W13 th Realignment Study. Public Meeting. How to get the most out of this meeting:

Similar documents
CHAPTER 3.0: TRANSPORTATION IMPACTS

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

RiNo Railroad Crossing Connectivity Analysis. Stakeholder Workshop June 29, 2017

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Major Bike Routes 102 Avenue Workshop April 21, 2015

42nd Ave N Reconstruction

MASTER BICYCLE AND PEDESTRIAN PLAN

Thank you for attending

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Safe Routes to School: Valverde Elementary Walk Audit Report. Image: CPLIVE, SkyscraperPage.com

Tonight is for you. Learn everything you can. Share all your ideas.

Santa Fe/Kalamath Pedestrian Improvements Study

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

San Jose Transportation Policy

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Norfolk Tide LRT System Weaving Transit in Downtown Norfolk

PEDESTRIAN ACTION PLAN

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study

City of Seattle Edward B. Murray, Mayor

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE


ABOUT THE PROJECT. DOWNTOWN WEST Transportation Planning Study. Pennsylvania Ave. NW: H Street NW: Farragut. K St. NW. North. I St.

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

Bus Rapid Transit Plans

Community Task Force March 14, 2018

Executive Summary Route 30 Corridor Master Plan

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Fitting Light Rail through Well-established Communities

122 Avenue: 107 Street to Fort Road

PEDESTRIAN ACTION PLAN

Providing an Efficient and Multi-modal Transportation System

East Corridor Final Environmental Impact Statement

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

EXECUTIVE SUMMARY. Vision

including infrastructure, transit and open space, Open Space changed approximately 50 to approximately 60

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

CHIEF PEGUIS TRAIL EXTENSION WEST

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Reams Road RCA Study. Board of County Commissioners Public Hearing

Austin Avenue Bridges Project. Public Meeting Summary

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Community Transportation Plan Acknowledgements

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

LOOP 360 IMPROVEMENT STUDY

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

5 CIRCULATION AND STREET DESIGN

City of Birmingham Draft Multi-modal Transportation Plan

Mobility Study Welcome to Public Meeting #1

Plant City Walk-Bike Plan

MAKE YOUR PLACE IN CHANNELSIDE

Arterial Transitway Corridors Study. Ave

Community Task Force July 25, 2017

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

STUDY ADVISORY COMMITTEE. October 8, 2015

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

KEARNY MESA COMMUNITY PLAN UPDATE

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

1. In Reach 3, Perry, Knox, Lowell, and Hooker have crossings identified. What are these?

North Avenue Corridor Study

Land Use and Transportation Town Hall September 17, 2018

It would be an active transportation link to the Metroparks and downtown for Lakewood and the West side of Cleveland.

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

ADVANCED TRANSIT OPERATIONS AND MODELING

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

STONY PLAIN ROAD STREETSCAPE

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Public Meeting #1 January 30, 2018

North Shore Transportation Improvement Strategy

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Moving Ahead. (Community Engagement) Chapter Three

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Board of Supervisors February 27, 2017

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

4. Mobility and Transportation Element. Page Bikes and Pedestrians

Technical Working Group November 15, 2017

YELLOWHEAD TRAIL / 149 STREET INTERCHANGE

TRAFFIC IMPACT STUDY CRITERIA

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Waterford Lakes Small Area Study

Chapter 3: Multi-Modal Circulation and Streetscapes

Transcription:

Welcome! W13 th Realignment Study Public Meeting We are pleased you are here to learn more about the study, and we are eager to hear your ideas. How to get the most out of this meeting: Spend as little or as much time with our staff this evening as you like Listen to the brief presentation at 6:00PM Review each display and talk with our staff to learn more and share your ideas Participate in the interactive activities to help us understand your priorities Complete a comment sheet and place it in the drop box

PROJECT AREA W HOLDEN PLACE W 13TH AVENUE N FEDERAL BOULEVARD N DECATUR STREET N ZUNI STREET 11TH AVENUE

13th Avenue: A Transformative Project The realignment of 13th Avenue was identified in the Decatur-Federal Station Area Plan as a transformative project to improve connectivity in Sun Valley. overview 13th Avenue will be a major east-west connection linking Sun Valley to Downtown Denver across the South Platte River. The realignment will provide greater access and connectivity to a number of key assets, including Auraria Campus, Metro State Recreation Fields, Rude Recreational Center, and the La Alma/Lincoln Park neighborhood. As a major connection across downtown, 13th Avenue will include a robust multi-modal facility for pedestrians and bikers, as well as higher density development and connection to a new riverfront park. recommendations Realign 13th Avenue west of river to connect Federal Boulevard directly to downtown Enhance bike and pedestrian connections along 13th Avenue Celebrate the South Platte River Crossing by creating a gateway Encourage active uses along the street and higher density mixed use to spur reinvestment Connect 13th Avenue to new riverfront drive, park and trails Evaluate impacts of realignment on BNSF freight line FELSBURG HOLT & ULLEVIG

PROJECT SCHEDULE AND GOALS Public Process Data Collection INPUT ON COMMUNITY VALUES Public Meeting JUNE 28TH, 5:00-6:30 PM, SUN VALLEY KITCHEN Stakeholder Workshop Feedback e on range of draft alternatives and Evaluation process Roadway Design/Feasibility INPUT ON PREFERRED ALTERNATIVE Public Meeting (Date to be determined) SEPTEMBER 13TH, 5:00-6:30 PM, SUN VALLEY KITCHEN Stakeholder Workshop Feedback on alternatives and selection of Preferred e Alternative Draft/Final Document 2016 March April May June July August September October November PROJECT GOALS: Study the technical feasibility of realignment alternatives for 13th Avenue Understand and communicate the trade-offs with different alignment alternatives Develop conceptual design and cost estimates for the preferred alternative to help find funding for the project

PREVIOUS AND ONGOING PROJECTS IN SUN VALLEY FEDERAL BLVD 6th Avenue to Holden Study and Design DECATUR-FEDERAL E STATION AREA PLAN Construction Anticipated Summer of 2017 GENERAL PLAN DEVELOPMENT DENVER HOUSING AUTHORITY Master Planning Process WEST LINE AND DECATUR - FEDERAL STATION OPENING N (April, 2013) 13TH AVE REZONING (Oct 2015) CITYWIDE EFFORTS Denver Moves Bikes (completed) Blueprint Denvere Denver Moves Pedestrian & Trails Denver Moves Transit Game Plan FEDERAL BLVD CORRIDOR STUDY 2009 2010 2011 2012 2013 2014 13th AVENUE REALIGNMENT E STUDY 2015 2016 2017

AVERAGE DAILY TRAFFIC 5th St 7th St Curtis St Mile High Stadium Cir 43,500 W Colfax Ave Lakewood Gulch Trail 5,000 36,500 26,500 3,600 40,000 35,500 W 13th Ave 2,100* 3,200** 6,100* W Holden Pl 3,800** 250* 1,500 W 11th Ave 4,200 1,100 4,700 3,600** 1,100 W Barberry Pl 5,500 1,100 8,500 3,400 2,600** Lincoln Park Legend W 14th Ave W 10th Ave W 9th Ave W 8th Ave < 1,000 ADT ADT 1,000-2,500 ADT 2,500-5,000 ADT 5,000-10,000 ADT > 25,000 Zuni St Decatur - Federal Station 10th & Osage Station Alcott Way Clay Way Primary Study Area * 2014 Count ** 2014 Estimate Federal Blvd Wyandot St Tejon St Yuma St Yuma Ct Shoshone St Quivas St Rio Ct 3,300* 249,000 Pecos st Osage St W Mulberry Pl 7,500 Canosa Ct Alcott St Navajo St Vallejo St Mariposa St Decatur St 5,225 25 1,800 1,000 W 6th Ave

Study Hi g es W Colfax Ave t Lin M il e hs St E, W C urtis St D, F, H Lines C, E Lines IS ve 25 Mariposa St Osage St Rio Ct Tejon St Wyandot St Alcott St Canosa Ct Federal Blvd Vallejo St y ve Lines ha Industry Spur ML Main Line * Based on April 5, 2016 field observations; 4:30-5:30 PM 447 Trains per Day (Average) 41 Trains during PM Peak Hour* "Gates down" time ranging from 30 seconds to 3.5 minutes* Gates down approximately 52% of Peak Hour* E, F, H W 8th Ave IS LRT C, D, W Barberry Pl 6t 13th Ave W Mulberry Pl W 9th Ave W LRT Navajo St t Wa Cla y W ay Yuma Ct Alcot W 10th Ave Yuma St W 11th Ave Quivas ivas St Zuni St Lincoln Park s st W Holden Pl Shoshone St W 13th Ave Peco Lak Decatur atur St oo ew ine WL dg Tra IS Primary Study Area il h ulc Legend LRT Light Rail C, D, E, F, H Lines Rio Ct ha 14t 7t C, 13th Ave ML ML W 5th IS 38 Trains per day (Average) 1-2 trains during PM Peak Hour* "Gates down" time ranging from 40 seconds to 6 minutes.* Gates down approximately 9% of Peak Hour* m Cir RAILROAD CROSSINGS hs tad iu W 13th Realignment

LEVEL OF SERVICE B/B Federal Blvd B/B W Holden Pl W 11th Ave W 10th Ave Decatur St c/c W 13th Ave W 11th Ave Alcott Way Zuni St Yuma St 25 A B Legend X/X x/x Explanation of LOS No vehicle waits longer than one signal indication. On rare occasions vehicles wait through more than one signal indication. = AM/PM Peak Hour Signalized Intersection Level of Service = AM/PM Peak Hour Unsignalized Intersection Level of Service = Stop Sign = Traffic Signal C Intermittently vehicles wait through more than one signal indication, occasionally backups may develop, traffic flow still stable and acceptable. b/b a/b

W 13th Realignment Study hs hs Hi g M il e t St Existing C u r t is S t Off-street Multi-use Trail Bike ve 25 i t Wa Yuma Ct Alcot Alcott St W 7th Ave Canosa Ct W Frog Hollow Park Primary Study Area Proposed Protected Bike Proposed Shared Roadway Navajo St e ir Barnum Park Federal Blvd W 6t ha ve W 8th Ave Tejon St W Barberry Pl Wyandot St G u il lch T r a 10th & Osage Station Proposed W Mulberry Pl W 9th Ave Decatur - Federal Station Proposed Bike Vallejo St y Cla y W ay Yuma St W 11th Ave W 10th Ave Mariposa St Osage St Lincoln Park s st W Holden Pl Zuni St W 13th Ave Quivas St Trail Trail Access iver tte R a l P h Sout o kew Gu Shared Use Sidewalk Peco La od lc Decatur atur St S l ra h T Shared Roadway Rio Ct ha Shoshone St 14t W W Colfax Ave Legend 7t 5th tad iu m Cir BIKE ROUTES Proposed Shared Use Sidewalk Proposed Buffered Bike

TRANSIT ROUTES 5th St 7th St W Colfax Ave Legend Curtis St C, E, W Lines Decatur - Federal Station 10th & Osage Station Bus Stop in Primary Study Area Lincoln Park 16 West Colfax 1 West 1st Ave 33 Platte Valley 9 West 10th Ave 30 South Federal 36L Fort Logan Limited W Line C, D, E, F, H Lines Primary Study Area Zuni St W 14th Ave W 11th Ave Alcott Way Clay Way W 10th Ave W 9th Ave W 8th Ave W Mulberry Pl Federal Blvd Canosa Ct Alcott St Yuma St Wyandot St Yuma Ct Tejon St Shoshone St Quivas St Rio Ct Pecos st Navajo St Vallejo St Osage St Mariposa St Mile High Stadium Cir W 13th Ave Decatur St W Line W Holden Pl W Barberry Pl D, F, H Lines C, D, E, F, H Lines 25 C, E Lines Z i St Lakewood Gulch Trail A W 6th Ave

W 13th Realignment Study EXISTING CROSS SECTIONS 3 Federal Boulevard W. 13th Avenue Zuni Street 5 Decatur Street 2 Holden Place 1 25 6 4 11th Avenue Shldr 6' Bike 1 10' Turn 10' 6' Bike Shldr SW 2 FHU1984 COLORADO FHU1984 COLORADO FHU1984 COLORADO 8' Sidewalk 4 10' 18' Lan ne/parking /Parking 7' Tree Lawn 12' 1 La 7' Tree Lawn 9' Sidewalk 18' 12' Sidewalk 3 18' FHU1984 COLORADO FHU1984 COLORADO 70' Approximate Right of Way 60' Approximate Righ Right of Way 77' Approximate Right of Way LOOKING WEST LOOKING WEST LOOKING NORTH 19' 19' 12' Tree Lawn 7' Tree Lawn SW SW 18' /Parrking /Parking 18' COLORADO SW 4' SW 30' /Parking 6 5 FHU1984 7' Tree Lawn 12' Sidewalk 7' Tree Lawn 77' Approximate Right of Way 60' 60 0' Approximate Approximat Right of Way 60' Approximate Right of Way LOOKING NORTH LOOKING WEST LOOKING WEST SW

COMMUNITY VALUES IN SUN VALLEY, HOW IMPORTANT DO YOU FEEL IT IS TO: VERY UNIMPORTANT UNIMPORTANT NEUTRAL IMPORTANT VERY IMPORTANT Improve access to public transit Provide better walking connections Provide better biking connections Keep on-street parking on W. 13th Ave. and W. Holden Pl. Have safe streets with slow speeds Have safe streets with separate spaces for different users (walk, bike, car) Make improvements that attract residents and businesses Limit land impacts to businesses and homes Keep the existing character Other: Please add other values