Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

Similar documents
Troyer s Gourd Rack 8 unit F R H O P

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

First Team Sports, Inc. Stellar Recreational Volleyball System

Retractable Security Cover for a Swim Spa

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

American Flagpole & Flag Co. 1(800)

BALL STOP INSTALLTION GUIDE

Tripod Setup Guide (M-TPx)

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Instant Garage 20' x 12' 3" x 8' 3"

STATIONARY TRUCK INTERNAL HALYARD CAM CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL COMMERCIAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

E-trike Li Assembly Guide

GATE INSTALLATION INSTRUCTIONS

Methylethycetone (MEC) - PMS 60 polyurethane glue - Grease - White silicone

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

THOR 10 HAMMER CAGE INSTRUCTIONS

ASSEMBLY INSTRUCTIONS

Assembly Guide ST200 FUNCTIONAL TRAINER

Halsey Taylor Owners Manual STOP!

SUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide

First Team Sports, Inc. Blast Recreational Volleyball System

Gurney Flap for WRX and STI w/low Profile Trunk Spoiler

GRAVITY BIKE RACK ASSEMBLY & OPERATING INSTRUCTIONS

CHAPTER 5 REWIND STARTERS

Anchors that can be used for a lifeline in a grain bin. or Ladder do not make good anchors!

Santa Fe Cycles Assembly Guide Introduction

Bladerider X8 Assembly Help Notes

S110 Steel Level Panel Installation Instructions

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

VISIT THE LIFETIME WEB SITE: **U.S. and Canada customers ONLY** IF ASSISTANCE IS NEEDED, COPY

Installation Instructions

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

Retrofitting Green SkiErg Handles

BRONZE BUSHING REPLACEMENT PROCEDURE DN345 & NL450C

VERTICAL SURFBOARD CARRIER READ ME! IMPORTANT WARNING!

OWNER'S MANUAL LOCK-N-LOAD BULLET FEEDER (PISTOL)

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

SECTION 2 RING MOUNT

Array Solutions 350 Gloria Rd Sunnyvale, TX Phone FAX

Cleaning rod: spring steel, stainless steel or carbon fibre cleaning rod - only use a one-piece rod. Avoid using snakes.

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

FNFB-30 (30 FT FIELDPRO FOOTBALL BACKSTOP SYSTEM) Installation Instructions

Instruction Manual for ZY-021 Height adjustable Acrylic Backboard with Chain net

Trilogy Theory of Operation

RADIUS ROD BUSHING SET

Lectric Cycles Mid-Drive Electric Motor Installation

TOURNAMENT ICE. 8Ft-Gold Standard Manual Score Home Air Hockey Game Assembly Instructions / Manual

MODEL CHEST PULLEY SYSTEM

3190A NEO-ANGLE DOOR INSTALLATION INSTRUCTIONS. Series MODEL NO

MODEL / SINGLE and DUPLEX PULLEY SYSTEMS

Parts Manual. Scraper Hitches PH:

VISIT THE LIFETIME WEB SITE: **For U.S. and Canada Customers ONLY:** IF ASSISTANCE IS NEEDED,

600 / 600FC OWNER'S MANUAL

Installation and Training Manual

Xtender30. Home Batting Cage. Assembly Instructions

Vac Bagger Wheelhorse 42 and 48 Mowers for Classic Garden Tractors

Made in the USA. For Fall Protection Only. SafeLok Part Description

WEIGHT STACK ATTACHMENT. Assembly Manual (888) FOR YOUR SAFETY READ ALL INSTRUCTIONS CAREFULLY

OUTDOOR BACKSTOP WITH 5'-0" EXTENSION

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

Parts & Installation Instructions SV & SV 2 8.5, 9.5 & 10.5 and SVLD 7.5 Snow Plow

HOME ASSEMBLY INSTRUCTIONS

HEAVY DUTY H.S. DISCUS CAGE NET POLE NET POLE INSTALLATION

VERSA BIKE RACK INSTRUCTIONS

Trampoline & Enclosure Assembly Instructions

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

2010 International Snow Science Workshop

VL SHEAVES/CABLE UPGRADE KIT INSTRUCTIONS

TR-AUGER. Section C INDEX BOOT / HOPPER

Reproduction. Not for. Installation Instructions. Installation Instructions. Part No Installation. 32/36 Bagger 32/36 Kit WARNING

BP48-1 AND SSP48-1 IN-GROUND POST INSTALLATION INSTRUCTIONS

Instant Garage 16' x 12' 3" x 8' 6"

FRAME FEATURES TABLE OF CONTENTS INTRODUCTION. A guide to your Cervélo C Series frame.

PART NUMBER: E361SXA200 DESCRIPTION: KAYAK CARRIER

Model PSI Compressor with 3-Gallon Air Tank 12VDC

MODEL TRIPEX PULLEY SYSTEM

Swing Set. Sheffield Model 22-PS320

INSTRUCTION MANUAL. January 23, 2003, Revision 0

CO V E R S TA R AU TO MAT I C S A F E T Y CO V E R INSTALLATION GUIDE

Using Your Bike Friday : Folding Rear Rack

Table of content Introduction 5 1. Part 1. Assembly Tools needed for Assembly Glossary Hulls Mounting the beams 7

Panoptix PS51-TH FrontVü/LiveVü Thruhull

BEAMGUARD SAFETY POST TM INSTRUCTIONS

Backboard and Rim Owners Manual

Dual Electronic Basketball System Owners Manual

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

400/488 Rotating Davit Installation Instructions

Assembly Instructions

General Information. Installation Instructions. CP1000 & FCP1000 Folding Markers. Used with: CP1000 FCP1000

INSTRUCTIONS 360 Y-DROP HAGIE STS 2015

Installation and Operation Instruction Manual

PUNE TECHTROL PVT LTD. Instruction and Maintenance Manual for Float and Tape Gauge FTG

ST Shimano Total Integration. Technical Service Instructions. General Safety Information SI-6CT0B

Rudder Kit Assembly Instructions for Quest 13

DIY Shallow Water Anchor Assembly Instructions for Rods, T-grips, Stainless Tips, Stainless Couplers, and the 4-in-1 Paddle

-- SGP (NOVA TEAM SQUARE)

INSTALLATION INSTRUCTIONS: SCTB1600

VOLLEYBALL SPIKE TRAINER. Assembly Instructions. Owner s Manual. Model # VST-100. Club Volleyball Gear WARNING

Transcription:

Deluxe Gourd Racks H F K I D E J C G A Shown above are parts for the two-level, Deluxe Gourd Rack (DGR V)with arms for vertically hung gourds. Parts List Code Quantity A B C D E F G H I J 6, or 4 6, or 4 K Description Ground stake BOTTOM pole section (no holes) TOP pole section with bottom splice 0-4 x /4 stainless steel set screws 3/3 Allen wrench Plastic cap for pole top Top perch rods (packed with poles) Rope winder with() 3/4 stainless steel hex bolts and () /4-0 stainless steel nuts Hitch pins (Depending on which system you ordered) Gourd hanging arms (straight, left-bend, and right-bend arms) Assembled hub, rope, pulleys, quick link carabineer, and 3/8 stainless steel eyebolt Thank you for purchasing this product from the PMCA. Your purchase helps support the educa- B

tion, conservation, and research projects of the PMCA. Please read all instructions carefully before assembly! Location of pole: Your gourd rack should be placed as far away from trees and bushes as possible. The average minimum distance housing can be placed from trees and still attract martins is about 40 feet (southern landlords can get away with less). Martins require wide-open flight paths around their housing. Also housing should be no further than 0 feet from human housing martins like to be near humans and no closer than about 5 feet. Step : Digging the Hole and setting the Ground Stake Using a post hole digger, dig a hole 36 deep by 9 wide Put the ground stake (A) in the center of the hole, painted end up. ( The ground stake is the -/ x -/ square black steel tube with a long piece of angle iron welded to it.) The end of the ground stake with the piece of welded angle iron should be the end that sticks out of the ground. (End with welded nut goes in bottom of hole. The welded nut is for shipping purposes only.) Add two 80# bags of wet, premixed concrete and fill the hole to ground level. Depending on the soil conditions, a larger hole with more concrete may be needed. Be sure to leave of the ground stake above the concrete. Important: fill the ground stake itself with cement to prevent water from accumulating and freezing inside. This also keeps the inside of the ground stake from rusting and makes it stronger. The gourd rack will be placed over this ground stake later in the assembly process. Wipe off any wet cement from the outside of the ground stake above ground level; the pole will need to slide over this ground stake smoothly. Before the cement hardens, make sure the ground stake is vertically plumb by checking it on at least two planes with a long bubble level. Allow the cement to harden for 48 hours. Coat the outside of the ground stake with oil or grease. Step : Assembling the Pole Lay the bottom section of the pole (B) on an overturned 5 gallon bucket (or similar object). Slide splice section of pole (C) into bottom section until both sections meet. (See photo) The two sections of pole are held together by friction and gravity once erected. Step 3: Attaching the Perch Rods Slide both perch rods (G) into holes in top of pole. Center the rods using the tape measure, then secure with two 0-4 x /4 set screws (D) and the 3/3 Allen wrench (E) that was included with the hardware. (see photo left) Step 4: Inserting Pole Cap Insert the black plastic plug cap (F) into top of pole. This is held in position by friction. Important: without the cap at the top of the pole water will fill the pole. If the water freezes the pole will split.

Step 5: Sliding the Hub onto the Pole Orient the pole so the remaining hole, at the top of the pole, is vertical and on the left half side of the pole as shown in the photo. Slide the hub assembly (K) over pole so that the quick link (carabineer) is on the same side as the 3/8 hole. The hub assembly (K) is completely assembled at the factory with rope and pulley system attached to top of hub. Step 6: Attaching the Pulley to the Pole Remove the outer locknut from the 3/8 eyebolt and push the eyebolt through the 3/8 hole in top section of pole. Upper pulley should be on the same side of the pole as the pulley on the hub. Replace locknut and tighten with wrench. The split of the eyebolt should face upper end of pole so pulley hangs freely and eyebolt will not open with the weight of the hub assembly (see photo). Step 7: Attaching the Rope Winder Attach the rope winder (H) to the pole at your desired height using two /4 x -3/4 bolts and /4 flange nuts. Make sure the rope winder is oriented so that the rope is wound on the side of the pole directly underneath the large eyebolt and pulley. Mounting the winder 4 feet above the ground will allow you to mount a pole guard just below the rope winder; pole guards work best if you mounted 4 feet above the ground. (Please note: Pole guards are available from the PMCA. They are strongly recommended as rat snakes and raccoons will climb metal poles and raid nests.) Step 8: Placing Pole on Ground Stake Place pole vertically over the ground stake and slide it down to ground level. The pole will rest on top of the cement. An adult of average strength can typically do this alone, but to be safe, have another person assist you with this step. Step 9: Attaching Arms to Hub Attach arms (J) to gourd rack. The end of the arm with the small hole drilled in it is the end that the gourd will attach to; therefore, insert the opposite end into the hub assembly. (PLEASE NOTE: The Deluxe Gourd Racks come with 3 kinds of arms: Straight, right bend, and left bend. The straight arms go into the hub side with single holes. Right bend arms (bundled with red rubber bands) go into the hole on the right side of hub bracket with two holes, as looking out from the pole (left side as landlord looks at hub). Left bend arms (bundled together with blue rubber bands) go into the hole on the left side of the hub bracket with two holes as looking out from the pole (right side as landlord looks at hub). Step 0: Seating the Arms 3

Make sure the gourd arms are pushed all the way down in the U shaped slot. Step : Attaching the Gourds Slide the gourds on the arms and insert one hitch pin (I) per arm to keep the gourd from sliding off. Vertically hung gourds may need to have their hanging holes enlarged with a 3/8 drill bit to fit on the arms. Horizontally hung gourds will need hitch pins inserted per arm, one on each side of the gourd. Raising the Gourd Rack Standing about 3 feet from the pole, pull down on the rope until the hub and the arms slide up the pole. Make sure the rope comes down between the set of arms directly below the pulleys. Once raised, tie off the excess rope around the aluminum rope winder. After installation is completed, the excess rope may be cut off, but be sure to do this when the unit is lowered so that too much is not cut off. Caution: for safety reasons, stand approximately 3 feet from the pole (completely clear of the gourd rack system overhead) when raising or lowering the system with the rope and pulley in case the rope should slip from your hands. Using gloves with nonslip coating makes raising and lowering the system both easier and safer. Caring for your Gourd Rack It is HIGHLY recommended that the pulleys be oiled once a year to keep them functioning properly (and to prevent them from squealing) and to wax the aluminum pole once a year with car wax. Remove the nests and hose out the gourds at the end of the season (late August or early September). Bring the gourds in out of the weather and store them in an outside shed. It s also recommended that the landlord s bring the arms, hub, rope, and pole in out of the weather at the season s end. Remove the arms before disassembling the upper pole system for winter storage. If the rope ever shows signs of wear, or becomes damaged, replace immediately; /4 braided nylon rope should be used. Check all the bolts and fasteners to make sure they are secure before reinstalling the Deluxe Gourd Rack each spring. Purple Martin Conservation Association 30 Peninsula Drive, Suite 6 Erie, PA 6505 84-833-7656 (phone) 84-833-45 (fax) www.purplemartin.org info@purplemartin.org 4

5