RAIMONDI. 3-way globe valve for feedwater heater outlet bypass Installation and Maintenance Instructions

Similar documents
Sempell High Pressure Forged Check Valves Forged steel, swing check and tilting disc configuration

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Installation & Operation Manual Proven Quality since 1892

Engineering Data Sheet

INSTALLATION, OPERATION & MAINTENANCE MANUAL

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

VALVES & MEASUREMENT

INSTRUCTION MANUAL. Anchor Darling 800 Globe Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Installation, Operation and Maintenance Manual for Back Pressure Regulator

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

Operating instruction

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

PC3_ and PC4_ Pipeline Connectors

DelVal Flow Controls Private limited

CARTRIDGE FILTERS TECHNICAL MANUAL MT 080. Installation, commissioning and maintenance instructions. 08/02 Edition

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

Telefon (+45) Telefax (+45)

VALVE GLOBE CAM TS OF 11 DOC NO REV. NO DATE PAGE NO. maximum life. DESIGN CONDITION 1g of force in. property damage.

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

Manual Actuated Boiler Blowdown Valves

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

WHEATLEY Series 500 Swing Check Valve

BUTTERFLY VALVES Series 800

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

FLANGED MULTI-PORT BALL VALVES

Eaton Filtration, LLC

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

Eaton Filtration, LLC

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25

1.0 - OPENING AND CLOSING THE DOOR

BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

FLANGED TWO-PIECE BALL VALVES

KTM V-PORT CONTROL BALL VALVES INSTALLATION AND OPERATION MANUAL

FLANGED TWO-PIECE BALL VALVES

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

Fisher and Whisper Disk Diffusers

INSTRUCTIONS AND MAINTENANCE MANUAL SERIES: FK

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

Pure-Flo Handwheel Operated Valves (903, 913, 963) Instruction Manual

TITAN FLOW CONTROL, INC.

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

INSTRUCTIONS AND MAINTENANCE MANUAL SERIES: RT

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

INSTALLATION, OPERATION and MAINTENANCE MANUAL

A3S Bellows Sealed Stop Valve Installation and Maintenance Instructions

KECKLEY. Installation, Operation, and Maintenance Manual. Style KGV - Knife Gate Valve

Crosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY

SV5 Safety Valve Installation and Maintenance Instructions

MANUALLY OPERATED VALVE VLM SYNCROFLUX TECHNICAL MANUAL MT042/E

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

INSTRUCTIONS AND MAINTENANCE MANUAL SERIES: K

KENNEDY VALVE RESILIENT WEDGE GATE VALVE MAINTENANCE MANUAL

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

Installation Troubleshooting Maintenance Instructions Installation / Start-up

Installation Instructions For Flat Seated Bolted Type RAH Series Disk Holders

Atmospheric relief valve type 1100 Installation and maintenance instructions

BCV31 DN20 - Blowdown Control Valve

USER INSTRUCTIONS. NAF Duball DL Ball Valves. Installation Operation Maintenance. Experience In Motion. flowserve.com

KTM METALTITE BALL VALVES - FLOATING TYPE INSTALLATION AND OPERATION MANUAL

INSTALLATION & MAINTENANCE INSTRUCTION

Constant Pressure Crude Oil Container Model CPCCP

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

Serie 06-M6. Swing wafer check valve. made in. Application fields. Check valves E U R O P E WATER CONDITIONING INDUSTRY

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Pure-Flo Handwheel Operated Valves (970) Instruction Manual

DIRECT DRIVE DIXIE DOUBLE SEAMER Model 25D

Pneumatic switch module 3/2-way valve (On/Off) Types P Types FP Function tested for use of the float in Ex-zone 0

TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions

Declaration of Conformity as per Directive 97/23/EC

OPERATING AND MAINTENANCE MANUAL ALFA SPLIT BODY TRUNNION MOUNTED BALL VALVES Model ALFA T2 (Valid for S.B. valves both for D.B.B.

Threaded Closures Installation, Operation & Maintenance

1. Preface Important Safety Notes Brief Product Information Product Working Principle Installation Guidelines...

Control Valves ZK 610 ZK 613

Control Valve ZK 29. Original Installation Instructions

THE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

Pressure Reducing Valve DMV 750 set range: bar

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

Installation, Operation, and Maintenance Manual

GREIG FILTERS, INC. OPERATION MANUAL

Instruction Manual. Alfa Laval SB Membrane Sample Valve ESE02963-EN Original manual

WW-720. Pressure Reducing Control Valve

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Welker Magnetic Indicator (With Gravity Mixer) Model CP2GM-HP

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

Transcription:

RAIMONDI Index Introduction 1 1. Verification upon receipt and storage before installation 1 2. Handling 1 3. Installation 2 4. Scheduled maintenance 2 5. Possible damage and relevant solutions 3 6. Disassembly instructions 4 7. Assembly instructions 4 8. Spare parts list 5 9. Enclosures 6 Introduction This manual provides guidelines to be observed for the following operations: storage installation into the pipeline maintenance preservation The manual is intended for the following personnel/staff: plant warehouse staff installers maintenance engineers This symbol means and indicates all matters relating to safety. Please read the warning notices carefully and follow the instructions. These serve to guarantee your safety and to prevent damage to people and property. In addition to the instructions in this manual, specific plant safety regulations must always be followed. It is recommended that this manual is read carefully and entirely, before starting any maintenance, in order to optimize intervention timing, and to ensure that suggested spare parts and gaskets are available in the event of valve assembly. For installation and maintenance operations no specific equipment or tools are required, other than those usually available in the plant. Fig. 1 - Valve lifting and handling Emerson is always at the Customer s disposal for any further technical information. 1. Verification upon receipt and storage before installation When the materials arrive, it is recommended to: Check the integrity of the case. Open the case and verify that there is no damage due to transportation. Do not open the barrier bag (if present). Verify that the contents are those stated on the packing list. Store the valves (unless damaged) in their original packaging. Please observe the following: 1. Store the valves in a closed, clean and dry storage room. 2. Do not place packages directly on the ground. 3. Check the packages every two months. 4. Substitute the silica gel every six months. This is not applicable in the case of barrier bag packages. 2. Handling During handling operations, valves must be lifted and handled as indicated in fig. 1 by using lifting equipment (fasteners, hooks, etc.) that must be sized and selected on the basis of valve weight (indicated in the drawings). If there are any eyebolts in the valve body, these can be used to lift the valve. Do not use any lifting points located on the actuator to lift the valve. These lifting points are to lift the actuator only. Lifting and handling must be done only by qualified personnel. Do not use any lifting straps that are either damaged or of inadequate/unknown size. www.valves.emerson.com Emerson reserves the right to change the contents without notice RAIIC-0052-EN-1310

3. Installation For correct operation, the valves must be installed in horizontal pipes with the stem in vertical position. If installed in vertical lines or in horizontal lines with the stem not vertical, maintenance is much more difficult. Any installation position other than those indicated may cause incorrect operation and/or rapid deterioration. The following operations must be performed only immediately before the installation: 1. Remove the protection caps of the end faces. 2. Check the upstream and downstream pipeline sections. Make sure that there are no solid particles or any other kind of dirt or debris inside. If necessary, clean carefully by using an air line. 3. Pay attention to the flow direction. Before starting the installation of the valve, please verify that: the valve class is suitable for the required operating pressure, and the materials of construction are suitable for the intended service (type of process fluid). Fig. 2 - Possible installation positions Verify that the flow direction of the line corresponds to the flow direction indicated by the arrow on the valve body. General notes In order to avoid damage during welding and post welding heat treatment, we suggest to disassemble the internal part following the instructions given in section 6 of this manual. In case that one end of the valve is not connected to the line for a period of time longer than half a day, the open end must be properly closed and sealed in order to prevent entry of dirt or debris. Check that there is sufficient space to easily disassemble the valve. Position the valve and verify its alignment with the pipe. Proceed with welding in accordance with the procedure indicated by the engineering company that designed the plant. During site welding of the valve to the pipe, the valve and adjacent piping must be supported so that the pipeline stresses are not transmitted to the valve body. Usually, the first weld layer will be made with TIG, while following weld layers will be made with the appropriate electrode for the valve body material. Welding and stress relieving procedures should conform to the applicable code or standard. Position the valve and verify its alignment with the pipe. Proceed with the welding operation in Protect eyes with appropriate welding masks or goggles during all welding operations. 4. Scheduled maintenance 4.1 Routine inspection Normal check Verify once a month that there is no leakage from packing or in the body/bonnet area. a. In case of leakage from the packing, tighten the appropriate gland nuts and bolts according to the procedures described in the assembly section. b. In case of leakage from the body/bonnet gasket, tighten the bonnet support bolts as stated in the re-assembly procedure. Otherwise de-pressurize the line as soon as possible in order to prevent erosion. Verify bearings greasing and stem thread every two or three months, depending on operating frequency. For actuated valves, refer also to the actuator manual in addition to the above. Preventive Verify the tightness of gland bolts every three months. Grease the stem and bearings every six months for motorized valves and every eight months for hand-operated valves. Check the travel of the gland follower every twelve months. Install a new packing when the end of the travel is approaching. Disassemble critical and/or actuated valves every four years. Verify the sealing surfaces and lap them if necessary. Substitute the bonnet gasket and the packing. Grease the stem. For the actuator, proceed as indicated in its maintenance manual. Emerson reserves the right to change the contents without notice page 2

5. Troubleshooting guide Below is a list with the most common problems. 5.1 Leakage from the packing When there is humidity or droplets near the packing area, the stem or the gland, and these cannot be corrected by tightening the gland bolts, you may want continuing the work of the line until the first stop of the plant. In this case, the stem can be set in backseat position, verifying the following: Packing may have hardened. In this case, it must be replaced. The gland is at the end of its travel. This means that the packing cannot be compressed. Packing must be replaced. Scratches, scorings or other marks may be found in the stem. It may also have got bound. In these cases, the stem must be replaced. The gland may be jammed on the stem because of a non-uniform tightness of the gland bolts. Release the gland bolts. Move the gland and set it again; then tighten the bolts progressively. 5.2 Leakage from body/bonnet joint Leakage under operation from the pressure seal joint requires immediate action, since it may cause major damage to the valve rapidly. Typical causes for leakage are: Previous incorrect reassembly of the valve. Re-using pressure seal gasket. A defect inside the valve body. 5.3 Leakage between seat and disc In case of leakage between seat and disc, we recommend to perform closing and opening operations with a pressure differential. If leakage persists, check that: No foreign material is locked between seat and disc, scoring the sealing surfaces. No foreign material is deposited between the seats, thus preventing the disc from closing. Incomplete previous closing allowed the fluid to impact onto the seal surfaces, eroding these. The valve has been used for line flushing, and therefore seats have been damaged by foreign material. For all the above cases it is absolutely necessary to disassemble the valve as soon as possible and proceed with an inspection of the internal parts in order to reduce further damage. 5.4 Jamming of valve along the stroke If a higher torque is required at some points along the stroke when opening/closing the valve, proceed as follows: Examine the stem and make sure that there is no picking-up in either the smooth or the threaded parts. Disassemble the valve, as a seizure may be starting to form between body guides and disc. 5.5 Problems relevant to motor operators For these problems, refer to the actuator instruction manual. Emerson reserves the right to change the contents without notice page 3

6. Disassembly Instructions Below are the procedures to follow to disassemble valves. Before starting any operation, it is important to: identify the problem clean the area around the valve that is to be disassembled arrange for a box and/or a pallet for all components arrange for a polyethylene sheet to protect all components and to avoid that any particles inadvertently enter the body. 1. Fully close valve. 2. Loosen and remove the nuts (26.1), remove the position indicator 3. Loosen and remove the nuts (9). 4. Using suitable lifting equipment, lift the handwheel/yoke assembly. 5. Loosen and remove the gland nuts (17), gland flange (16) and gland (15). 6. Remove safety ring (4). 7. Knock down the bonnet (2) with a soft-faced hammer to relieve the load on the segment ring (5), by pushing them outside through the four radial holes in the body. 8. Reassemble the safety ring and nuts (4). 9. Tighten the nuts (11) of the bonnet bolts (10) evenly, until the bonnet is lifted. Remove the ring (6) and the pressure seal gasket (7). 10. After the gasket has been removed, proceed by removing the bonnet (2) assembly with stem (20) and disc(28). Before starting disassembly it is very important to verify for your safety that: the line is not pressurized the line is at ambient temperature the line is drained all electrical supplies have been switched off and disconnected prior to dismantling the valve. Refer to figs. 3 and 4 7. Assembly Instructions Before starting assembly it is recommended to verify the following points: Remove any dirt or particles with a wire brush or abrasive cloth; remove any oil or grease with a suitable solvent, to avoid damage cause by foreign particles in particular on the sealing area. Never re-use the old gaskets, even though they seem to be in good shape. Verify that there are no scratches on the body sealing area. 1. Place the disc (28) on a clean flat surface, then fit the stem (20) into the disc. 2. Fit the disc nut (30) over the stem (20), screw into the disc (28) and then tighten. Ensure that the stem is free to move. Then tack weld the disc nut to the disc. 3. Fit the bonnet assembly with stem (20) and disc (28) into body (1). 4. Place a new pressure seal gasket on the bonnet. 5. Assemble the ring (6) and the segment rings (5). 6. Insert the safety ring (4) and tighten the nuts (10) to the torque values stated in table 2. 7. Fit the ground ring (13), a new gland packing (14), gland (15), gland flange (16) and gland nuts (17), and tighten these evenly. DO NOT over-tighten as this will cause high friction loads on the stem. 8. Using suitable lifting equipment, carefully lower the handwheel/yoke assembly onto the valve, taking care not to damage the yoke studs (8). Secure the assembly by cross-tightening the yoke nuts (9). 10. Fit the position indicator (25) 11. After the valve has been pressurized, verify that the nuts (9) are tightened by following the tightening torque values indicated in table 2. Emerson reserves the right to change the contents without notice page 4

8. Spare parts list Emerson guarantees the supply of any spare part for a period of at least ten years from the manufacturing date (month/year) indicated on the tag plate. The main objective in formulating a service parts inventory policy is the capability to provide prompt valve service, thus preventing extension of maintenance down time. To accomplish this, it is necessary to have the proper service parts immediately available for the optimum number of valves. This can be achieved at a minimum cost by defining the inventory on a frequency of need basis. To assist in reaching this objective, the field service and repair organization of Raimondi recommends following these guidelines in order to establish inventory levels: 1. Identify the total number of valves in service by size, type number, pressure/temperature class, tag number. 2. Identify the frequency of replacement tendency of specific parts: Class I Parts most frequently replaced. Class II Parts less frequently replaced, but critical in the event of an emergency requirement. Class III Parts seldom replaced Class IV Hardware (e.g. nuts, bolts, pins, cap components etc.) Class V Parts practically never requiring replacement 3. Operational reliability is defined as a probable percentage (%) of total, uninterrupted operational time that can be expected by stocking predetermined valve component classifications. Determine the operational reliability which is compatible with a specific company s operational objectives and service parts inventory investment policy. Then relate operational reliability to part classifications, which will satisfy that need. Guidelines are as follows: Parts classification Operational reliability Class I 70% Class I and II 85% Class I, II and III 95% Class I, II, III and IV 99% 4. Consult recommended spare parts list by valve type to determine quantity of parts valves to be covered by the inventory plan. 5. Select parts and specify quantities. Classification of spare parts Classification Item No. Description CLASS I 7 Pressure seal Parts most frequently replaced 14 Gasket CLASS II 20 Stem Parts less frequently replaced but 15 Gland critical in case of an emergency 28 Disc 30 Disc nut 33 Socket head screw CLASS III 25 Position indicator Parts seldom replaced 16 Gland flange CLASS IV 8 Body/yoke stud Hardware (e.g. nuts, studs, pins, etc.) 9 Body/yoke nut 10 Body/bonnet stud 11 Body/bonnet stud 18 Gland stud 17 Gland nut CLASS V Parts practically never requiring replacement Balance Emerson reserves the right to change the contents without notice page 5

9. Appendices The reference drawings are those relating to the supply only. The drawings published in this manual are typical drawings only and may not represent the valves supplied. Fig. 3 - Typical valve 51A 51B 32 22 24 21 36 26.1 26 18 17 16 15 14 5 59A 51 59 35 23 27 20 3 25 19 8 9 11 10 4 13 6 2 7 33 By-pass Outlet 31 30 28 1.3 1 28.1 Inlet Table 1 - Parts list Pos. Part name Material Pos. Part name Material Pos. Part name Material 1 Body A 105 1.3 Body seat surface A 182 F6A 2 Bonnet A 105 3 Yoke A 105 + St 35 4 Safety ring A 105 5 Segment ring A 105 6 Ring A 105 7 Body/bonnet gasket Pure graphite 8 Body/bonnet bolts A 193 B7 9 Body/bonnet nuts A 194 2H 10 Nuts A 194 2H 11 Bolts A 193 B7 13 Ground ring A 182 F6A 14 Packing Pure graphite 15 Gland A 182 F6A 16 Gland flange A 105 17 Gland nuts A 194 2H 18 Gland bolts A 193 B7 19 Gland gasket Graphite 20 Stem X35CrMo17 21 Yoke nut B 148 Gr. B 22 Bearings C. steel 23 Flange A 105 24 Socket head screw Class 12.9 25 Position indicator A 105 26 Security pin Class 12.9 26.1 Nut Class 65 27 Lubricator C. steel 28 Disc A 105 28.1 Disc surface A 182 F6A 30 Disc nut A 182 F6A 31 Cylinder A 182 F6A 32 O-ring Viton A-75 Sh.A 33 Socket head screw Stainless steel 35 Key AISI 4140 36 Stem key AISI 4140 39 Actuator 51 Stub PFE Nuts Extension Extension key AISI 4140 Emerson reserves the right to change the contents without notice page 6

Table 2 - Tightening torque values for bolts/screws Body/yoke - Bolts/screws: A 193 B7 Bonnet - Bolts/screws: A 193 B7 Ø Bolts/screws Torque values Ø Bolts/screws Torque values Kgm (Nm) Kgm (Nm) M12 5 (50) M12 1 (9) M16 10 (100) M16 2 (18) M20 17 (170) M20 3 (30) M22 29 (280) M22 5 (48) M24 43 (420) M24 7,5 (73) M30 61 (600) M30 11 (105) M33 86 (850) M33 15 (150) M36 112 (1100) M36 21 (205) Stem Gland bolts: A 193 B7 Diam. M16 M18 M20 M22 M24 M27 M30 M33 25,4 1,90 2,10 2,40 2,60 2,80 3,20 3,60 3,90 31,8 3,00 3,30 3,70 4,00 4,40 5,00 5,60 6,10 34,9 3,30 3,60 4,00 4,40 4,80 5,40 6,00 6,60 44,5 4,90 5,50 6,10 6,60 7,30 8,20 9,10 10,00 50,8 6,60 7,40 8,20 8,80 9,70 11,00 12,20 13,40 57,2 8,60 9,60 10,60 11,40 12,60 14,20 15,80 17,30 63,5 9,40 10,40 11,50 12,50 13,70 15,50 17,30 18,80 69,8 10,10 11,30 12,50 13,50 14,90 16,80 18,70 20,40 76,2 12,70 14,10 15,60 16,80 18,50 21,00 23,30 25,40 82,5 13,90 15,50 17,10 18,50 20,40 23,00 25,60 28,00 95,3 15,30 17,00 18,80 20,30 22,40 25,30 28,10 30,70 Select the constant in relation to stem diameter and packing bolt size In order to obtain the packing bolt torque in Nm multiply the selected constant for pressure in MPa Example Valve under pressure of 24 MPa with steam diameter equal to 44,5 mm and packing bolt size equal to M16 a. Constant is equal to 4,9 b. Packing bolts torque is equal to 4,9 x 24 = 117,6 Nm Table 3 Suggested greases Manufacturers Suggested Greases for bearings Agip GRMUEP2 API PGX2 BP Grease LTX 2 Esso Beacon 2 Fina Finagrease HP Finagrease EPL2 Mobil Mobilux EP2 Q8 Q8 Rembrandt EP2 Shell Alvania R2 Supergrease A Texaco Multifak EP2 Grease L2 Total Multis EP2 Multis 2 Viscol Signal Rolsfer 2 Apply Molykote to the stem threads. All other bolts and nuts are assembled with usual lubricant or Molykote. Emerson reserves the right to change the contents without notice page 7