Developing a Portwide Asset Management Program

Similar documents
Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.

Asset Replacement Plan Town of Bradford West Gwillimbury

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Public Transport Asset Management

Business Plan Presentation

Building Great Neighbourhoods QUEEN ALEXANDRA

2015 Business Plan September 2014

Building Great Neighbourhoods LANSDOWNE

The Corporation of the Town of Amherstburg, Ontario ASSET MANAGEMENT PLAN

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

83 AVENUE PRE-CONSTRUCTION MEETING

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

DRAFT. Lecompton. Table of Contents. Background

IMPLEMENTATION STRATEGIES

Rhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Providence County

Active Transportation Infrastructure Investment A Business Case

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council

City Sidewalk Repair and Replacement Program

Building Great Neighbourhoods BONNIE DOON

DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND

Resource Guide. Copyright 2017 Institute of Certified Management Accountants. Updated 8/30/17

Revision of maintenance quality requirements to promote cycling in the city of Kuopio. Winter Cycling Congress , Oulu Timo Perälä

Pre-Construction Meeting

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Safe Routes to School Action Plan Aberdeen, Idaho

CITY OF ROSEVILLE DESIGN STANDARDS

DRAFT. Table of Contents. Background

Transportation Day at the Capitol. Charlie Zelle Commissioner, MnDOT Feb. 16, 2017

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Draft. Lecompton. Table of Contents. Background

STATE TRANSPORTATION COMMISSION HEARING

Where Did the Road Go? The Straight and Narrow about Curves

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

ACTIVE TRANSPORTATION

SECTION 5: PEER CITY REVIEW

Fairfax County Transportation Funding and Roadway Service Delivery Study. Study Update Transportation Advisory Commission

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Preparing a Curb Ramp Project. December 15, 2010

Living Streets Policy

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

CITY OF SOUTH DAYTONA

CHAPTER SIXTEEN THE MASTER PLAN. Oakland Alive

Paving for Progress Municipal Streets Seminar

Public Transportation and Bicycle & Pedestrian Stakeholder Webinar. April 11, :30 PM

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 21, 2017

City of Madison: 2017 Capital Budget Capital Improvement Plan

CITY MANUALS AND STANDARDS REVIEW

City of Waterloo Complete Streets Policy

PEDESTRIAN ACTION PLAN

Public Facilities & Services

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Lake Waterford Community Association Meeting. November 15, 2016

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

CURBSIDE ACTIVITY DESIGN

Fahmida Ahmed Director, Office of Sustainability Department of Sustainability & Energy Management Stanford University

Engineering - Bicycle and Pedestrian

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

limburg.be Quality monitoring of the tourist cycle network in Limburg

Access requests to County streets and roadways are processed through one of the following methods:

ADA TRANSITION PLAN 2013

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Paul Vraney Bureau of Project Development 02/11/2016

Pedestrian Project List and Prioritization

SIDEWALK INSPECTION AND MANAGEMENT SYSTEM

First and Last Mile Plan. April 2016

BYPAD. Bicycle Policy Audit CITY OF GENT March Summary. Tim Asperges Liesbeth Reekmans. Langzaam Verkeer

Philip Schaffner Minnesota Department of Transportation October 22, 2013

[ Fundación PONS ] [ Fundación PONS ] [ Expertise PONS ] Investing in road safety

Fiscal Year Budget Overview

Smoothing Out the Bumpy Road Ahead

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

MOBILITY RESULTS AREA. Budgeting For Outcomes Council Presentation January 12, 2007

Montclair s Complete Streets Experience

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

10.0 CURB EXTENSIONS GUIDELINE

East Burke Transportation, Safety and Capacity Improvements

Toronto Public Library

DRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH

Fulton Market Streetscape

Pavement Management Report. City Council Meeting of May 21, 2013

Delivering the. Strategy 7.0

ADA Operations Contact Info

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

4. Mobility and Transportation Element. Page Bikes and Pedestrians

Welcome. Background. Goals. Vision

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

RZC Appendix 8A Marymoor Subarea Street Requirements

Trail Feasibility. 1. Introduction FINAL. October What s inside?

Transcription:

Developing a Portwide Asset Management Program American Association of Port Authorities Marine Terminal Management Training Program September 17, 2015 Colin Chung, PhD President, Kayuga Solution

Asset Management Program

Asset Management Program AM processes and practices Asset data Information systems Organizational leadership & support Staff understanding and acceptance Creating Balance!

Goal of Asset Management Customer Expectations Cost of Service Level of Service Risk

Asset Management Program Objectives To find out: Catch Up ($) Restoration Keep Up ($) Preservation Moving Forward ($) How? Document the assets owned and managed Understand the current state of assets Establish appropriate levels of service Prioritize the need by risk Understand what budget and resources are required to catch up, keep up, and move forward Calculate cost of service Communicate the infrastructure problem

Portwide Asset Management Program Port is a small city! 1. Roadway assets Pavement, sidewalks, curbs and gutter, lights, signage, etc. 2. Building assets Warehouses, office buildings, comfort stations 3. Underwater assets Wharfs, moorings, sheet piles, floating dock, etc. 4. Park assets Playgrounds, benches, picnic tables, gazebos, etc. 5. Water and wastewater assets Pipes, pumps, motors, MCCs, gensets, valves, hydrants, manholes, etc. 6. Drainage assets Pipes, channels, structures, BMPs 7. Fleet 8. Urban Forestry 9. And more

Asset Management Program Methodology Inventory and assess condition Project preservation and restoration costs and schedules Assess criticality and estimated asset replacement costs Determine the desired service levels Understand the finance and resources required to sustain the delivery of services Optimize and prioritize the critical needs based on risk Tell the infrastructure story

Asset Management Plan Development Process Create Asset Database Assess Asset Criticality Perform Life Cycle Cost Assessment Develop Risk Based Plan Asset Inventory Condition Assessment Asset Valuation Asset Hierarchy Criticality Ranking Asset Risk Catch Up Keep Up Moving Forward Risk Budget Resources Align with Strategic Direction

ASSET INVENTORY & CONDITION ASSESSMENT

Asset Inventory / Data Collection Activities

Roadway Condition Assessment

Underwater Condition Assessment

Building Inventory and Condition Assessment

Building Maintenance and Repair Challenges

Maintenance Needs

Condition Assessment

ADA Compliance Assessment Tight stall width Non-compliant faucets Needs grab rails

Assets are Recorded and Organized Port of Sunshine

Condition Assessment Results 19

Installation & Consumption Profiles

RISK ASSESSMENT

Risk PoF CoF Risk Probability of Failure (Timing to Failure) Mortality Capacity Level of Service Financial Efficiency Consequence of Failure (Impact of a failure) Economic Environment Social

Risk Profile

State of Facilities 100% 80% 60% 40% 20% 0% LS302 LS304 LS305 LS306 LS307 LS309 LS310 LS312 LS313 LS314 LS315 LS316 LS317 LS318 LS319 LS320 LS323 LS324 LS325 LS326 LS327 LS329 LS352 LS353 LS354 Total High Risk Medium Risk Low Risk

State of Pavement 25

Risk-Based Strategy

LIFE CYCLE COST ASSESSMENT

Condition Rating Calculating the Timing to Failure 1 2 3 4 5 2000 2005 2010 2015 2020 Year

Risk / Condition Asset Life Cycle Investment Logic Max Risk Risk Con PoF CoF Risk Min Risk Min Con Mn$ Op$ Cum$ CoF Cumulated Cost Condition Maintenance PoF Operation Min Cond Investment Time

Asset Management Tool IRIS (Infrastructure Reinvestment Intelligence System)

Asset Valuation (Parks)

Understanding the Need (Year By Year Asset By Asset )

Prioritize by Risk

Results are Mapped

Understanding the Impact of Funding $120,000,000 10 YEAR PROJECTED RENEWAL NEED $100,000,000 $80,000,000 $60,000,000 Projected Budget $40,000,000 Current Budget $20,000,000 $- 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 General District Potable Water Recycled Water Sewer

Work Backlog Analysis $120,000,000 10 YEAR PROJECTED RENEWAL NEED Unfunded Portion $100,000,000 $80,000,000 $60,000,000 $40,000,000 Current Budget $20,000,000 $- 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 General District Potable Water Recycled Water Sewer

What If We Don t Do Anything? $100,000,000 Current Budget $- 10 YEAR BACKLOGS AT CURRENT BUDGET 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 $(100,000,000) $(200,000,000) $(300,000,000) $(400,000,000) $(500,000,000)

What If We Increase the Funds by 5%? $100,000,000 Increased Budget $- 10 YEAR WORK BACKLOGS AT 5% INCREASE 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 $(100,000,000) $(200,000,000) $(300,000,000) $(400,000,000) $(500,000,000)

Scenario Comparison

Asset Management Data Flow GIS Work CMMS Budget Finance Continuous Improvement

Using Asset Management Results to Understand and Communicate Catch Up Keep Up Moving Forward Managing Risk & Planning for the Future

Thank you!