Broadway Area Group Working Practices. One Team, One Goal...

Similar documents
IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

Site Induction Document & Site Rules

Bitumen Delivery Driver Inductions Eurobitume UK

Site Induction Document & Site Rules

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

Two phases have been established for the classification of incidents to help in determining the appropriate course of action;

SOAS LONE WORKING GUIDANCE

Safety, health and environment values that are expected of all persons who are working and visiting the Quattro Ports Port Kembla Grain Terminal,

Health & Safety Guidance

Health and Safety Policy

COGPOLY39 Meet safety, health and environmental requirements in the workplace

CONTRACTOR SAFETY INDUCTION HANDBOOK

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

Work Health & Safety Event Safety Checklist Small Event

McCain Foods (Aust) CONTRACTOR INDUCTION PROGRAM PENOLA SITE QUICK GUIDE

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

Hampstead Hill School Health and Safety Policy: Confined Spaces

Bogo Operations Pollution Incident Response Management Plan

Site Induction Document & Site Rules

UETTDRRF06B PERFORM RESCUE FROM A LIVE LV PANEL LEARNER GUIDE

KIERNAN ELECTRICAL SITE INDUCTION. Site Supervisors: Chris Lettice

RISK IDENTIFICATION HMS BELFAST

Working Environment Safety Assessment

Site Induction Document & Site Rules

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

Health & Safety Policy & Plan. Rightway Roofing.

How severely could the risk hurt someone?

Emergency Response Plans

Health & Safety Plan `

Contractor/Visitor Safety Orientation UNBC

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE

CIRCULAR NO. O-6. Passenger Train Handling Safety and Emergency Procedures

FIRE HYDRANT TESTING METHOD STATEMENT.

General Policies July Hydrotherapy Pool Policy

Contractor / Exhibitor Handbook

Contractor handbook. Purpose

Risk Assessment for Beacon Cricket Club

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Induction SGAC - EVENTS -

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

Safe Work Method Statement

Morden Hall DHQ. Please record any problems or concerns you have about the DHQ so the Maintenance Team can deal with them

Valley View Copy Shop: POLICIES & PROCEDURES

HEALTH AND SAFETY POLICY

SAFE WORK METHOD STATEMENT CARPENTER

Woodlarks Camp Site Trust. Health and Safety Policy & Procedures. Amended Date Signature

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Pocklington Town Council Risk Assessment Christmas Festival Wednesday Assessor: Gordon Scaife Date

THE PONY CLUB RISK ASSESSMENT CHECK LIST SUMMER CAMP

GAS PIPELINE SAFETY GUIDE.

Important Safety Information Enclosed

S31 Opening Statement Working at Height

Health and Safety Policy Castlebrae. Pool Safe Operating Procedures. Normal Operating Procedures (NOP)

Theory Assessment CS Confined Space Entry

unable to summon help as a result of injury, ill health or an emergency. unable to carry out a task safely while alone.

First Aid Policy. Date Prepared: January Date Approved by Governing Body: January 2018

Minimum Safety Requirements for Contractors Working on Railway Property

SAFE WORK METHOD STATEMENT SWMS No Version

Workplace Safety Inspection Sheet

Contractor OHS Induction. AOHS-05-GUI September 2016

To comply with the OHS Act, the responsible manager must carry out and document the following:

Powerplay Paintball Brighouse Risk Assessment

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Cobra Cold Cut System

McCain Foods (Aust) CONTRACTOR INDUCTION PROGRAM SMITHTON SITE QUICK GUIDE

Emergency Procedures for Forecourt Sites Storing and Dispensing LPG

Initial training - OCCUPATIONAL HEALTH AND SAFETY and FIRE PROTECTION

Health, Safety and Environment Induction. Section 1: Introduction. Section 1: Introduction. Aims & Objectives of the induction MGJV

In an emergency the safety of all personnel and the public is of priority.

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT

Monash University Academy of Performing Arts Safety Induction

Risk Assessment June Skirmish Paintball Games Exeter

Method Statement Author

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Lone Working Guidance for University Departments and Functions December 2009 Safety Services Office

Accident/Incident Reporting and Investigation Procedures

Communicate and document the health and safety arrangements and ensure that these are available to staff and clients alike.

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

RISK ASSESSMENT FORM- MANAGING HEALTH AND SAFETY

Company Policy Health & safety for work performed at Customer premises

Basketball Risk Assessment for AoC Sport National Championships 2018 Nottingham University

Health and Safety Inspection Procedure

OPERATIONL RISK ASSESSMENTS

Appendix A: Induction check list

Western Sydney University Safety Inspection Checklist - Laboratory Environments

A Checklist for a Health and Safety Risk Assessment

Cranes and Hoists. Elevating Work Platforms ASSESSMENT

SEMBIT SQA Unit Code F9JC 04 Complying with statutory regulations and organisational safety requirements

Workplace health and safety questions

Handout Activity: HA107

WORK HEALTH AND SAFETY

SAFE WORK METHOD STATEMENT Part B

A MESSAGE FROM THE MD

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

This procedure must be read in conjunction with WHS-PRO-020: Emergency Procedures

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5

Plant Isolation Lock out/tag out Procedure

UCAS shell scheme event organiser risk assessment

Bachelor of Paramedic Science

Transcription:

Broadway Area Group Working Practices One Team, One Goal... Issue 1. 2/4/2014

Broadway Area Group's Mission Statement The Broadway Area Group are committed to the rebuilding of Broadway Station and its operating Services, restoring it to its former Glory, and when operational, increase the profitability of the Gloucestershire Warwickshire Steam Railway, improve business opportunities for the Broadway Community and create a Heritage Railway experience for all to enjoy...

Broadway Area Group Index of Local Procedures No. Title Issue Date 100 Duty Officer Job Description 1 28/02/2014 101 Fire Warden s Duties 1 24/02/2014 102 Emergency Reporting 1 04/03/2014 103 Local Induction for New Volunteers 1 28/02/2014 104 Updating of Site Assets & Materials 1 28/02/2014 105 Site Close Down 1 28/02/2014

PROCEDURE BAG 100 Issue 1 Date 28/02/2014 Duty Officer Job Description Author J.H. Approved By B.B. Job Title Location Reports to Responsible for Job Summary Duty Officer Broadway Station Broadway Area Group Manager (Bill Britton) All volunteers and on-site activities To ensure the smooth and safe operation of the Broadway Station Reconstruction site. Job Tasks 1. Allocate Volunteers to tasks in accordance with priorities set by the Broadway Area Group Manager and their individual skills. 2. Ensure Personal Protective Equipment (PPE) appropriate to the task in hand, is in use at all times. 3. Carry out the duties of Fire Warden in the event of a fire alert, using Procedure BAG 101. 4. In the event of an emergency, take responsibility for contacting the Emergency Services and the GWSR Duty Officer if on Duty, using Procedure BAG 102. 5. Undertake site induction for new volunteers including a site familiarisation tour, using Procedure BAG 103. 6. Ensure that any accidents and near miss incidents are recorded in the site record book and that the details are promptly advised to the Broadway Area Group Manager. 7. Ensure that any deliveries received are both complete and stored correctly. 8. Act as the focal point for recording damage to any tools and equipment. Report this to the Broadway Area Group Manager using Procedure BAG 104. 9. Act as the focal point for recording any impending shortage of consumable items e.g. sand, cement, paint, bricks etc. Report these to the Broadway Area Group Manager using Procedure BAG 104.

10. Be a point of contact with members of the general public whenever practical and ensure that they enter the site only when it is safe to do so and when wearing the necessary protective equipment. 11. Arrange for the site to be closed down and made secure at the end of the working day, using Procedure BAG 105. 12. Ensure that the mess room is left in a clean and tidy condition at the end of the working day. 13. Undertake such other duties as may be specifically requested by the Broadway Area Group Manager from time to time. Version 1 Dated 28/02/2014

PROCEDURE BAG 101 Issue 1 Date 24/02/2014 FIRE WARDEN S DUTIES Author J.H. Approved By B.B. Purpose: Actions: This Procedure is designed to be used by the Duty Officer in the event that a fire or other emergency occurs at the Broadway Station Construction Site. By following the actions listed in this procedure, a safe and consistent response should be achieved, whoever is undertaking this role at the time. On becoming aware of a fire or other similar emergency requiring site evacuation, sound the fire alarm bell which is located on the external wall of the mess room building. Verbally encourage all Volunteers to evacuate the site and assemble at the Fire Evacuation Point adjacent to the main site entrance gate. Collect the signing on sheet from the mess room and systematically check that all Volunteers are present at the Assembly Point. If it is safe to do so, tackle the fire using the fire-fighting equipment available on site. If this is not possible, or the fire is too large, telephone 999 to call out the Fire Brigade. Give a clear site address as per the details below. Give a site contact telephone number also. Equipment: A 6kg powder fire extinguisher is provided adjacent to the mess room door and water supplies are available at the electrical boxes located on platforms 1, and 1A, and also in the mess room and on platform 2B. There is also a small fire extinguisher in the Sales Shed adjacent to the main gate. Address: Broadway Old Station (Opposite Broadway Caravan Park) Evesham Road Broadway WR12 7DF

PROCEDURE BAG 102 Issue 1 Date 04/03/2014 EMERGENCY REPORTING Author J.H. Approved By B.B. Purpose: Actions: This Procedure is designed to be used by the Duty Officer in the event that an emergency or serious accident occurs at the Broadway Station Construction Site. By following the actions listed in this procedure, a safe and consistent response should be achieved, whoever is undertaking this role at the time. When there is an emergency or a serious incident that requires assistance from one of the emergency services, these should be contacted by calling 999. A clear site address as per the details below, and contact telephone number, must be given. In addition the GWSR Duty Officer, currently Neill Carr, should also be advised of the circumstances. He can be contacted by telephoning 01242 621906 or via mobile number 07816 365257. Finally the Broadway Area Group Manager, currently Bill Britton, should also be advised of the circumstances. He can be contacted by telephoning 01242 674718 or via mobile number 07423 015270. In the event that it becomes necessary to contact a Volunteers next of kin, a list of contact telephone numbers will be found in the Duty Officer s file, located in the Administration section of the filing cabinet. In the event that treatment for a minor injury is required then transport to a medical facility should be arranged. Details of the nearest hospitals are given overleaf. Address: Broadway Old Station (Opposite Broadway Caravan Park) Station Road Broadway WR12 7DF

Details of Local Hospitals Name Address Telephone Facilities Distance Evesham Community Hospital North Cotswold Hospital Stratford Hospital Cheltenham General Hospital Worcester Royal Hospital Waterside, Evesham, Worcs. WR11 1JT Stow Road, Moretonin-Marsh, Gloucs. GL56 0DS Arden Street, Stratford-upon-Avon, Warwicks. CV37 6NX Sandford Road, Cheltenham, Gloucs. GL53 7AN Charles Hastings Way Worcester, Worcs. WR5 1DD 01386 502 388 0300 421 8770 Minor Injuries Unit Minor Injuries Unit 01789 205831 Minor Injuries Unit 03004 222 222 01905 763 333 A & E A & E 5 miles 8 miles 13 miles 13 miles 17 miles Note: Minor Injuries Units are able to deal with cuts, grazes, wounds, strains, minor burns and broken bones.

PROCEDURE BAG 103 Issue 1 Date 28/02/2014 LOCAL INDUCTION FOR NEW VOLUNTEERS Author D.B./J.H. Approved By B.B. Purpose: Actions: This Procedure is designed to be used by the Duty Officer in order to ensure that all new Volunteers receive the same information regarding local Health & Safety issues, are made aware and agree to comply with site safety rules, and accept the need to take responsibility for their own safety and well being. The Induction process will consist of the following four themes: 1) An introduction to the Broadway Area Group Organisation, the H & S Committee and the Site H & S Representative 2) An explanation of the site including a brief tour 3) A check on the Volunteer s qualifications/abilities/limitations 4) An explanation to the Volunteer of the Site Rules and general H & S information including Risk Assessments, First Aid, and the Fire Evacuation Procedure Note: A checklist of items to be discussed is attached overleaf. These should be ticked off during the Induction Process and at the end, both parties should sign and date that the Induction Process has been completed. This should then be filed under Induction in the H & S section of the filing cabinet. A copy of the Site Rules & Safety Briefing, forms part of this induction procedure and a copy should be given to the new Volunteer.

Name:.. Date: INDUCTION CHECKLIST 1 Introductions Covered Y/N a BAG Manager b BAG Committee c H & S Committee d H & S Representative e Friends of Broadway 2 Site Details a Tour b Boundaries c Buildings & contents d Security, keys, padlocks, CCTV e Messing facilities f General hazards 3 Volunteer Checks a GWSR Membership b GWSR Induction c BAG Manager Acceptance d Work Permit e Qualifications/Competencies f Physical Limitations/Health Issues g Check PPE (Hat, Hivis, Boots, and Gloves) 4 Site Rules & Safety Briefing a Site Rules & Safety Briefing (provide a copy) b Fire Evacuation Procedure c First Aid Arrangements d Risk Assessments e Accident and Near Miss Reporting ANY QUESTIONS?

Signature: Signature: Print Name: Print Name:

Broadway Site Rules & Safety Briefing for all Volunteers Health & Safety laws apply on this site. Although you are a volunteer and not a paid employee you must be aware of, and comply with, site rules and precautions. Unlike the situation with domestic DIY, this is not an option. You have a legal duty of care for yourself and for others working on the site. You must not report for work when under the influence of drink or drugs, including medicinal ones, which would impair your ability to concentrate and perform safely. You should also consider any health problems, such as eyesight or hearing deficiencies, which could impact on either yourself or your colleagues, and require special measures to be implemented in order to maintain a safe working environment. Declare these to the Duty Officer. To work on site you must have a valid Permit to Work Regular work days are Saturdays and Wednesdays, but some tasks are arranged on other days which will be notified. There are no set working hours, but you must sign in at the beginning of each shift and sign out when you leave. Also, if you leave the site temporarily, leave a note on the signing-in sheet. You must not work on site when no-one else is on duty. If you are working at a remote part of the site, make sure others know where you are. Certain tasks are covered by Risk Assessments detailing precautions to be taken, so please familiarise yourself with these before starting you ll find details in the Site H&S Information Pack. Some equipment, e.g. dumpers, chainsaws, may only be used by authorised operators, listed in the H&S Information Pack Don t take on a task or use equipment unless you feel able and competent to do so. If you need advice, instruction or assistance, please ask. Everyone helps everyone else here. When working on site you must wear:- Hard hat, for head protection Safety boots with steel toecap Protective gloves suitable for the task in hand A high visibility orange jacket or vest Be aware of the general hazards around the site. These include:- Uneven ground, uncovered pits & trenches, steep drop off platform edges Trip hazards hoses, cables, bricks, slabs, timber etc. which may appear anywhere Steep embankments need extra care to avoid tripping, slipping or falling Movement of vehicles & machinery around the site Be alert & take care! Don t take risks it s not worth it. You don t get paid for this, and you probably have loved ones at home who need you more than we do. If you have an accident or suffer an injury, however minor, you must report it using the forms in the H&S Information Pack.

If you need any general advice on safety matters, or have any concerns, please consult Chris Helm (designated safety officer for the site) or Gordon Wood (CDM Coordinator). Make sure you know the basic rules, stay alert, use common sense and everything will be fine!

PROCEDURE BAG 104 Issue 1 Date 28/02/2014 UPDATING OF SITE ASSETS & MATERIALS Author D.B. Approved By B.B. Purpose: Actions: This Procedure is designed to be used by all Volunteers to record any problems, deficiencies or shortages in the equipment, tools, hardware, or consumable materials kept on site. On becoming aware of any defective tool or piece of equipment an entry should be made on the form overleaf. This includes anything that is in need of repair, servicing, adjustment or replacement. In addition, this form should also be used to record materials which are running short, or any additional/new items that are considered necessary. When making an entry, please provide as much detail as possible and ensure that your name is clearly identifiable in case further discussion is necessary. A copy of this form will be made available in the messroom and the Broadway Area Group Manager will endeavour to take the necessary action within a reasonable timescale, subject to funding being available.

BAG PROCEDURE 104 cont. Item Description Deficiency, Type, Quantity, Suggested Action Noted By (Print Name) Date BAG Manager s Response Version 1 Dated 28/02/2014

PROCEDURE BAG 105 Issue 1 Date 28/02/2014 SITE CLOSE DOWN Author J.H. Approved By B.B. Purpose: Actions: This Procedure is designed to be used by the Duty Officer in order to ensure that the site is correctly closed down and made secure at the end of the working day. By following the actions listed in this procedure, a secure and consistent close down of the site should be achieved, whoever is undertaking this role at the time. Site Close Down involves the following four main Areas: 1) Take a walk through the areas where work has been carried out and check that no tools, equipment or vulnerable materials are on view. Remove any such items into their correct secure storage area. 2) Check that padlocks fitted to all storage facilities and access gates are in position and locked. 3) Check the signing on sheet to ensure that all Volunteers have signed out or have been accounted for. 4) Carry out the items listed in the schedule of mess room checks on the back of this procedure. Note: Whilst Site Close Down is the responsibility of the Duty Officer, he should enlist the assistance of other Volunteers in undertaking the above activities.

Schedule of Mess Room Checks 1 Place the Fire Alarm board & extinguisher inside the mess room 2 Switch off the cold water supply using the external stopcock 3 Close and secure the window shutter. N.B. This operation requires a second person to push the shutter 4 Switch off the hot water heater at the sink 5 Unplug the kettle & the tea urn 6 Check the fridge is still switched on 7 Check the switch feeding the security light is on 8 Check the switch feeding the security camera is on 9 In summer check the wall heater is switched off 10 In winter check the wall heater is switched on with the thermostat turned down to the frost setting 11 In winter open the left hand cupboard door under the sink to allow some heat to reach the cold water pipes 12 Place any uneaten items of food in the fridge 13 Remove any tools and/or materials to their correct storage area 14 Turn out the light, sign out, exit the mess room and lock both mortice locks Issue 1 Date 28/02/2014