ARAI/TA(4G)/HORIBA/MEXA 584L/ Dated 19 th Jun 2008 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

Similar documents
INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

SPORTS AUTHORITY OF INDIA NETAJI SUBHAS REGIONAL CENTRE, SAROJINI NAGAR, KANPUR ROAD, LUCKNOW

OPTIMA 7 - BIOGAS Calibrating the gas sensors SENSOR ADJUSTMENT. Diamond Scientific 625 Peachtree St., Cocoa, Florida /Tel:

Vehicle- or rack-mounted liquefied gas meters, pump supplied

Calibration Gas Instrument INSTRUCTION MANUAL. Release I. Advanced Calibration Designs, Inc.

MCC Cricket Academy Terms And Conditions For The Hire Of Nets

Instrument Installation and Performance Verification

RULES & REGULATIONS OCTOBER 2018 REELS OF FORTUNE SLOT TOURNAMENT

RIVER CREE PROMOTIONS RULES & REGULATIONS

PRESSURE SYSTEMS POLICY

PUBLIC COMPANY ORLEN LIETUVA OCCUPATIONAL HEALTH AND SAFETY PROCEDURE BDS-12 USE OF PORTABLE GAS ANALYZERS I. GENERAL

BOXING FEDERATION OF INDIA

NIT LIMITED NO. NC-105-P-SCS-NOCB CYLINDERS & REGULATORS

BOXING FEDERATION OF INDIA REQUEST FOR PROPOSAL (RFP) FOR ENGAGING SERVICE PROVIDERS FOR UNIFORMS FOR

APPLICATION FOR USE OF PERFORMING ANIMALS IN FILMS (PRE-SHOOT & REGISTRATION)

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

O2 Portable. User Manual

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

Vehicle-mounted meters, pump supplied

VARIABLE TEMPERATURE HOT AIR GUN VALIDATION

Official Journal of the European Union L 92/3

Industry Consultation Paper

ANNEXURE I (PARAMETER 1) NUMBER OF TENNIS COURTS. i. Total no. of Tennis Courts : ii. Break of Courts according to surface:

Guidance on the Legal Obligations for Importers, Retailers and Distributors of Category 1 Fireworks

For Department of CSSD

i) Filtration machine, measuring equipment and other related machinery

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the

Acid- Rite ph Adjustment System 2500 by Axiall, a Westlake Company

NIT LIMITED NO. NC-185-SCS-P-NOCB ARGON & NITROGEN CYLINDER WITH REGULATOR

NIT LIMITED NO. RD-NC-40-SPS-PH

White Paper. Chemical Sensor vs NDIR - Overview: NDIR Technology:

USA RUGBY EVENT SANCTION AGREEMENT

Operating Manual. Models AQT-02 & AQT-COO2 Manual No. MON004 (Rev 2 April 2000)

EU Directive on Placing on Market of Pyrotechnic Articles (2007/23/EC) Guidance on Legal Obligations for

BOXING FEDERATION OF INDIA

Ratnagiri Gas & Power Pvt. Ltd. C&M Department. Ref.: RGPPL/C&M/CS-2335/Pre-Bid queries Date: 24/09/2016. Clarifications to bidder

MANUAL DIRECT PURGE OPTION. UNION Instruments GmbH CWD2005 PLUS. General information, safety standards and regulations for direct purge option

STATUTORY PRESSURE TESTING AND PAINTING OF LPG CYLINDERS

ACS.CoNGLP1 SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC NATURAL GAS TO LPG GENERIC

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy

EN ISO/IEC Technical Requirements

Distribution Connection Forms

CHAPTER 7 : SMOKE METERS AND THEIR INSTALLATIONS

Supersedes: The copy of this document located on Measurement Canada s website is considered to be the controlled copy.

USA RUGBY EVENT SANCTION AGREEMENT

METHOD 25A - DETERMINATION OF TOTAL GASEOUS ORGANIC CONCENTRATION USING A FLAME IONIZATION ANALYZER

ACS.TPCP1 SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS; LPG; OTHER GASES TESTING AND PURGING

Mr Roger Wood Measurement & Process Group (M&P) Network Strategy National Grid Gas plc Brick Kiln Street Hinckley Leicestershire LE10 0NA

APPENDIX C. 40 CFR PART 60 App. B SPEC. 1-4, 6

DRAFT. Dublin City Council Control of Stationless On-Street Bicycle Hire Bye-Laws 2017.

ACS.CoNGLP1 SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC NATURAL GAS TO LPG GENERIC

GM/GN2646. Guidance on Axle Bearing Maintenance. Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue Four

Technical Specifications of Hydrogen Isotope Handling and Recovery System

PM105 PRESSURE METER USER S MANUAL

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

These Terms and conditions apply to audit trails incorporated in weighing and measuring devices and systems 1.

Gas Distribution Connection Forms

Terms and Conditions

Annual Inspection and Calibration Checklist VAF Oilcon MK-6(M) MEPC.108(49) Page 1 of 5

Policy for Testing of Oil Discharge Monitoring and Control System Operational Procedure : QOP (17) Revision: 0 Page 1

RULES. 1 st LAW COLLEGE DEHRADUN NATIONAL MOOT COURT COMPETITION AUGUST 2013

TENDER FOR THE SUPPLY OF MEDICAL OXYGEN AND NITROUS OXIDE GASES CYLINDERS FOR ONE YEAR.

E2K-L. Liquid Level Sensor That Is Unaffected by the Color of the Pipe or Liquid. Liquid Level Sensor. Ordering Information

Rimage Everest 600 Thermal Retransfer Printer

Pressure Systems Safety Regulation

Activities. I. General Instructions. Task Information. Advancd Field Training Activities Checklist

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

3. The younger team member must be aged 18 years or over as at the date of the event (Saturday 7 October 2017).

Working in Gas Hazard Areas

Swipe your Loyalty Club Member Card in the tipping terminals to print the week s entry form.

Accu-Tab PowerBase 3070AT by Axiall Corporation

JORDAIR/BAUER Service Manual

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

Nick Competition Rules. SpongeBob s Cracking Christmas Competition (the Competition)

WORKPLACE SAFETY AND HEALTH ACT (CHAPTER 354A) WORKPLACE SAFETY AND HEALTH (CONFINED SPACES) REGULATIONS 2009

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

Terms & Conditions Ice/Floor Use

Portable Gas Monitor GX User Maintenance Manual (H4-0050)

I N T E R N A T I O N A L S K A T I N G U N I O N

Liquefied Petroleum Gas Market Regulations S.L

2 August 2014 AMF Golden Grove Bowl 3 August 2014 Salisbury Bowland 2014 Junior Nationals Oil Pattern WTBA Athens

Operating Instruction Manual for Liquid Nitrogen Containers. CRY/CRYC Series. Hagavish st. Israel Tel: , Fax:

West Coast Offshore Race 2017 Notice of Race

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

TQC Bresle Chloride test 2008

for the of and the EM55-1

FORMATE FOR SUBMITTING IMPORT APPLICATION TO THE NATIONAL RIFLE ASSOCIATION OF INDIA

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

GENERAL SAFETY INSTRUCTION GSI-M-1 LIFTING EQUIPMENT AND ACCESSORIES

MERCHANT SHIPPING ACT 1985 FISHING VESSELS (LIFE-SAVING APPLIANCES) REGULATIONS 1988

INSTALLATION AND OPERATING INSTRUCTIONS:

ASSE International Product (Seal) Listing Program

2018 FIM ENTRY FORM FIM Track Racing World Championship or Trophy Events

APPLICATION FOR PROFESSIONAL / APPRENTICE JOCKEY LICENCE

Sr. No. General points CPCB Comments 1. Print option, acknowledgement of submission for CPCB OCEMS Protocol

Ilkley & District Motor Club. Ilkley & District Targa Rally

453 Series Steam Heated Vaporizing Regulator

SERVICE PROVIDERS FOR GAMES PROMOTION

INSPECTION OF MEDICINAL GASES

Transcription:

CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Horiba India Pvt. Ltd. Room 1521, 15 th Floor, Eros Corporate Tower Nehru Place New Delhi 110 019 Cert Annex Drg Tot al 1 6 0 7 pgs Exhaust Gas Analyser Model MEXA 584L from M/s Horiba India Pvt. Ltd., New Delhi, was examined and tested as per the revised test procedure approved by Ministry of Shipping, Road Transport and Highways, Government of India, New Delhi, and specified in MoRTH/CMVR/TAP-115/116, Issue No.3, Part-VIII for 4-gas analyser. Based on the above, it is certified that the 4-Gas Analyser Model MEXA 584L manufactured by M/s. Horiba Ltd., Japan, and marketed by M/s. Horiba India Pvt. Ltd., New Delhi, meets the requirements of the provisions of Rule 116(3) of the Central Motor Vehicles Rules 1989, as amended up-to-date, for the 4-gas analyser. The 4-Gas Analyser Model MEXA 584L is suitable for measurement of idling CO and HC of in-use vehicles fitted with SI engines as per CMVR 115(2), subject to following conditions : i. The supplier shall abide by the Code of Practice attached herewith as Annexure-A. The supplier has already submitted an affidavit to this effect. ii. The supplier shall enter into AMC agreement on annual basis with the authorized PUC Test Centres to whom this model is supplied. The AMC terms shall be as per the Code of Practice referred in (i) above. This Type Approval certificate is valid for the period of 5 years from the date of its issue or any amendment in the test procedure, whichever is earlier. The first Conformity of Production testing will be due on or before 18 th June 2010 or production of 200 units from 19 th June 2008, whichever is earlier. Authorised Signatory A. B. Komawar Shrikant R.Marathe Dy. Director Director Place of Issue : Pune Ref : i) Type Approval Test Report No.AED/SPR78/2008-09/2008-252 Dated 19 th June 2008 Page 1 of 7

ANNEXURE - A (1 Page) CODE OF PRACTICE FOR PUC EQUIPMENT MANUFACTURER / SUPPLIER 1. PUC equipment manufacturer / supplier should include the description of the test procedure described in Part I or Part II, whichever is applicable, amended from time to time of the document MOST/CMVR/TAP 115/116 in the user s manual of the PUC equipment. PUC equipment manufacturer / supplier shall keep PUC operator informed about the changes in the test procedure in future. 2. PUC equipment manufacturer/ supplier shall supply copy of type- approval certificate with date of validity along with the PUC equipment. 3. The validity of the type approval certificate of the PUC equipment shall be 5 years, after the expiry of which the PUC equipment manufacturer/ supplier shall get it re-validated from the test agency. 4. PUC equipment manufacturer / supplier shall provide the status of production/ supply of PUC equipment at a regular interval of 1 year to the test agency from where the equipment has been certified. 5. PUC equipment manufacturer / supplier shall submit the equipment for COP as per procedure mentioned above. 6. PUC equipment manufacturer / supplier shall enter into AMC on annual basis with the authorised PUC test agency based on charges as approved and finalized in EECG meeting as per Annexure-4. This AMC contract shall include 3 visits and equipment as per field procedure given in Annexure-1. PUC equipment manufacturer/ supplier shall provide certificate as per format given in the Annexure-2. 7. PUC equipment manufacturer / supplier shall train minimum 3 operators of PUC test agency and shall provide training certificate as per format given in Annexure 3. *********** Page 2 of 7

ANNEXURE 1 TO ANNEXURE A (2 Pages) FIELD CALIBRATION PROCEDURE FOR TESTING OF GAS ANALYSERS 1.0 INTRODUCTION This procedure has to be carried out on gas analysers after they are commissioned in the field and for the subsequent. 2.0 TESTING The test procedure for gas analysers is as follows: i) Check that the power supply is as per specifications of the manufacturer and electrical earthing is proper. ii) iii) iv) Check that all the accessories as per manufacturer are available and are functioning properly. Check the span and zero using sample gas of suitable value for CO as well as HC. Check the electrical. v) Check that the sampling system is leak proof. vi) vii) The printer is working correctly and the print out details are correct. Checking of 1 no. of vehicle for idling emission measurement using this analyzer. ************ Page 3 of 7

1.0 INTRODUCTION 2.0 TESTING ANNEXURE 1 TO ANNEXURE A (2 Pages) (contd..) FIELD CALIBRATION PROCEDURE FOR TESTING OF SMOKE METERS This procedure has to be carried out on meters after they are commissioned in the field and for the subsequent. The test procedure for smoke meters is as follows: i) After the warm-up of the meter, the of the meter has to be checked at zero and midscale point with the neutral density filter available. The value must lie within 0.1 m -1. ii) iii) iv) The meter shall have the standard accessories as specified by the manufacturer. It shall be checked that the sample hose, internal pipes etc are not deteriorated or damaged to ensure that there is no leakage. The functionality of oil temperature and RPM sensor. The heating system for the optical chamber is functioning. v) The purge air system is working correctly. vi) vii) viii) ix) Visual displays are functioning correctly. The printer is working correctly and the printout details are correct. The instrument casing is proper and has proper electrical earthing. Free acceleration test is carried out using a vehicle and the print out details are checked. ************ Page 4 of 7

ANNEXURE 2 TO ANNEXURE A (1 Page) CALIBRATION CERTIFICATE FORMAT 1.0 Component: PUC equipment model: Sr. No. 2.0 PUC Center Registration No.: 3.0 Objective of the test: To carry out Physical check and of gas Analyser / Smoke meters as per the test procedure specified in Annexure 1 of CMVR / TAP 115-116 Part-8. 4.0 4.1 Detailed Observations Checking of supply/ earthing 4.2 Checking of accessories: 4.3 Span Calibration Details of accessories checked. OR 1. Details of span gas concentration % 2. Calibration gas cylinder No.: 3. Calibration gas cylinder make: 4. Calibration gas validity date: 5. Details of Natural Density filters used for mid point 4.4 Electrical Calibration OK/ Not OK 4.5 Leak test: Passed/ Failed 5.0 One no of petrol / diesel vehicle checked for idling Emission / Free acceleration, measurement 6.0 Conclusion: 7.0 Next Calibration Due Date: Signature & Seal of manufacturer/ Supplier Page 5 of 7

ANNEXURE 3 TO ANNEXURE A (1 Page) TRAINING CERTIFICATE PUC Operator Photograph It is to certify that Mr. / Mrs. has attended the training and knows all required operation of the smoke meter / Gas Analyser model to perform PUC tests. Training is given in the following areas: Understanding of procedure for testing of Idling emission/ free acceleration smoke as CMVR/ TAP/ 115/116 procedure. 1. Normal thermal condition of the vehicle 2. Actual testing procedure 3. Procedural understanding of issue of PUC certificate Operation of smoke meter / Gas analyzer 1. Vehicle testing mode 2. Zero Calibration 3. Span 4. Electronic 5. Leak test Maintenance 1 Replacement of filters 2 General maintenance ************* Authorized Signature & seal of manufacturer / supplier Page 6 of 7

ARAI/TA(4G)/HORIBA/MEXA 584L/2008-10 Dated 19 th Jun 2008 ANNEXURE-4 TO ANNEXURE-A (1 Page) AMC CHARGES Sr. No. Details 4 Gas Analyser 2 Gas Analyser Smoke Meter 1. Maintenance done at centralized station of PUC equipment manufacturer Rs.5,700/- + Rs.750/- per Rs.3,750/- + Rs.750/- per Rs.4,500/- 2. Maintenance done at PUC center s place Rs.9,500/- + Rs.1,500/- per Rs.6,250/- + Rs.1,500/- per Rs.7,500/- Note: 1. For 2/4-gas anlyser, PUC equipment manufacturer shall provide the gases required for. 2. For smoke meter, the AMC charges include with neutral density filter (NDF) by PUC equipment manufacturer. *************** ARAI issues Type Approval Certificates for vehicles / components / parts / assemblies etc., based on the documents produced / submitted by the customer and on these basis, the vehicles / components / parts / assemblies, etc., are examined and if approved, the certificate is issued. ARAI is in no way responsible for any misuse of copying of any design / type / system in connection with entire vehicle / components / parts and assemblies. Breach of any statutory provision of Indian laws or laws of other countries, will be the sole responsibility of the customer and ARAI shall not be liable for any claims or damages, made by the party, whatsoever. The customer shall alone be liable for the same and undertakes to indemnify ARAI in this regard. Further, the ARAI has the right to initiate cancellation / withdrawal of the certificate issued, in case of any fraud, misrepresentation, when it surfaces and comes in the knowledge of ARAI. The appropriate local courts at Pune shall have the jurisdiction in respect of any dispute, claim or liability arising out of this certificate. Page 7 of 7