OPERATION AND MAINTENANCE MANUAL

Similar documents
TECHNICAL DATA. than the water inlet pressure to the concentrate

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

Model MTB-ASME Vertical Bladder Tanks

Model MTB-ASME Vertical Bladder Tanks

Model MTB-ASME Horizontal Bladder Tanks

FOAM TANK (1/2) DATA SHEET

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Bladder Tank Installation & System Design Information

FOAM TANK (1/2) DATA SHEET

Wet pipe low flow foam/water system

WW-720. Pressure Reducing Control Valve

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

INSTALLATION OPERATION MAINTENANCE

WW-720. Pressure Reducing Control Valve

OBSOLETE. Wet pipe low flow manifold system

WW-730. Pressure Sustaining/Relief Control Valve

Horizontal Bladder Tanks

Vertical Bladder Tanks

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate

Bermad Model:

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

Standard Operating and Maintenance Instructions for Pumping System Model PS-90

AIR-OPERATED DOUBLE DIAPHRAGM PUMP USER S MANUAL

TECHNICAL DATA. Dry 132a. October 1, 2008

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

VERTICAL BLADDER TANK

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate

TECHNICAL DATA Q= C. Table 1 - Specifications

Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel

Cozumel Turbodraft. Operational Considerations

Foam Mixers & Proportioning Systems

Digester Processes. 1. Raw Sludge Pumping System

ACCU-PULSE Installation and Operation Instructions

TOP VALVE. Pat. #5,857,486 & 5,944,050. Mid-Range Pressure PSIG Back Pressure and Pressure Relief Valves. Instruction Manual

OPERATION MANUAL NTF-15

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1

BLADDER TANK PROPORTIONING SYSTEM PRE-PIPED

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

Installation, Operation and Maintenance Instructions Buffer Vessel OM006

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

ASTRA - DRY PIPE VALVES GROOVE/GROOVE

WPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE

TECHNICAL DATA. Table 1 - Specifications

Bermad Pressure Reducing. Model: 42T

BALANCED PRESSURE PROPORTIONERS

INSTALLATION, OPERATION & MAINTENANCE MANUAL

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

TECHNICAL DATA NOTICE

HORIZONTAL BLADDER TANK

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

ANSUL. Part No

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Unit 24: Applications of Pneumatics and Hydraulics

Model: 43T. Bermad Pressure Relief Valve

CONCENTRATE CONTROL SYSTEM

VIKING OBSOLETE CONCENTRATE CONTROL SYSTEM OPERATING, MAINTENANCE, AND FILLING MANUAL. Vertical And Horizontal Bladder Tanks

INJECTION ODORIZING SYSTEMS : DOSAODOR TYPE

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

HIGH RATE BASKET STRAINER

Cash Valve TYPE KP PILOT OPERATED BACK PRESSURE VALVE. ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 9001 Certified

VALVES & MEASUREMENT

SABERINDO PACIF SABERINDO PACIFIC CIFIC SABERINDO PA. A Tyco International Company

WHEATLEY Series 500 Swing Check Valve

OBSOLETE DESIGN DATA. Foam 301a. February 9, 1998

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Injection Systems INSTALLATION AND OPERATING GUIDE HI FLO VERTICAL TANK SYSTEMS

Fisher DVI Desuperheater Venturi Inline

OPERATION MANUAL NTF-60 Plus

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

from Thames Cryogenics Ltd Total Cryogenic Solutions Cryogenic Cluster Day 22/09/2010

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger

TOP VALVE. Pat. #5,857,486 & 5,944,050. High Temperature: max. 300 F (149 C) Back Pressure And Pressure Relief Valves. Instruction Manual

FUNDAMENTALS OF PRESSURE RELIEF VALVES IN NATURAL GAS INSTALLATION - OPERATION - MAINTENANCE. Gary S. Beckett

TECHNICAL DATA PILOT PRESSURE REGULATED DELUGE SYSTEM CONTROLLED BY PNEUMATIC RELEASE. 1. DESCRIPTION (Refer to Figures 1, 2 or 3.

TECHNICAL DATA PILOT PRESSURE REGULATED DELUGE SYSTEM CONTROLLED BY ELECTRIC RELEASE 1. DESCRIPTION 2. LISTINGS AND APPROVALS 3.

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

Vertical and Horizontal Bladder Tanks

VTL VFL VCL. Low Profile Series V RIGGING & ASSEMBLY INSTRUCTIONS

1800C and 1800C-HC Series Service Regulators

Accu-Tab PowerBase 3012AT by Axiall Corporation

553 Series.

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

BUTTERFLY VALVES Series 800

I T T Pressure Reducing Valve WARNING INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Installation, Operation and Maintenance Instructions for Direct Hot Water Storage Vessels

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

Standard Operating and Maintenance Instructions for Pumping System Model PS-150

Installation, Operation and Maintenance Manual for Back Pressure Regulator

TECHNICAL DATA OBSOLETE

LAKOS Waterworks. PWC Series Sand Separators. Installation & Operation Manual LS-829 (10/12)

1200B2 Series Service Regulators. Instruction Manual

KTM 50 (DN ) Installation, maintenance and operating instructions

Assembly-, installation- and maintenance instruction manual for bladder accumulators IBV / EBV , top reparable

S & M Water Consultants

Transcription:

OPERATION AND MAINTENANCE MANUAL Skum Bladder Tank Type Vertical. Table of Contents Page General Description 2 1. Installation 1.1 Safety 2 1.2 Transporting 2 1.3 Inspection 2 1.4 Filling Instruction 3-7 2. Maintenance and Inspection 2.1 Maintenance 8 2.2 Inspection 8 3. Trouble Shooting 8 4. Repair 8 Svenska Skum AB Tel: +46 303 57700 Page 1 of 8

General Description The new Skum Bladder Tank is designed to meet a wide variety of demands for many different applications. The bladder tank system will inject foam concentrate in to the water supply piping. This system will automatically and accurately proportion over a wide range of flows and pressures. The required percentage can easily be set at the TP/TPW unit (proportioner). The water supply feeds and pressurises the TP/TPW unit; this pressure also pressurises the Tank. This means that the foam concentrate have the same pressure through the elastic bladder inside the Tank. This pressure wills therefore feed the TP/TPW unit with foam concentrate from a pipe, and downstream after the proportioner the premix has the right mixing rate. 1. INSTALLATION 1.1 Safety The installation is uncomplicated but must be carried out by qualified personnel. The directions given in this manual must be followed. Make sure that the bladder tank and its components are safely secured when installing and running the bladder tank system. Use only lifting gear and equipment that are well suited for the purpose. 1.2 Transporting During transport the air surrounding the bladder is evacuated to form a vacuum to prevent damages to the bladder, do not open valves. 1.3 Inspection Inspect the bladder tank and any additional equipment for damage that might have occurred during transport. Check marking and signs of the equipment against material specification / order confirmation. Locate the tank in it s correct location and complete the pre-piping. Svenska Skum AB Tel: +46 303 57700 Page 2 of 8

1.4 Filling The instructions and methods must be followed to prevent personal injury and damages to the equipment. When filling the tank use suitable equipment, to prevent spillage use an overflow tube attached to the vent of the water and foam concentrate. Caution: foam concentrate on the Tank is very slippery. Keep the tank and the floor clean from foam concentrate. During transport of the tank, the bladder is filled with air, to ensure it retains the right position in the tank shell. All valves will be closed from factory. 1.4.1 Normal Stand-By position The normal Stand-By Position valve status: Valve 1 closed Valve 2 closed. Valve 3 closed. Valve 4 open. Valve 5 closed. Valve 6 closed. Valve 7 open, connection foam concentrate. Valve 8, swing check valve or a closed Water Activated Foam Valve. Water vent Foam vent Level indicator Water drain Foam Concentrate Supply Water Non-return valve (alt. WAFV) Foam solution Proportioner TP/TPW Svenska Skum AB Tel: +46 303 57700 Page 3 of 8

1.4.2 Initial Filling Inspect that all valves are closed. To let the air out, open first valve 2 and then valve 1, then open valve 3. Connect the foam concentrate pump to the feeding pipe (pos 8), and then start the pump. Open valve 7 slowly. The tank indicates that it is almost filled when foam and air bubbles mixed together detected in valve 2, continue to fill until foam concentrate without air bubbles appears in valve 2. The tank is now completely full. Close valve 2 and valve 7, shut of the hand pump and remove it, then close valve 1 and valve 3. Open valve 4 and valve 5. The bladder tank system is now in normal Stand-By position and is ready to be activated. Note! If the check swing valve pos 8 has been replaced with a Water Activated Valve, it must remain to be closed. Hand pump filling Foam Concentrate Svenska Skum AB Tel: +46 303 57700 Page 4 of 8

1.4.3 Filling after discharge Caution: The bladder tank may be under pressure when opening valves. Do not put body or face in front of valve before pressure has been vented. Isolate the tank by closing valve 4 and valve 5. Carefully vent pressure from tank by open valve 1. To prevent spillage on the tank and floor use an overflow tube to the vent of the water and foam concentrate. Connect the foam concentrate pump to the feeding pipe. Start pump, then open valve 7 slowly. The Tank indicates that it is almost filled when foam and air bubbles mixed together detected in valve 2, continue to fill until foam without air bubbles appears in valve 2 and water stops flowing from valve 1. The tank is now completely full. Stop the pump, close valve 2 and valve 7, remove the pump, then close valve 1. Open valve 4 and valve 5. The bladder tank system is now in normal Stand- By position and is ready to be activated. Note! If the check swing valve pos 8 has been replaced with a Water Activated Valve, it must remain to be closed. Hand pump filling Foam Concentrate Svenska Skum AB Tel: +46 303 57700 Page 5 of 8

1.4.4 Manual Filling Manual filling should only be required when very small amounts of foam concentrate need to be replaced, otherwise use pump. Caution: The bladder tank may be under pressure when opening valves. Do not put body or face in front of valve before pressure has been vented. Manual Filling Isolate the tank by closing valve 4 and valve 5. Carefully vent pressure from tank by opening valve 1. Open valve 3 and let all water drain from the tank. The amount of drained water indicates the required amount of foam concentrate that needs to be filled. Open valve 2 and hand fill the tank with suitable equipment. When foam and air bubbles mixed together are detected in valve 2 stop fill and wait for the air bubbles to rise to the surface, this could take a while. Repeat filling procedure until foam without air bubbles appears in valve 2 and water stops flowing from valve 1. Use an overflow tube to drain the water at valve 1 and valve 3. The foam concentrate is very slippery, clean the tank and the floor from foam concentrate to avoid injuries. Close valve 2 then valve 1 and valve 3. Open valve 4 and valve 5. The bladder tank system is now in normal Stand-By position and is ready to be activated. Note! If the check swing valve pos 8 has been replaced with a Water Activated Valve, it must remain to be closed. Svenska Skum AB Tel: +46 303 57700 Page 6 of 8

1.4.5 Level Indication (optional) To read/find the level of foam concentrate in the tank. Isolate the tank by close valve 4 and valve 5. Carefully vent pressure from the tank by opening valve 1. Open valve 3 and let the water drain from the tank, then open valve 2. Open valve 6 and measure foam concentrate level; this may take some time. If the system needs to be filled, follow the instruction 1.3.3 or 1.3.4. If the foam concentrate level is acceptable and does not need to be refilled. Level indicator Close valve 6 and valve 3. Fill the tank with water at valve 1, when the tank is full with water close valve 1 and valve 2. Open valve 4 and valve 5. The bladder tank system is now in normal Stand-By position and is ready to be activated. Note! If the check swing valve pos 8 has been replaced with a Water Activated Valve, it must remain to be closed. Svenska Skum AB Tel: +46 303 57700 Page 7 of 8

2. Maintenance and Inspection 2.1 Maintenance Check all valves to insure that they are in the normal Stand-By position according to instruction in 1.4.1. After using the system, close valve 5 and valve 4 flush the proportioner and the system by allowing the main water supply to flow until clear water issues from devices (foam generators, sprinkler heads etc) being operated. Open valve 4 and valve 5. The bladder tank system is now in normal Stand-By position and is ready to be activated. Note! If the check swing valve pos 8 has been replaced with a Water Activated Valve, it must be closed manual by using the handle sitting on top of the valve. 2.2 Inspection Inspect the system for physical damage and repair. Check flanges and piping for leakage. Check flange bolts for tightness. Inspect the fire water supply system to ensure that it will be operational when required. 3. Trouble Shooting Check all valves to ensure that they are in the normal Stand-By position. If using motor driven control valves make sure there is power. Ensure that there is freedom of movements in the valves. Make sure that there is foam concentrate in the bladder. Make sure that water supply system deliver right pressure and flow. If the system still does not work properly, contact your Supplier or Svenska Skum for advice. 4. Repair Personell familiar with the system and this type of work must carry out repair on the Skum bladder tank system. Contact your supplier or Svenska Skum for advice. Svenska Skum AB Tel: +46 303 57700 Page 8 of 8