Greetings! See you out on the line, Alan, Chris C., and Richard.

Similar documents
Greetings! See you out on the line, Alan, Chris C., and Richard.

Greetings! See you out on the line, Alan, Chris, and Richard.

Greetings! We ll see you out on the line, Alan, Chris, and Richard.

Greetings! We ll see you out on the line, Alan, Chris, and Richard.

Greetings! Many thanks to all our incredible volunteers who make our railroad possible. Always remember, no track, no train.

Greetings! See you out on the line, Alan, Chris, and Richard.

Greetings! See you out on the line, Alan, Chris, and Richard.

Work Standard CABLE PULLING OPERATIONS

Fun Parking a Blimp. Episode 13. Pilot Season. A Day with Uncle FunBuck

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

Air Tractor Preventative Maintenance Manual And Troubleshooting

INSTRUCTIONS. for installing ALDON Two-Way LOCOMOTIVE Hinged Derail on wooden ties. For 4-Axle and 6-Axle Locomotives and all Freight Cars

OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM

STYLE 3414/3416 & 3421/3423 Apollo Monitor with Foldaway Legs OPERATING & MAINTENANCE INSTRUCTIONS

BUTTERFLY VALVES Series 800

DRILL MAINTENANCE ADJUSTMENTS BEFORE GOING TO THE FIELD

How to Replace Ball Joints

Product Guide. Crawler Crane

Service Call: Procedure for Bleeding the Hydraulic Leveling System. Tools Required: S-Wrench 1/2, 9/16, 5/8, 11/16, & 3/4 Drain Pan

Owner s Manual

75 Ton SD Shop Press Operating Instructions

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

CRYOGENIC TANK SERVICES - CHART RECORDER MANUAL

HYDRAULIC MOBILE LIFTING TABLE

This section provides general information and recommendations required prior to installing, operating or maintaining your KAT Master Hitch.

DOUBLE AUGHT BREATHES AGAIN!

Document How to Set Single Stage Press Pressures

Southern Eagles Soaring

24 Litre Air Compressor

20 Ton SD Shop Press Operating Instructions

Hercules Space Saver Sole Press series

GCI CYLINDER INVERTER

SAILTEC, INC CONGER COURT, OSHKOSH, WI USA

1. SAFETY 2. PREPARATION 3. FRAME 4. TRANSMISSION 5. DRIVE 6. ROW UNIT 7. OPTIONAL EQUIPMENT

Darling Downs Soaring Club Inc

MUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

WW-720. Pressure Reducing Control Valve

TECH TIPS TZ34/20 & TZ50/30. Service Call: Machine will not automatically level. Tools Needed: Multi Meter Jumper wire 7/16 Combination wrench.

Inside Front cover This page will remain blank.

WATER CONTROL SYSTEM QUICK START

CLIENT NAME: LOCATION: CALM BUOY INSPECTION:

GAP Tool Box Talk: Quick Hitches

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT

WW-720. Pressure Reducing Control Valve

Safety Manual: Hazardous Energy. January, 2017

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

USER S MANUAL SPOON KIT FOR AI TORNADO GRENADE

NIV EAU MATIC ST User Manual Made in Canada

DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

AR STYLE FIREARMS OWNER'S MANUAL: OPERATION, HANDLING, DISASSEMBLY / REASSEMBLY & SAFETY INSTRUCTIONS

The Best Day of My Life

FOUR-ON-THE SNOW Newsletter

GRI-1300/1350Li. User Manual

Safety, Operating and Maintenance Manual. TRAIN Rat DS9-TRAIN

THE PONY CLUB TETRATHLON CHAMPIONSHIPS BISHOP BURTON COLLEGE, BEVERLEY, HUMBERSIDE 11th - 13th AUGUST 2017

USER GUIDE TO POWER ASSISTED BIKES

POWER ASSISTED BICYCLES OWNERS MANUAL

! CAUTION! ! WARNING! General Information

Directional Control valves

MUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

Operators & Maintenance Manual OPERATOR S MANUAL USAGE AND MAINTENANCE F100M F100M. Powered Fixed Hoist Ideal for raised swimming pools and hot tubs

Instructions for High Altitude Conversion

DBML-60/80 Squeeze Tool

Technical Data Sheet TI-F50 Locking Units series KFH

Conversion instructions from natural gas to propane

Savard Labor & Marine Staffing, Inc. Compressed Gas Safety Program Rev3/14

Outbound Progress Report Choosing an Engine:

All information correct as of 25 th September 2013 and subject to change without notice. 6 inch HURRICANE modular dredge equipment operations manual.


30T A/Manual Hydraulic Shop Press

Model 420-HY Pressure Regulating Hydrant Valve

Photo: Jonas Wall ANTARES OVAL DRY GLOVE SYSTEM BY SI TECH.

PISTOL CALIBER AR STYLE FIREARMS

WBM Installation Manual KAT Master Hitch


Installation and Operation Instruction Manual

Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

SecureLift Lifting System Use Guide Nemisys

Q-POWER 106 SERIES HYDRAULIC SQUEEZE CHUTE PRODUCT MANUAL arrowquip.com

Fiat - Argentina - Wheel Aligner / Headlamp Aimer #16435

WIRE ROPE PULLING MACHINE

Sport Grouse PRO REMOTE CONTROL LAUNCHER INSTRUCTION MANUAL

Temperature Controllers

Installation Instructions, Pressure Regulator Series

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL OTHER FLUID POWER VALVES. This work covers part of outcome 2 of the Edexcel standard module:

Elevator Concepts ltd. by Wurtec Krause Riverview, MI Fax:

SHUR-LOK CORPORATION TECHNICAL SALES BULLETIN

35 TON HYDRAULIC PUNCH WARNING

John Deere Mt Parts Manual L130 Mowing Deck

BoatWasher Swede, , MS Float

ANTARES. User Manual ANTARES OVAL DRY GLOVE SYSTEM BY SI TECH. Photo: Jonas Andersson, Lysekil

PORTABLE WORK LIGHT MODEL NO: CL6FS OPERATION INSTRUCTIONS PART NO: GC0315

Grip-Lock Chock Repair Decision Instructions: Procedure and Examples (June 2013)

Risk Management Resources

Product Name: Hold Me Rope Anchor

Operating Instructions Models and Hydrostatic Test Pumps

SAMPLE. Clap and Pat. Clap and Pat Example for the Word my. Clap and Pat SAY DO EXAMPLE. Letter Clap m - one clap. Letter Clap y - one clap

Troubleshooting Lift Cylinder Drift and Tilt Cylinder Drift

Installation and Operation Instructions

Transcription:

Greetings! This is your Maintenance of Way Team update for December 4, 2016. Polar Express is in full swing and so is your MOW Team. Let s get this update going before it the full swing is swung. It was darn-right chilly inside the Erecting Shop on Tuesday. But, Pat Scholzen, Anthony Filamor, Cliff Hayes, Joe Margucci, Matt McCracken, Mike Harris, Frank Werry, Gene Peck, Harry Voss, Chris Carlson, and Alan Hardy brought warm spirits for an evening of good MOW fun. Cliff is working to make a new latching system for the tie-shear s kickers (which kick-out the ends of old ties after it has sliced them in threes). The current latches are latching so, while Cliff and Alan surveyed the situation and worked on a design plan, Mike H. and Chris C. fired-up the shear to deploy the kickers. But, they wouldn t deploy. Although the hydraulic system engaged, no air-pressure seemed to be getting to the valves to actuate them. Troubleshooting the problem kept Chris C. and Mike H. busy for the rest of the evening. Meanwhile, Joe, Matt, and Anthony headed over to Old Sacramento to fix a wobbly switch-stand problem at the House Track Switch reported by our trusty track inspectors. The solution was to pull the spikes supporting the stand, plug the spike-holes, and re-spike the stand. Anthony pulled the stand s spikes while Joe and Matt drove plugs deep into the head-block. Then, Matt re-spiked the stand. This did the trick, for now, and now the stand is stable again. But, more work on the head-block will need to be done. It was a good evening of accomplishment all around. Thursday, Joe, Weston Snyder, Mike H., Frank, Chris C., Heather Kearns, and Alan made good use of a windy evening in Erecting Shop. Heather and Weston headed over to Old Sacramento to replace the red-circle switch-stand target on the House Track switch with a yellow-diamond. When the stand was damaged some weeks ago, a red-circle target had been installed as a temporary measure. But, red-circle targets are reserved for Mainline switches. Weston had restored a spare yellow-diamond target and he and Heather got it in place. As the ballast-regulator would be used on Saturday (which was behind the Kalamazoo tug in the Erecting Shop), Chris C. and Frank switched it out so it would be up front and go. Mike H. and Chris C. continued their efforts at fixing what was ailing the tie-shear. By testing various air-valves, they found a faulty air-valve in the cab. They fixed it, fired-up the shear, and everything worked as it should. Over in the Boiler Shop, Joe fixed a problem with the hitch-wires of the white trailer. Frank and Weston loaded the cracked wing-rail and a replacement rail for the frog at Switch 19 into the truck. After several years of it being out of service, the frog is being repaired. But, a new wing-rail needs to be professionally milled to fit in the frog structure. So, it s being taken to a machine shop to be shaped. Once fixed, the south switch on the east siding at Baths will be reactivated. With that, the Team called it an evening. Of course, Saturday started with plenty of doughnuts. But, Santa had left a stash of magical Polar Express jingle bells for the Team. Not surprisingly, Alan, Michael Florentine, Clem Meier, Anthony, Heather, Steve Nemeth, Weston, Chris C., Matt, Joe, Pam Tatro, and Chris Machado could hear them ring obviously, they believe. A track-raise near Mile Post 1 to remove a dip in the track was the plan of the day. Joe and Mike F. arrived early to get the truck loaded with the necessary tools. Conductor Heather conducted Chris C. in the ballast regulator over the UP Main from the Shops. Anthony got the tamper opened and Mike F. piloted it down the line. Matt hopped on the A-6 motorcar and pulled the work-train consist down the line. At MP 1, Chris C. ran the ballast-regulator through the work-site with the plows deployed to cut-down the windrows and spread the rock evenly between the rails. Pam, Weston, Heather, Clem, and Chris M began digging pockets under the rails to insert jacks. Steve and Alan set up the spot-board and rabbit (used for measuring the raise). Joe laid down at the rabbit and guided the lift. Matt, Anthony, and Weston followed Joe s signals and cranked on the jacks, lifting the west rail to the appropriate height. Steve and Chris C. measured the cross-level and jacked the east rail even with the west. Mike F. brought in the tamper and, with Alan and Chris M. guiding, tamped each tie to the new level. As the track was raised and tamped, the jacks would be pulled and shuttled down the line in a hop-scotch fashion to the next area for raising. The Team was working like a well-oiled machine and by lunch time, the area had been raised, lined, leveled and surfaced. It looked great. In the afternoon, Polar Express coopted several Team members for service. So, those who remained retreated to Old Sacramento where they adjusted Switch 2, the House Track switch, which had become exceedingly difficult to throw. Matt, Joe, Weston, Chris C., Mike F., Steve, and Alan cleaned debris out of the switch, changed the position of the connecting rod and got it back in working order. Chalk-up another success to your MOW Team! A great day, indeed, for a great Team! As you might have predicted, this week, the Team will gather on Tuesday and Thursday in the Erecting Shop at or before 5 o clock. Saturday, the magic bells will ring doughnut time promptly at 8 o clock a.m. More MOW fun is promised! See you out on the line, Alan, Chris C., and Richard.

Cliff and Alan work on a new locking-latch for the tie-shear s kickers Anthony pulls spikes at Switch 2 as Joe and Matt stand ready to plug and re-spike the stand

Matt drives spikes into the newly plugged spike-holes at the switch Mike H. checks air-pressure at various valves as he trouble-shoots the tie-shear s problem

Joe repairs the hitch-wires on the trailer Frank loads the cracked wing-rail from Switch 19 into the MOW truck

Frank uses the rail-saw to cut the rail being milled for replacing the cracked wing-rail to its proper length Weston and Frank load the replacement wing-rail in the truck ready to head out for milling

Weston replaces the red round switch target at Switch 2 with a yellow diamond Chris C. working to cure the ailing tie-shear

The ballast regulator is deployed Chris C. in the regulator plows windrows of rock

Anthony and Matt spot the A-6 motorcar and work-consist on the Clunie Siding Weston and Pam dig pockets under the rails for jacks to be inserted

Heather and the Team prepare the rails for raising Joe peers through the rabbit towards the spot-board to measure the raise and directs the Team manning the jacks

Sometimes, it takes a little effort to raise the track as Matt and Chris M. demonstrate Joe signals to Anthony, Keep jacking!

Alan directs Mike F. in the tamper as Clem and Chris M. manually operate the actuators for the work-heads Chris M. takes over guiding the tamper as Weston and Anthony prepare to pull jacks

Track triage: Matt nips up a tie (that didn t lift when the rail was raised) as Chris M. re-spikes it In the afternoon, the Team adjusts Switch 2