Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

Similar documents
5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

Standard Operating Manual

OXFORD PLASMALAB 80PLUS (CLOEY)

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

Operating Procedures for Metal Evaporator I

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

University of MN, Minnesota Nano Center Standard Operating Procedure

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

Standard Operating Procedure. For. PVD E-Beam

SPUTTER STATION STANDARD OPERATING PROCEDURE

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating

Angstrom Dielectric Sputterer Operation Manual

Basic ICP Operating Procedures

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

STS PECVD Instructions

Plasma Asher: March PX-500 User guide (May-30, 2017)

Revised: June 7, 2017

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

Standard Operating Manual

Standard Operating Manual

Standard Operating Manual

University of MN, Minnesota Nano Center Standard Operating Procedure

Notes-PECVD: Chamber 1

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

Cambridge NanoTech: Savannah S100. Table of Contents

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

Unaxis PECVD. SiH4 (5% in He)

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Xactix XeF2 OPERATION MANUAL

Operating Procedures for the. SAMCO ICP RIE System

University of Minnesota, MN Nano Center Standard Operating Procedure

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

Edge Isolation Tool. Standard Operating Procedure. Version 1.1. Date: Prepared by, Sandeep S S. Department of Electrical Engineering

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

March Asher Operation

OPERATION OF THE DIMPLER

Oerlikon Sputtering Evaporator SOP

March CS-1701F Reactive Ion Etcher

Nordiko Metal Sputtering System Standard Operating Procedure

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

Unaxis ICP/RIE SOP Revision 8 09/30/16 Page 1 of 5. NRF Unaxis ICP/RIE Etch SOP

WATER CONTROL SYSTEM QUICK START

[USING THE VITROBOT April 9, Using the Vitrobot

Arizona State University NanoFab XACTIX ETCHER. Rev A

University of MN, Minnesota Nano Center Standard Operating Procedure

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

NORDSON MARCH PX-1000 PLASMA ASHER STANDARD OPERATING PROCEDURE Version: 1.0 July 2016

CDS-2000 CO 2 Sensor Verification, Calibration, and Troubleshooting Bulletin

BEST KNOWN METHODS. Transpector XPR3 Gas Analysis System. 1 of 6 DESCRIPTION XPR3 APPLICATIONS PHYSICAL INSTALLATION

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

CircuFlow Quick Setup Guide

The SPI Sputter Coater Handbook

Approved by Principal Investigator Date: Approved by Super User: Date:

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

SOP for Karl Suss MJB3 #1 Mask Aligner

MMRC PVD Evaporator Instructions

Standard Operating Manual

Cover Page for Lab Report Group Portion. Head Losses in Pipes

Cryo-Evaporator Operation

STS ICP-RIE. Scott Munro (2-4826,

Arizona State University NanoFab PLASMATHERM 790 RIE. Version A

Nanofabrication Facility: Sputter Evaporator SOP Rev. 04, June 2007

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure

Plasma II (AXIC) Standard Operating Procedure. Revision: 1.0 Last Updated: Feb.6/2013, Revised by Grace Li

Met One E-BAM Particulate Monitor

Time-Delay Electropneumatic Applications

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

LESKER #1 STANDARD OPERATION PROCEDURE

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

Warnings: Notes: Revised: October 5, 2015

Standard Operating Manual

Usage Policies Notebook for STS DRIE System

Operation of the contact mask aligner Canon PPC 210 Projection Print Camera

Model 106 DPI "Micro-switch" Installation and Operating Instructions

University of Minnesota Nano Center Standard Operating Procedure

Karl Suss MA6 Mask Aligner SOP

Section 3- Repair and Calibration Procedures

MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE

Approved by Principal Investigator Date: Approved by Super User: Date:

RAPID THERMAL PROCESSOR (Annealsys AS-ONE 150) Lab Manual

Chromat Calibration Updated October 27th, 2017

Standard Operating Manual

Operations Manual. Internal automatic Pressure control for orbital tube welding. By Exel Orbital Systems, Inc. Page

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

Model 130M Pneumatic Controller

2 Switching off ECRIS 3. 4 Acquire Beam Spectrum 4. 6 Vent Instrument Chamber 5. 7 Pump down Chamber 5. 8 Baking out Chamber 5.

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

OAI Model 200 Tabletop Mask Aligner Portland State University

Cover Page for Lab Report Group Portion. Pump Performance

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager.

Appendix: Simplified Instructions for Operating the HP 5890 GC/FID and Air Sampling Systems

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel

OLED vacuum deposition cluster system Sunicel Plus 400 / Plus 400L (Sunic Systems)

Transcription:

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions Contributors: Devin Brown, Kevin Klein, Ben King, Eric Woods Anything that is BOLD UNDERLINED ITALICS means that you should press that button on the screen. If at any time, you cannot follow these instructions because there is a problem with the tool, or, you get in a situation where you are unsure how to proceed, you must contact Devin Brown (5-4220) for help. If Devin is unavailable, contact Joel Pikarsky (5-0910). Unifilm PVD-300 Operating Instructions Page 1 of 16

Loading samples Main Menu System Control Select LoadLock Menu Unload Plate Load Sample 1. Operator input is performed via the touch screen monitor. If the computer monitor screen saver is on, simply touch the screen. TIP: The screen is a little finicky and takes some getting used to (you aren t doing anything wrong). Over time, you will learn where the sweet spots are and it will be less frustrating. It helps if you are deliberate in your finger touching, by approaching from far away and then retracting your finger to a far away position. If you leave your finger near the screen, you will tend to accidentally select unwanted items. DATE: 29 Aug 2003 TIME: 14:54:13 UNIFILM TECHNOLOGY PVD-300 SYSTEM CONTROL (C) 1986-2001 (Rev. U11) SELECT PROGRAM Use TOUCHSCREEN to make selections touch the logo for HELP. DEPOSIT LOADLOCK Figure 1: Main Menu "SYSTEM CONTROL" Display Select LoadLock Menu 2. The main menu (see Figure 1) called SYSTEM CONTROL shows DEPOSIT and LOADLOCK at the bottom of the screen. If you see this, press LOADLOCK. It is possible that you are already in the LOADLOCK menu (see Figure 2). The LOADLOCK menu will display LOAD, UNLOAD, PURGE, VENT, etc. at the bottom of the screen. If this is the case, proceed to step #3. Unifilm PVD-300 Operating Instructions Page 2 of 16

UNIFILM TECHNOLOGY PVD-300 LOADLOCK CONTROL SELECT OPERATION LOADLOCK 5.1 Torr Make sure the LOADLOCK is closed before proceeding. EXIT LOAD UNLOAD VENT PURGE Figure 2: LOADLOCK MENU Display 3. Check the Loadlock (LL) view port (see Figure 3) for the presence of a plate a. If there is a plate then go to Load Sample (step #5) b. Otherwise, go to Unload (step #4) view port plate Figure 3: Load lock with lid open Unifilm PVD-300 Operating Instructions Page 3 of 16

Unload Plate 4. Unload Plate from chamber a. Press UNLOAD in the LL menu, then press 1 (or other plate number) in the next screen (see Figure 4). TIP: The Unifilm PVD-300 normally processes in sequential mode, meaning one wafer at a time. This mode does not allow for wafers to be loaded on adjacent plates because they are exposed to the plasma and would receive uncontrolled deposition. There are only 5 plates, so 3 is the maximum number of nonadjacent wafers which can be loaded, in positions 1, 3, and 5. If you are only processing one or two wafers, you may put them in any combination of nonadjacent positions (e.g. 1 & 3, OR 1 & 5, OR 2 & 4, and so on). Note that there is a 6 th position that the Quartz Monitor occupies, so this is why 1 and 5 are considered non-adjacent. For more information, see the Unifilm Manual at http://grover.mirc.gatech.edu/manuals/. UNIFILM TECHNOLOGY PVD-300 LOADLOCK CONTROL UNLOAD LOADLOCK 5.1 Torr Select planet to unload. ABORT 1 2 3 4 5 QM Cover Figure 4: The Unload Screen Unifilm PVD-300 Operating Instructions Page 4 of 16

b. The monitor will prompt you to Verify planetary is at index XX (see Figure 5). Verify the planetary index XX in the chamber view port (see Figure 6) and press GO ON. TIP: The first number in the index represents the source or load lock position. The second number represents the plate. For instance, an index of 13 means that plate 3 is under port 1 (which is the load lock). An index of 45 means that plate 5 is under port 4 (which currently is Aluminum or Chromium.) UNIFILM TECHNOLOGY PVD-300 LOADLOCK CONTROL UNLOAD PLANET #4 LOADLOCK 5.1 Torr Verify planetary is at index 14... touch GO ON to proceed. GO ON ABORT Figure 5: The Unload Process: Index Verification Screen chamber view port Figure 6: Chamber View Port Unifilm PVD-300 Operating Instructions Page 5 of 16

c. You will now prompted to physically unload a plate (see Figure 7). Follow the diagram and directions EXACTLY!! on the screen to unload a plate from the chamber to the LL. Take this step seriously! You will damage the LL if you do not. Damaging the tool will result in loss of access and will require re-training. UNLOAD PLANET #4 STEP #1 STEP #2 STEP #3 STEP #4 STEP #5 OPEN FULL SWING IN CLOSE HALF SWING OUT CLOSE FULL LOADLOCK 5.1 Torr Follow this manual 5-step procedure EXACTLY... touch GO ON when done. GO ON ABORT Figure 7: The Plate Unload Procedure Screen d. After pressing GO ON, the LL will vent automatically on it s own. Proceed to step #5. Unifilm PVD-300 Operating Instructions Page 6 of 16

Load Sample 5. Load Sample a. Open LL lid and place sample onto plate. If you have skipped here from step #3, and the LL lid is under vacuum and will not open, you will need to vent it first. Press VENT and then place sample onto plate. b. Press LOAD, then press 1 (or other plate number) c. Hold down the lid to stow (pump down) the LL. TIP: The monitor will request when it wants the operator to hold down the lid to stow the LL. During this time, Nitrogen is being vented into the LL. So when the operator holds down the lid, the pressure will increase above atmosphere. The tool senses this pressure increase and therefore knows that the lid is being held shut and it is safe to begin pumping. Occasionally, the weight of the lid is enough to cause a pressure increase without the operator holding it down. This will cause a premature pump down of the LL before the user has a chance to load their sample. Usually this occurs while the operator is not looking at the monitor and is busy preparing their sample. If this happens, no problem, just press VENT. d. Verify the planetary index XX in the chamber view port, then press GO ON. e. You will now be prompted to physically load a plate (see Figure 8). Follow the directions EXACTLY!! on the screen to load the plate, with your sample, from the LL to the chamber. Take this step seriously! You will damage the LL if you do not. LOAD PLANET #4 STEP #1 STEP #2 STEP #3 STEP #4 STEP #5 OPEN HALF SWING IN OPEN FULL SWING OUT CLOSE FULL LOADLOCK 5.1 Torr Follow this manual 5-step procedure EXACTLY... touch GO ON when done. GO ON ABORT Figure 8: The Plate Load Procedure Screen 6. Repeat steps 4 & 5 for additional wafers if necessary. 7. EXIT the Load Lock Unifilm PVD-300 Operating Instructions Page 7 of 16

Metal Deposition Main Menu System Control Select Deposit Menu Select a Program Enter Run Comments Set Parameters rate, thickness, etc. Set / Record Operator s Name & System Pressure Adjust and Record Settings Ar flow, Current, Voltage etc. Deposition Print Hardcopy Select Deposit Menu 1. From the main menu (see Figure 1) called SYSTEM CONTROL press DEPOSIT. Select a Program 2. Select your program e.g., CM-seed. You can toggle between program menu pages by pressing MENU x of 2. (see Figure 9) UNIFILM TECHNOLOGY PVD-300 DEPSITION CONTROL SELECT RUN Touch any filled position on the run menu to do a previously-defined run. NEW RUN GO BACK MENU 1 OF 2 LAST RUN Heat-Deposit Ti CM-seed ti/cu/ti ALSi2% ti/au ti/ni/ti au/ti ti_au_ti Cr Figure 9: Deposit Menu "DEPOSITION CONTROL" Enter Run Comments 3. Enter any comments you wish in the Chamber Load screen (see Figure 10) and then press GO ON. Unifilm PVD-300 Operating Instructions Page 8 of 16

ti/au CHAMBER LOAD PROJECT SUBSTRATES PLANETS COMMENTS ti_au 4inch 3,5 RUN LOG Touch CHAMBER LOAD or RUN LOG to edit... touch GO ON to proceed. GO ON GO BACK CLEAR CHAMBER LOAD RUN LOG LOADLOCK Figure 10: The Chamber Load Screen Set Parameters rate, thickness, etc. 4. The previously defined program is now displayed (see Figure 11), you may accept the predefined parameters as is and proceed by pressing GO ON. If you wish to modify the deposition rate, thickness, target source, or planet positions, press GO BACK repeatedly to place the cursor over the following items. a. Select Source: Cu-DC1-2-C i. Cu specifies the source material (i.e. Copper). ii. DC1 means DC power supply 1. This is currently the only option available. iii. 2 means the copper target is in source position two. There is no source position one. The LL occupies position one. iv. C is the calibration version. b. Select Mode: S4-3-A i. S signifies sequential mode. Wafers are processed one at a time and only on non-adjacent plates. ii. 4 signifies 4 diameter wafers. It is appropriate to use this for samples less than 4 in size. iii. 3 means 3 stop and spin positions. iv. A is the mode version. c. Select desired planets: 1,3, then press ENTER. d. Select total Thickness (Å): 2000 e. Select Peak Rate (Å/m): 800 TIP: The deposition profile has a Gaussian distribution with the peak deposition rate occurring directly under the center of the target. The wafer is rotated as well as moved back and forth under the target in an orbital path to achieve an uniform film. Therefore, you cannot divide the total thickness by the peak rate to obtain the total time of deposition. You can divide the total thickness by the peak rate, Unifilm PVD-300 Operating Instructions Page 9 of 16

and then multiply by 6 to get an approximate deposition time. However, while you are at the computer monitor, the program automatically calculates and displays the total deposition time for you. For more information, see the Unifilm Manual at http://grover.mirc.gatech.edu/manuals/. f. Press DONE. g. Press GO ON. NEW RUN NO. 1 SOURCE (0.50 ) PLANETARY (6X) DEPOSITION Type Mode Pos Cal Mode Planets Thickness(A) Rate(A/m) Time(m) Ti DC1 5 A S4-3-A 3 600 @ 1X 1000 3.34 o o RUN MODE IS MANUAL OPERATOR S NAME MiRC PRESSURE (Torr) 7.57E-8 Touch START RUN to begin the deposition sequence. START RUN GO BACK CHAMBER LOAD RUN LOG EXIT RUN EDIT RUN LOADLOCK SAVE RUN Figure 11: Operator's Name and System Pressure Menu Set / Record Operator s Name & System Pressure 5. For operator name, MiRC is fine, so press GO ON. 6. Check chamber pressure (as shown in Figure 12). The pressure shown is the recommended base pressure before commencing the run. 1E-6 is typical. If the pressure is close to 1E-6 or less than 1E-6 Press GO ON. TIP: The pressure during processing is 2E-3 or higher, which is 3 orders of magnitude above 1E-6. The main concern for a low initial base pressure is gas or particle contamination. Use your own judgment and experience as to what an acceptable base pressure is for your process. Unifilm PVD-300 Operating Instructions Page 10 of 16

chamber pressure Figure 12: Location of the Chamber Pressure 7. Press START RUN. Adjust and Record Settings Ar flow, Current, Voltage etc. 8. A new screen is displayed as in Figure 13. Check for Planet Predeposit Index XX in chamber view port (see Figure 6) and press GO ON. NEW RUN TASK 1 OF 1 SOURCE (0.50 ) PLANETARY (6X) DEPOSITION Type Mode Pos Cal Mode Planets Thickness(A) Rate(A/m) Time(m) Ti DC1 5 A S4-3-A 3 600 @ 1X 1000 3.34 o o DEPOSITION PARAMETERS Pre-deposit Index: 52 Source Selector: DC1-5 Pre-Deposit Time: 1.0 FLOW PRESSURE SOURCE O2 N2 Ar Open Throttled Amps Volts n/a n/a #3 = 90.1 2.00E-3 5.00E-3 0.593 225 SOURCE CURRENT:? Touch GO ON if OK. GO ON GO BACK TASK SUMMARYCHAMBER LOAD RUN LOG X 0.1A X 1A 1 2 3 4 5 6 7 8 ABORT RUN 9 0 Figure 13: Settings Record Screen (Note: the state of this screen corresponds to step 15.) 9. Select Source by pressing button (e.g. DC1-4) on Source Selector (see Figure 14) and press GO ON. Unifilm PVD-300 Operating Instructions Page 11 of 16

source selector unit Figure 14: Source Selector Unit 10. Pre-Deposit Time is usually set for 1 minute, adjust as necessary and press GO ON. TIP: If the target you are using was installed recently and this is the first time it has been run, there will be a film of the previous metal on the shielding around the new target, some of which will be sputtered off by the plasma. How much is sputtered off, and how long before it is covered by a film from the new metal is not known. Currently it is recommended that the pre-deposit time be set to 3 minutes if the target is being run for the first time after installation. 11. Turn on Argon flow by turning up the switch labeled Mass Flow Controller (see Figure 15). If the switch is already up, turn it down and then back up. Check the flow rate of Argon in the Mass Flow Controller display (see Figure 16) to ensure that it is 90 sccm and press GO ON. TIP: Occasionally, all of the lights may be on that are located above the switches in the vicinity of the Argon switch. This occurs when the chamber has been pumped down from atmosphere to Hi Vac. This does not occur during normal operation of the tool, but would occur for instance after a target change. To clear the lights, temporarily push down the switch labeled Purge immediately to the right of the Argon switch. Unifilm PVD-300 Operating Instructions Page 12 of 16

Argon switch Throttle valve switch Figure 15: Argon & Throttle switches 12. Verify the correct Open Pressure (It should be 2E-3 Torr. Note: currently the 10-3 LED is burnt out.) on the display (see Figure 16) of the MKS 270 Signal conditioner then press GO ON. Argon flow Open\Throttle pressure Figure 16: Mass Flow Controller Display 13. Throw the Throttle switch up (see Figure 15) to throttle the High Vac valve. Check the throttle pressure on the MKS 270 Signal Conditioner (see Figure 16). If the pressure matches what the program is requesting, press GO ON, and proceed to step #14. If the throttle pressure displayed is not what your program is requesting then: a. Un-throttle by pushing the throttle switch down b. Turn the throttle knob to adjust the pressure (ONLY DO THIS WHEN UN-THROTTLED!!). Unifilm PVD-300 Operating Instructions Page 13 of 16

i. Clockwise (CW) decreases the throttle pressure ii. Counter-Clockwise (CCW) increases the throttle pressure c. Re-engage the throttle by pushing the Throttle switch up. d. repeat steps a,b, & c as necessary to achieve correct throttle pressure. e. When finished, press GO ON. TIP: Throttle is the act of partially closing the high vacuum valve to effectively reduce the pumping rate of the cryogenic pump, which raises the chamber pressure to the desired point. By rotating the throttle positioner, you are moving a mechanical stop which the high vacuum valve rests against. 14. Turn on the H 2 O flow by holding the appropriate switch up (see Figure 17) on the source selector unit until the interlock light comes on. H 2 O flow on switch current knob Figure 17: Water interlock & power supply controls 15. Striking the plasma: a. Set the Current knob (see Figure 17) on the power supply to 0. b. Turn the power on by toggling up the On Switch. (see Figure 17) c. Increase current knob slowly, until the current increases > 0. d. Set the current to the value requested on the monitor, then press GO ON. e. Verify the voltage is within +/-10V of the voltage displayed on the monitor and press GO ON. TIP: Sometimes the plasma will not strike. If increasing the knob causes only an increase in current while voltage is zero, this means that there is a short somewhere. Usually this is caused by metal flakes shorting the target to ground. If increasing the knob causes an increase in voltage while current is zero, this means there is a very high impedance or open somewhere. (You may notice a distortion in the CRT display. This is being caused by a high E-field from the adjacent power supply.) Sometimes this high impedance is caused by insufficient gas flow or a chamber Unifilm PVD-300 Operating Instructions Page 14 of 16

pressure which is too low. Check to make sure you have turned on the Argon gas and the Throttle pressure is correct. Deposition 16. The current status of the deposition will be displayed on the screen as in Figure 18. If you are depositing multiple layers of metal, you will need to repeat steps 8 15. NEW RUN TASK 1 OF 1 Ti-DC1-5,S4 FLOW PRESSURE SOURCE O2 N2 Ar Open Throttled Amps Volts n/a n/a #3 = 90.1 2.00E-3 5.00E-3 0.593 225 DEPOSITION STATUS COUNTERS TIMERS Layer Cycle Step Step Cycle Task n/a 1 1 1 6 0:00 0:5.7 0:00 3:20 0:11 4:38 POSITIONS & TIMES Reference Plt 1 Plt 2 Plt 3 Plt 4 Plt 5 Plt 6 >> 1:00 >>0:11 Pre-depositing... ABORT TASK ABORT RUN Print Hardcopy Figure 18: Deposition Status Screen 17. After the deposition is finished you may print a hardcopy of the run conditions if you want by pressing HARDCOPY (see Figure 19), otherwise press RUN COMPLETE. DATE: 29 Aug 2003 TIME: 15:15:43 UNIFILM TECHNOLOGY PVD-300 DEPSITION CONTROL Touch RUN COMPLETE when finished with HARDCOPY and RUN LOG options. RUN COMPLETE HARDCOPY RUN LOG Figure 19: Run Complete / Print Hardcopy Screen Unifilm PVD-300 Operating Instructions Page 15 of 16

Unloading samples 1. Press LOADLOCK. 2. Press UNLOAD to unload samples. (See step #4 of the Loading Samples section for details.) 3. Press LOAD to load empty plate back into chamber. (See step #5 of the Loading Samples section for details.) It is acceptable to leave the last plate in the load lock without loading it back into the chamber. Unifilm PVD-300 Operating Instructions Page 16 of 16