US 301 Resurfacing, Restoration, and Rehabilitation

Similar documents
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Bay to Bay Boulevard Complete Streets Project

Thank you for attending

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Richmond-Adelaide Cycle Tracks

CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016

Highway 93 South Corridor. Planning

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Financial Project ID No(s).: and ETDM No(s).: and 14181

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Pavement Rehabilitation & Buffered Bike Lane

Road Diets FDOT Process

Bellevue Downtown Association Downtown Bike Series

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay

Completing the Street: Denning Drive

Welcome. If you have any questions or comments on the project, please contact:

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

2.0 LANE WIDTHS GUIDELINE

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Blair/Williamson Intersection Expressed Needs

Market/Octavia - Transportation Projects Update

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Omaha s Complete Streets Policy

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Fleur Drive Reconstruction

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Transportation Planning Division

Building Great Neighbourhoods BONNIE DOON

Designing for Pedestrian Safety

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Transportation Planning Division

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

42nd Ave N Reconstruction

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Station 1: Street & Sidewalk Upgrades

Riverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015

Building Great Neighbourhoods QUEEN ALEXANDRA

2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Defining Purpose and Need

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Pre-Construction Meeting

Central Avenue Corridor Study FPID Number:

2014 Regional Bicycle and Pedestrian Study Evaluation Tools Leslie A. Meehan, AICP MPO Technical Coordinating Committee Meeting April 1, 2015

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Physical Implications of Complete Streets Policies

Tonight is for you. Learn everything you can. Share all your ideas.

Transportation & Land Use. Workshop: March 6, 2013

Cycle Track Design Best Practices Cycle Track Sections

City of Saline. Complete Streets Ordinance

Zlatko Krstulich, P.Eng. City of O9awa

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Environment and Public Works Committee Presentation

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

Laurier Segregated Bike Lane Pilot Project July 2013 update

Foothill Expressway Improvements Between El Monte and San Antonio

N. Frederick Street to N. Manchester Street

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

Las Tunas Downtown Revitalization City Council Study Session. December 1, :00 p.m. Live Oak Park Community Center

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Broadway Complete Streets Project

Arlington s Master Transportation Plan

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Wood and Cortland Neighborhood Greenways

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

CTDOT Pedestrian and Bicycle Safety Initiatives

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Pennsylvania Avenue (CR 484) Design Alternatives Study

Long Island Rail Road Expansion Project Floral Park to Hicksville

Peter Kremer, WSP/Parsons Brinckerhoff

Henderson Ave. Complete Streets Project

Board of Supervisors February 27, 2017

F L E T C H E R A V E N U E

City of Wausau Wausau Center Urban Design and Transportation Master Plan. Design Workshop // October 18, 2018

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

CITY OF LOMITA CITY COUNCIL REPORT

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Simulation Analysis of Intersection Treatments for Cycle Tracks

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Plant City Walk-Bike Plan

Water Street Promenade Engineering and Design Services

Lawrence Avenue Streetscape Concepts August 30, 2011

LOUISIANA COMPLETE STREETS POLICY. Ellen W. Soll, AICP Principal Soll Planning

Transcription:

US 301 Resurfacing, Restoration, and Rehabilitation From Pond Ave to North of Pioneer Museum Rd/Long Ave Pasco County, FL Work Program Item No. 429075-2

Project Overview Project Location: POND AVE WHITEHOUSE AVE GLADDIS AVE LOCK ST LONG AVE PIONEER MUSEUM RD End Project US 301/7 TH ST 7 TH ST Begin Project Project Extent

Project Overview Project Information: Project Scope: Milling and Resurfacing (3R) Safety Enhancements Operational Improvements Lock St. Signal Upgrades Driveway & Median Adjustments Sidewalk Reconstruction Schedule: Design - Fall 2018 Letting Feb. 2019 Construction - Spring 2019 Approx. 15 months

Existing Conditions Number of s: POND AVE WHITEHOUSE AVE GLADDIS AVE LONG AVE LOCK ST 6-s PIONEER MUSEUM RD 4-s US 301/7 TH ST 7 TH ST 2-s

Existing Conditions Typical Cross-Sections (Existing) 11 11 11 11 11 11

Complete Streets Approach Complete Streets: Accommodate ALL road users Promote Connectivity Improve Safety FDOT will routinely plan, design, construct, reconstruct, and operate a context-sensitive transportation network that works for all modes of travel.

Proposed Concept Typical Cross-Sections (Proposed) 7 Bike 12 12 12 12 7 Bike

Existing Conditions Historical Annual Volumes (AADT): US 301 S. of Lock Street US 301 N. of Lock Street 6L LOS D 6L LOS D 4L LOS D Extra Capacity 4L LOS D Extra Capacity AADT 4L LOS D 6L LOS D AADT 4L LOS D 6L LOS D Over the last 10 Years, Traffic Volumes are not increasing Data Source: Florida Traffic Online 2016 Historical AADT Reports

Benefits of Proposed Concept Improves Overall Safety Reduces merge and weave movements/conflicts Reduces crossing distance and exposure Reduces bottlenecks at lane transitions Opportunities for dedicated turn lanes Better speed management More comfortable pedestrian environment Provides Dedicated Bicycle Facility 7 buffered bicycle lanes Green paint at conflict points

Benefits of Proposed Concept Continued Improves Bicycle Connectivity Connections to existing bike facilities to the north and south Connection to planned trail facilities (Lock St Trail) Improved connections into downtown Dade City Local Support Pasco MPO BPAC Tri-County MPO BPAC Major Property/Business Owners Completed within Existing Pavement Width No impacts to existing curbs

Thank You For additional information please contact: FDOT Project Manager: Pia Cormier (813) 975-6176 Pia.Cormier@dot.state.fl.us And/or FDOT D7 Bike/Ped Coordinator: Chris Speese (813) 975-6405 Christopher.Speese@dot.state.fl.us

Existing Conditions Existing Daily Traffic Volume (15-Min. Counts, 24 HR Breakdown): US 301 S. of Lock Street US 301 N. of Lock Street 700 600 500 400 300 200 6L LOS D 4L LOS D Extra Capacity 800 700 600 500 400 300 200 6L LOS D 4L LOS D Extra Capacity 100 100 0 0 NB Vol SB Vol 4L LOS D 6L LOS D NB Vol SB Vol 4L LOS D 6L LOS D Even during Rush Hour, 6 s are not needed to handle current traffic. Data Source: Florida Traffic Online 2016 Synopsis Reports

Reduction Will removing a lane create congestion? Existing traffic volumes US 301 S. of Lock Street US 301 N. of Lock Street 6L LOS D 6L LOS D 4L LOS D 4L LOS D

Reduction Projected traffic volumes (US 301 N of Lock St) AADT Peak Hour (2-Way) 70,000 60,000 6L LOS D 6,000 5,000 6L LOS D 50,000 40,000 30,000 20,000 4L LOS D 4,000 3,000 2,000 4L LOS D 10,000 1,000 0 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2027 0 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2027 AADT 4L LOS D 6L LOS D Projected Peak Hour 4L LOS D 6L LOS D Projected *Average 3R cycle is 12 Years

Buffered Bicycle s What is a buffered bicycle lane? Bicycle lanes with a designated buffer space separating the bicycle lane from adjacent motor vehicle traffic

Proposed Project Concept Opportunity to Introduce Turn s NB Right Turn to Pioneer Museum Rd./Dade City Business Center

Pioneer Museum Rd. (Concept)

Public Outreach Sept. 14, 2017 Sept. 18, 2017 Oct. 12, 2017 Nov. 4, 2017 Nov. 15, 2017 Nov. 15, 2017 Public Workshop Withlacoochee River Electric (Ronnie Deese) Dade City Business Center (Mr. Guedry) Open Air Market Jan. 17, 2018 Workshop #2 Jan. 23, 2018 Iglesia de Dios (Pastor Marcello) Farmworkers Self-Help (Margarita Romo) Pioneer Museum (Stephanie Black)