Hazardous Energy Control/Lockout

Similar documents
Control of Hazardous Energy Lockout / Tagout Program

LOCKOUT/TAGOUT PLAN August 2015

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY)

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

Lockout Tagout Program

Lockout / Tag out Program

Lock Out/Tag Out Control of Hazardous Energy

Lockout/Tagout Program

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

University of Arkansas Office of Environmental Health and Safety

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

LO/TO LOCKOUT/TAGOUT PROGRAM

H. Control of Hazardous Energy: Lockout/Tag Out

LOCKOUT/TAGOUT PROGRAM

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

Lockout/Tagout Training Overview. Safety Fest 2013

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

Health, Safety, Security and Environment

Lockout/Tagout - Energy Control Program

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

Hazardous Energy Control (Lockout-Tagout)

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

Lockout/Tagout Program

LOCKOUT/TAGOUT PROGRAM

Lockout/Energy Control

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

230-LOCKOUT/TAGOUT PROGRAM

Facilities Management

Lockout/Tagout Manual

THE UNIVERSITY OF NORTH CAROLINA

CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

Lockout / Tagout Safety Program

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM

LOCKOUT-TAGOUT PROGRAM

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

Lockout/Tagout Safety Policy

Energy Control Procedures Lockout/Tagout 29 CFR

Lockout Tagout Policy

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

RiskTopics. Lockout/Tagout October 2017

LOCKOUT/TAGOUT PROGRAM

The Control of Hazardous Energy (Lockout/Tagout) California State University Chico

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

Lockout/Tagout Program

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

Big 5 Site Training Support Information

LOCKOUT / TAGOUT PROGRAM

Control of Hazardous Energy Program (Lockout/Tagout)

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

Elements of a Lockout/Tagout Program OSHA

Control of Hazardous Energy (Lockout/Tag-out) 29 CFR

Lockout/Tagout - Control of Hazardous Energy Program

This session covers the safety procedure known as lockout/tagout, which is required by Occupational Safety and Health Administration (OSHA) in its

General Lockout Training Briefing

Health and Fire Safety Review 2/15

Control of Hazardous Energy. Environmental Health and Safety

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

University of Tennessee Safety Program

2523-LDG-E. Leader s Guide

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

Product Information Report Lockout/Tagout Hazardous Energy Control

Safety Manual: Hazardous Energy. January, 2017

UCHC Lockout/Tagout Policy (4/09)

Hazardous Energies Control and Lockout/Tagout Program

Texas Department of Insurance Division of Workers Compensation. Lockout Tagout HS96-100D (8-06)

Environmental Health & Safety Programs

SAINT MARY S COLLEGE OF CALIFORNIA STANDARD HAZARDOUS ENERGY CONTROL PROGRAM INCLUDING LOCKOUT/TAGOUT. Prepared by

Environmental Health & Safety

Lockout Tagout Program

Lock-out Tag-out Program (Zero Energy State)

LOCKOUT TAGOUT. Quick Reference FAQs REQUIREMENTS OF THE STANDARD COMMONLY USED TERMS

Hazardous Energy Lockout Standard. Safety Resources

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Hazardous Energy Program Lockout/Tagout

Control of Hazardous Energy Program (LOTO)

Reviewed: 11/1/12 Effective: 2/1/13 Supersedes: 06/08 Preparer: Owner: Approver: EHS Hub Team Member EHS Hub Team Member EHS Hub Manager

Lockout/Tagout. Page. Introduction. Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4.

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

Lockout Tagout Program

Lockout/Tagout And Alternative Methods

University of Illinois at Chicago. Control of Hazardous Energy Program (Lockout/Tagout)

LOCKOUT/TAGOUT POLICY

PROGRAM: Control of Hazardous Energy (LOCKOUT) Chapter 5

LOCK OUT \ TAG OUT PROGRAM

Lock Out - Tag Out Safety Program

MCW s Control of Hazardous Energy Program

ANNUAL IDOL COMPLIANCE TRAINING

University of Vermont Department of Physical Plant Burlington, Vermont

Environmental Health and Safety (EH&S) Revision Date: Initial. Prepared by: EH&S and Facility Management and Campus Services (FMS)

MORE HIGH-IMPACT LOCKOUT/TAGOUT SAFETY TRAINING

The Proper Procedure

Hazardous Energy Control Lockout/Tagout

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary?

Transcription:

This is a photographic template your photograph should fit precisely within this rectangle. Hazardous Energy Control/Lockout MESH 8.0 - Process Safety Awareness Training 2008 Eaton Corporation. All rights reserved.

Scope/Purpose The hazardous energy control/lockout program establishes requirements for the control of hazardous energy Covers maintenance and servicing tasks when unexpected activation or release of stored energy can occur Primary purpose of the program is to furnish lockout procedures that will reduce the risk of injury to employees and contractors performing maintenance and servicing tasks on equipment 2 2

Definitions Person The individual who operates equipment or an individual who works in an area in which servicing or maintenance activities under lockout are being performed. Person The individual who is authorized to lockout a piece of equipment in order to perform servicing or maintenance activities Stored Energy A potential hazard that exists after a primary energy source has been locked out. For example, a pump motor for a hydraulic system may be locked out, effectively stopping fluid flow, but energy in the form of hydraulic pressure may still exist in the machine or hydraulic line. This pressure must be released before work proceeds. Zero Energy State When all sources of hazardous energy have been locked out and stored energy has been released such that the possibility of unexpected activation or movement has been eliminated. 3 3

Definitions Energy Control Energy control is the process of turning off a piece of equipment, placing a lock on each source of hazardous energy Energy control also involves releasing stored energy in order to bring the equipment to a zero energy state Energy control is also called lockout 4 4

Definitions Hazardous Energy Hazardous energy is any level of energy present in a piece of equipment that can cause unexpected activation, start-up, or movement that can cause injury. Types of hazardous energy include: Electrical Pneumatic (Pressurized Air) Chemical (Ammonia, Natural Gas, Nitrogen, Coolants) Hydraulic (Fluids Under Pressure) Water Thermal (Hot or Cold) Radiation Magnetic Stored Energy Rotation Gravity Tension 5 5

Application Lockout must be used when performing SERVICING OR MAINTENANCE on equipment when a safeguard is bypassed or when any part of the body is placed into an area where injury would result if the equipment starts unexpectedly (danger zone) Minor servicing activities which take place during NORMAL PRODUCTION OPERATIONS do not require the use of lockout provided that the tasks are routine, repetitive, and integral to the use of the equipment for production and safeguarding or another approved method is provided to protect operators performing the task 6 6

Application CONTINUED Lockout is NOT required for plug connected equipment if the equipment or tool can be unplugged, nor is an equipment specific procedure required. The person performing work on the piece of equipment must unplug the equipment before beginning work The plug must be under the exclusive control of the person performing the work 7 7

Work Permits Partial Energy Work Permit There may be situations when a piece of equipment must be partially energized to perform a tasks. A Partial Energy Work Permit must be utilized to authorize such activities Work on partially energized equipment is only allowed when it is absolutely necessary for energy to be present Convenience or time savings may not be used as justification Line Breaking Permit A Line Breaking Permit is required whenever breaking into a hazardous substance line. Hazardous substance process lines include: Fluids or gases at pressures greater than 10 psig (0.7 bar) Thermal temperatures > 135 o F (57 o C) or < 41 o F (5 o C) Liquids with a flash point less than 100 o F (38 o C) Any substance for which an SDS is required to be maintained Hazardous substance process lines at Sumter include: Compressed air distribution lines Natural gas lines Wastewater conveyance lines Water lines Oxygen lines Paint Line Washer Feed 8 lines 8

Energy Isolation Devices An energy isolation device is a physical device that prevents the transmission or release of energy Examples include: Electrical disconnects Circuit breakers Lockable valves Blanks or blinds Blocks/pins under suspended objects 9 9

Energy Isolation Devices CONTINUED Can emergency stops, feed hold buttons, or key switches be used for lockout? No. Locking of buttons or other control circuitry such as PLC controls does not qualify as energy isolation. Control circuits can fail due to component failure, program errors, magnetic field interference, electrical surges, improper use, or lack of maintenance. When lockout is required, electrical energy must be isolated using an approved energy isolation device such as an electrical disconnect or circuit breaker that provides a physical separation between the hazardous energy source and machine. 10 10

Equipment-Specific Procedures CONTINUED Written energy control procedures are required for each piece of equipment These procedures tell us the steps that we must take in order to bring the equipment to a zero energy state and must be located on the equipment. Lockout procedures must contain the following information: Equipment identification; Identification of applicable production-related tasks that require lockout; The type and magnitude of all hazardous energy sources; List of all energy isolation devices; Specific steps necessary to obtain zero energy state; and Specific steps for verifying that stored energy has been released and the machine is in a zero energy state condition The applicable written energy control procedure must be reviewed by employees before locking out a piece of equipment. 11 11

Locks The use of tags without locks is not permitted for lockout. All employees working on a piece of equipment must affix locks to the applicable energy isolating devices in accordance with the written procedure Employees may not work under the protection of another employee s lock Locks used for energy control may only have one key May not be used for any other purposes Red Personal Locks Never remove a lock you did not place unless you are following the lock removal procedure Green Out of Service locks Blue Group Locks 12 12

Basic Lockout Sequence 10 - Complete the work 9 - Maintain key to locks 8 - Verify zero energy state 7 - Verify that e-stops have been released 6 - Place red lock on each energy isolation device 5 - Affix a multi-lock hasp to each energy isolation device 4 - Place lockout adaptors on energy isolation devices IF REQUIRED 3 - Turn off energy isolation devices listed in written procedure 2 - Bring equipment to a complete stop 1 - Notify employees in area that the equipment will be locked out 13 13

Contractors Contractors must follow Eaton Energy Control policies. Eaton will issue each contractor employee a sufficient number of RED locks if they do not have their own. Equipment lockout will be supervised by an Eaton supervisor RED locks must be returned to Eaton at the end of the project 14 14

Inspections and Review Periodic documented inspections will be conducted at least quarterly as a spot check to verify that energy control is utilized properly Verification of Proficiency is performed annually to evaluate each individual s energy control competency Annual review of Energy Control program must be completed 15 15

16 16