Aquatic Concepts. July 23, 2018

Similar documents
KINDERSLEY AQUATICS CENTRE Town of Kindersley. Public Consultation #2 July

Honey Lake Valley Recreation Authority Pool Community Workshop Presentation

A Comparison for Ames, Iowa

22'-9 1/2" 6.94 m. 48'-10" m TEACH TOT POOL. POOL AREA = ±3845 ft². 35'-1 1/2" m BEACH ENTRY MINI SPLASH PAD = ± 475 SF. 16'-0 1/2" 4.

VALPARAISO HIGH SCHOOL NEW NATATORIUM Valparaiso Community Schools

Cordova Community Pool Replacement Cordova Recreation and Park District Community Workshop #2 October 23, 2018

CITY OF MERRIAM PARKS AND RECREATION FACILITIES MASTER PLAN

KINDERSLEY AQUATICS CENTRE DESIGN Town of Kindersley. Public Consultation #1 May

Big Sky Recreation Center Big Sky Event Center

Aquatic Facility Feasibility Study Falmouth, MA. Presented By: James Preisig: Falmouth Aquatics Kevin Post: Counsilman-Hunsaker

Area of existing house. Gross Flr. area excluding parking. (+1,657 basement) Gross Flr. area inc. covered parking & accessory bldg.

FLUSHING YMCA SUMMER 2014 SWIM SCHEDULE

LAKE BLUFF PARK DISTRICT BLAIR PARK SWIMMING POOL Questions and Answers OVERVIEW

SWIM POOL MANAGEMENT City of Blue Springs, Missouri

Outdoor Pool Public Forum University of New Hampshire. July 1, 2014

East Portland Community Center Family Swim Center Addition Complete Community Survey Results May, 2004

2018 Meet Date: July 31st, through August 4th, 2018

Discussion on Super Splash USA. December 14, 2015

Q1 In your household, who would come to the Long Bridge Aquatics & Fitness Center?

Aquatic Contact Information: Aquatic Coordinator: Nathan Garcia Office:

Moana Springs Recreational Complex Aquatic Center

Aquatic Contact Information: Aquatic Director: Hector Velez Office:

Lincoln County Environmental Health Department 302 North Academy Street, Suite B Lincolnton, NC Phone: Fax:

THERAPY POOL Specifics

BRECKSVILLE RECREATION COMMISSION January 22, 2018 Meeting Minutes. The meeting was called to order by Councilwoman Redinger at 7:30pm.

June Pre-C/C Novice Quad Meet Riptide Swim Team

CITY COUNCIL AGENDA REPORT

Town of Carbondale John M. Fleet Municipal Pool

TULSA PARKS POOL FACILITY IMPROVEMENTS AND REPAIRS

City of Harrisburg, PA Swimming Pool Feasibility Study Harrisburg, PA

Springville Aquat ic Act ivit y Cent er Explorat ory Commit t ee Meet ing Tuesday, February 24, :00pm

FREQUENTLY ASKED QUESTIONS

2016 MN RIPT SPEEDO Series 2 RIPTIDE

Conference Series #3 Riptide Swim Team

POOLS, SPAS & LANDSCAPES

Swimming Pool Requirements

2016 MN RIPT SPEEDO Series #1 RIPTIDE

It features some design elements and details that you should consider and include on your completed swimming pool plan.

2016 MN RIPT Riptide/Aquajets/Orcas BC Meet Series #1 RIPTIDE

BAINBRIDGE ISLAND AQUATICS FEASIBILITY STUDY 01/17/2019

CASL AAAA Divisional Championships

Have your say. Aquatic AND Leisure Facility. Aquatic AND Leisure Facility ON THE NEW. Information Booklet

Versatile On Ground/Semi-Inground Pool Systems. Featuring the ROCKWOOD. and CHAMPLAIN Series. lathampool.com

2004 U.S. Open Synchronized Swimming Championships July 20-24, New Orleans, Louisiana

Aquatic Facility Needs Assessment Study

Public Swim Hours Regular Hours (Jan 3-end of USD116 school year) Lap Swim Hours Regular Hours (Jan 3-end of USD116

NEIGHBORHOOD PLAN RENDERING A1.0: NEIGHBORHOOD PLAN

Schedule Friday 11/30 Saturday 12/1 Sunday 12/2 Officials' Meetings

District 86 Swimming Pools Pool Task Force Recommendations

BYLAW NUMBER

ST. JOSEPH FAMILY YMCA COMMUNITY AQUATIC FORUM WEDNESDAY, JULY 16, YMCA

ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW

Pre-Application Meeting Request Form

2013 CASL All-Star Championships

ORRVILLE YMCA. Natatorium Project

Pleasant Valley Aquatic Center

102 E. Michigan, Urbana Green/Grey/Bronze Questions: Register: Closure Dates Closed all day - No public activities

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program

See Figure 38, Existing Nonmotorized Connections.

2015 YMCA Sectional Swim Meet Saturday, February 14, 2015 Hosted by the Burlington Area YMCA Bullsharks

North Liberty, Iowa. Aquatic Master Plan

Schedule Friday, December 2 Saturday, December 3 Sunday, December 4 Officials' Meetings

Sincerely, SUMMER CAVE STAFF

TOWN OF AURORA. Pool Enclosure Permit Guide. PLANNING AND BUILDING SERVICES Building Division

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee

CARMACKS. Summary of Facilities: Community Hall Curling Rink Gymnasium Swimming Pool Outdoor Rink Playground/Gazebo Boardwalk Golf Course

Swimming Pool Plans and Specification Report

PRE-SEASON SUMMER SEASON FALL SEASON Sat. May 19 to Fri. May 25 Sat., May 26 - Mon., Aug. 20 Tues., Aug Mon., Sept. 3 (weather permitting)

BY-LAW NUMBER 816. WHEREAS Notice of Motion of the present By-law was given at the Council Meeting held on July 6 th, 2015;

Cumberland Valley High School 6746 Carlisle Pike Mechanicsburg, PA Emergency calls the day(s) of the meet:

Existing Clubhouse Issues - Non-Spatial PRELIMINARY

COMMUNITY AQUATIC FACILITY

Schedule Friday 12/5 Saturday 12/6 Sunday 12/7 Officials' Meetings

Traffic Impact Memorandum. May 22, 2018

CHAMPAIGN COUNTY YMCA HEAT MID-WINTER CLASSIC A-B MEET JANUARY 17-19, 2014

John H. Furbee Aquatics Center Operations Study

GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST

REQUEST FOR PROPOSAL SUMMER AQUATIC FACILITIES MANAGEMENT CITY OF DECATUR, GEORGIA

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

USA Synchro U.S. Collegiate Championships Bid Application

SWIMMING POOL PERMITS ARE ABOUT HEALTH AND SAFETY

SPRING & SUMMER PROGRAM GUIDE PRIVATE LESSONS TOURNAMENTS, CAMPS & CLINICS. OPEN PLAY Tuesday & Thursday, 1-4 p.m., $5 per person $90 $60

Backyard PARADISE. Five In-ground Pool Considerations

Summary of Proposal to Upgrade Swimming Facilities for the Wanaka Ward

NSAC Polar Plunge NORTH SUBURBAN AQUATIC CLUB

We are pleased to announce that Custom Construction are the Authorised Installers of Compass Pools in the New Plymouth and Wanganui Areas.

Optima, The Drive, Brudenell Avenue Canford Cliffs, Poole, Dorset, BH13 7NW

2018 MN HOP ICED COIFFURE MEET HURRICANES SWIM TEAM

Article 1 Administration and Enforcement Article 2 Zoning Districts and Map

PEAK ALL FREESTYLE MEET Sponsored by CENTRAL CHESAPEAKE SWIMMING (PEAK) October 6, 2012

2018 USA Diving Region 8 Championships

JANUARY 8, 9, & 10, 2016 HELD UNDER THE SANCTION OF USA SWIMMING #OH-16SC-55

The following is submitted together with the plans and application for the staff and plan commission consideration of approval.

Pool Submittal & Inspection Packet

With Unmatched Amenities

Marlins Super Bowl Challenge January 29, 2017

Edwardsville YMCA Breakers 2015 Halloween Invitational October 23 rd - 25 th, 2015

CHAMPAIGN COUNTY YMCA HEAT 10 th Annual ERIN BLOCK MEMORIAL INVITATIONAL NOVEMBER 7-9, 2014

JOHN RHODES COMMUNITY CENTRE POOL A

Transcription:

Aquatic Concepts July 23, 2018

DESIGN DIRECTION Lazy River Zero Depth Entry Water slides at least one for 48 + and one for little kids Spray features Indoor lap lanes Outdoor lap lanes that can accommodate the swim team Therapy pool Two 1m Diving Boards Other Components Appropriate deck space for amenities Amenities spaced so that all users can have enjoyable experience What goes inside (365 days) vs. what goes outside (90 days)

SLATER HOBBY LOBBY IKEA WAY

Exterior Images

View from Southeast:

View from Southwest:

View from Northwest:

View from Northeast:

Floor Plans

Main Level:

Lower Level:

Interior Images

Interior View to Pool:

Interior View of Pool:

Interior View of Pool:

Lifeguard Area:

Lifeguard Area:

Pool Party Room:

Locker Area:

Fit Bar:

Gym View from Above:

Lobby/ Reception

Gallery Area:

Gallery Area:

Community Room:

Community Room:

Child Watch:

Office Area:

Office Area:

SLATER HOBBY LOBBY IKEA WAY

INDOOR POOL LAYOUT PROPOSED AMENITIES Therapy Pool Lazy River Zero Depth Entry Spray Features Family Slide Large Slide Lap Lanes - Four Lanes, 25 yards Open Swim & Play Area

Outdoor Aquatics: Initial Layouts from July 9

OPTION #1 Features 25 Yard, 8-lane Pool 7 Foot Lanes vs. traditional 8 Foot Lanes Two diving boards (1m) Zero depth entry ramp Zero depth spray features Option Included in Project Budget Estimated Bather Load Indoor: 395 Outdoor: 260 Total: 655

OPTION #2 (Design Committee Recommended Option) Features 25 Yard, 6-lane Pool Two diving boards (1m) Expanded zero depth Zero depth spray features Option Included in Project Budget Estimated Bather Load Indoor: 395 Outdoor: 367 Total: 762

Funding Discussion

Outdoor Aquatics: Revised Layouts from July 16

OPTION #4 Features 25 Yard, 6-lane Pool (75 x 51 ) Enlarged Zero depth pool entry and increased pool area New terraced area to the south Notes Requires additional retaining walls along pool deck Requires additional excavation / grading Requires additional pool equipment increasing building size 162 sq. ft. Additional Cost Over Budget: $1.2 million Estimated Bather Load Indoor: 395 Outdoor: 477 Total: 872

OPTION #5 Features 25 Yard, 8-lane Pool (75 x 59 ) 7 Foot Lanes vs. traditional 8 Foot Lanes Enlarged Zero depth pool entry and increased pool area New terraced area to the south Notes Requires additional retaining walls along pool deck Requires additional excavation / grading Requires additional pool equipment increasing building size 325 sq. ft. Additional Cost Over Budget: $1.6 million Estimated Bather Load Indoor: 395 Outdoor: 539 Total: 934

Outdoor Aquatics: New Layout Options

OPTION #7 Features 25 Yard, 6-lane Pool (75 x 51 ) Medium sized fan area Dive well Terraced seating area Outdoor convenience exit at south end Notes Requires additional retaining walls along pool deck Requires additional excavation / grading Outdoor pool equipment (filters/pumps) now housed in an exterior pool equipment building Additional Cost Over Budget: $2.25 million Estimated Bather Load Indoor: 395 Outdoor: 464 Total: 859

OPTION #8 Features 25 Yard, 8-lane Pool (75 x 59 ) 7 Foot Lanes vs. traditional 8 Foot Lanes Medium sized fan area Dive well Terraced seating area Outdoor convenience exit at south end Notes Requires additional retaining walls along pool deck Requires additional excavation / grading Outdoor pool equipment (filters/pumps) now housed in an exterior pool equipment building Additional Cost Over Budget: $2.5 million Estimated Bather Load Indoor: 395 Outdoor: 524 Total: 919

Summary Pool Data Slide Option Description Outdoor Pool Square Footage Outdoor Pool Bather Load Outdoor Pool Occupancy Total Pool Square Footage Total Pool Bather Load Total Pool Occupancy % of Pool Sq. Ft. Outside % of Pool Sq. Ft. Inside In Current Budget? 1 8 Lane Zero Depth 5,326 270 107 11,250 665 226 47% 53% Yes 2 6 Lane Fan 5,785 367 116 11,709 762 235 49% 51% Yes 4 6 Lane Large Fan 9,105 477 182 15,029 872 301 61% 39% No (+$1.2m) 5 8 Lane Large Fan 9,905 539 198 15,829 934 317 63% 37% No (+$1.6m) 7 6 Lane Medium Fan + Dive Pool 8 8 Lane Medium Fan + Dive Pool 7,918 464 158 13,842 859 277 57% 43% No (+$2.25m) 8,774 524 175 14,698 919 294 60% 40% No (+$2.5m) Existing 50M+Plunge+Zero Depth 14,415 811 289 14,415 811 289 100% 0% N/A NOTE: Information on this table is for water spaces only deck spaces are not included The Indoor Aquatics Water Spaces are 5,924 sq. ft. with a bather load of 385 and an occupancy of 119.

What is a site plan? A site plan is a landscape architectural plan, and a detailed engineering drawing of proposed improvements to a given lot. A site plan usually shows a building footprint, travelways, parking, drainage facilities, sanitary sewer lines, water lines, trails, lighting, and landscaping and garden elements.

Site Plan Submittal Due August 10 for September 5 Planning Commission If approved, goes to city council on September 24 September 24 request council approval of site plan, rezoning, TIF On September 25 mobilization; steel package If we miss August 10 deadline: October 3 Planning Commission October 22 City Council meeting We will miss the fall construction season and the building won t open until late 2020

Questions?