APPENDIX G: 20 Year Transportation Improvement Project Cost Lists

Similar documents
Amendment to the Summary of Regional Strategic Investments included in the Regional Transportation Plan

APPENDIX B: Planned and Programmed Improvements Technical Memorandum

APPENDIX 1 CAPITAL PRGRAM PROJECT LISTS

State Route 160 (Blue Diamond Highway)

Nevada s Transportation Infrastructure and Future Transportation Needs

REGIONAL BICYCLE NETWORK GAP ANALYSIS

Bluffdale/ UDOT South High-T Intersection Project Type Operations

San Jose Transportation Policy

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

PATRICK COMMERCE CENTER

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

Relevant Studies and Industry Practices Summary

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

NEED FOR ADDITIONAL FUNDING

2012 PRIORITY TRANSPORTATION PROJECTS

PRESS RELEASE San Joaquin Council of Governments

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Building Great Neighbourhoods BONNIE DOON

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

A METHODOLOGY TO IDENTIFY HIGH PEDESTRIAN CRASH LOCATIONS: AN ILLUSTRATION USING THE LAS VEGAS METRO AREA

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

Maryland Parkway Corridor Complete Streets Analysis and Considerations Technical Report

AVAILABLE: Park West Business Center

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Project Description Form 8EE

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

CITY OF PORTSMOUTH PLANNING DEPARTMENT

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Applications for Funding

FY Regional Transportation Improvement Program

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

TRANSPORTATION COMMISSION Agenda Staff Report

Freeway System Considerations

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Roadway Project Recommendations:

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Chapter 4: Funding and Implementation

Basalt Creek Transportation Refinement Plan Recommendations

F.1 ENHANCED FISCALLY CONSTRAINED CAPITAL IMPROVEMENT PLAN

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

Chapter 6 Transportation Plan

Date: February 18, 2015 Page: 1 of 9. ICBC invests $1.195 million to improve Surrey, Delta & White Rock roads

Appendix 1. Public Participation

Building Great Neighbourhoods QUEEN ALEXANDRA

ANNUAL VEHICLE MILES OF TRAVEL

APPENDIX D COST SUMMARY TABLES

CITY OF LANCASTER PROPOSED NEW PROJECTS

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

York Region Population and Employment Growth

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

US287 Asset Inventory Fort Collins. Figure 5-1 Fort Collins Bridges and Traffic Signals

STUDY ADVISORY COMMITTEE. October 8, 2015

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Project Description Form 6V

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Planning Committee STAFF REPORT

Anniedale- Tynehead NCP Best Practices in Transportation Planning Summary

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Why invest in the 1 Street S.W. Corridor?

VIII. Project Prioritization & Implementation

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

Bus Rapid Transit Plans

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

A Step-by-Step Guide to Complete Streets Implementation. Mark A. Cole, PE Charlotte Department of Transportation

TRANSPORTATION & MOBILITY

A: PLANNED P ROJECTS PROJECTS

Project Fact Sheet. August 1,

What Is a Complete Street?

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Projects to Be Evaluated for the STP and CMAQ Funds and the 2021 TAP Programs

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Tacoma Streets Initiative 2017 Progress Report City of Tacoma Public Works Transportation Commission February 21, 2017

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Route 7 Corridor Study

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

Freeway Performance Report 2015, 3 rd Quarter. Photo courtesy of

Road Diets FDOT Process

Bicycle and Pedestrian Plans and Improvements

5. RUNNINGWAY GUIDELINES

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Sacramento Grid 2.0. The Downtown Transportation Study

Transportation Corridor Studies: Summary of Recommendations

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Staff Report. Within the $10 million funding limit, ten projects submitted by six different jurisdictions are recommended for funding:

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

Transcription:

APPENDIX G: 20 Year Transportation Improvement Project Cost Lists

Fiscal Year 2018 2022 Projects KEY BIKE LANE QUANTITY FOR KPI LENGTH ESTIMATED CLV OTHER ENTITY Buffered Non Buffered but New Basic WARD (MILES) COST ($M) COST ($M) Lanes Enhanced Existing Lanes Lanes O&M IMPACT DURANGO STREET REHAB AND BUFFERED BIKE LANES FARM TO BRENT LANE 6 1.25 $1.10 0.75 0.5 IMPROVED ASSETS GRAND TETON STREET REHAB AND BUFFERED BIKE LANES SKY POINTE TO DURANGO 6 0.5 $0.50 0.5 IMPROVED ASSETS GRAND TETON STREET REHAB AND BUFFERED BIKE LANES DURANGO TO BUFFALO 6 1 $0.80 1 IMPROVED ASSETS JONES BOULEVARD STREET REHAB AND BUFFERED BIKE LANES LONE MOUNTAIN TO RANCHO 4 1 $1.50 1 IMPROVED ASSETS EASTERN AVENUE COMPLETE STREET CEDAR TO OWENS 3 1.25 $7.20 $2.00 1 0.25 TREE MAINTENANCE MARYLAND PARKWAY STREET REHAB AND BIKE LANE RETROFIT STEWART TO BRUCE 3/5 1.25 $2.75 1.25 IMPROVED ASSETS BUFFALO STREET REHAB AND BIKE LANE RETROFIT LAKE MEAD TO CHEYENNE 1/4 1.5 $0.80 1.5 IMPROVED ASSETS DESERT INN STREET REHAB AND BIKE LANE RETROFIT FORT APACHE TO GRAND CANYON 2 0.5 $0.75 0.5 IMPROVED ASSETS DESERT INN STREET REHAB AND BIKE LANE RETROFIT GRAND CANYON TO HUALAPAI 2 0.5 $0.75 0.5 IMPROVED ASSETS HUALAPAI STREET REHAB AND BIKE LANE RETROFIT SAHARA TO CHARLESTON 2 1 $0.80 1 IMPROVED ASSETS HUALAPAI STREET REHAB AND BIKE LANE RETROFIT SAHARA TO DESERT INN 2 1 $1.10 1 IMPROVED ASSETS WASHINGTON STREET REHAB AND BIKE LANE RETROFIT JONES TO RAINBOW 1/5 1 $1.50 1 IMPROVED ASSETS RANCHO STREET REHAB AND SIDEWALK WIDENING/STREET TREES ALTA TO CHARLESTON 1 0.5 $5.00 TREE MAINTENANCE DURANGO STREET REHAB AND BIKE LANE RETROFIT SAHARA TO CHARLESTON 1/2 1 $0.80 1 IMPROVED ASSETS ALTA STREET REHAB AND BUFFERED BIKE LANES DURANGO TO RAINBOW 1,2 2 $1.60 2 IMPROVED ASSETS LAKE MEAD STREET REHAB AND BIKE LANE RETROFIT HILLS CENTER TO ANASAZI 2/4 1.25 $0.80 1.25 IMPROVED ASSETS TENAYA STREET REHAB AND ENHANCED BIKE LANES ALEXANDER TO SMOKE RANCH 2/4 2 $1.60 2 IMPROVED ASSETS TENAYA STREET REHAB AND ENHANCED BIKE LANES SMOKE RANCH TO LAKE MEAD 1,4 0.5 $0.40 0.5 IMPROVED ASSETS TENAYA STREET REHAB AND ENHANCED BIKE LANES LAKE MEAD TO WASHINGTON 1 1 $0.80 1 IMPROVED ASSETS CHEYENNE STREET REHAB 215 TO HUALAPAI 4 0.5 $0.55 IMPROVED ASSETS WASHINGTON STREET REHAB AND BIKE LANE RETROFIT JONES TO DECATUR 1/5 1 $1.10 1 IMPROVED ASSETS PARADISE COMPLETE STREET/GATEWAY CONVERSION SAHARA TO SAINT LOUIS 3 0.25 $3.00 0.25 TREE MAINTENANCE GRAND CANYON STREET REHAB AND BUFFERED BIKE LANES CHEYENNE TO ALEXANDER 4 1 $0.80 1 IMPROVED ASSETS GRAND CENTRAL STREET REHAB IRON HORSE TO CITY PARKWAY 1/5 1 $0.80 IMPROVED ASSETS WASHINGTON STREET REHAB AND ENHANCED BIKE LANES RAINBOW TO DURANGO 1,5 2 $2.00 2 IMPROVED ASSETS BUFFALO STREET REHAB, BUFFERED BIKE LANES, ENHANCED MEDIAN SAHARA TO CHARLESTON 1 1 $4.00 1 IMPROVED ASSETS SMOKE RANCH STREET REHAB AND BUFFERED BIKE LANES RAINBOW TO BUFFALO 1/4/5 1 $0.80 1 IMPROVED ASSETS DECATUR STREET REHAB WASHBURN TO TROPICAL 6 1 $0.80 IMPROVED ASSETS ALEXANDER STREET REHAB AND BUFFERED BIKE LANES HUALAPAI TO CLIFF SHADOWS 4 1 $0.80 1 IMPROVED ASSETS VEGAS DRIVE STREET REHAB AND ENHANCED BIKE LANES BUFFALO TO RAINBOW 1 1 $0.80 1 IMPROVED ASSETS VEGAS DRIVE STREET REHAB AND ENHANCED BIKE LANES RAMPART TO BUFFALO 2 1.5 $1.20 1.5 IMPROVED ASSETS FARM STREET REHAB AND ENHANCED BIKE LANES TENAYA TO DURANGO 6 1.75 $2.00 1.75 IMPROVED ASSETS DECATUR STREET REHAB AND BIKE LANE RETROFIT FARM TO ELKHORN 6 0.5 $1.10 0.5 IMPROVED ASSETS TROPICAL STREET REHAB AND ENHANCED BIKE LANES DECATUR TO JONES 6 1 $1.10 1 IMPROVED ASSETS US95 AT VEGAS DRIVE OVERPASS COMPLETION AND BIKE LANE EXTENSION 1/5 0.25 $5.50 0.25 NDOT BRIDGE US95 AT ALEXANDER ROAD OVERPASS COMPLETION AND BIKE LANE EXTENSION 4 0.25 $5.50 0.25 NDOT BRIDGE US95 AT LONE MOUNTAIN OVERPASS COMPLETION AND BIKE LANE EXTENSION 4 0.25 $5.50 0.25 NDOT BRIDGE JOHN HERBERT / 215 INTERCHANGE / FRONTAGE ROAD TO OSO BLANCA / OSO BLANCA UNDERPASS 6 1 $0.50 $60.00 1 NDOT BRIDGE PINTO LANE "NEON" MLK TO RANCHO COMPLETE STREET 1 0.75 $5.00 0.75 TREE MAINTENANCE LAS VEGAS BLVD STEWART TO CHARLESTON PEDESTRIAN FRIENDLY RECONSTRUCTION 3/5 1 $17.00 TREE MAINTENANCE LAS VEGAS BLVD CHARLESTON TO SAHARA PEDESTRIAN FRIENDLY RECONSTRUCTION 3 1 $19.00 TREE MAINTENANCE LAS VEGAS BLVD STEWART TO OWENS COMPLETE STREET / BIKE LANE RETROFIT 5 1.25 $21.00 1 TREE MAINTENANCE CALIFORNIA STREET COMMERCE TO 3RD COMPLETE STREET 3 0.25 $2.40 TREE MAINTENANCE COLORADO STREET COMMERCE TO 3RD COMPLETE STREET 3 0.25 $2.40 TREE MAINTENANCE BRIDGER MAIN TO GRAND CENTRAL EXTENSION W/ BRIDGE OVER UPRR 5 0.25 $34.25 0.25 TREE MAINTENANCE CITY PARKWAY / US95 INTERCHANGE 5 0.25 $5.00 $20.00 NDOT BRIDGE CITY PARKWY BONANZA TO GRAND CENTRAL PARKWAY CAPACITY AND COMPLETE STREET 5 0.25 $4.00 0.25 TREE MAINTENANCE OWENS AVENUE COMPLETE STREET H STREET TO UPRR CROSSING 5 0.75 $12.00 0.75 TREE MAINTENANCE LOSEE ROAD EXTENSION LAKE MEAD TO OWENS 5 0.5 $4.50 IMPROVED ASSETS I 15 FRONTAGE ROAD WASHINGTON TO LAKE MEAD 5 1 $14.00 IMPROVED ASSETS OGDEN AVENUE COMPLETE STREET LVB TO 13TH 3,5 0.5 $4.50 TREE MAINTENANCE

Fiscal Year 2018 2022 Projects KEY BIKE LANE QUANTITY FOR KPI LENGTH ESTIMATED CLV OTHER ENTITY Buffered Non Buffered but New Basic WARD (MILES) COST ($M) COST ($M) Lanes Enhanced Existing Lanes Lanes O&M IMPACT 6TH STREET BRIDGER TO BONNEVILLE COMPLETE STREET 3 0.25 $2.40 TREE MAINTENANCE 7TH STREET BRIDGER TO STEWART COMPLETE STREET 3,5 0.4 $3.20 TREE MAINTENANCE 8TH STREET BRIDGER TO STEWART COMPLETE STREET 3,5 0.4 $3.20 TREE MAINTENANCE 9TH STREET FREMONT TO STEWART COMPLETE STREET 3,5 0.125 $1.60 TREE MAINTENANCE WASHINGTON AVENUE BIKE LANE RETROFIT/STREETSCAPE MLK TO D 5 1.25 $4.00 1.25 TREE MAINTENANCE HOOVER AVENUE AT UPRR BIKE/PED BRIDGE 1/3 0.25 $6.50 BRIDGE UPRR TRAIL CHARLESTON TO 515 1/5 1 $13.00 TRAIL LIGHTING SPENCER ALIGNMENT TRAIL CHARLESTON TO SAHARA 3 1 $1.50 TRAIL LIGHTING WASHINGTON LAS VEGAS BLVD TO BRUCE STREET REHAB AND BIKE LANE RETROFIT 3,5 0.5 $0.60 0.5 IMPROVED ASSETS BONANZA MLK TO H STREETSCAPE AND BIKE LANE RETROFIT 5 1 $3.00 1 TREE MAINTENANCE BOTTLENECK IMPROVEMENT US95/DECATUR SB OFFRAMP 1/5 0.25 $1.25 IMPROVED ASSETS BOTTLENECK IMPROVEMENT CC215/CHARLESTON SB ON/OFF RAMPS 2 0.25 $0.25 $2.00 IMPROVED ASSETS BOTTLENECK IMPROVEMENT CHARLESTON / NELLIS 3 0.125 $1.25 IMPROVED ASSETS BOTTLENECK IMPROVEMENT ANN / CENTENNIAL CENTER 4,6 0.25 $1.25 IMPROVED ASSETS LAKE MEAD LOSEE TO TONOPAH COMPLETE STREET 5 2 $10.00 $5.00 2 TREE MAINTENANCE LAMB STEWART TO OWENS COMPLETE STREET 3 1.5 $10.00 1.5 TREE MAINTENANCE 215 BELTWAY TRAIL CENTENNIAL TO DECATUR 6 5.75 $8.00 BRIDGE STEWART AVENUE COMPLETE STREET 13TH TO NELLIS 3,5 3.75 $9.00 3 0.75 TREE MAINTENANCE STEWART AVENUE COMPLETE STREET LVB TO 13TH 3/5 0.5 $5.00 0.5 TREE MAINTENANCE WYOMING INDUSTRIAL TO LVB CAPACITY / COMPLETE STREET 3 0.5 $5.00 0.5 TREE MAINTENANCE SYMPHONY PARK PEDESTRIAN BRIDGE N/O FREMONT 3/5 0.125 $9.00 BRIDGE FREMONT EAST PHASE 2 8TH TO MARYLAND PEDESTRIAN ENHANCEMENTS / STREETSCAPE 3 0.25 $3.50 TREE MAINTENANCE VARIOUS INTERSECTION IMPROVEMENTS CITYWIDE FOR BIKE LANE PINCH POINTS 1,2,3,4,5,6 1 $5.00 IMPROVED ASSETS SUMMERLIN PARKWAY TRAIL RAMPART TO 215 2/4 3.5 $6.00 TRAIL LIGHTING RAINBOW WESTCLIFF TO SAHARA COMPLETE STREET 1 2 $6.50 2 TREE MAINTENANCE NELLIS AVENUE BUS TURNOUTS AND SHELTER RELOCATIONS OWENS TO CHARLESTON 3 2 $1.80 IMPROVED ASSETS EASTERN AVENUE BUS TURNOUTS AND SHELTER RELOCATIONS CEDAR TO SAHARA 3 1.5 $1.00 IMPROVED ASSETS VARIOUS INTERSECTION IMPROVEMENTS CITYWIDE FOR CAPACITY AND SAFETY 1,2,3,4,5,6 1 $10.00 IMPROVED ASSETS ADCOCK AND GARSIDE SCHOOL SAFE ROUTE IMPROVEMENTS 1 0.25 $1.25 IMPROVED ASSETS HARRIS AVENUE SAFE ROUTE TO SCHOOL UPGRADES BRUCE TO WARDELLE 3 0.85 $1.50 0.85 IMPROVED ASSETS CLARK HIGH SCHOOL SAFE ROUTE IMPROVEMENT PENNWOOD BETWEEN DECATUR AND VALLEY VIEW 1 1 $0.80 $0.20 1 IMPROVED ASSETS CLARK HIGH SCHOOL SAFE ROUTE IMPROVEMENT ARVILLE BETWEEN SIRIUS AND SAHARA 1 1 $2.50 $0.25 IMPROVED ASSETS HANCOCK ELEMENTARY SCHOOL SAFE ROUTE IMPROVEMENT LINDELLE BETWEEN CHARLESTON AND OAKEY 1 0.5 $2.00 IMPROVED ASSETS FORT APACHE / RAMPART / DURANGO DESERT INN TO CHEYENNE BIKE LANE RETROFIT 2/4 5 $8.00 5 IMPROVED ASSETS BOULDER AVENUE 1ST TO ART WAY COMPLETE STREET 3 0.1 $0.60 TREE MAINTENANCE CENTENNIAL CENTER TRAFFIC CALMING ANN TO GRAND MONTECITO 6 1.25 $1.00 IMPROVED ASSETS CHARLESTON RANCHO TO MLK SIDEWALK / STREETSCAPE IMPROVEMENT 1 1 $6.00 TREE MAINTENANCE SYMPHONY PARK PHASE 2 PARCEL ROADWAY INFRASTRUCTURE 5 1 $6.50 $1.60 IMPROVED ASSETS DECATUR BLVD BUS TURNOUTS AND SHELTER RELOCATIONS US95 TO ELKHORN 1,5,6 8 $3.00 IMPROVED ASSETS CENTENNIAL HILLS SAWTOOTH INFILL (VARIOUS LOCATIONS) 6 4 $7.00 IMPROVED ASSETS BUFFALO DRIVE BUS TURNOUTS AND SHELTER RELOCATIONS CHARLESTON TO CHEYENNE 1,2,4 4 $2.50 IMPROVED ASSETS NORTHWEST EXPANSION AREA AT FORT APACHE/MOCCASSIN MAJOR STREET ROAD IMPROVEMENTS 6 3 $8.00 IMPROVED ASSETS GOWAN HUALAPAI TO BUFFALO ROAD DIET / BUFFERED BIKE LANES / TRAFFIC CALMING MEDIANS 4 3.5 $0.60 3.5 IMPROVED ASSETS GRAND CENTRAL / INDUSTRIAL CONNECTOR OVER UPRR 1,3 0.5 $32.00 0.5 BRIDGE BONANZA TRAIL CYCLE TRACK US95 NB OFF TO US95 SB ON 1 0.125 $0.30 IMPROVED ASSETS TENAYA CHEYENNE TO SMOKE RANCH BUS TURNOUTS, SHELTER RELOCATIONS, MEDIAN RETROFIT 1 1 $1.00 IMPROVED ASSETS SUMMERLIN PARKWAY OVERLAY 215 TO BUFFALO 1,2,4 4 $3.50 IMPROVED ASSETS FORT APACHE / RAMPART ROUTE 120 BUS TURNOUTS AND SHELTER RELOCATIONS 2,4 5 $2.00 IMPROVED ASSETS DURANGO/WESTCLIFF/BUFFALO ROUTE 121 BUS TURNOUTS AND SHELTER RELOCATIONS 1,2,4 4 $1.50 IMPROVED ASSETS LAKE MEAD / HILLS CENTER / TOWN CENTER ROUTE 210 BUS TURNOUTS AND SHELTER RELOCATIONS 2,4,5 6 $1.50 IMPROVED ASSETS CIMARRON ROAD OAKEY TO VEGAS DRIVE BUFFERED BIKE LANES AND TRAFFIC CALMING 1,2 2.25 $0.80 2.25 IMPROVED ASSETS

Fiscal Year 2018 2022 Projects KEY BIKE LANE QUANTITY FOR KPI LENGTH ESTIMATED CLV OTHER ENTITY Buffered Non Buffered but New Basic WARD (MILES) COST ($M) COST ($M) Lanes Enhanced Existing Lanes Lanes O&M IMPACT HILLPOINTE LAKE MEAD TO RAMPART ROAD DIET / BUFFERED BIKE LANES 2,4 1.75 $0.75 1.75 IMPROVED ASSETS CHARLESTON / US95 INTERCHANGE SAFETY AND CAPACITY IMPROVEMENTS 3 0.5 $2.00 $6.00 IMPROVED ASSETS BONANZA RANCHO TO NELLIS BUS TURNOUTS AND SHELTER RELOCATIONS 3,5 6.5 $2.00 IMPROVED ASSETS OAKEY VALLEY VIEW TO WESTERN STREET REHAB AND BIKE LANE RETROFIT 1 1.75 $1.40 1.75 IMPROVED ASSETS WASHBURN DURANGO TO TENAYA SAWTOOTH INFILL AND TRAFFIC CALMING 4 2 $1.50 IMPROVED ASSETS JACKSON AVENUE "H" TO "C" COMPLETE STREET IMPROVEMENTS 5 0.25 $2.00 TREE MAINTENANCE MLK ALTA TO CAREY BUS TURNOUTS AND SHELTER RELOCATIONS 5 2.5 $1.25 0.25 IMPROVED ASSETS TOTAL 150.25 $451.00 $97.05 25.5 9.25 32.1 O&M CONSIDERATIONS: 1) EACH OF THE PROJECTS HAVE BEEN NOTED FOR O & M IMPACT. THE MAJORITY OF THE PROJECTS RENEW/REPLACE AN EXISTING OLD ASSET SO THE O&M IMPACT IS ACTUALLY POSITIVE FOR MOST PROJECTS 2) AN EXCEPTION IS COMPLETE STREET PROJECTS THAT HAVE BEEN NOTED TO ADD TREES. TREE MAINTENANCE HAS A SIGNIFICANT IMPACT ON O&M. THE CITY ESTIMATES THAT A STREET TREE COSTS $760/YR TO MAINTAIN (WATER, IRRIGATION SYSTEM, PRUNING, FERTILIZING) 3) THE EXPANSION OF THE BIKE LANE NETWORK AND ADDITION OF BUFFERED BIKE LANES WILL REQUIRE ADDITIONAL SIGN AND MARKING MAINTENANCE STAFF 4) FOR EVERY MILE OF NEW ROADWAY ADDED, THE CITY GAS TAX ALLOCATION IS INCREASED. THESE FUNDS DO NOT COVER THE FULL COST OF MAINTAINING THE NEW ROADWAY MILEAGE

Fiscal Year 2023 2027 Projects WARD LENGTH (MILES) ESTIMATED CLV COST ($M) OTHER ENTITY COST ($M) O&M IMPACT SHEEP MOUNTAIN PARKWAY 215 TO GRAND TETON WITH DIRECT RAMPS TO/FROM 215 6 2.5 $35.00 NEW BRIDGE CC215 BELTWAY TRAIL BRIDGES AT LAKE MEAD, GRAND CANYON, TORREY PINES 2,4,6 0.25 $10 CMAQ; $15.00 $5 SNPLMA NEW BRIDGE MICHAEL WAY AT US95 BIKE / PED BRIDGE 1,5 0.25 $6.50 CMAQ NEW BRIDGE CHEYENNE AVENUE 215 TO DECATUR BUS TURNOUTS / SHELTER RELOCATIONS 4,5 6 $6.00 IMPROVED ASSETS US95 AT PAIUTE / CITY 600 ACRE SITE INTERCHANGE 6 1 $30.00 NEW BRIDGE CITY 600 ACRE SITE AT MOCCASSIN/FORT APACHE MAJOR STREET INFRASTRUCTURE 6 3.5 $35.00 IMPROVED ASSETS MAIN STREET US95 TO OWENS COMPLETE STREET 5 1.5 $15.00 TREE MAINTENANCE MLK OAKEY TO TEDDY EXTENSION; DIRECT CONNECT TO D.I. OVERPASS 1 1.5 $62.00 NEW BRIDGE I 515 TRAIL UPRR TO CHARLESTON 3,5 3 $4.00 SNPLMA TRAIL LIGHTING BONANZA MAIN TO EASTERN BIKE LANE RETROFIT AND SIDEWALK WIDENING 3,5 1.5 $3.00 IMPROVED ASSETS MICHAEL WAY BUFFERED BIKE LANES LAKE MEAD TO RANCHO 5 2 $1.00 IMPROVED ASSETS OAKEY BUFFALO TO RAINBOW STREET REHAB AND ENHANCED BIKE LANES 1 1 $1.10 IMPROVED ASSETS OAKEY DURANGO TO BUFFALO STREET REHAB AND ENHANCED BIKE LANES 1 1 $0.80 IMPROVED ASSETS HUALAPAI CHEYENNE TO ALEXANDER STREET REHAB AND BUFFERED BIKE LANES 4 1 $0.80 IMPROVED ASSETS DURANGO CENTENNIAL TO US95 STREET REHAB AND BIKE LANE RETROFIT 6 1.5 $1.20 IMPROVED ASSETS DECATUR BLVD LONE MOUNTAIN TO 215 STREET REHAB AND BIKE LANE RETROFIT 6 2 $3.00 IMPROVED ASSETS VEGAS DRIVE RAINBOW TO JONES STREET REHAB AND ENHANCED BIKE LANES 5 1 $0.80 IMPROVED ASSETS VEGAS DRIVE JONES TO DECATUR STREET REHAB AND ENHANCED BIKE LANE 5 1 $0.80 IMPROVED ASSETS ALEXANDER CIMARRON TO DURANGO STREET REHAB AND BUFFERED BIKE LANES 4 0.5 $0.40 IMPROVED ASSETS ALEXANDER DURANGO TO FORT APACHE STREET REHAB AND BUFFERED BIKE LANES 4 1 $0.80 IMPROVED ASSETS ALEXANDER FORT APACHE TO HUALAPAI STREET REHAB AND BUFFERED BIKE LANES 4 1 $0.80 IMPROVED ASSETS HORSE JONES TO DECATUR STREET REHAB AND BUFFERED BIKE LANES 6 1 $0.80 IMPROVED ASSETS GRAND TETON JONES TO DECATUR STREET REHAB AND BUFFERED BIKE LANES 6 1 $0.80 IMPROVED ASSETS ELKHORN JONES TO DECATUR STREET REHAB AND BUFFERED BIKE LANES 6 1 $0.80 IMPROVED ASSETS JONES 215 TO ELKHORN STREET REHAB AND BUFFERED BIKE LANES 6 1 $0.80 IMPROVED ASSETS JONES ELKHORN TO HORSE STREET REHAB AND ENHANCED BIKE LANES 6 2 $1.60 IMPROVED ASSETS RAINBOW US95 TO SMOKE RANCH STREET REHAB AND BIKE LANE RETROFIT 5 1.75 $2.00 IMPROVED ASSETS SAINT LOUIS PARADISE TO BOULDER HIGHWAY STREET REHAB, ENAHNCED BIKE LANES, DECORATIVE MEDIANS 3 2.5 $4.00 TREE MAINTENANCE GRAND MONTECITO CENTENNIAL TO OSO BLANCA STREET REHAB AND ENHANCED BIKE LANES 6 1.25 $1.00 IMPROVED ASSETS GRAND TETON PULI TO OSO BLANCA STREET REHAB AND BUFFERED BIKE LANES 6 2 $1.60 IMPROVED ASSETS DURANGO BRENT TO MOCCASSIN STREET REHAB AND BUFFERED BIKE LANES 6 1.25 $1.00 IMPROVED ASSETS RANCHO CHARLESTON TO SAHARA STREET REHAB 1 1 $0.80 IMPROVED ASSETS VEGAS RANCHO TO MLK STREET REHAB AND ENHANCED BIKE LANES 5 1.5 $1.20 IMPROVED ASSETS OWENS MLK TO H STREET REHAB AND ENHANCED BIKE LANES 5 0.5 $0.50 IMPROVED ASSETS OWENS UPRR TO LVB STREET REHAB AND PEDESTRIAN SAFETY COUNTERMEASURES 5 0.75 $2.00 IMPROVED ASSETS DEER SPRINGS HUALAPAI TO DURANGO STREET REHAB AND BIKE LANE RETROFIT 6 1.5 $1.65 IMPROVED ASSETS ELKHORN GRAND CANYON TO DURANGO STREET REHAB AND BUFFERED BIKE LANES 6 1 $0.80 IMPROVED ASSETS FORT APACHE DEER SPRINGS TO GRAND TETON STREET REHAB AND BUFFERED BIKE LANES 6 1.5 $1.20 IMPROVED ASSETS GRAND CANYON DEER SPRINGS TO GRAND TETON STREET REHAB AND ENHANCED BIKE LANES 6 1.5 $1.20 IMPROVED ASSETS VEGAS DRIVE DECATUR TO RANCHO STREET REHAB AND ENHANCED BIKE LANES 5 1 $0.80 IMPROVED ASSETS SHAUMBER GRAND TETON TO CENTENNIAL STREET REHAB AND BIKE LANE RETROFIT 6 2 $0.50 IMPROVED ASSETS JONES LONE MTN TO 215 STREET REHAB AND BUFFERED BIKE LANES 4,6 1.75 $1.40 IMPROVED ASSETS TORREY PINES SAHARA TO US95 STREET REHAB AND ENHANCED BIKE LANES 1 2 $1.60 IMPROVED ASSETS

Fiscal Year 2023 2027 Projects WARD LENGTH (MILES) ESTIMATED CLV COST ($M) OTHER ENTITY COST ($M) O&M IMPACT DECATUR BRT RETROFIT PENNWOOD TO US95 (PART OF LARGER PROJECT DOWN TO 215 SOUTH) 1 2.25 $2.00 $12 (RTC/FTA) IMPROVED ASSETS MARYLAND PKWY LRT LOCAL MATCH FUNDS (MISC UPGRADES ALONG CARSON, BONNEVILLE, TONOPAH) 1,3 $5.00 IMPROVED ASSETS TOWN CENTER ROUNDABOUTS AT HUALAPAI AND CANYON RUN ADA UPGRADE / REPLACEMENT 2 0.5 $4.50 IMPROVED ASSETS ALTA DESERT FOOTHILLS TO DURANGO STREET REHAB AND ENHANCED BIKE LANES 2 4.5 $3.60 IMPROVED ASSETS OWENS LVB TO NELLIS STREET REHAB AND BIKE LANE RETROFIT 3,5 4 $2.40 IMPROVED ASSETS CRAIG ROAD DECATUR TO RANCHO BUS TURNOUTS AND SHELTER RELOCATIONS 4,5 1.5 $0.50 IMPROVED ASSETS RAINBOW US95 TO LONE MOUNTAIN BUS TURNOUTS AND SHELTER RELOCATIONS 4,5 5 $3.50 IMPROVED ASSETS BRADLEY ROAD ANN TO GRAND TETON ROAD DIET / BUFFERED BIKE LANES 6 3 $0.85 IMPROVED ASSETS EGAN CREST BIKE LANE RETROFIT DORELL TO GRAND TETON 6 1.25 $0.20 IMPROVED ASSETS FARM ROAD BIKE LANE RETROFIT SHAUMBER TO OSO BLANCA 6 2.25 $0.40 IMPROVED ASSETS TOTAL 89.00 $274.00 O&M CONSIDERATIONS: 1) EACH OF THE PROJECTS HAVE BEEN NOTED FOR O & M IMPACT. THE MAJORITY OF THE PROJECTS RENEW/REPLACE AN EXISTING OLD ASSET SO THE O&M IMPACT IS ACTUALLY POSITIVE FOR MOST PROJECTS 2) AN EXCEPTION IS COMPLETE STREET PROJECTS THAT HAVE BEEN NOTED TO ADD TREES. TREE MAINTENANCE HAS A SIGNIFICANT IMPACT ON O&M. THE CITY ESTIMATES THAT A STREET TREE COSTS $760/YR TO MAINTAIN (WATER, IRRIGATION SYSTEM, PRUNING, FERTILIZING) 3) THE EXPANSION OF THE BIKE LANE NETWORK AND ADDITION OF BUFFERED BIKE LANES WILL REQUIRE ADDITIONAL SIGN AND MARKING MAINTENANCE STAFF 4) FOR EVERY MILE OF NEW ROADWAY ADDED, THE CITY GAS TAX ALLOCATION IS INCREASED. THESE FUNDS DO NOT COVER THE FULL COST OF MAINTAINING THE NEW ROADWAY MILEAGE

Fiscal Year 2028 2032 Projects LENGTH ESTIMATED CLV OTHER ENTITY WARD (MILES) COST ($M) COST ($M) O&M IMPACT SUMMERLIN PARKWAY ULTIMATE IMPROVEMENTS 215 TO US95 1,2,4 4.5 $5.00 $90 (NDOT**) IMPROVED ASSETS ARTERIAL / COLLECTOR REHAB (CORRIDORS TO BE DETERMINED) 1,2,3,4,5,6 60 $60.00 IMPROVED ASSETS NORTHWEST EXPANSION AREA INTERCHANGE AT US95 N/O SNOW MOUNTAIN 6 1 $26.00 NEW BRIDGE MARYLAND PARKWAY / I 515 INTERCHANGE 3,5 1 $5.00 $145 (NDOT) NEW BRIDGE SANDHILL OWENS TO WASHINGTON TRAFFIC CALMING AND OVERPASS AT LAS VEGAS WASH 3 0.5 $6.00 NEW BRIDGE MARION CHARLESTON TO OWENS TRAFFIC CALMING AND OVERPASS AT LAS VEGAS WASH 3 2 $6.00 NEW BRIDGE CIRCULAR PEDESTRIAN BRIDGE AT SAHARA/LVB 3 0.125 $20 ($10 NDOT, $10.00 $10 CCPW) NEW BRIDGE TOTAL 69.13 $118.00 **The bulk of costs for this project are shown being borne by NDOT. CLV is in discussions with NDOT to trade Summerlin Pkwy for Charleston Blvd and other arterial streets and we fully expect trade to occur prior to the date these improvements are needed O&M CONSIDERATIONS: 1) EACH OF THE PROJECTS HAVE BEEN NOTED FOR O & M IMPACT. THE MAJORITY OF THE PROJECTS RENEW/REPLACE AN EXISTING OLD ASSET SO THE O&M IMPACT IS ACTUALLY POSITIVE FOR MOST PROJECTS 2) AN EXCEPTION IS COMPLETE STREET PROJECTS THAT HAVE BEEN NOTED TO ADD TREES. TREE MAINTENANCE HAS A SIGNIFICANT IMPACT ON O&M. THE CITY ESTIMATES THAT A STREET TREE COSTS $760/YR TO MAINTAIN (WATER, IRRIGATION SYSTEM, PRUNING, FERTILIZING) 3) THE EXPANSION OF THE BIKE LANE NETWORK AND ADDITION OF BUFFERED BIKE LANES WILL REQUIRE ADDITIONAL SIGN AND MARKING MAINTENANCE STAFF 4) FOR EVERY MILE OF NEW ROADWAY ADDED, THE CITY GAS TAX ALLOCATION IS INCREASED. THESE FUNDS DO NOT COVER THE FULL COST OF MAINTAINING THE NEW ROADWAY MILEAGE

Fiscal Year 2033 2038 Projects OTHER ENTITY WARD LENGTH (MILES) ESTIMATED CLV COST ($M) COST ($M) O&M IMPACT CLIFF SHADOWS PARKWAY / SHAUMBER ROAD CONNECTOR LONE MTN TO WASHBURN 4 0.5 $25.00 IMPROVED ASSET US95 AT SMOKE RANCH HOV DIRECT CONNECT RAMPS 1,5 1 $5.00 $35 (NDOT) BRIDGE I 15 AT MEADE HOV DIRECT CONNECT RAMPS 1 0.5 $5.00 $50 (NDOT) BRIDGE US95 AT PECOS / STEWART INTERCHANGE 3 1 $5.00 $45 (NDOT) BRIDGE CHEYENNE TRAIL 215 TO RONEMUS 1,4 4 $16.00 CMAQ, SNPLMA TRAIL LIGHTING PEAK TRAIL TENAYA TO RANCHO W/ PED/BIKE BRIDGE OVER US95 1,5 3 $15.00 CMAQ, SNPLMA TRAIL LIGHTING SHEEP MOUNTAIN PARKWAY KYLE CANYON ROAD TO US95 WITH DIRECT RAMPS 1.5 $90.00 BRIDGE 4TH STREET LAS VEGAS BLVD TO BRIDGER 2 WAY CYCLE TRACK 3 1 $10.00 IMPROVED ASSET RAMPART CHARLESTON TO SUMMERLIN PARKWAY AUX LANES 2 X $25.00 IMPROVED ASSET CRESTDALE AT SUMMERLIN PARKWAY HOV DIRECT CONNECT RAMPS 2 O.5 $7.00 BRIDGE ARTERIAL AND COLLECTOR STREET REHAB (CORRIDORS TBD) 1,2,3,4,5,6 60 $60.00 IMPROVED ASSET TOTAL 72.5 $263.00 *BALANCE OF ANTICIPATED FUNDS FOR COST ESCALATION **The interchange at Pecos/Stewart is currently under design by NDOT and it is expected that it will be funded by NDOT; HOV interchanges are expected to be funded by NDOT as they are part of their HOV Master Plan. O&M CONSIDERATIONS: 1) EACH OF THE PROJECTS HAVE BEEN NOTED FOR O & M IMPACT. THE MAJORITY OF THE PROJECTS RENEW/REPLACE AN EXISTING OLD ASSET SO THE O&M IMPACT IS ACTUALLY POSITIVE FOR MOST PROJECTS 2) AN EXCEPTION IS COMPLETE STREET PROJECTS THAT HAVE BEEN NOTED TO ADD TREES. TREE MAINTENANCE HAS A SIGNIFICANT IMPACT ON O&M. THE CITY ESTIMATES THAT A STREET TREE COSTS $760/YR TO MAINTAIN (WATER, IRRIGATION SYSTEM, PRUNING, FERTILIZING) 3) THE EXPANSION OF THE BIKE LANE NETWORK AND ADDITION OF BUFFERED BIKE LANES WILL REQUIRE ADDITIONAL SIGN AND MARKING MAINTENANCE STAFF 4) FOR EVERY MILE OF NEW ROADWAY ADDED, THE CITY GAS TAX ALLOCATION IS INCREASED. THESE FUNDS DO NOT COVER THE FULL COST OF MAINTAINING THE NEW ROADWAY MILEAGE

MMP Projects not Included in Funding Model (Funded or Scheduled for Completion in FY 2017) FUNDING SOURCE CLV COST ($M) COOLIDGE COMPLETE STREET MAIN TO 4TH FRI 1 $1.60 GASS COMPLETE STREET CHARLESTON TO MAIN FRI 1 $4.50 6TH STREET COMPLETE STREET BRIDGER TO STEWART FRI 1 $4.00 ELKHORN AT US95 HOV DIRECT CONNECT ACCESS RAMPS CMAQ $4.50 US95 AT KYLE CANYON INTERCHANGE FRI 1R $6.50 3RD STREET COMPLETE STREET CHARLESTON TO FREMONT FRI 1 $7.00 BOTTLENECK IMPROVEMENT CHARLESTON AND LAMB CMAQ $6.00 SHADOW LANE SIDEWALK AND STREETSCAPE FRI 1 $2.50 JONES BLVD STREET REHAB AND BIKE LANE RETROFIT US95 TO SMOKE RANCH NDOT $3.00 MEADOWS WALKABLE COMMUNITY IMPROVEMENTS VARIOUS $2.50 CLIFF SHADOWS PARKWAY NOVAT TO GILMORE WIDENING, REHAB, BIKE LANES FRI 1 $2.20 OAKEY RAINBOW TO VALLEY VIEW STREET REHAB AND BIKE LANE RETROFIT FRI 1 $2.50 SUMMERLIN PARKWAY AUX LANES TOWN CENTER TO BUFFALO FRI 1 $5.50 CIMMARON ROAD AT SUM PKWY BIKE / PEDESTRIAN BRIDGE CMAQ $5.00 28TH STREET BIKE LANES BONANZA TO CHARLESTON GF $0.01 BUFFALO STREET REHAB AND BUFFERED BIKE LANES SKYPOINTE TO GRAND TETON FRI 1 $1.50 CIMARRON STREET REHAB AND BUFFERED BIKE LANES SKYPOINTE TO GRAND TETON FRI 1 $1.25 ELKHORN STREET REHAB AND BUFFERED BIKE LANES US95 TO TENAYA FRI 1 $1.00 JONES BLVD STREET REHAB AND BUFFERED BIKE LANES RANCHO TO ANN FRI 1 $1.60 WASHINGTON RANCHO TO MLK BIKE LANE RETROFIT FRI 1 $0.30 WESTCLIFF TRAFFIC CALMING Durango to Rainbow GF $0.15 Town Center Street Rehab and Bike Lane Retrofit Charleston to Sum Pkwy FRI 1 $1.20 Total $64.31

Major Transit Investments *WE HAVE DETERMINED THAT OUR ANTICIPATED ROADWAY FUNDING ALLOCATIONS CAN NOT SUPPORT THE HUGE INVESTMENTS THAT WOULD BE NEEDED FOR MAJOR TRANSIT SYSTEM IMPROVEMENTS. THE FOLLOWING MMP TRANSIT PROJECTS REQUIRE A DEDICATED LOCAL TRANSIT SYSTEM FUNDING SOURCE IN ORDER TO LEVERAGE AN FTA GRANT THAT COULD BE NEAR 50% OF COSTS: 1) CHARLESTON CENTER RUNNING LIGHT RAIL TOWN CENTER TO BTC TO SLOAN TURNAROUND LENGTH: 15.2 MILES COST: $1,106,834 (APPROXIMATELY $73 MILLION / MILE INCLUDING DESIGN, R/W, CONSTRUCTION, AND PURCHASE OF LIGHT RAIL VEHICLES) 2) RANCHO CENTER RUNNING LIGHT RAIL RAINBOW TO BTC LENGTH: 7.1 MILES COST: $484,973,000 (APPROXIMATELY $68 MILLION / MILE INCLUDING DESIGN, R/W, CONSTRUCTION, AND PURCHASE OF LIGHT RAIL VEHICLES) 3) MARYLAND SIDE RUNNING LIGHT RAIL MCCARRAN AIRPORT TO LAS VEGAS MEDICAL DISTRICT LENGTH: 8.7 MILES COST: $465,000,000 (APPROXIMATELY $53.5 MILLION / MILE INCLUDING DESIGN, R/W, CONSTRUCTION, AND PURCHASE OF LIGHT RAIL VEHICLES) 4) LAS VEGAS BLVD LIGHT RAIL MCCARRAN AIRPORT TO CASHMAN CAMPUS LENGTH: TBD COST: TBD