September 2017 Safety Meeting Conducting Regulator Performance Tests

Similar documents
September 2018 Pressure Test

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1*

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION MANUAL

/2004 US/CA

INSTALLATION AND OPERATING INSTRUCTIONS BIG TEX VENTED GAS LOGS

INSTALLATION & OPERATION MANUAL FOR Stockpot Range

The conversion of new certified central heating gas appliances must conform to directions outlined in this instruction.

GAS FRYER Instruction Manual Model #5099NS

Cover Page for Lab Report Group Portion. Head Losses in Pipes

ACCESSORY KIT INSTALLATION INSTRUCTIONS

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity

INSTALLATION INSTRUCTIONS

Natural Gas Conversion Kit

Standard Operating and Maintenance Instructions for Pumping System Model PS-150

ACCESSORY KIT INSTALLATION INSTRUCTIONS

Self-operated Pressure Regulators for special applications

Cover Page for Lab Report Group Portion. Pump Performance

R122H, R222, R232A, and R232E Series Instruction Manual

INSTRUCTOR GUIDE REFERENCES: PUMPING APPARATUS DRIVER/OPERATOR HANDBOOK, FIRST EDITION, IFSTA

INSTALLATION OPERATION MAINTENANCE

Natural Gas High-Altitude Conversion Kit For Installations in the United States (2,001 10,000 Feet)

Activities. I. General Instructions. Task Information. Advancd Field Training Activities Checklist

WARNING: FOR OUTDOOR USE ONLY

Installation Instructions

SIZING AND CAPACITIES OF GAS PIPING

SIZING AND CAPACITIES OF GAS PIPING

WARNING: Gas Conversion Kit Instructions Applies to: Model UDAP, UDAS, UDBP, and UDBS Unit Heaters. General and Warnings FOR YOUR SAFETY

Natural Gas to L.P. Gas Conversion Kit

INSTALLATION & OPERATION MANUAL FOR Teppan-Yaki Griddles

Driver Operator Pumps: Water Supplies. 2 Skills Total. NFPA 1002, Standard for Driver Operator Professional Qualifications, 2014 Edition

R600 and HSRL Series Instruction Manual

Gas Conversion Kits CERAMIC HEATER SERIES (1, 2, 3, 4 Burner Units)

SL G3. Warning

2.2 Bobtail Delivery Operations Performance-Based Skills Assessment 2016

THE FOLLOWING MATERIALS ARE FOUND IN THIS PACKET:

Instruction Manual VCG-6

Natural Gas to L.P. Gas Conversion Kit

XDF BURNERS DUAL FUEL EXCESS AIR BURNER FEATURES DESCRIPTION EXCESS AIR OPERATION

SL G3 - Fuel Conversion to Natural Gas (LP to NG) P-Kit 301

NORMAL OPERATING PROCEDURES Operating Parameter Information

Propane Conversion Kit Instructions

Operator: Save these instructions for future use!

SL G3 - Fuel Conversion to Propane (NG to LP) P-Kit 302

Installation Instructions WARNING: WARNING: WARNING: LP AND HIGH ALTITUDE LP GAS CONVERSION KIT FOR UNITED STATES INSTALLATIONS

UNIVERSAL GAS FRYER Instruction Manual Model #8065NS

A guide to Part 10 of the

WARNING: Installation Instructions. Natural Gas High Altitude Conversion Kit United States Installations Only

INSTALLATION, OPERATION, SERVICE & PARTS MANUAL FOR STOCK POT RANGE MODELS VSP100, VSP200 & VSP300

THE IMPACT ON ENERGY CONSUMPTION CAUSED BY PRESSURE DROP IN A COMPRESSED AIR SYSTEM

Eliminating Medical Gas Shutdowns for 10 years

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

36E03 and 36E38 DSI and HSI Step Opening Combination Gas Valve INSTALLATION INSTRUCTIONS

At this time of year,

V8200A,C,H,M and VR8200A,C,H,M Continuous Pilot Combination Gas Controls

GAS DELIVERY PRESSURE AND MEASUREMENT

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Warning: NEVER ALTER TEST EQUIPMENT

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

Types 749B and R130 Changeover Manifolds

ACCESSORY KIT INSTALLATION INSTRUCTIONS

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

SIZING AND CAPACITIES OF GAS PIPING

Instructions for High Altitude Conversion

Module 6. Tightness Testing

VS8420 Millivolt Gas Valve

Thank You for Attending Today s Webinar. Today s Featured Speaker

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

GAS SUPPLY APPLICATION GUIDE

Incorrect installation, adjustment, or misuse of this burner could result severe personal injury, or substantial property damage.

Operator: Save these instructions for future use!

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

SIZING AND CAPACITIES OF GAS PIPING Reserved

Flammability Chart. Gas Formula Ignition

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

GEN-1e CO2 Generator OVERVIEW INSTALLATION PROPANE GENERATORS ONLY NATURAL GAS GENERATORS ONLY

Gas Conversion Kits Push Through (Positive Pressure) Tube Heater Models

Table of Contents. I. General Instructions. II. Task Information. III. Operator Qualification Checklist. IV. Railroad Commission/Employer Record

Gas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation.

Model: 43T. Bermad Pressure Relief Valve

SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED 36RB 36IRB VULCAN C36RB C36IRB WOLF

RULES PUBLICATION NO. 119/P

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

IWCF Equipment Sample Questions (Surface Stack)

Standard: NFPA 86 Process Ovens and Furnaces. NFPA 85 Boiler and Combustion Systems Hazards Code

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

Installation Instructions

Residential Pressure Booster Systems

Standard Operating and Maintenance Instructions for Pumping System Model PS-90

High-Pressure Boiler Inspection Procedures: A Complete Checklist

Models 106-RF / 206-RF Rate of Flow Control Valve

For use with select HPC Fire Pits ONLY- refer to product catalog or website. 100K BTU Maximum WARNING: FOR OUTDOOR USE ONLY

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate.

installation instructions

Operating Instructions

Data Sheet Issue A

Piped Air SCBA Refilling System Standard

SINGLE VALVE WITH LOW-FLOW BYPASS

Transcription:

September 2017 Safety Meeting Conducting Regulator Performance Tests When a gas appliance is turned on, gas flows through the line to the appliance where it is burned. The regulator ensures that the proper amount of gas is flowing to the appliance and that the pressure is not too high or too low. When the appliance is shut-off, gas pressure will continue to build in the line unless the regulator automatically turns off the flow of gas. Flow & lock-up tests as they are commonly known, are typically performed on vapor distribution systems during start-up to determine if the tank, piping system and regulator are properly sized for the intended British Thermal Unit (BTU) load and that the regulator properly stops the flow of gas when there is no more demand from the appliance. Performing A Flow Pressure Test The regulator flow pressure test is done first, making out-put pressure adjustments if needed. Step 1: Install a water column manometer or other suitable low pressure measuring device in the test tap of an appliance shut-off valve at the appliance farthest from the regulator. Step 2: Relight all pilots and operate all appliances at full capacity. Step 3: Check the flow pressure shown on the manometer with all appliances operating. If necessary, adjust the 2 nd stage or line regulator to 11 inches water column. Delivery (flow) pressure must not fall to less than the appliances required input pressures as given on the manufacturer s appliance rating plates. If adequate flow pressure is not maintained with all connected gas appliances operating, check for the following problems: The regulator output capacity may not be adequate to supply the connected appliances. The service regulator upstream may not be properly sized. Piping may be too small and friction losses may be limiting the gas volume and pressure available to the appliances and/or regulator being flow tested. If the flow tests are satisfactory, the next check is to test the regulator lock-up. Performing A Regulator Lock-Up Test Step 1: Turn all appliance controls off. Step 2: Close all appliance shut-off valves. Step 3: Leave the container service valve open in order to maintain pressure on the system. With the appliance shut-offs in the off position, the pressure will increase

slightly then stop. This is the lock-up pressure. The lock-up pressure should not exceed the flow pressure by more than 30 percent. Step 4: Watch the pressure for one minute. If the flow pressure was 11 inches water column, then the lock-up pressure should not exceed 14.3 inches water column. The pressure should stay steady and not creep up during your observation period. If the regulator fails to lock-up or creeps upward, the regulator is malfunctioning. This problem indicates the regulator must be replaced. Never exceed the manufacturer s recommendation for flow and lock-up pressures. Never attempt to perform these tests unless you have been properly trained. Documentation The job isn t finished until all paperwork is properly completed. All required pressure, flow, and lock-up tests and leak checks must be documented on the designated company form or report per your company s standard operating procedures (SOP). Closing Operating pressures are very critical to proper appliance operation. Many high efficiency appliances will not operate if regulator lock-up pressure is too high or flow pressures are not within operating range. Always consult the appliance manufacturer s operating instruction for required gas pressure information.

September 2017 Regulator Performance Tests Name: Date: Instructions: Read and answer each of the following questions. When complete, grade the test and review incorrect answers so each employee is armed with the correct answers before they leave the training. 1. A general guide line for regulator lock-up pressure is that it should not be in excess of higher than flow pressure. a. 10% b. 25% c. 30% d. 100% 2. When performing the regulator flow test, of the gas appliances should be operating. a. all b. first c. last d. none 3. During the lock-up test, you should watch the pressure for. a. 30 seconds b. 1 minute c. 2 minutes d. 3 minutes 4. Delivery (flow) pressure must not fall to less than the appliances required input pressures as given on the manufacturer s appliance rating plates. a. True b. False 5. As required by NFPA 54, a leak check and pressure test must be documented, but a flow and lock-up test can be omitted from documentation. a. True b. False

September 2017 Test Answer Sheet 1. c. 2. a. 3. b. 4. a. 5. b.

MONTHLY SAFETY MEETING MINUTES AND ATTENDANCE RECORD Company Name: City: State: Date: Time Started: Time Finished: Instructed By: Number Attending: Subject Covered and Comments: By my signature below, I certify that I attended and participated in this Safety Meeting and I understand the material presented. Employee Name (Please print) Employee Signature *License Expires **Endorsements ***Physical Exam 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. *Driver licenses may be for multiple years and require HazMat testing between license renewal periods. List expiration date. **Check licenses for proper endorsements and re-testing. (HazMat) List endorsements in this column. ***Physical Examinations are good for 2 years from the original date of the exam or sooner by Physician s request. List original exam date in this column. By my signature below, I hereby certify that the employees listed above have been trained in accordance with the applicable regulations and curriculum for this monthly safety meeting. Instructor s Signature: Date: