ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

Similar documents
2017 (FY 21,22,23) Ohio CMAQ Project Selection

2017 (FY 21,22,23) Ohio CMAQ Prioritization

Highway Construction

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Impact Report

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

DISTRICT CONSTRUCTION PROGRAM

CY2017 Summary of STP applications

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

FDOT Treasure Coast Traffic Impact Report

Kentucky s Surface Transportation System

I-90 Corridor Performance Corridor Result

Gerald P. Oliveto, P.E. George Franz NJDOT

Theodore Roosevelt Expressway (TRE) Annual Meeting. Jane E. Berger PE, Programming Engineer North Dakota Department of Transportation Nov.

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR

OKI Awards More Than $41 Million to Transportation Projects Across the Region

News Release Eastern Oregon Region 5

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

information, please contact the District 9 Offices at or

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000

Building Great Neighbourhoods BONNIE DOON

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND

District Construction Projects

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Use of Funding for Local Improvements City Example. Andrew Stone, P.E. City Engineer & Director of Public Works

Freeway ramp intersection study

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

New Mexico Transportation Funding Challenges

Financial Project ID No(s).: and ETDM No(s).: and 14181

When trying to gauge where future roadway extensions and/or lane widening projects will be needed, it is necessary to first anticipate and analyze

Mandan Commission Meeting August 2, 2016 Mandan City Hall

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

Legislative Update Williamsburg Residency

Manual Of Standard Traffic Signs And Pavement Markings Alberta

PREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

Appendix C. Data on Transportation Improvements

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

National Network Safety Analysis (6/4/2015 Revision) FRA and FRA PID 86661

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

San Tomas Expressway

Smoothing Out the Bumpy Road Ahead

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

Transportation Planning Division

2018 ROAD MAINTENANCE PROGRAM

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Water Street Promenade Engineering and Design Services

Engineering - Bicycle and Pedestrian

Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program

R O A D W A Y S. Chapter

2040 Long Range Plan Projects Draft October 2011

Basalt Creek Transportation Refinement Plan Recommendations

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

IMPLEMENTATION WORKBOOK

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

Building Great Neighbourhoods QUEEN ALEXANDRA

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

Riverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Culpeper District. Albemarle County Monthly Report September, 2011

Transportation Planning Division

Appendix A. Summary of Progress Made Since 2004 Plan. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan

FY 2005 TRANSPORTATION CAPITAL PROGRAM

The Year Ahead: Virginia Department of Transportation Northern Virginia District

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Chapter 4: Funding and Implementation

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Culpeper District. Albemarle County Monthly Report October, 2011

CITY OF LANCASTER PROPOSED NEW PROJECTS

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

ECONOMY PEOPLE ENVIRONMENT

Parewanui Road (RP ) 1960 Prog. Mar-18 Prog. May-18

Pavement Management Program

Kentucky Highway District 7

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

I-25 South Gap Project Monument to Castle Rock

MIAMI & ERIE CANAL SHARED USE TRAIL

Project Name Project Description Authorized Amount

APPENDIX L: COST ESTIMATING TOOLS

Annual Listing of Obligated MPO Projects

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

El Dorado County / Tahoe Roadwork Schedule

Transcription:

ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Tammy K. Campbell, P.E., District Deputy Director

2 $2.35 BILLION 28 90% 10% 2018 TOTAL MAJOR PROJECTS (each more than $10m) PRESERVING THE SYSTEM ENHANCING CAPACITY FROM 2011 TO 2018 ODOT 2018 Construction ODOT prepares for another near-record construction season 2018 CONSTRUCTION SEASON HIGHLIGHTS 959 PROJECTS 200 SAFETY PROJECTS 5,645 MILES OF PAVEMENT 1,040 BRIDGES $16.4 BILLION 7,918 PROJECTS KEEPING OHIO S ECONOMY MOVING Since 2011, $16.4 billion invested into nearly 8,000 projects COLUMBUS This year, the Ohio Department of Transportation is investing $2.35 billion into nearly 1,000 projects that will preserve existing roads and bridges, enhance capacity, and improve safety. Roads and bridges don t get better over time. That s why 90 cents of every dollar we re investing this year is to take care of what we have, said ODOT Director Jerry Wray. We re using better data and more frequent maintenance to address the small issues with our infrastructure before they become big issues. ODOT and contractors will repair or replace 5,645 miles of pavement, enough to pave a four-lane highway from Columbus to Albuquerque, New Mexico, and perform work on 1,040 bridges. While orange barrels can be an inconvenience, they are a sign of progress and improvement. Since 2011, ODOT has invested an unprecedented $16.4 billion into 7,918 projects across the state. ODOT is responsible for maintaining 43,211 lane miles of roadway and 14,095 bridges. Ohio has the 4th largest interstate system by lane miles. Ohio s transportation infrastructure supports the state s 6.5 million jobs. Our transportation network is Ohio s most valuable man-made asset, said Wray. It gives us the ability to move goods to market, get to work, take our children to school, visit an amusement park or explore the beautiful natural wonders of Ohio. District 8 Deputy Director Tammy Campbell said, These projects will greatly enhance mobility in southwest Ohio. We are rebuilding our existing system while making strategic investments to add capacity where it s essential. Despite a near-record level of road work, last year saw the second lowest number of work zone crashes in a decade in Ohio. There were 4,891 work zone crashes, resulting in 119 serious injuries and 19 deaths. The vast majority of these crashes were caused by drivers following too close. We need drivers to pay attention every moment they are behind the wheel, but it s even more vital in work zones. These zones often contain narrow lanes and changing traffic patterns. When driving through work zones, drivers need to leave more room between their vehicle and the vehicle in front of them, slow down, pay attention, and avoid all distractions, Wray said. ODOT crews were struck 152 times last year. Ohio law requires that drivers move over or slow down when they see our crews working along the roadway. Unfortunately, through the years 164 ODOT employees have lost their lives while on the job.

2018 Construction Season Highlights in District 8 Cover: Photo shows concrete pour for pedestrian tunnel that is being constructed as part of the I-75 reconstruction and widening work between Shepherd Lane and Glendale-Milford Road. Inside: Red: Bridge/culvert work; Green: Road resurfacing; Blue: Section improvement, safety and enhancement; Purple: Major construction. Project I-71/Western Row Interchange Description Construction of full interchange Cost: $47 million County Warren PID 93964 Start May 2017 Est. End June 2019 Project I-75 Mill Creek Expressway Description Two-phase Rreconstruction and widening of I-75 from Monmouth Street overpass to Clifton Avenue Cost: $79 million County Hamilton PID 104667 Start August 2018 Est. End May 2022 Project I-275 Description Pavement and bridge repair from Four Mile Road to Ohio River; project includes Combs-Heil Bridge County Hamilton PID 84492 Start June 2018 Est. End August 2020 Project I-75 Thru the Valley Description Reconstruction of I-75 between Shepherd Lane and Glendale-Milford Road Cost: $105 million County Hamilton PID 82288 Start May 2017 Est. End September 2020 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 11, 2015, and executed by FHWA and ODOT. 3

Butler County Map No. Project No. PID No. Location Work Type Construction Dates Contract Estimate/Cost Award Date 1 198-17 87090 SR 73/177 Resurfacing July 2017 to Sept. 2018 $5.3 million Sold 2 6-18 94263 SR 73 Urban Paving, Trenton May to Aug. 2018 $258,900 Sold 3 91864 SR 747 Resurfacing Aug. to Nov. 2018 $2.8 million June 7 4 105133 SR 129 Resurfacing Oct. 2018 to Oct. 2019 $8.7 million Aug. 20 1 638-17 102165 SR 748 Erosion Protection March to Sept. 2018 $566,538 Sold 2 2007-18 97457 SR 744 Intersection Improvement July to Aug. 2018 $75,000 April 2 4

Clermont County Map No. Project No PID No. Location Work Type Construction Dates Contract Estimate/Cost Award Date 1 240-18 106565 SR 32 Bridge Repair July to Sept. 2018 $135,000 April 16 1 127-18 102536 SR 28/125/132 Resurfacing May 2018 to June 2019 $3.8 million Sold 1 351-17 104407 I-275/SR 32 Ramp Widening Aug. 2017 to Aug. 2018 $2.1 million Sold 2 120-18 103594 Loveland Ave. Signage, Striping April to Sept. 2018 $58,292 Sold 3 103755 SR 32 Section Improvement Aug. 2018 to Aug. 2019 $3.4 million July 2 5

Map No. Clinton County Project No. PID No. Location Work Type Construction Dates Contract Estimate/Cost Award Date 94237 Clinton Routes Crack Seal Aug. to Nov. 2018 $548,430 July 2 1 127-18 102536 SR 380/730 Resurfacing May 2018 to June 2019 $3.8 million Sold 2 105164 SR 350 Pavement Overlay Oct. 2018 to March 2019 $2.2 million Sept. 24 1 532-17 94208 SR 133 Culvert Jan. to Oct. 2018 $647,846 Sold 6

Map No. Greene County Project No. PID No. Location Work Type Construction Dates Contract Estimate/Cost Award Date 1 200-18 101251 Central State Resurfacing Campus Roads May to July 2018 $864,434 Sold 2 8016-17 87094 SR 72 Resurfacing March to June 2018 $2.5 million Sold 3 84485 US 35 Preventive Maintenance July to Oct. 2018 $1.5 million June 18 4 98161 Creekside Trail Resurfacing Aug. to Oct. 2018 $472,000 May 14 5 105643 I-71 Pavement repair Sept. to Nov. 2018 $315,000 July 23 1 400-17 94209 Countywide Bridge Maintenance Aug. 2017 to June 2018 $480,000 Sold 2 532-17 94208 US 42/343 Culvert Repair Jan. to Oct. 2018 $647,846 Sold 3 562-17 81627 US 42 Culvert Repair Jan. to Oct. 2018 $1.3 million Sold 4 593-17 99489 SR 4 Culvert Repair Jan. to Sept. 2018 $1.6 million Sold 1 359-17 101212 US 68 Xenia Bikeway Improvement Aug. 2017 to May 2018 $1.5 million Sold 2 4011-17 93536 Yellow Springs Safe Routes to School Aug. 2017 to June 2018 $385,000 Sold 3 16-18 102060 US 35 Turn Lane Addition March to Aug. 2018 $130,050 Sold 4 94-18 101301 I-675 exit ramp Intersection Improvement May to Nov. 2018 $1.3 million Sold 199-18 87039 Countywide Sign Upgrade July 2018 to July 2019 $1.4 million Sold 5 106324 Yellow Springs Curb Ramp Upgrade Sept. to Nov. 2018 $122,000 June 18 7

8 Greene County

Hamilton County Map No Proj. No. PID No. Location Work Type Construction Dates Contract Est./Cost Award Date 1 44-17 82288 I-75 Major Reconstruction May 2017 to Sept. 2020 $105 million Sold 2 3000-18 104667 I-75 Major Widening Aug. 2018 to May 2022 $79 million June 21 1 620-16 101427 Mt. Adams Wall Preventive Maintenance Jan. 2017 to Aug. 2018 $1.7 million Sold 2 154-17 91939 US 50 Bridge Repair May 2017 to July 2018 $5.4 million Sold 3 318-17 101815 SR 126 Bridge Maintenance July 2017 to July 2018 $1.4 million Sold 4 361-17 89835 SR 4/SR 561 Bridge Replacement July 2017 to Oct. 2018 $7.5 million Sold 5 4007-18 94187 US 50 Culvert construction May to Nov. 2018 $738,713 Sold 6 41-18 84492 I-275 Bridge Repair June 2018 to Aug. 2020 $31 million Sold 7 98533 SR 126 Bridge Painting Sept. 2018 to Aug. 2020 $2.6 million July 23 8 106469 SR 128/Harrison Road Culvert Aug. to Dec. 2018 $181,000 July 2 1 42-17 82975 I-71 Pavement Rehab, Bridge Repair March 2017 to Aug. 2018 $24 million Sold 2 360-17 84491 I-71 Pavement Rehab Aug. 2017 to Aug. 2018 $4.2 million Sold 3 521-17 101578 US 42 Major Rehabilitation Oct. 2017 to Oct. 2018 $1 million Sold 4 572-17 84484 I-275/SR 126 Crack Seal May to Aug. 2018 $539,496 Sold 5 586-17 102535 US 50 Resurfacing April to Aug. 2018 $3 million Sold 6 118-18 91826 I-71 Resurfacing July 2018 to Aug. 2019 $36 million Sold 7 1022-18 106857 Winton Woods Resurfacing April to June 2018 $368,042 Sold 8 84481 US 127 Pavement Aug. to Nov. 2018 $3.2 million May 28 9 87125 I-74/I-275 Crack Seal Sept. to Dec. 2018 $990,000 Aug 20 1 133-17 88790 SR 264 Intersection Improvement April 2017 to July 2018 $3.8 million Sold 2 244-17 98760 SR 125 Sidewalks May 2017 to May 2018 $2.3 million Sold 508-17 102061 US 22/US 27/SR 125 Signal Upgrade Sept. 2017 to Sept. 2018 $1 million Sold 3 628-17 103358 I-71/75 Banks Variable Message Signs March to Dec. 2018 $475,664 Sold 4 17-18 104942 Reading Signal Updates April to Aug. 2018 $330,315 Sold 5 59-18 100032 SR 264 Sidewalks May to Dec. 2018 $295,867 Sold 6 133-18 100031 Harrison Avenue Bikepath May to Nov. 2018 $646,042 Sold 7 134-18 103505 SR 126 Intersection Improvement May to Sept. 2018 $2.2 million Sold 8 101199 Norwood Safe Routes to School Sept. to Nov. 2018 $656,000 July 2 9 9 106444 I-71 Signage Sept. 2018 to June 2019 $302,000 Aug. 6

10 Hamilton County

Preble County Map No. Proj. No. PID No. Location Work Type Construction Dates Contract Estimate/Cost Award Date 1 532-17 94208 US 127 Culvert Jan. to Oct. 2018 $647,846 Sold 2 30-18 94212 SR 122 Bridge Repair April to July 2018 $501,454 Sold 3 70-18 92193 SR 725 Bridge Replacement May to Oct. 2018 $1.1 million Sold 1 441-17 91931 SR 503 Resurfacing Aug. 2017 to June 2018 $3.1 million Sold 2 106549 Hueston Woods Resurfacing Oct. to Dec. 2018 $1.2 million May 28 3 105646 SR 726 Pavement Repair/ Sealing Oct. to Dec. 2018 $348,000 Sept. 24 11

Warren County Map No. Project No. PID No. Location Work Type Construction Dates Contract Estimate/Cost Award Date 1 116-17 93964 I-71/Western Row Interchange May 2017 to June 2019 $47 million Sold 1 108-17 91727 I-71 Bridge Repair March 2017 to Oct. 2018 $4.9 million Sold 2 562-17 81627 US 42 Culvert Repair March to Oct. 2018 $655,117 Sold 3 101842 SR 123 Bridge Repair/Erosion Protection Aug. to Nov. 2018 $119,810 Aug. 6 94237 Warren Routes Crack Seal Aug. to Nov. 2018 $548,000 July 2 1 106242 I-71 Resurfacing Sept. 2018 to Aug. 2019 $12 million July 23 1 101201 Franklin Safe Routes to School Aug. to Oct. 2018 $82,000 July 2 12

Districtwide Project No. PID No. Work Type Construction Dates Contract Estimate/Cost Award Date 593-16 88704 Bridge Maintenance March 2017 to May 2019 $910,400 Sold 8013-17 91684 Bridge Maintenance June 2017 to Oct. 2018 $2.2 million Sold 87127 Bridge Maintenance Sept. 2018 to May 2019 $2.1 million Sept. 24 280-17 88820 Signals June 2017 to June 2019 $2.2 million Sold 341-17 88819 Pavement Markings June 2017 to June 2018 $3.3 million Sold 97132 Pavement Markings April 2018 to April 2019 $3 million April 16 102937 Signs May 2018 to March 2019 $504,000 April 16 101382 Tree Removal/Pruning Sept. 2018 to Oct. 2019 $782,000 Sept. 3 8015-17 91406 Preventive Maintenance Aug. 2017 to June 2018 $2.6 million Sold 107133 Friction Surface Treatments Sept. 2018 to June 2019 $1.9 million July 23 13

Local Projects Agency PID Work Type Construction Dates Contract Estimate/Cost Award Date Butler County Engineer 99558 SR 747 widening June 2017 to Nov. 2018 $6.7 million Sold Butler County Engineer 96493 Yankee Road widening June 2017 to Dec. 2018 $3.3 million Sold Butler County Engineer 96452 Cincinnati-Dayton Road widening June 2018 to Nov. 2019 $7.3 million May 15 Butler County Engineer 98784 Princeton Road widening July 2018 to July 2019 $2.2 million May 30 Butler County Engineer 98793 Beckett/Smith roundabout June 2018 to Oct. 2019 $968,090 Sold Butler County Engineer 99229 Myers Road Bridge Replacement July 2018 to July 2019 $733,812 Sold Butler County Engineer 103317 Lanes Mill Bridge replacement June 2018 to June 2019 $2.4 million May 15 Butler County Engineer 103754 I-75/Tylersville exit ramp June 2018 to June 2019 $1.3 million May 1 City of Fairfield 98532 SR 4 Urban Paving May to Oct. 2018 $3.7 million April 2 City of Fairfield 98771 Central Traffic System Upgrade June 2018 to June 2019 $2.8 million May 1 City of Hamilton 93593 SR 129/177/Eaton Avenue realignment June 2018 to Nov. 2018 $2.4 million May 1 City of Middletown 95124 Yankee Road Phase 3 widening May 2017 to May 2018 $5.7 million Sold Clermont County Engineer 99839 SR 32/Bells Lane, SR 32/Old 74 intersection improvements Clinton County Engineer 97872 SR 350/CR 7 intersection improvement July 2018 to Nov. 2019 $4.1 million May 16 July 2017 to July 2018 $555,904 Sold Clinton County Engineer 99228 Spring Hill Road Bridge replacement Oct. 2018 to June 2019 $1 million May 23 Clinton County Engineer 101511 Guardrail replacement Oct. to Nov. 2018 $208,000 Sept. 14 Clinton County Engineer 101536 Pavement Markings Oct. to Nov. 2018 $156,000 Sept. 14 City of Beavercreek 98125 Grange Hall/National Road widening Nov. 2018 to Nov. 2020 $1.1 million Sept. 3 City of Beavercreek 100925 Indian Ripple Road widening April to Oct. 2018 $602,615 Sold City of Beavercreek 106217 Indian Ripple Road resurfacing Sept. to Nov. 2018 $1 million Sept. 1 City of Fairborn 96243 Dayton Drive widening Aug. 2017 to Oct. 2018 $1.3 million Sold City of Fairborn 103676 Central Avenue Resurfacing June to Aug. 2018 $658,432 Sold 14

Local Projects Agency PID Work Type Construction Dates Contract Estimate/Cost Hamilton County Engineer 89122 Pippin Road Phase 1 Bridge and Pavement June 2017 to July 2018 $6 million Sold Hamilton County Engineer 94547 Pfeiffer Road Bridge rehab March to Nov. 2018 $555,669 Sold Hamilton County Engineer 95282 Cheviot Road pavement rehab Aug. 2018 to Aug. 2019 $2.8 million May 29 Hamilton County Engineer 98772 Winton Road rehab July 2018 to Nov. 2019 $3.5 million May 15 Hamilton County Engineer 104409 Banks Dynamic Message Signs Aug. 2018 to Oct. 2019 $5 million June 8 City of Montgomery 99954 US 22 Sidewalks Oct. 2017 to June 2018 $597,007 Sold City of Cincinnati 94068 Marburg Bridge replacement April 2017 to Nov. 2018 $2 million Sold City of Cincinnati 102062 High Friction Surface Treatments April to July 2018 $290,859 Sold City of Cincinnati 94484 Signals Jan. 2018 to April 2019 $8 million Sold City of Cincinnati 101886 Signals Jan. 2018 to Jan. 2019 $3.5 million Sold Warren County Engineer 100784 Old SR 122/Township Line roundabout April 2018 to April 2019 $1.4 million Sold Warren County Engineer 98803 Strout Road bridge replacement March to Nov. 2018 $807,520 Sold Warren County TID 94494 SR 48/Mason-Morrow-Millgrove Intersection Feb. 2017 to Sept. 2018 $2.7 million Sold Warren County TID 95318 SR 741/73 intersection improvement June 2017 to June 2018 $2.9 million Sold City of Mason 98857 Mason Montgomery/Bethany Bikepath June 2017 to June 2018 $512,217 Sold City of Lebanon 97451 SR 48 Urban Paving July to Oct. 2018 $2 million Sold Award Date 15