Section Access Control Plan - SH 14 (Mulberry Street)

Similar documents
4.0 ACCESS CONTROL PLAN - SH 14 (JEFFERSON STREET/RIVERSIDE AVENUE)

Chapter 4: Funding and Implementation

Iowa Highway 58 Corridor Improvement Study

3.0 ACCESS CONTROL PLAN - HARMONY ROAD (SH68)

US287 Asset Inventory Fort Collins. Figure 5-1 Fort Collins Bridges and Traffic Signals

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Appendix D: Concept Screening

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

GENERAL DESCRIPTION. Page 1 of 5

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Proposed Project I 35 from Denton to Cooke County Line

3.0 Future Conditions

Bluffdale/ UDOT South High-T Intersection Project Type Operations

5.0 Roadway System Plan

Basalt Creek Transportation Refinement Plan Recommendations

F.1 ENHANCED FISCALLY CONSTRAINED CAPITAL IMPROVEMENT PLAN

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Glenn Avenue Corridor Traffic Operational Evaluation

I-10 Bypass Project Banning to Cabazon

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

HIGHWAY 11 CORRIDOR STUDY

A: PLANNED P ROJECTS PROJECTS

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

San Tomas Expressway

Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles.

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CIRCLE DRIVE TRAFFIC AND ACCESS MANAGEMENT POLICY GUIDE. Management Principles and Implementation Concepts

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Oldham County Major Thoroughfare Plan

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

State Route 160 (Blue Diamond Highway)

Short and Long Term Needs

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

Route 29 Corridor Assessment Update. Development of Possible Solutions

Traffic Study North Shore School District 112

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

Regional Transportation Needs Within Southeastern Wisconsin

#!! "$% ##! &! # '#! % $ #!

Hospital Link Project Project Update September 2017

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Golden s Plan. For the Highway 6 & 93 Corridor

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

DRAFT. Memo. Range of the Alternatives Considered in the EIS

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

Huntington Station Metro Zone / North Kings Highway Concept Plan

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Appendix A: Safety Assessment

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Harrah s Station Square Casino

Clackamas County Comprehensive Plan

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012

City of Homewood Transportation Plan

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

APPENDIX D COST SUMMARY TABLES

122 Avenue: 107 Street to Fort Road

Hospital Link Project Project Update November 2017

Reams Road RCA Study. Board of County Commissioners Public Hearing

CITY OF SASKATOON COUNCIL POLICY

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

DEKALB COUNTY. 22. Priority Projects for DeKalb County

Welcome to the Quebec Alternatives Analysis Public Meeting

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

RED BANK CORRIDOR. Community Partners Committee Meeting Madisonville Recreation Center. May 21,

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

INTERSECTION IMPROVEMENTS

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Marina Loft (DRC 51-R-12)

Rideau Canal Corridor Pedestrian Crossing Study. Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave.

Creating the Future Bruce B Downs Blvd

List of Display Boards

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

A Matter of Fairness: ROCOG s Environmental Justice Protocol. What is Mobility Limitation?

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

I-10 AT SCENIC LOOP RD. Open House

Mandan Commission Meeting August 2, 2016 Mandan City Hall

APPENDIX L. Design Criteria

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

Gardiner Expressway Improvements Kipling Avenue to Park Lawn Road Class Environmental Assessment Study

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

WELCOME TO OPEN HOUSE # 1 June 14, 2017

APPENDIX L: COST ESTIMATING TOOLS

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Access Management Regulations and Standards

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Intersection Traffic Control Feasibility Study

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Transcription:

US 287/SH 14 Access Management Report Section 5.0 - Access Control Plan - SH 14 (Mulberry Street) Page 92

US 287/SH 14 Access Management Report Section 5.0 - Access Control Plan - SH 14 (Mulberry Street) Page 93

Section 5.0 - Access Control Plan - SH 14 (Mulberry Street) Page 94

Construct a raised median on Link Lane to restrict access between the highway and the frontage road. The raised median is an interim improvement that would be removed when the frontage road is relocated away from the highway. Construct a raised median island in the intersection at Airpark Drive to restrict the access to only ¾ movements as an interim improvement. Access to the frontage road on the south side of the highway would eventually be closed. Create a new ¾ movement access approximately mid-point between Airpark Drive and Timberline Road on the north side of the highway. Restrict access to ¾ movements to/from the south side of the highway approximately mid-point between Airpark Drive and Timberline Road. Provide a public street connection to Timberline Road approximately 475 feet south of Mulberry Street. The new connection would create a four-legged intersection at the location of an existing T intersection on Timberline Road at the existing median opening. Timberline Road to I-25 This is the easterly section of the corridor and it is entirely within Larimer County. The improvements documented in this section are a direct result of recommendations included in the I-25/SH14 Interchange Area Study plan that was approved by the North Front Range in September, 1999. The work of the project team mirrored these recommendations; however, in some cases, they were expanded upon. Following is a list of improvements that should be undertaken. Develop a six-lane roadway between Timberline Road and I-25. Relocate the frontage road intersections along both the north and south sides of Mulberry Street a minimum of 150 feet from the state highway. By doing so, additional space will allow for vehicle movements at these two intersections to operate in a more safe manner while also providing more stacking distance for vehicles waiting to access the highway. Close the median at the Summit View Drive intersection and limit movements to/from Summit View Drive to right-in/right-out only. An interim improvement would be to restrict movements to ¾ (leftin, right-in, right-out). Close the median at the Dawn Drive intersection and eliminate movements to/from the highway. Install new traffic signals at the Greenfields Court and Stockton Avenue/John Deere Road intersections with Mulberry Street. Evaluate the potential to construct a grade-separated pedestrian crossing near the Canal Drive and Centro Way intersections along the Frontage Road system. Section 5.0 - Access Control Plan - SH 14 (Mulberry Street) Page 95

Ultimately reconstruct the I-25 interchange area to convert the interchange from a cloverleaf interchange to a diamond interchange. Interim improvements have been identified in the I-25/SH 14 Interchange Area Study that will improve safety and provide additional capacity. 5.7 Cost Estimates Conceptual level cost estimates (Year 2000 dollars) have been prepared on a more detailed segment-bysegment basis. Since the improvement recommendations are conceptual in nature, detailed cost estimates were not prepared. The following basis was used to develop conceptual cost estimates, which includes design, construction and construction observation but does not include right-of-way acquisitions or displacements/relocations: Interchange Reconstruction - $7,076,000 Traffic Signals - $150,000 each. Private Access Reconstruction - $2,000. Median Construction - $80 per lineal foot. Collector Street - $1,500,000 per mile. Connector Street System - $500,000 per mile. Bridge Construction - $75 per square foot Box Culvert Construction - $500 per lineal foot. Left Turn Lane Construction - $200,000 each. Expansion to a Six-Lane Facility - $1,250,000 per mile. Table 5-4 presents the estimated total cost (in Year 2000 dollars) for all recommended improvements in each section. The costs per section are broken down into smaller segments for better clarity. Section 5.0 - Access Control Plan - SH 14 (Mulberry Street) Page 96

Table 5-4 Conceptual Opinion of Probable Costs By Section Corridor Section Total Cost Estimate 1 Riverside Avenue to Link Lane $7,802,000 Link Lane to Timberline Road $3,875,000 Timberline Road to Greenfields Court $6,479,000 Greenfields Court to I-25 $10,009,000 Entire Corridor $28,165,000 1 Cost estimates do not include cost for right-of-way acquisitions or displacement/relocations. All cost estimates are Year 2000 dollars. Although the cost information provided in Table 5-4 provides a conceptual level estimate for the project as a whole, estimates of cost for the improvements listed in Sections 5.3.1 were also developed. By estimating cost for specific improvements, The agencies will have a mechanism for allocating funds to these projects. These cost estimates should be reviewed and updated as appropriate on an annual basis in order to reflect inflation. These improvements have been prioritized by level of importance and the project listed and associated cost is provided in Table 5-5. These improvements are also graphically summarized on Figure 5-16. Section 5.0 - Access Control Plan - SH 14 (Mulberry Street) Page 97

Table 5-5 Conceptual Opinion of Probable Costs by Project Project Description High Priority - Widen Mulberry Street to/ six lanes between Riverside Avenue and Link Lane - New bridge over the Poudre River - Add second EB and WB left turn lanes at Lemay; access restrictions/frontage road improvements at 12th Street - Median construction at Link Lane - Median construction at Airpark Drive - Frontage road connection, SE corner at Timberline Road - 3/4 movement access at Summit View Drive - Frontage road improvements and signalization at Greenfields Court 1 - Intersection improvements, signalization at John Deere Road/Stockton Avenue intersection Medium Priority - Frontage road improvements at Link Lane - South side frontage road improvements adjacent to Fort Collins Nursery - Pedestrian crossing at Canal Drive/Centro Way Low Priority - Widen Mulberry Street to six lanes between Link Lane and I-25 - Frontage road improvements/driveway refinement, Riverside Avenue to I-25 - South frontage road improvements at 12th Street - North Frontage road improvements at Airpark Drive - 3/4 movement to Airpark Drive/Close access to south frontage road - Frontage road connection to Countryside Drive - Frontage road connection to Industrial Drive - Add EB and WB second left turn lanes at Timberline - Restrict movements to RIRO at Summit View Drive - I-25 interchange improvements Conceptual Cost Estimates $792,000 $5,721,000 $817,000 $19,000 $9,000 $237,000 $579,000 $3,034,000 $975,000 $323,000 $208,000 $475,000 $3,300,000 $2,978,000 $146,000 $219,000 $83,000 $134,000 $174,000 $735,000 $131,000 $7,076,000 TOTAL $28,165,000 1 Traffic signal completed in Spring of 2000. Section 5.0 - Access Control Plan - SH 14 (Mulberry Street) Page 98

Section 5.0 - Access Control Plan - SH 14 (Mulberry Street) Page 99