THIRD&GRAND. Public Workshop #1. Transportation Hub Area Plan. June 12, 2013

Similar documents
Intermodal Connections with Light Rail in Phoenix, AZ Wulf Grote, P.E. Director, Planning & Development

Community Task Force July 25, 2017

Bus Rapid Transit Plans

MEETING Agenda. Introductions. Project Overview. Key Study Components. Alternative Station Concepts. Preferred Station Concept. Next Steps.

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Regional Alternatives Analysis. Downtown Corridor Tier 2 Evaluation

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

San Jose Transportation Policy

Living Streets Policy

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Metropolitan Council Transportation Committee

Capital Metro Downtown Multimodal Station

A Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study

JOINT PARTNERSHIPS: Working Together To Support Light Rail in Santa Monica

West Village Mobility & Integration

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Mumford Terminal Replacement Opportunities Neighbourhood Open House. we are here. PHASE 2 Identifying and Evaluating Candidate Sites

Item B1 November 19, 2009

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Bicycle Master Plan Goals, Strategies, and Policies

Public Meeting #1 January 30, 2018

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop

Central Avenue Corridor Study FPID Number:

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Corridor Vision Workshop Summary James Madison Elementary February 22,2018

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

North Coast Corridor:

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

Perryville Transit Oriented Development & Greenway Plan

Vision Public Workshop: Findings

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

NEWMARKET UPHAM S CORNER

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

Providing an Efficient and Multi-modal Transportation System

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

North Shore Transportation Improvement Strategy

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

E Grand Complete Street Pilot Project

SMART 1 Public Meeting #1. February 24, 2016

Bicycle and Pedestrian Access in Transit Oriented Developments. Bruce Wright Chairman, Fairfax Advocates for Better Bicycling April, 2009

PEDESTRIAN ACTION PLAN

VAN AKEN DISTRICT CONNECTIONS PLAN COMMUNITY MEETING #1 June 20, 2016 SMITHGROUP JJR WSP PARSONS BRINCKERHOFF STUDIO GRAPHIQUE

Lord Overpass Multi-Modal Boulevard. Nicolas Bosonetto, P.E.

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

KEARNY MESA COMMUNITY PLAN UPDATE

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Arterial Transitway Corridors Study. Sept. 26, 2011

ACTION TRANSMITTAL No

Planning Transit Operations and Bike Sharing Denver RTD. Bill Van Meter, Assistant General Manager, Planning March 23, 2012

City of Wilsonville 5 th Street to Kinsman Road Extension Project

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Brainstormed Solutions - Passenger 1-1a Air / Exand: Expand capacity (runway lengths) at BG airport (LOW)

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

Causseaux, Hewett, & Walpole, Inc.

Kansas City Area Transportation Authority. Downtown Transit Improvement Vision 2/11/15

Public Transportation and Bicycle & Pedestrian Stakeholder Webinar. April 11, :30 PM

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

About the Wilmington Downtown Circulation Study

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

Ann Arbor Downtown Street Plan

I-35W Solutions Alliance Project Update July 13, 2017

Detroiters need to be able to conveniently and reliably get to work, school, church, stores, and parks.

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

Governor s Transportation Vision Panel


Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

Austell Road Access Management Plan Public Meeting February 17, 2009

BICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

BIKE PLAN CONTENTS GATEWAY

T1-A - Service Reduction (Re-sizing)

Stakeholder Meeting Handouts. January 2013

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Overview: Phase 3 Draft Development and Circulation Plans, White Bear Station

Complete Streets 101: Placemaking, Mobility and Parking

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Goals, Objectives, and Policies

Good TOD. July 7, 2016 SPUR

5. RUNNINGWAY GUIDELINES

Fordham Plaza. Conceptual Design Study

Berkeley Strategic Transportation Plan A-76

MAKE YOUR PLACE IN CHANNELSIDE

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Martha Coello, Fairfax County DOT Jeffrey Hermann, Fairfax County DOT Abi Lerner, VDOT. May 19, 2014

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Transcription:

Transportation Hub Area Plan Public Workshop #1 June 12, 2013

Agenda Study Background Who is Involved Process and Schedule Planning Area and Project Site The Opportunity Site Analysis Land Use/Zoning Transportation Utilities Edges, Barriers and Links Planned Improvements Local and National Multimodal Center Examples Next Steps

Study Background TAC Meeting TAC Meeting Notice: Public Workshop #1 Stakeholder Meetings Notice: Market Forum Public Workshop #1 Market Forum TAC Meeting Stakeholder Meetings Notice: Public Workshop #2 TAC Meeting Public Workshop #2 Notice: Final Public Presentation TAC Meeting Final Public Presentation Process and Schedule

Study Background Kansas City Transportation Authority (KCATA) City of Kansas City, Missouri Jackson County, Missouri Mid-America Regional Council (MARC) Who is Involved?

Study Background Project Site 1.8-Acres Project Site

Study Background Study Site Study Area Multimodal Circulation Development Context Neighborhood Character Study Area

Study Background Study Site Study Area Bus Routes The Opportunity

Study Background Study Site Study Area Bus Routes Streetcar The Opportunity

Study Background Study Site Study Area Bus Routes Streetcar Potential Commuter Rail The Opportunity

Study Background Provide a multi-modal connection point for bus service, streetcar, commuter rail, intercity bus, bicycles, trails, and other modes of transportation while continuing to function as a park and ride facility. Serve as a catalyst for economic growth. Improve connections and provide greater pedestrian amenities that will improve the quality of life in the greater Kansas City downtown area. Integrated with the surrounding neighborhoods, and provides for greater connectivity with the region. Form a vision for a premier transit-oriented development site for the Kansas City Region. The Opportunity

Public Site Context Streetcar Line 3 rd & Grand Stop Intersection Improvements and Signalization Maintenance Facility Potential Reopening of Walnut through City Market Spirit of Kansas City Trail Connection Private River Market West Development Columbus Park Neighborhood Redevelopment Riverfront Park Development BrightFarms Hydroponic Greenhouse Study Area Investments

Site Context Current Use Serves both local bus transit and MAX bus rapid transit (BRT) Megabus stop Zoned UR Urban Redevelopment Public parking / Transit Airport height restriction Land Use/Zoning

Site Analysis Multiple transportation connections/nodes at the project site Potential modification of the Grand and 3 rd intersection Multimodal needs along Grand and 3 rd Transportation

Site Analysis Intercity Bus, MAX transfers, Commuter Rail Other Transportation Considerations

Site Analysis Grand and 3 rd are primary utility corridors for steam, natural gas, and water. A 72 sewer overflow line traverses 40 + beneath the site. Utilities

Site Analysis Grand connection to Berkeley Riverfront Park and I-29/35 9 Hwy is a visual and access barrier River Market / Industrial Use / Riverfront Transition 2 nd Street connection to Riverfront Trail and residential 3 rd street connection to Columbus Park neighborhood and Heart of America Bridge 3 rd Street connection to River Market and West Bottoms Grand connection to Central Business District Edges, Barriers, Linkages

Precedent Studies - Local Rockhurst University North Garage Kansas City, Missouri 1.4 Acres Bus, Parking Joint Development Facility LEED Silver Health Clinic Other Retail

Precedent Studies - Local 39 th & Troost MetroCenter Kansas City, Missouri 1.3 Acres Bus Local, BRT Joint Development Facility Child Care / Education Facility

Precedent Studies - Local Midtown KCK MetroCenter Kansas City, Kansas 3.8 Acres Bus 8 vehicle bays Joint Development Facility (11,000 sf) Police Substation Area Agency on Aging Mobility Management Services Community Meeting Space

Precedent Studies DART Central Station Des Moines, Iowa 0.89 Acres Bus (local, planned BRT), Bike 15 vehicle bays 12,000 sf building LEED Gold Bike rental/storage Indoor waiting, restrooms, customer service Vendor space for café/coffee shop

Precedent Studies Sunset Transit Center Portland, Oregon 4.3 Acres Light Rail, Bus, Bike 12 vehicle bays 630-space parking structure Coffee shop Bike-n-Ride rental Bike racks, Lockers

Precedent Studies Bonneville Transit Center Las Vegas, Nevada 3.0 Acres Bus (local, BRT), Bike 16 vehicle bays 20,000 sf building - LEED Gold 100 bike storage Self-service bike repair station Showers, lockers

Precedent Studies Rosa Parks Transit Center Detroit, Michigan 2.4 Acres Light Rail, Bus, Megabus, Taxi, Bike 15 vehicle bays 3-story, 25,700 sf building - LEED Platinum Waiting area, Transit offices Retail space Police station

Precedent Studies Tempe Transportation Center Tempe, Arizona 2.7 Acres Light Rail, Bus, Bike 13 vehicle bays 3-story, 40,300 sf building - LEED Platinum City s Transportation Offices Traffic Management Center Community Room Bike Station (114 bikes, showers, lockers)

Next Steps Additional Input Intercept Survey Online Survey - http://www.surveymonkey.com/s/pt7mffq Stakeholder Meetings Public Workshop #2 - August Feedback on proposed concepts For more information, go to www.kcata.org