PANACEA P125 USER MANUAL

Similar documents
PANACEA P100 LOW PRESSURE USER MANUAL

PANACEA P200 STAINLESS STEEL USER MANUAL

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Pressure Dump Valve Service Kit for Series 2300 Units

Pressure Dump Valve Service Kit for Series 3000 Units

Air Operated Hydraulic Pumping Systems to 50,000 psi

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

Installation, Operation, and Maintenance Manual

RD(H)20/25 Pressure-Reducing Regulator User Manual

Geotech 1.66 Reclaimer

4400 TwinHybrid Gas Seal

LRS(H)4 Pressure-Reducing Regulator User Manual

MAINTENANCE PROCEDURE FOR X 650

MB-SP Series Solvent Purification System

Geotech 1.66 Auto-Reclaimer

RG1200 Service and Repair Manual

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

COMPRESSION TUBE FITTINGS

COMPRESSION TUBE FITTINGS

Smooth Vent Valve. Series XVD XL XL Q D- XVD XGT CYV

RHPS Series PRV 6 User Manual

DBML-60/80 Squeeze Tool

RS(H)20, 25 USER MANUAL

Paintball Marker. User s Manual. 530 South Springbrook Road Newberg, OR 97132

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

Gas Lines. Technical Manual. Sumitomo (SHI) Cryogenics of America, Inc Vultee Street Allentown, PA U.S.A.

Geotech 1.66 Auto-Reclaimer Installation and Operation

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

Zero Head Space Extractor. Catalogue No. YT HW. Operation and Maintenance Manual

Geotech 3.5 Reclaimer Installation and Operation Manual

Geotech Bladder Pumps

Geotech 1.66 Reclaimer Installation and Operation Manual

CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES

Smooth Vent Valve XVD. Series

Booster Pump PB4-60 Replacement Kits

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INLOOP ACE CRUDE OIL SAMPLER

2.0 INSTALLATION & SERVICE

UBP32 Sealed Balanced Pressure Thermostatic Steam Trap for use with PC_ Pipeline Connectors Installation and Maintenance Instructions

COMBINATION AIR RELEASE DEGASSING (CARD) VALVES INSTALLATION AND MAINTENANCE MANUAL

TECHNICAL DATA. Q = C v P S

Geotech Portable Bladder Pumps Installation and Operation Manual

Combination Air Valve

SINORIX Valve Reconditioning

Anti-flood device Model B-1

Smooth Vent Valve. XVD Series

35 TON HYDRAULIC PUNCH WARNING

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION

Beverage Systems. Component Inspection and Service TSB-Y Date: Subject: Products Affected: Description: July Inspection of CO 2

Installation, Operation, and Maintenance Manual

Installation Instructions

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

GREIG FILTERS, INC. OPERATION MANUAL

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Application and Sizing

600 o F High Temperature Aging Cell Instruction Manual

SIMPLAIR PIPING TOOL. JXT Company

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER RELIEF VALVE

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

PDY TON HYDRAULIC CRIMPING TOOL WARNING

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

Designed for low pressure, medium volume circulation of finishing materials

INSTALLATION & START-UP INSTRUCTIONS. Clack WS1 & WS1.25 METER WATER SOFTENER SYSTEMS

Service and Repair Manual

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

PRO SINK -R 1 and 2. Dilution system CONTENTS

Plant, components and devices for very high and high pressures (7000 bar and over)

H4802, H4802-1, H , and Pole Tampers

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

SCUBAPRO Repair Guide. S600-S550 Second Stages

Running HPLC Methods on an ACQUITY UPLC System

REL-46 WARNING NOTICE 15 TON SINGLE ACTING REMOTE HYDRAULIC CRIMPING HEAD. Compatible with RELIABLE R15 and P Style dies. REL-46 Manual

INSTALLATION INSTRUCTIONS

JARVIS. Model CPE Hock and Neck Cutter EQUIPMENT... TABLE OF

Please refer F 90 of the present manual for the identification of the valves used in the detector.

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

SERVICE INSTRUCTIONS

Side-of-Pole Mount for 1 Module (SPM1) For Module Type C

COMPRESSION TUBE FITTINGS 1/16 THROUGH 2 -INCH, 2 MM THROUGH 50 MM-METRIC

Torque Specifications

TECHNICAL DATA. Q= Cv S

DynaPak Gas Sampler S Y S T E M S U P P O R T M A N U A L DP-2000

Product Information News

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Solid Indicator (Non-mixer) Model CP-30SI

User s Manual Edition 1/2007

INSTALLATION & MAINTENANCE INSTRUCTION

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

Easy Nest Kits. Installation Suggestions

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

DynaPak 2000L System Support Manual Version

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL

Adjustable. Unloader Valve. O&M Manual. Part #

Suggested Installation & Operating Instructions for Sidewinder Pumps

Transcription:

Basic Features Stainless steel body with 1.125 outside diameter. Will fit into wells down to 1-1/4 (schedule 80). Uses static water pressure to fill gas and sample return tubes. Maximum depth below ground surface of 3000 ft. Other Features Compatible with Volume Booster for increased volume per cycle. Compatible with Timer Control Unit for pump cycle automation. Compatible with Zone Isolation Sampling Technology (ZIST). Specifications PU-P-125-1000 Body Construction 316 Stainless Steel, Delrin Length (in) 12.5 Outer Diameter (in) 1.13 Weight (lbs) 1.4 Maximum Pressure (psi) 1500 Maximum Depth (ft bgs) 3000 Minimum Submergence (ft) 6 Internal Volume (ml) 0 Standard Filter Pore Size (µm) 80, others available Standard Tubing OD (in) 1/4 Seal Material Buna-N Gas Compatibility Nitrogen, Compressed Air ZIST Compatibility 1.25 Panacea P125 Precautions For Safe Use 1. Never disassemble the pump while it is connected to a pressurized source. 2. Never operate the pump past its specific maximum pressure. 3. Never use tube ferrules other than those provided by BESST INC or authorized distributor. 4. Never disconnect the pump while it is pressurized with gas. 1

Panacea P125 Deployment Procedure Step 1: Locate the tall tube on the top of the pump; this is the connection for the gas tube. The shorter tube on the pump top is for the sample return tube. Gas Tube Connection Sample Tube Connection Step 2: Place the nut, back ferrule, and front ferrule onto the tube. Rotate the nut finger-tight. Tighten nut 1.25 turns. Note: If the tube has already been swaged rotate the nut finger-tight then tighten the nut a quarter turn. 2

Step 3: Connect 3 way valve or timer control unit to the end of the gas line. Connect pressure source to the 3 way valve or timer control unit. Connect gas pressure source Connect gas tube to 3 way valve or timer control unit Step 4: Place wire crimp on deployment wire. Thread deployment wire through the loop on the pump top. Crimp free wire end to deployment wire to complete the loop. Step 5: Deploy pump and tubing down well pipe. 3

Panacea P125 Downhole Operation Step 1: Determining the mode of operation. The Panacea pump can be used to purge and ratchet ground water samples to the surface. In both modes of operation the operator pressurizes the pump s gas tube to displace water into the sample return tube, and then depressurizes the pump to allow the refill of the pump and gas tubing. Purge Mode Fully discharge water in the system each pump stroke High pumping rates and volumes Minimizes gas usage Ratchet Mode Partially discharge the system with each pump stroke Samples are gently discharged, ideal for delicate analytes Sample water does not contact nitrogen gas Purge Mode Ratchet Mode Note: The mode of use determines the pressure, flow rate, and time of the pump cycle. Step 2: Determining regulator pressure. The pressure to be used to pump the sample up to the surface is dependent upon the static water pressure, and frictional losses due to fluid movement while pumping. The pressure needed to overcome static water pressure is: = h The pressure needed to overcome frictional losses is subjective to system setup. BESST INC. recommends that an additional pressure of 25psi to 50psi be added to the static water pressure to compensate for these frictional losses and help with the sealing of the foot valve poppet. = h = Pressure (psi) = Fluid density = gravitational constant h = Depth below ground surface (ft) For water applications: = 0.4325 / h = 25 50 = + 4

= 25 50 The pressure to be set on the regulator is the total pressure. = + In use, the operator of the pump can adjust the dynamic pressure to achieve a specific flow rate. Step 3: Determine time of cycle. The cycle time will consist of an on time and an off time. On Time The time that the gas tube is pressurized. Sample is displaced from the gas tube and the pump into the sample tubing. Water is discharged at the surface. Off Time The time that the gas tube is vented of the pressure. Recharge of the pump and gas tube to static water level. Cycles are sequenced for time efficiency. To achieve the specific mode of operation the timing of the pump cycle must meet the following criteria. Purge Mode On Time will cause pressurized gas to escape the sample tube. Off Time Will allow for gas tube and sample return tube to completely vent of pressurized gas. Ratchet Mode On Time will result in no pressurized gas exiting the sample tube. Off Time will allow for gas tube to completely vent of pressurized gas. Note: The first few pump cycles in Ratchet Mode will typically build the water column in the sample tubing. It is the best practice to determine timing cycles once the water column has been built to ground level. Step 4: Refine pressure and timing intervals for optimum performance. On Time Pressurizing pump and getting sample. Off Time Venting pump and refilling to static water level. 5

17 14 6 1 2 3 4 5 7 9 8 10 11 Number Panacea P125 Part Number Part Name Quantity 1 PU-P125-1001 Top 1 2 PU-P125-1002 Sample Return Spring 1 psi 1 3 PU-P125-1003 Poppet 2 4 PU-P125-1004 Valve O Ring 2 5 PU-P125-1005 Short Hex Cap 1 6 PU-P125-1006 Chamber 1 7 PU-P125-1007 ZIST Docking O Ring 1 8 PU-P125-1008 Long Hex Cap 1 9 PU-P125-1009 Foot Valve Spring 1/3 psi 1 10 PU-P125-1010 Foot Valve Adapter 1 11 PU-P125-1011 Poly Filter 1 14 PU-P125-1014 Seam O Ring 1 17 PU-P125-1017 Tube to Tube Connector 2 6

Panacea P125 Disassembly Procedure Step 1: Unscrew the chamber assembly from the top. 7

Step 2: Remove the seam o-ring from the base of the chamber threads. 8

Step 3 Unscrew the poly filter from the bottom of the foot valve adapter. 9

Step 4 Unscrew the foot valve adapter from the bottom of the chamber assembly. 10

Step 5 Unscrew the large hex cap from the bottom of the chamber assembly. A 3/8 socket can be used unscrew the large hex cap. Note: If following these instructions for reassembly, the large hex cap must be firmly tightened to the chamber in order to seat the valve o-ring properly. 11

Step 6 Use a pick to pull out the valve o-ring which is seated inside the bottom of the chamber. 12

Step 7 The poppet and the foot valve spring will slide out the bottom of the chamber. Note: If following these instructions for reassembly, the flat face of the poppet must face the large hex cap and valve o-ring in the orientation shown. 13

Step 8 Unscrew the small hex cap from inside the top assembly. A 3/8 socket can be used to unscrew the small hex cap. Note: If following these instructions for reassembly, the hex cap must be firmly tightened to the top in order to seat the valve o-ring properly. 14

Step 9 Use a pick to pull out the valve o-ring which is seated inside the top assembly. 15

Step 10 The poppet and the sample return spring will slide out the top assembly. Note: If following these instructions for reassembly, the flat face of the poppet must face the small hex cap and valve o-ring in the orientation shown. 16

Panacea P125 Troubleshoot Symptom 1: Pump is hooked up and deployed downhole. Gas is on and nothing happens. That is, neither air nor water comes out of the sample return line. Symptom 2: Pump is hooked up and deployed downhole. Gas is on and just gas comes out of the sample return tube. Symptom 3: Sample is flowing back into the pump after the pump cycle. Causes 1. The sample return tube and gas tube are switched. The sample return poppet is being locked by pressurization. Turn the gas off and connect the gas tube to the gas regulator. Turn gas on and retest. 2. Using too low of a pressure. The pressure is not high enough to overcome static pressure. Recalculate the necessary static pressure. 3. There is a leak. Pull pump from well. Check position of poppets. The flat of the poppet should face the bottom of the pump. Make sure a valve O-Ring is between the poppet and hex cap. When re-assembling make sure the hex caps are tightened firmly against top and the chamber. Check condition of the seam O-Ring on the chamber. Causes 1. Initial gas discharge is caused by the displacement of water in the sample return tube. Allow several pump cycles to build water column. 2. The pump is not submerged in water. Lower the pump to at least 6 ft below water level. 3. High pressure compressed gas is coming out of the pump. Purging for too much time. Lower the cycle on time. Repeat cycling of the pump. 4. Using too low of a pressure. The pressure is not high enough to overcome static pressure. Recalculate the necessary static pressure. Causes 1. Top poppet is not sealing. Pull pump from well. Check position of poppets. The flat of the poppet should face the bottom of the pump when deployed. Make sure an unblemished valve O- Ring is between the poppet and hex cap. When re-assembling make sure the hex caps are tightened firmly against top and the chamber. Check condition of the seam O-Ring on the chamber. 17