost estimate (attached) has been prepared to provide preliminary estimated costs, in today s dollars, for removal and replacement of the existing Lacy Pool Facility with a modernized aquatic facility. The estimate is based on the following: mechanical building, and the existing concrete decks and walks. 3. The new aquatic facility may include fitness lap lanes, a zero beach entry, a floatable walk, a play structure, 2 water slides, a tot pool, and multiple shade structures. same location. The existing Lacy pool is approximately 5,500 square feet in pool surface area. 5. Estimated 2013 replacement cost = $2,442,195.00 Pools Report_062513.doc

McCLURE PARK SWIMMING POOL FACILITY pool $94.20 sf 12,100 $1,139,820 gutters $352.00 lf 475 $167,200 paint $5.83 sf 12,100 $70,543 concrete deck $5.50 sf 9,500 $52,250 concrete patio $5.50 sf 1,800 $9,900 ladders $885.00 ea 8 $7,080 lifeguard $2,875.00 ea 5 $14,375 slides (existing) $25,000.00 ea 0 $0 shade structure $12,000.00 ea 6 $72,000 bathhouse $304.00 sf 2,500 $836,000 mech'l building $304.00 sf 540 $180,576 TOTAL: $2,629,904 Demolition (bathhouse) $0.50 cf 42,500 $21,250.00 Demolition (mech'l) $0.75 cf 9,180 $6,885.00 Demolition (pool) $4.50 sf 12,100 $54,450.00 Demolition (paving) $2.33 sf 11,300 $26,366.67 dump / haul $0.50 cy 35,910 $17,955.00 TOTAL: $126,907 TOTAL: AND CONSTRUCTION $2,756,811 contingency 20% $551,362 OH&P 18% $595,471 Design 12% $468,437 TOTAL: SOFT COSTS $1,615,271 TOTAL PROJECT (2013 COSTS) $4,372,081

REED PARK SWIMMING POOL FACILITY pool $94.20 sf 5,600 $527,520 gutters $352.00 lf 300 $105,600 paint $5.83 sf 5,600 $32,648 concrete deck $5.50 sf 6,000 $33,000 concrete patio $5.50 sf 1,800 $9,900 ladders $885.00 ea 4 $3,540 lifeguard $2,875.00 ea 4 $11,500 slide $25,000.00 ea 2 $50,000 shade structure $12,000.00 ea 5 $60,000 bathhouse $304.00 sf 1,260 $421,344 mech'l building $304.00 sf 290 $96,976 TOTAL: $1,335,212 Demolition (building) $0.50 cf 21,420 $10,710.00 Demolition (mech'l) $0.75 cf 4,913 $3,684.75 Demolition (pool) $4.50 sf 5,600 $25,200.00 Demolition (paving) $2.33 sf 7,800 $18,200.00 dump / haul $0.50 cy 22,425 $11,212.50 TOTAL: $69,007 TOTAL: AND CONSTRUCTION $1,404,219 contingency 20% $280,844 OH&P 18% $303,311 Design 12% $238,605 TOTAL: SOFT COSTS $822,760 TOTAL PROJECT (2013 COSTS) $2,226,979

LACY PARK SWIMMING POOL FACILITY pool $94.20 sf 5,500 $518,100 gutters $352.00 lf 310 $109,120 paint $5.83 sf 5,500 $32,065 concrete deck $5.50 sf 4,480 $24,640 concrete patio $5.50 sf 1,600 $8,800 ladders $885.00 ea 6 $5,310 lifeguard $2,875.00 ea 4 $11,500 slide $25,000.00 ea 2 $50,000 shade structure $12,000.00 ea 5 $60,000 bathhouse $304.00 sf 1,260 $421,344 mech'l building $304.00 sf 500 $167,200 TOTAL: $1,488,239 Demolition (building) $0.50 cf 8,500 $4,250.00 Demolition (pool) $4.50 sf 5,500 $24,750.00 Demolition (paving) $2.33 sf 6,080 $14,186.67 dump / haul $0.50 cy 16,995 $8,497.50 TOTAL: $51,684 TOTAL: AND CONSTRUCTION $1,539,923 contingency 20% $307,985 OH&P 18% $332,623 Design 12% $261,664 TOTAL: SOFT COSTS $902,272 TOTAL PROJECT (2013 COSTS) $2,442,195

New Facility Option- Neighborhood ($2M-$4M) Aquatic Elements Outdoor leisure pool with Fitness lap lanes Zero beach entry 2 water slides Floatable walk Participatory play structure Tot pool Multiple shade structures