Station 1: Street & Sidewalk Upgrades

Similar documents
Addendum to Mitigated Negative Declaration

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Upper Market Street Bike Lane Project

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

East 12 th Street Bikeway Feasibility Study

Freeway ramp intersection study

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Multi-Modal Traffic Analysis. Parisi and Associates

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Geary Corridor Bus Rapid Transit

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Transportation Planning Division

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Active Transportation Facility Glossary

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Rank #1 Highest Priority Intersection

Community Advisory Committee of Market and Octavia Area Plan City and County of San Francisco. Meeting Minutes

Bay to Bay Boulevard Complete Streets Project

Welcome! San Jose Avenue Open House August 25, 2015

6.4 RECOMMENDED IMPROVEMENTS

Lawrence Avenue Streetscape Concepts August 30, 2011

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Meade Street Bridge Design Alternative Study

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

WORKSHOP 2 SUMMARY OVERVIEW GENERAL COMMENTS. Walking and Biking. Greening & Stormwater. Transportation & Parking. Lighting, Art and Identity

Market/Octavia - Transportation Projects Update

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

Omaha s Complete Streets Policy

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

CURBSIDE ACTIVITY DESIGN

MARKET STREET STUDY TECHNICAL REPORT

Access Routes from US 101 to the Richmond San Rafael Bridge

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

SANTA CRUZ/ALAMEDA ROAD CONFIGURATIONS INTERSECTION AND STREET VIEWS

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Polk Streetscape Project

Henderson Ave. Complete Streets Project

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

North Avenue Corridor Study

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Vision Zero Priority Projects (March 2017)

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Pedestrian and Bicycle Conditions

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

What Is a Complete Street?

3.0 PROJECT DESCRIPTION

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

City of Davis East Covell Corridor Plan

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Better Market Street Project. Project Update January 15, 2015

Broadway Complete Streets Project

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Harrah s Station Square Casino

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Bicycle Network. Vision Zero San Francisco The City and County of San

NEWMARKET UPHAM S CORNER

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Water Street Promenade Engineering and Design Services

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM

Broad Street Bicycle Boulevard Design Guidelines

122 Avenue: 107 Street to Fort Road

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

Retrofitting Urban Arterials into Complete Streets

Columbia Pike Implementation Team (CPIT) Meeting

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Blair/Williamson Intersection Expressed Needs

Simulation Analysis of Intersection Treatments for Cycle Tracks

City of Seattle Edward B. Murray, Mayor

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

Draft North Industrial Area-Wide Traffic Plan

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

C C C

Foothill Expressway Improvements Between El Monte and San Antonio

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

San Francisco 2009 Collisions Report April 21, 2011

City of Scotts Valley CITY COUNCIL STAFF REPORT

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Compiled by the SFMTA Livable Streets Subdivision Staff

Terwillegar Drive Expressway Draft Concept Plan

Transcription:

Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO ST CASTRO ST 17TH ST Castro Street/17th Street

s Improved green bike lane and buffer Existing painted safety zone, to remain and thru-lane guidance Improved ADA curb ramps 16TH ST NOE ST NOE ST 16TH ST and thru lane/turn lane guidance Green bike box Improved ADA curb ramps and thru lane/turn lane guidance Removed/reconstructed curb extension and ramp Existing left-turn pocket Potential left turn arrow; see Circulation Study boards for more information Noe Street/16th Street

s Improved green bike lane and buffer Thru-intersection lane guidance and green-back sharrows Green bike box (by developer) 15TH ST 15TH ST SANCHEZ ST SANCHEZ ST Green-back sharrow and thru lane/turn lane guidance Green bike box Thru-intersection lane guidance Existing painted safety zone, to remain Sanchez Street/15th Street

s 14TH ST 14TH ST CHURCH ST CHURCH ST Improved green bike lane Church Street/14th Street

Buchanan Street converted to one lane nortbound with angled parking (adds up to 8 spaces depending on final configuration) Realigned crosswalk and reconstructed curb ramp Green bike box Parking-protected bike lane (improved existing lane) DUBOCE BIKEWAY BUCHANAN ST DOLORES ST DUBOCE ST Remove pork chop island Thru-intersection lane guidance and green-back sharrows Thru-intersection lane guidance and green-back sharrows Consolidate right turn lane with left/through lane Existing green buffered bike lane Dolores Street to Buchanan Street/Duboce Street

Hermann Street converted to one-way eastbound with angled parking (adds approx 5-6 spaces) Modify (expand) soon-to-be-constructed Mercy housing bulbout (if angled parking approved) Upgrade existing crosswalks with accessible pedestrian refuge islands; upgrade painted center divider with pavers, potential rolled curbs } Proposal currently being reviewed by the Fire Department and subject to significant change Fill-in existing bike channel to expand plaza (potential future art installation by others) Existing bulbout removed to provide protected bike lane and widened transit boarding island (no impacts to existing trees) Relocate existing accessible blue zone on Octavia Street Transit boarding island extended and widened Parking-protected bike lane (removes 4-5 metered spaces) 10 Replace left-turn lane with landscaped center median; allows for additional green time on westbound Market Street (& northern crosswalk) and/or Octavia Boulevard 11 2 3.5 Parking-protected bike lane (helps avoid issues with double-parking) Large new sidewalk extension and continuation of center median made possible by combining northbound Guerrero St left-turn and through lanes Existing sidewalk bulbout maintained to slow bicyclists approaching Octavia New wide median helps buffer bicycle lane from vehicle travel lane / illegal right turns; requires narrowing of existing plaza Market-Octavia Safety Project - Alternative A Inbound & Outbound Protected Bikeways with Center Median Island www.sfmta.com/octavia Requires coordination with Better Market Street project alternatives; merge may be improved with leading bike interval from Octavia Blvd signal 5 4 2 New protected left-turn signal phase from Market Street Add physical protection to northbound bicycle lane on Octavia local road 12 Accessible bulbouts help separate & expand pedestrian / bicycle waiting areas; requires Caltrans coordination and approval Revised southbound bike crossing with dedicated bike signal and two-stage turn box (removes conflicts with pedestrians in crosswalk); new pedestrian refuge islands

Hermann Street converted to one-way eastbound with angled parking (adds approx 5-6 spaces) } Proposal currently being reviewed by the Fire Department and subject to significant change Planned/approved Mercy housing bulbout (shown) Fill-in existing bike channel to expand plaza and reduce pedestrian crossing distance; add lead-in bike lane from Octavia local road for southbound and inbound (two-stage left turn) access Upgrade existing crosswalks with accessible pedestrian refuge islands; maintain existing painted divider with safe-hit posts Existing bulbout removed to provide protected bike lane widened transit boarding island (shown with refuge island / forward bike box alternative) Relocate existing accessible blue zone on Octavia Street Transit boarding island extended and widened Parking-protected bike lane (removes 4-5 metered spaces) Maintain accessible passenger load zone with parking-protected bikeway (detailed design TBD) Add physical protection to northbound bicycle lane on Octavia local road Explore extinguishable NO RIGHT TURN ON RED electronic sign to ensure compliance with signal phasing Remove/trim existing medians to maintain two EB vehicle thru lanes while adding dedicated right-turn lane ~35 4 4 10 9 7 Parking-protected bikeway removes conflict with double-parked vehicles Convert existing left-turn lane into through-only lane New palm trees with small median Landscaped median to match remainder of Guerrero St corridor to south OPTIONAL: Consider right-turn-only except bikes from curbside lane behind transit boarding island (reduces uncertainty with right-turn conflicts and potential weaving on farside of intersection) Wide island for commercial loading; painted area to maintain utility and hydrant access Inbound bike lane extended to Valencia Street; separate signal phase for bikes and right turns Wide median island wcreates additional separation for bikes and reduces potential for illegal right-turns Market-Octavia Safety Project - Alternative B Inbound & Outbound Protected Bikeways with Valencia Street Right-Turn Pocket www.sfmta.com/octavia Revise corner with expanded waiting space for people on bikes and shorter crossing distances for people walking Revised southbound bike slot with two-stage turn box (removes conflicts with pedestrians in crosswalk)

effe effe effe Project Objectives Improve the safety of Market Street at Octavia Blvd by addressing illegal turns onto the freeway and improving traffic compliance Increase physical protection for bike facilities and reduce overall conflicts with other modes Reduce pedestrian crossing distances and improve ADA accessibility Provide urban gateway elements to reinforce the transition from the Central Freeway to city/neighborhood streets Project Alternatives & Elements Alternative A This draft alternative fills in the existing EB Market left-turn lane onto Octavia Blvd with a landscaped center median, and narrows the existing plaza at McCoppin St to provide a wide physical buffer between the inbound bike lane and adjacent vehicle travel lane. Alternative B This draft alternative converts the existing EB Market left-turn lane into a thru-lane, allowing for a better connection to Franklin St. This change requires the removal of pedestrian refuge islands on the east leg of Market St and narrowing of the center median. A buffer between the EB bike and travel lanes is achieved by either narrowing the McCoppin St plaza or dropping the curbside travel lane midblock. Draft design elements compatible with either Alternative A or B Prohibition of EB Market left-turns onto Octavia (currently used by ~140 vehicles in the PM peak hour) Increased green time for westbound Market Street and/or Octavia Boulevard/Central Freeway (TBD); new left-turn signal phases for Market at Laguna/Guerrero Parking-protected bikeway (EB & WB) between Octavia and Laguna Combined left-turn / thru lane for Laguna at Market (adds pedestrian refuge island) Combined left-turn / thru lane for Guerrero at Market (adds large corner bulbout and narrow center median) Extended / widened outbound boarding island for F-line streetcar ssc NB Octavia bike lane buffer island (narrows existing 8-ft bike lane) Illegal crossings by bikes (x2) Illegal left turns onto freeway (x2) Improved SB Octavia to EB Market bike lane / crossing Illegal right turns onto freeway (x14) effe Removal of bike channel for widened plaza island on Octavia New pedestrian bulbouts at Central Freeway touchdown ramp Fatality tef Accessibility upgrades to median islands and curb ramps tef Reported injury-inducing collisions at Market/Octavia (2011-2015)* Party at fault (bike/ped) *Does not include MUNI F-Line collisions Party at fault (vehicle) Hermann/Laguna design proposal (independent of Market Street alternatives) A proposal to convert Hermann St between Buchanan and Laguna streets to one-way eastbound, in order to add angled parking and a large bulbout adjacent to the Mercy Housing development, is currently being reviewed by various City agencies. Design options shown reflect ongoing discussions and are subject to change. Project Contact: Casey.Hildreth@sfmta.com Market-Octavia Safety Project - A Coordinated Effort with the Upper Market Safety Project Project Summary www.sfmta.com/octavia