MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

Similar documents
COMPLETE STREETS DURING CONSTRUCTION

Welcome! Fore River Bridge Reconstruction Project Quincy & Weymouth Project File No Public Information Meeting May 18, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Cincinnati Dayton Rd Widening

PROJECT FACT SHEET May 25, 2018

PROJECT FACT SHEET March 21, 2018

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Bicycle + Pedestrian Connectivity Gap Analysis

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Design Criteria. Design Criteria

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

MBTA Key Bus Route. Community Meeting Route 1 - Cambridge

Commonwealth Ave Bridge Replacement Project Community Meeting: Summary

The Van Ness Campus. Weekly Construction Bulletin #238

Trial Restriping Project. October 21, 2010

IL Route 71 Construction Update

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

Traffic Control Inspection Checklist Segment:

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Purple Line Extension Community Meeting

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

MBTA Key Bus Route Improvement Program. Community Meeting Route 1 - Boston

Upper Market Street Bike Lane Project

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Blair/Williamson Intersection Expressed Needs

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

Hospital Link Project Project Update September 2017

MASTER BICYCLE AND PEDESTRIAN PLAN

Everyone is a Pedestrian

GRANDFORKS MILSPURFEASIBILITYSTUDY. GrandForksandEastGrandForksMPO. FINALReport. August2010

2017 Temporary traffic control guidelines for pedestrians. v.2

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Roadways. Roadways III.

PCH/DEL PRADO STREET IMPROVEMENTS PUBLIC OUTREACH MEETING

April/May 2017 Public Meetings: Summary

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

5. RUNNINGWAY GUIDELINES

Hospital Link Project Project Update November 2017

Marina Bay Trail Community Meeting #1

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

FDOT Treasure Coast Traffic Impact Report

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Tunnel Reconstruction South 5 th Street Association October 16, 2018

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Transportation Management Program Office Newsletter J U L Y

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

NEWMARKET UPHAM S CORNER

Glebe Neighbourhood Cycling Plan

Route 79/Davol Street Corridor Study

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

The Northern Avenue Bridge is being replaced, and the city is debating just who will be allowed to use it

FDOT Treasure Coast Traffic Report

Meeting Date 10/18/2005 Type Internal Team Progress Other Date of Issuance 10/25/05. Coordination See attached sign-in sheet

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

TRAFFIC IMPACT ANALYSIS

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND:

Road Safety Evaluation ation A process to investigate traffic safety on tribal, county, or city roadways Roadway may be selected for evaluation if the

RÉGION D OTTAWA-CARLETON

Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008

Gateway Transportation Study

Chapter 17. Work Zone Management. 17 Work Zone Management

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Long Island Rail Road Expansion Project Floral Park to Hicksville

North Avenue Corridor Study

Why invest in the 1 Street S.W. Corridor?

MBTA Key Bus Route Improvement Program. Community Meeting Route 28

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

2. executing a legal agreement with respect to the above.

Access Routes from US 101 to the Richmond San Rafael Bridge

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

CURBSIDE ACTIVITY DESIGN

M14A/D Select Bus Service

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

City of Seattle Edward B. Murray, Mayor

Forest Hills Improvement Initiative

7th Street Bridge Project. Public Presentation February 24, :30pm-8pm

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Meadow Woods Elementary School

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

FDOT Treasure Coast Traffic Impact Report

North Avenue Corridor Study

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Orange Center Elementary School

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

Duwamish Way-finding and CTR Report

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Transcription:

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

AGENDA Introductions Project Benefits Progress to Date Schedule for Remaining Work Phase 3 Activities, Impacts & Traffic Detours Phase 4 Activities & Impacts Public Outreach & Contact Information 2

PROJECT TEAM Mayor Martin J. Walsh 3

PROJECT LOCATION 4

PROJECT BENEFITS Deteriorated elements are replaced 5

PROJECT PROGRESS 6

PROJECT PROGRESS 7

CONVENTIONAL BRIDGE CONSTRUCTION Conventional Construction Would Have Taken 3+ Years: Constant lane takings on both Mass Ave and Comm Ave At times only 1 lane of traffic in each direction on Mass Ave More night work over 3 years Reduced speed and detouring large trucks, buses, and bicyclists through the neighborhood 8

ACCELERATED BRIDGE CONSTRUCTION Schedule and Scope of Remaining Work with 4-Day Bridge Replacement: Phase 1: Early utility relocation Complete Phase 2: Substructure improvements by alternating closure of Comm Ave bypasses Ongoing Phase 3: Bridge replacement 4-day full closure of Mass Ave over Comm Ave bypasses between surface roads to replace bridge 10:00 PM, Thursday, May 10, to 5:00 AM, Tuesday, May 15 19-day full closure of Comm Ave bypass roads under bridge Saturday, May 5, through Wednesday, May 23 Phase 4: Comm Ave bypass barrier completion, Mass Ave sidewalk and barrier work, Mass Ave surface work (new lighting, traffic signals, refurbished fence, new pavement, pavement markings, and bike lanes) May Fall 2018 9

CONSTRUCTION IMPACTS Phase 3 (10:00 PM on Thursday, May 10, to 5:00 AM on Tuesday, May 15; 24 hours/day) prepare for and install new prefabricated bridge units Mass Ave between Comm Ave surface roads closed, with through traffic detours Access maintained for local traffic and to businesses Pedestrians and bicyclists use crossings at Charlesgate East and Hereford Street No parking spaces will be taken on Mass Ave 10

CONSTRUCTION IMPACTS (CONT.) Phase 3 (cont.) Comm Ave east and westbound bypass roads under Mass Ave closed for work required to prepare for and complete prefabricated bridge unit installation Access maintained for vehicles and bicyclists using surface roads No parking will be permitted on Comm Ave surface roads between Charlesgate East and Hereford Street because they are detour routes 11

CONSTRUCTION IMPACTS (CONT.) Detour Routes no parking permitted on detour route limits outlined below Maintain emergency response access and accommodate increased traffic volumes Commonwealth Avenue east and westbound from Hereford St. to Charlesgate West Beacon Street even side from Hereford St. to Massachusetts Ave. Beacon Street odd side from Massachusetts Ave. to Charlesgate West Hereford Street both sides from Boylston St. to Beacon St. Boylston Street both sides from Massachusetts Ave. to Hereford St. No parking spaces will be taken on Mass Ave 12

CONSTRUCTION IMPACTS (CONT.) MBTA Bus Stops for Routes 1 and CT1 Inbound traveling south on Massachusetts Avenue at Marlborough Street Closed at Newbury Street Unaffected Outbound traveling north on Massachusetts Avenue at Beacon Street Relocated to opposite side of Beacon Street at Newbury Street Relocated to Boylston Street at St. Cecilia Street 13

CONSTRUCTION IMPACTS (CONT.) Phase 4 (May Fall 2018) Mass Ave surface work (new lighting, traffic signals, refurbished fence, new pavement, pavement markings, and bike lanes) and Comm Ave bypass median barrier completion Mass Ave alternating lane closures during off-peak hours (10:00 AM to 2:00 PM), one lane of travel in each direction maintained; one sidewalk maintained for pedestrian access at all times Comm Ave westbound bypass road closed for approximately three months following Phase 3 (westbound vehicles and bicyclists continue to use surface road, eastbound vehicles use eastbound bypass and eastbound bicyclists use surface road) Note: During Phase 4, noise will be limited to 7:00 AM 7:00 PM, except for nighttime paving operations 14

WORK HOURS Extended Work Shifts: Monday Friday 7:00 AM 7:00 PM During the Weekend Closure: 24 hours a day for 4 ¼ days Starting at 10:00 PM Thursday night and ending at 5:00 AM Tuesday morning 15

PREFABRICATED BRIDGE UNIT DELIVERY PBUs stored at Beacon Park Rail Yard in Allston & delivered via the route below to the project site. 16

PRECAST BRIDGE DELIVERY PBUs will be stored on the closed roadway in the Comm Ave bypass area. 17

WEEKEND CLOSURE SCHEDULE 18

FINAL CONDITION 20

PUBLIC OUTREACH E-Blast updates and advisories Flyers hand delivered to abutters Press releases Social media Business coordination meeting - 4/18/2018 Public meetings 2/6/2017, 3/28/2018, 4/25/2018 BAA and City coordination for permitted events Signage advanced notification of traffic patterns and VMS boards 21

CONTACT US Donny Dailey, MassDOT Legislative Liaison: Donny.Dailey2@dot.state.ma.us 617-945-4272 Website: www.mass.gov/massdot/massavebridge 22

APPENDIX I: POLICE DETAIL LOCATIONS Police detail locations during Mass Ave. shutdown 23

APPENDIX II: RELOCATED BUS STOPS Relocated bus stops for Routes 1 and CT1 during Mass Ave. shutdown. 24