Standard Operating Procedure. For. PVD E-Beam

Similar documents
Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

Operating Procedures for Metal Evaporator I

SPUTTER STATION STANDARD OPERATING PROCEDURE

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

Angstrom Dielectric Sputterer Operation Manual

Cryo-Evaporator Operation

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

Oerlikon Sputtering Evaporator SOP

Temescal BJD-1800 E-Beam Evaporator 1 System Overview - Cryo-pumped for typical base pressures in the low 10e-7 Torr range. - Four pockets in the

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

Revised: June 7, 2017

OPERATION OF THE DIMPLER

Standard Operating Manual

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

Standard Operating Manual

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

Approved by Principal Investigator Date: Approved by Super User: Date:

Scanning Electron Microscope JEOL JSM F

1)! DO NOT PROCEED BEYOND THIS MARK

Unaxis ICP/RIE SOP Revision 8 09/30/16 Page 1 of 5. NRF Unaxis ICP/RIE Etch SOP

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

Standard Operating Manual

QUARTZ HOUSING COATING PROCEDURE

University of Minnesota, MN Nano Center Standard Operating Procedure

Standard Operating Manual

BEST KNOWN METHODS. Transpector XPR3 Gas Analysis System. 1 of 6 DESCRIPTION XPR3 APPLICATIONS PHYSICAL INSTALLATION

Karl Suss MA6 Mask Aligner SOP

MMRC PVD Evaporator Instructions

March CS-1701F Reactive Ion Etcher

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

NRF Suss Delta 80 Spinner SOP Revision /14/2016 Page 1 of 11. Suss Delta 80 Spinner SOP

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

COBILT CA-800 Mask Aligner Equipment Operation

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

Notes-PECVD: Chamber 1

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

Standard Operating Manual

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

LESKER #1 STANDARD OPERATION PROCEDURE

University of MN, Minnesota Nano Center Standard Operating Procedure

STS PECVD Instructions

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Standard Operating Manual

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager.

LEO SEM SOP Page 1 of 9 Revision 1.4 LEO 440 SEM SOP. Leica Leo Stereoscan 440i

Edge Isolation Tool. Standard Operating Procedure. Version 1.1. Date: Prepared by, Sandeep S S. Department of Electrical Engineering

Approved by Principal Investigator Date: Approved by Super User: Date:

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel

Approved by Principal Investigator Date: Approved by Super User: Date:

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Xactix XeF2 OPERATION MANUAL

ABM MASK ALIGNERS. NanoFab 26 March 2009 A Micro Machining & Nanofabrication Facility

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

BASIC Z-STACK AND TIME SERIES SCAN ON THE ZEISS LIGHTSHEET Z. 1

Plasma Asher: March PX-500 User guide (May-30, 2017)

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating

THERMAL EVAPORATION UNIT (for Al evaporation)

Karl Suss MJB4 Mask Aligner

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure

Usage Policies Notebook for STS DRIE System

Nordiko Metal Sputtering System Standard Operating Procedure

O P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

The SPI Sputter Coater Handbook

Warnings: Notes: Revised: October 5, 2015

QUORUM TECH 150RES THE FIRST AND THIRD WEEK WILL BE SET UP FOR CARBON COATING THE SECOND AND LAST WEEK WILL BE SET UP FOR GOLD COATING

Warnings: Notes: Revised: January 8,

Operating Procedures for the. SAMCO ICP RIE System

OXFORD PLASMALAB 80PLUS (CLOEY)

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

MP15 Jockey Pump Controller

STS ICP-RIE. Scott Munro (2-4826,

Model 130M Pneumatic Controller

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

STS DRIE User SOP Location: NRF Cleanroon, Dry Etch Bay

University of MN, Minnesota Nano Center Standard Operating Procedure

Standard Operating Manual

2 Switching off ECRIS 3. 4 Acquire Beam Spectrum 4. 6 Vent Instrument Chamber 5. 7 Pump down Chamber 5. 8 Baking out Chamber 5.

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8

Quintel Mask Aligner

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

Unaxis PECVD. SiH4 (5% in He)

The MRL Furnaces USED FOR THIS MANUAL COVERS

Installation Instructions

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

User Manual GRI- 1500Li

OFI MODEL 20 CONSTANT SPEED BLENDER INSTRUCTIONAL MANUAL

OLED vacuum deposition cluster system Sunicel Plus 400 / Plus 400L (Sunic Systems)

Nanofabrication Facility: Sputter Evaporator SOP Rev. 04, June 2007

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

Cover Page for Lab Report Group Portion. Boundary Layer Measurements

ACV-10 Automatic Control Valve

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

Standard Operating Manual

Transcription:

P a g e 1 Standard Operating Procedure For PVD E-Beam

P a g e 2 Introduction The PVD Electron-Beam Evaporator (E-Beam) thin film deposition machine uses a magnetically guided and collimated stream of electrons generated by applying high voltage to a large tungsten filament to heat, melt and vaporize materials in a vacuum chamber. This vaporized material streams out from the source and is deposited on all surfaces within line of sight in the chamber. At present only metals can be deposited using the PVD but in theory anything that can be melted and vaporized can be deposited. The E-beam has the advantage of being able to achieve high deposition rates and thicker films because of its large supply of deposition material in the chamber. The substrate receiving the film is far removed from the energies of the vapor source and so the deposition process is gentler on the sample. The process does, however, require a relatively high quality vacuum and so extended pump-down times are required any time the main chamber is opened to change the source material. Reservations are required at least 24 hours in advance for the machine and any new material not on the deposition list must be pre- approved. Deposition materials are typically loaded, refilled and cleaned for the day between 8 and 9 am; after materials loading, the chamber will typically be ready for use by 10 am. Safety considerations The e-beam is designed safely with interlocks that protect the user and machine, however if proper procedures are not followed there are risks to the user, the users materials and the machine. There are open moving parts, heavy hatches, hot surfaces, and intensely bright light sources that can cause injury; and actions are required in specific sequence so as to not cause injury and or damage. It is the responsibility of the user to follow all current procedures and failure to do so will incur additional cost to the user should there be a mishap. Always use this SOP while processing as updates and changes in procedure will always be current here. Altering the recipes beyond the evaporation run time can severely damage loaded devices and should only be done after consultation with staff. Alteration of any calibration settings, ramp times and crystal monitor settings can only be accomplished by staff. After long intense runs the substrate can be hot; use caution when handling the substrate holder and the holder cannot be removed from the load-lock until it is below 50 C. Visually confirm all crucible and shutter motions to ensure proper alignment and actuations; failure to do so could cause reversible damage to your substrate.

P a g e 3 Machine "Anatomy"

P a g e 4 Pre-operational Checks and Sign On: Step 1: Make sure that your deposition material has been loaded by checking the Load board. Step 2: Select the Chamber Tab on the PVD Laptop 1. Ensure that the Chamber Ion Gauge Vac 10-7 Torr 2. Ensure that the Load Lock Ion Gauge Vac 10-7 Torr 3. Ensure that the Chamber Cryo is on and is 15K 4. Ensure that the Chamber Cryo Gate Valve is open and Isolation is closed.

P a g e 5 5. Check the Interlock lights on the left of the screen and make sure that 1, 2, 3, 5, 9, 10, and 11 are on and 4, 6, 7, and 8 are off. Select the Evaporation Tab. 6. Ensure that the Inficon SQC-310 mode box is set to Auto. 7. If not already connected Click on Connect to Inficon button. 8. The Rate through active layer boxes should populate. Check that the frequency box and the % life box has data not 0 or characters. If there is no data in these boxes then the crystal monitor is not functioning properly and processes will not run. 9. Contact staff to fix this problem.

P a g e 6 Step 3: Sign on to the TUMI; you will be required to enter in the total thicknesses of each of the materials you plan to deposit. Step 4: Check that the interlock lights 4 and 7 on the left side of the screen are now lit. Step 5: Select Evaporation Tab 1. Click on the source shutter button to open the shutter that covers the hearth, this ill allow the chamber light to fully illuminate the hearth.

P a g e 7 2. Turn on the chamber light so that the hearth can be seen more easily 3. Click Indexer Mode button so it indicates manual. 4. Click the 4 button and watch the motor on the left of the machine drive the hearth feed through to ensure it rotates completely. It should rotate once for each pocket, check the rotary hearth in the chamber and confirm that is moving from pocket to pocket; if it does not rotate properly then repeat several times alternating from #1 to #4. If it fails after several attempts call staff for assistance. Watch the crucibles in the hearth rotate as well if there is any doubt about whether the indexing is correct call staff.

P a g e 8 Diagram of Hearth Configuration 5. Change the Indexer mode back to Auto mode, the hearth will automatically return to the last pocket that was selected by the program. 6. Close the source shutter and confirm visually. Powering up the machine: AT THE ELECTRONIC CONTROL RACK

P a g e 9 Step 1: Press the Power Supplies Enable button (turns green). Step 2: Turn the Main Power key to on, then press the On button. Step 3: In the High Voltage section press the Reset button.

P a g e 10 Step 4: Check that the VAC/Tank/Aux 1 lights are lit. The Air/Cab interlock light will light after approximately 5 minutes. Wait for this to happen. You can work on sample prep while waiting. ( See page edge tab for this section) Step 5: Once the Air/Cab light is on, press the On button. Do not press lightly; press firmly with no hesitation. Step 6: Ensure the DC/Kilovolts readout shows voltage. Do not change the voltage.

P a g e 11 AT SOURCE 1 SECTION Step 7: Move Remote/Loc/Hand toggle to Loc. Step 8: Press the On button. Step 9: Move the Remote/Loc/Hand toggle to Remote. AT THE POWER SUPPLY CONTROLLER Step 10: Set toggle to On.

P a g e 12 AT THE LAPTOP Step 11: Check to ensure all the lights, except for the Cryo High Temp, on the left of the screen are on. Start a log entry on the Excel workbook on the desktop. there should be a single line used for each deposition run, a stack of three metals should use three lines! Date time first name last name user number material FTF Xtal life (%) From the Xtal Set Dep rate (A/sec) set thickness indicated thickness measured thickness yy/mm/dd 1300 Nivla Nedgo 4242 Al 100 100 5 10000 10010 15000 Loading the sample (See sample preparation guide at the end): Step 1: Ensure that the loader handle is all the way against the right stop.

P a g e 13 Look in the chamber and make sure that there is no sample or sample holder loaded on the substrate Z stage. If there is then it will have to be unloaded first. (see removing the sample on pg 22) Step 2: Select the Chamber Tab. 1. Ensure that the isolation valve is closed. 2. Select the Pump Sequence drop down menu and select LoadLock Vent is vented when the load lock chamber reads ~ 7.5 E+2 Torr.. The loadlock Step 3: Once vented, manually open the loadlock door. Be careful, the door is heavy. DO NOT TOUCH THE O-RING.

P a g e 14 Step 6: Place the properly prepared (see sample prep section) sample holder on the loader arm; the posts on the loader arm (one on the right ant two on the left) should correspond with the slots on the sample carrier. Check to ensure there is there is no debris on the o-ring; if there is debris; clean the o-ring an isopropyl alcohol moistened wiper. Step 7: Close lid gently. Select loadlock pumpdown in Pump Sequence Window and wait for the load lock chamber ion gauge to reach 2.0 x 10-6 Torr. (lower if the material is reactive with Oxygen) Step 10: Open the manual isolation valve completely by turning the crank handle counterclockwise, slight resistance is felt followed by the sound of the gate snapping open, continue to turn the crank until the white bar appears in the Open Window.

P a g e 15 Step 11: Turn on chamber light if not already on. Step 12: Click the Main Tab. Step 13: Visually check to see if the substrate stage is in the load position. If not, then lower the substrate Z stage by clicking the Down button. Step 14: Slide the loader handle to the Chuck Safety Check line.

P a g e 16

P a g e 17 Step 15: Ensure that the sample holder will go between the substrate Z upper and lower rings as in the photo above. If it does not, adjust the Substrate Z (in the Main tab) until proper alignment is obtained by inputting 2mm into the jog box and clicking the Jog Up. Repeat if necessary until the proper alignment is reached. Be aware that more precision is required for the clamping small sample holder and or thicker samples. It may be that some samples may only be loaded manually. During this operation, no substrate Z motion is permitted with the loader arm past the safety line. Step 16: Slowly insert the sample holder all the way against the stop. If you feel resistance, visually inspect the sample holder. If further adjustment is needed, return the loader arm to the Safe position and make the proper adjustments. DO NOT FORCE ANYTHING, IT SHOULD BE EASY AND FRICTION FREE MOTION. If there is any mis-alignment or obstructions preventing a safe and proper load then stop return to safety line and call staff. there is ANY resistace to the remoal of the arm, stop and all staff!!! If Step 17: Press the Up button on the Substrate Z holder in the window and watch for the substrate holder to seat properly and clear the arm after picking up the sample holder. One can jog up as well I that is more comfortable. Any time that the Z is in motion the cursor should be hovering over the STOP button so that motion can be stopped instantly if there is a problem.

P a g e 18 Step 18: Click Main Tab 1. Ensure that Z is up (light will be on). Step 19: Once clear, move the loader arm to the far right stop. Step 20: Close the manual isolation valve by turning the crank clockwise. When nearly closed a slight resistance is felt during crank rotation followed by the sound of the gate snapping closed, a few more turns to resistance is all that is needed (The white bar appears in the Closed Window)

P a g e 19 Running a Process: Go to the chamber tab Step 1: Check that the substrate shutter is closed and the source shutter is closed. Do so by checking for the light on the computer as well as visually through the chamber port hole. If the light is off, the shutter is closed. Step 2: If rotation is not required, skip to Step 3. If you desire substrate rotation, go to the Main tab and enter the RPM set point you prefer (i.e. 10) and click Rotate. If substrate heating is required now is when the heater would be started; please note that heating is Staff programmed and a request must be made at least 24 hours in advance. See the substrate heating section at the end of this document. Step 3: Select the Evaporation Tab. 1. Ensure that the Inficon SQC-310 mode box is set to Auto.

P a g e 20 2. Select proper process number (See Process Assignment Board) 3. Click on Connect to Inficon button if it is not already connected. 4. The Rate through active layer boxes should be populated. Check that the frequency box and the % life box has data not 0 or characters. If there is no data in these boxes then the crystal monitor is not functioning properly and the process will not run. Call staff for assistance. Step 4: Set the desired thickness as follows. 1. Go to Electronics Control Rack 2. Go to SQC-310 deposition controller. 3. Press the Next Menu button until you see Process Menu on the list. 4. Press the Process Menu button. 5. Rotate the selector knob until your process is selected. 6. Press the Edit button

P a g e 21 7. Check that the layer contains the requested deposition material on the display. 8. Select the layer with the knob. 9. Select Edit. 10. Rotate the process knob until Final Thickness is selected. 11. Select Edit. 12. Set final thickness by rotating selector knob to desired set point.

P a g e 22 13. Press Enter. 14. If a different deposition rate is desired then it can be changed in this window, Dep rates over 5A/s are not allowed on any material. Usually the slower the rate the better the film. Discuss any changes to the default dep rate with staff prior to processing as there are many factors that affect the rate. 15. Press To Main button. 16. Press the main menu button until the process and film menu buttons are displayed, press the film menu then select each material to be deposited and confirm that each loaded material is designated with the correct pocket number as indicated on the load board.

P a g e 23 AT LAPTOP Step 17: Choose the correct process number by pressing the arrows next to the process number window (the correct process is indicated on the load board for each material) then press Start Process button. NOTE: The Indexer will move to the proper pocket if not already selected. Then the process will start. Turn on the chamber light and open source shutter so that the hearth is well illuminated, Watch the pockets move to the desired material. If I doubt that the proper pocket is not aligned properly in the window then press Stop Process and call or staff assistance. Step 18: Press Zero Thickness button. The process will proceed in the following manner. Indexing phase Film conditioning phase active evaporation phase material cool down and be designated using the following short hand so that one will be able to determine the total process time from beginning to end. percent power / time dwell time percent power / time dwell time evaporation power Evaproation A/sec percent power / time IE: 10 / 5 5 30/ 10 1 32 5 0 / 5 Will increase the power to 10 percent over a 5 minute period and hold it there for five minutes then will proceed to 30 percent power over the next 10 minutes and hold it there for 1 minute then a final ramp to the evaporation power set point at which time the shutters will open and the evaporation controller

P a g e 24 will vary the power to achieve rate setpoint, when the desired thickness is reached the shutters will close and the cool down will occur over the next 5 minutes. The phase box will indicate Stopped. Removing the sample: Step 1: Once the shutter closes after the deposition, select the Evaporation Tab. 1. Ensure that the source shutter is closed and open the substrate shutter. Step 2: Select the Chamber Tab. Step 3: Open the manual isolation valve. Step 4: Move the loader arm all the way to the left against the stop. Step 5; Select the Main Tab 1. Select the Down button in the Substrate Z stage box. 2. Move the cursor over the stop button (Do Not Click Yet) and watch the substrate lower on to the loading arm. Watch to make sure the loader arm pins align and seat will with the substrate holder pin holes. If they do not click the Stop button and call for assistance. 3. If there are not issues, click stop once the sample holder is elevated by the loader arm to the center substrate z assembly. Step 6: slide the loader arm all the way to the right against the stop. If ANY resistance or unusual friction is felt stop and visually check for proper adjustment and use the jog buttons to reposition the z holder BY SMALL STEPS until the sample holder if free of contact while removal Step 7: Close the manual isolation valve. (The white bar appears in the Closed Window ) Step 8: Select the Chamber Tab. 1. In the Pump Sequence drop down, select Loadlock Vent. Step 9: Once the chamber pressure reaches ~7.0E+2, carefully lift the loadlock door and remove sample.

P a g e 25 Step 10: Close the loadlock door. Step 11: In the Pump Sequence dropdown, select Loadlock Pumpdown. Shutting down the machine: AT THE POWER SUPPLY CONTROLLER Step 1: Set toggle to off. AT THE SOURCE 1 SECTION Step 2: Move Remote/Loc/Hand toggle to Loc. Step 3: Press the Off button. AT THE HIGH VOLTAGE SECTION Step 4: Press the Off button. AT THE MAIN POWER SECTION Step 5: press the OFF button, then turn the Main Power key to the off position. Step 6: Press the Power Supplies Off button. Step 6: Log off TUMI, making any notes that you feel are appropriate.

P a g e 26 Wafer and sample prep For whole 4 and 6 inch wafers there are dedicated holders and the wafer will just sit in the depression. For small pieces there is a holder with multiple screw holes and clamps so that many samples may be loaded on one carrier. A word of caution about the clamps on the small sample carrier; if the deposition is going to be long and intense so that the sample holder heats up or if the substrate heater is used there is the possibility that the clamps will loosen and drop the sample, in this case use multiple clamps of consult with staff. If a sample drops into the crucible and contaminates it then the user will be charged for the entire crucible of material. The small sample holder will not be used if there are any open holes; make sure that uncovered screw holes have a screw in them. For alternate methods of securing samples in the machine consult with staff. Fresh clear wafers and samples (No pattern clear substrate) should be thoroughly clean with the oxide stripped if appropriate. Samples that are post lithography should be well developed and residue free in the clear areas and, ideally, be undercut if liftoff is planned after deposition. It is wise to stop by the Asher and O2 clean the cleared features just before loading, be careful not to over clean, 10 seconds should do to remove any residue and over cleaning can remove too much PR and change the pattern. Sample holders can be made out of 4 inch wafers using the dicing machine and then loaded on the 4 wafer holder; custom holders must be designed with staff consultation and approval.

P a g e 27 Substrate Heating Note: Substrate heating must be requested 24 hours in advance and all samples, materials and mounting methods must be approved by staff. It is a staff programmed procedure that is initiated by the user at the appropriate time. There may be times, depending on the condition of the chamber that staff will require that a heated process be postponed until after a thorough chamber clean. Substrate heating process; 1 at the electronics rack press the PWR switch on the Heater Controller and allow it to initialize to the Standby mode. 2 Press the Start button so that the POWER indicator lights. 3 At the laptop; select the Main tab and click on the run button under Heater Substrate.

P a g e 28 The substrate heater will go through a preprogrammed heater ramping routine to the requested temperature. Wait for the temperature to stabilize at set point before proceeding with the deposit (return to Step 3) 4 after the deposition is finished and the shutter is closed return to the Heater Substrate window and press Skip; the heater will go through a pre-programmed cool down. 5 The Heated sample will not be removed until it has cooled down to less than 50 C. the progress of the cooling can be monitored on the laptop or the electronic rack. 6 after cool down go the the Removing Sample section.