BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

Similar documents
I-10 AT SCENIC LOOP RD. Open House

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Welcome. Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to:

Blair/Williamson Intersection Expressed Needs

County Board Workshop

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

Project Update May 2018

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Bay to Bay Boulevard Complete Streets Project

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

Washington St. Corridor Study

Proposed Action, Purpose and Need Technical Memorandum

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Short and Long Term Needs

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Lincoln Highway Streetscape Plan Concept Plan

2012 PRIORITY TRANSPORTATION PROJECTS

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Section Access Control Plan - SH 14 (Mulberry Street)

Ottawa Beach Road Study

Superstreet Concepts & Application. Prepared by: PAPE-DAWSON ENGINEERS, INC. October 16, 2012

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

ACTION TRANSMITTAL No

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

TRANSPORTATION COMMISSION Agenda Staff Report

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

CHAPTER 1 INTRODUCTION

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Access Management Regulations and Standards

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Tonight is for you. Learn everything you can. Share all your ideas.

Freeway System Considerations

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

MnPASS System Today and the Future

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Figure 1: Vicinity Map of the Study Area

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

WELCOME. to the meeting for the. Westside Avenue Action Plan Gateway to Revitalization

Route 29 Solutions Projects

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

COMMUNITY MEETING AGENDA

SC 41/Joe Rouse Intersection Improvements

Mark Malone, P.E. SD DOT

"Mobility 2040" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

SUPERSTREETS IN TEXAS. ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Legislative Update Williamsburg Residency

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Hillsboro Tanasbourne Town Center

Presentation Outline. Project/Study Purpose. Existing Conditions. Future Conditions. Understanding the Streetside. Similar Walkable Environments

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

EL CAMINO REAL BUS RAPID TRANSIT PROJECT

This page intentionally left blank.

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Bluffdale/ UDOT South High-T Intersection Project Type Operations

PROJECT PURPOSE & NEED

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

Hidden Oaks Elementary School

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

Part of Growing Rail Network

Chapter 4 Traffic Analysis

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Board of Supervisors February 27, 2017

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

Transportation Planning Division

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

IH 20 RANGER HILL PUBLIC MEETING

Project Team. Refined Pedestrian Crossing Toolbox. Problem Statement. Aerial of Study Corridor. Crossing Accommodations and Pedestrian Fatalities

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Omaha s Complete Streets Policy

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Road Diets. Presented by: Cristine Gowland, P.E. LADOTD District 62 March 2, 2016

Road Diets FDOT Process

INNOVATIVE INTERSECTION DESIGN

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Clay Street Bridge Replacement Project

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

City of Davis East Covell Corridor Plan

Transcription:

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM March 22, 2018

Frontage Road Operational Improvements 2

Frontage Roads Under Construction Fair Oaks Pkwy to Dominion I-10 - Fair Oaks Pkwy to FM 3351 Scope: Convert frontage roads to one way; construct overpass at Old Fredericksburg Road Cost: $31 Million Contractor: Sundt Construction Anticipated End Date: Late 2018 I-10 @ Fair Oaks Pkwy Scope: Bridge Replacement Expand Bridge to 4 Lanes & WB to EB Turnaround Cost: $7.6 Million Contractor: Relmco Construction Anticipated End Date: Mid 2018 I-10 - FM 3351 to Dominion Dr Scope: Convert Frontage Roads to One-Way; Intersection Improvements @ Boerne Stage Road, Dominion Dr., & Ralph Fair Road; Ramp Improvements Cost: $18.5 Million Contractor: Texas Sterling Construction Anticipated End Date: Completed 3

Frontage Roads Under Constr. & Planned SH 46 to Fair Oaks Pkwy I-10 SH 46 to Scenic Loop Scope: Convert frontage roads to oneway; replace SH 46 & BS 87 bridges with 6-lane bridges + intersection improvements Cost: $65 Million Contractor: Texas Sterling Construction Anticipated End Date: Mid 2021 I-10 @ SH 46 Scope: Relocate westbound exit ramp and construct partial frontage road Cost: $3.5 Million Contractor: Hanover/Zimmerman Anticipated End Date: Completed I-10 @ Scenic Loop Scope: Replace Overpass & Intersection Improvements Cost: $11.6 Million Contractor: Austin Bridge & Road Anticipated End Date: Mid 2018 Scenic Loop to County Line Scope: Convert frontage roads to oneway; construct new frontage road bridges at Balcones Creek Cost: $20 Million Contractor: TBD Anticipated Let Date: Spring 2019** **Funding Dependent I-10 County Line to Fair Oaks Pkwy Scope: Convert frontage roads to one-way; construct new overpass at Balcones Creek Road & intersection improvements Cost: $29 Million Contractor: TBD Anticipated Letting: July 2018 Anticipated End Date: Mid - 2021 4

US 87 (Main Street) Overlay US 87 Main Street (I-10 N to I-10 S) Scope: Resurface with Overlay Cost: $2.0 Million Contractor: Angel Brothers Anticipated End Date: Mid - 2018 5

Pedestrian Safety Improvements 1) SH 46 at Plant Ave 2) RM 474 at Old #9 Trail 2) RM 474 at Old #9 Trail 3) Main St at Hickman St 1) SH 46 at Plant Ave 3) Main St at Hickman / Hosack 6

Site #1 SH 46 (River Road) at Plant Avenue 7

Flashing Beacon Options Ground 8

Flashing Beacon Options Overhead 9

Flashing Beacon Options Rectangular Strobe 10

Curb Extension Options 11

Accessible Parking Spaces to be Relocated 12

Site #1 SH 46 (River Road) at Plant Avenue Design Options Accessibility On-Street Parking $150,000 Bid November 2018 Construction Spring 2019 13

Site #2 RM 474 (Blanco Rd) at Old Number 9 Greenway Closely Spaced Driveways and Streets 10,000 vehicles per day 35 mph Existing School Zone w/flashers 4-Lanes Pedestrian Refuge Median 14

Site #3 Main Street between Hickman/Hosack Streets Wide Roadway 5 Lanes with Continuous Left-turn Lane Limited Right-of-way Driveways and Streets 35 mph 22,000 vpd Ped Refuge Median 15

I-10 North Creek Road to US 87 Comfort - Estimated Construction Cost - $5 Million - Scheduled Letting May 2019 - Anticipated Construction Duration 18-24 Months 16

I-10 Added Capacity Expansion Near Term I-10 - FM 3351 to La Cantera Pkwy Scope: Expand to 6 Lane Expressway + HOV Lane Cost: $ 70 Million Contractor: Flatiron Scheduled Letting: May 2017 Anticipated End Date: Late 2019 17

Added Capacity Expansion 18

I-10 Added Capacity Expansion - Planned I-10 SH 46 to FM 3351 Scope: Expand Expressway Cost: $ 190 Million Contractor: TBD Scheduled Letting: TBD* Anticipated End Date: TBD* *Timeframes Dictated by Available Funding 19

SH 46 Expansion Esser to Ammann 20

SH 46 Expansion Scheduled Letting June 2018 Estimated Construction Cost - $11 Million Anticipated Construction Duration 18 Months Project Development Status: Environmental Cleared PS&E (Construction Plans) 95% complete Right of Way Acquisition Completed Utility Conflicts Some overhead conflicts remain **City of Boerne power poles are on critical path** 21

JOINT RESOLUTION WITH CITY AND COUNTY THIS IS A DATA DRIVEN PLANNING PROJECT TECHNICAL ANALYSIS PUBLIC INVOLVEMENT/FEEDBACK GOAL OF STUDY IDENTIFY VIABLE CORRIDORS WITH INTENT TO PRESERVE RIGHT OF WAY (ROW) METHOD OF CORRIDOR ROW PRESERVATION TO BE DETERMINED

DOWNTOWN BOERNE Preserve Boerne as a Destination Provide Efficient Through Route Provide System Redundancy IMAGES FROM GOOGLE

ALTERNATIVE SCREENING PROCESS Identify Universe of Alternatives Level 1 Screening (Fatal Flaw Analysis) Reasonable Alternatives WE ARE HERE Level 2 Screening Recommended Alternative(s)

Next Steps Refine Reasonable Concepts based on TWG/SWG workshop Reduce Reasonable Concepts to Recommended Concepts Present Recommended Concepts at 3 rd Public Meeting (Spring 2018) Draft Feasibility Report (Spring 2018)