MEMORANDUM. Sutter Street Bicycle Lanes, Stockton, CA SF

Similar documents
AGENDA ITEM G-2 Public Works

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

COMMUNITY MEETING AGENDA

Cycle Track Design Best Practices Cycle Track Sections

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

WELCOME Public Information Centre

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Draft North Industrial Area-Wide Traffic Plan

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

NEWMARKET UPHAM S CORNER

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Glebe Neighbourhood Cycling Plan

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President

Upper Market Street Bike Lane Project

CONNECTING PEOPLE TO PLACES

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Bellevue Downtown Association Downtown Bike Series

The Wiggle Route in Context

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Welcome! San Jose Avenue Open House August 25, 2015

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

Appendix A: Crosswalk Policy

Chapter 2: Standards for Access, Non-Motorized, and Transit

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

SAFE ROUTES TO SCHOOL

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Active Transportation Facility Glossary

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

Southside Pilot Proposal

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Improve the livability of our streets by

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

Chapter 3 BUS IMPROVEMENT CONCEPTS

Item No. 14 Town of Atherton

SECTION 1 - TRAFFIC PLANNING

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

City of Seattle Edward B. Murray, Mayor

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

10.0 CURB EXTENSIONS GUIDELINE

Public Information Centre

TABLE OF CONTENTS. Executive Summary

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Public Works and Infrastructure Committee. General Manager, Transportation Services

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

ALLEY 24 TRAFFIC STUDY

EXECUTIVE SUMMARY. Vision

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

Hidden Oaks Elementary School

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Bay to Bay Boulevard Complete Streets Project

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Richmond-Adelaide Cycle Tracks

Central Avenue Bikeway Traffic and Safety Impact Assessment

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

TRAFFIC ACTION PLAN. North Shoreview Neighborhood CITY OF SAN MATEO

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

MEMORANDUM. Discussion of the planned crosswalk improvement on Mount Vernon Road near Stratham Drive

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

Traffic Impact Memorandum. May 22, 2018

Edenbrook Hill Drive Traffic Calming Study

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Classification Criteria

Chapter 3 DESIGN SPECIFICATIONS

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

b. executing legal agreements with respect to the above.

Completing the Street: Denning Drive

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

Safe Streets. City of Lake Forest Park. March 21, 2017

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

The DC Pedestrian Master Plan

Lake Whitney Elementary School

Grove Hall Business District Parking Analysis

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

Transcription:

MEMORANDUM Date: To: From: Subject: PURPOSE Anthony J. Lopes, Siegfried Engineering Christine Carey & Matthew Ridgway, Fehr & Peers Sutter Street Bicycle Lanes, Stockton, CA SF09-0468 The City of Stockton intends to install bicycle facilities on Sutter Street between Alpine Avenue and the Calaveras River as part of the 2007 Bicycle Master Plan. Given the existing right-of-way, the construction of Class II onstreet bicycle lanes would require removal of vehicular parking on one side of the street. The community has expressed concern over the removal of parking and requested consideration of alternative facilities. Working with Siegfried Engineering, Fehr & Peers was retained by the City of Stockton to evaluate the proposed bicycle facilities and consider potential alternatives to meet the needs of the community. METHODOLOGY Looking north on Sutter Street Although the project site is limited to Sutter Street from Alpine Avenue to Ingram Street (0.7 miles), Fehr & Peers evaluated the immediately surrounding area as well to understand the context of the corridor, particularly connections to other bicycle facilities. The study area shown in Figure 1 includes Oak Park, Alpine Avenue to California Street, Ingram Street to El Dorado Street and north to Calaveras River Bike Path. To evaluate the proposed bicycle facilities and existing conditions in the study area, Fehr & Peers performed the following tasks: 1. Reviewed the Bicycle Master Plan 1 to understand the context of Sutter Street within the larger bikeway network. 2. Reviewed aerial photographs and survey drawings 2 of Sutter Street to evaluate geometric constraints and existing land uses in the area. 1 Fehr & Peers, 2007 2 Provided by Siegfried Engineering, 2009 332 Pine Street, 4 th Floor, San Francisco, CA 94104 (415) 348-0300 Fax (415) 773-1790 www.fehrandpeers.com

Blanchi Rd. Ingram St. Harper St. Gibson St. Fargo St. Essex St. Churchill St. Downs St. Wright Ave. 5 4 4 99 Fulton St. West Ln. N. Sutter St. Sutter St. Ave.N. Alpine Ave. Stadium Dr. Euclid Ave. Oak Park Barrymore St. 5 N Sonoma Ave. NOT TO SCALE STOCKTON, CA LEGEND: California St. Coronado Ave. San Mateo Ave. El Dorado St. N. Sutter St. Alvarado Ave. West Ln. Alpine Ave. N NOT TO SCALE = Study Area Sutter Street Bike Lane STUDY AREA Jan 2010 SF09-0468\graphics\0468-1 FIGURE 1

Page 3 of 14 3. Collected 24-hour tube counts at three locations on Sutter Street to determine total volume of vehicles and percentage of truck traffic traveling on the street during a typical weekday. Tube locations are listed below and shown on a figure in the Appendix. Sutter Street between Knoles Way and Grove Street Sutter Street between Barrymore Street and Churchill Street Sutter Street between Fargo Street and Gibson Street 4. Collected turning movement counts at four intersections along the corridor during morning (7:00-9:00 AM) and evening (4:00-6:00 PM) peak periods to determine vehicular circulation patterns in the neighborhood as well as bicycle and pedestrian movements. Counts were collected at the following intersections and shown on a figure in the Appendix: Sutter Street at Alpine Avenue Sutter Street at Fulton Street Sutter Street at Essex Street El Dorado Street at Ingram Street 5. Conducted a field evaluation of study area and observed existing conditions including bicycle and pedestrian activity, vehicular circulation and driver behaviors, parking capacity and demand, transit operations, and destinations that attract visitors along the corridor. 6. Met with City representatives from Public Works Department to discuss objectives and concerns about the project and plans for future developments in the area. 7. Evaluated the proposed plan based on the data collected and developed recommendations to address neighborhood concerns. The next step is to present the recommendations to the City and the community at a Public Hearing to obtain feedback and make modifications to the recommended plan as necessary. OBSERVATIONS AND FINDINGS General Sutter Street is a two-way local street that runs north-south through the center of the City of Stockton. In the study area, Sutter Street has one vehicular travel lane in each direction with parking permitted on both sides of the street. The roadway width varies between 38 feet at the narrowest point near Barrymore Street to 42 feet at the widest point near Gibson Street. Along the Existing cross-section on Sutter Street corridor, the terrain is generally flat and the geometry of the street provides good visibility along its length. Sidewalks are present on both sides of the street. There are currently no bicycle facilities on Sutter Street. 3

Page 4 of 14 The land use 3 is designated as Low Density Residential for most of the project area with High Density Residential (Casa Manana Inn Apartments) on the east side of Sutter Street between Fulton Street and Atlee Street. Most residences in the neighborhood face north-south and are oriented toward the cross-streets. Approximately 30 houses in the study area face east-west and have driveways located on Sutter Street. Destinations on Sutter Street are shown in Figure 2 and include Oak Park, which occupies the east side of the street between Alpine Street and Fulton Street and two churches with affiliated schools. St. Luke s Catholic Church/School between Fulton and Churchill Streets includes an elementary and middle school with a student enrollment of 212 and 30 faculty and staff. The Central Church of Christ/Sierra Christian School located at the northeast corner of the corridor has approximately 130 elementary and middle school students with 25 faculty and staff. The Casa Manana Inn Apartments, a Senior Housing facility with approximately 180 residents, is located on the northwest corner of Sutter Street at Fulton Street and often attracts visitors and caretakers. Vehicular Circulation Along Sutter Street in the project area, there are three intersections with stop-control on Sutter Street: 1. Alpine Avenue: stop on Sutter Street only 2. Fulton Street: all-way stop 3. Churchill Street: all-way stop Oak Park at south end of the study corridor All other intersections have stop signs only on the cross streets. There are no signalized intersections in the corridor. Traffic data collected in December 2009 on a typical weekday indicates that Sutter Street experiences relatively low vehicular volumes with the highest number of vehicles traveling on the south end of the corridor and significantly fewer vehicles on the north end. The average weekday traffic counts collected at three locations on Sutter Street are shown in Figure 3, along with parking data discussed in the next section. Turning movement counts collected along the corridor indicate that the majority of vehicles traveling northbound on Sutter Street turn onto Fulton, Churchill or Essex Streets. Southbound vehicles typically turned onto Fulton Street or continued to Alpine Avenue. A Level of Service (LOS) analysis of these intersections indicates that the intersections of Fulton and Essex Streets operate at LOS B or better with the existing lane configuration, signifying that both intersections operate with minimal to no delay. However, several southbound vehicles (approximately 100 in the AM peak and 70 in the PM peak) turn left onto Alpine Avenue, which causes significant delays on Sutter Street since vehicles must wait for a gap in traffic on Alpine Avenue. 3 City of Stockton General Plan, 2007 4

Blanchi Rd. Calaveras River Bike Path Ingram St. Harper St. Central Church of Christ/ Sierra Christian School Gibson St. El Dorado St. Fargo St. N. Sutter St. Essex St. Downs St. Churchill St. Wright Ave. St. Luke s Church/Schools Barrymore St. Fulton St. Atlee St. Casa Manana Inn Apartments Alvarado Ave. Grove St. Knoles Wy. Oak Park Stadium Dr. Euclid Ave. N NOT TO SCALE Alpine Ave. Sonoma Ave. California St. Sutter Street Bike Lane DESTINATIONS Jan 2010 SF09-0468\graphics\0468-2 FIGURE 2

Blanchi Rd. Calaveras River Bike Path Ingram St. Harper St. 115 El Dorado St. Gibson St. Fargo St. 559 N. Sutter St. 701 Essex St. Downs St. Churchill St. 1,155 1,345 Wright Ave. Barrymore St. 230 Atlee St. 60 Alvarado Ave. Fulton St. Grove St. 1,459 1,693 525 Knoles Wy. N NOT TO SCALE LEGEND: Stadium Dr. = Stop Sign Euclid Ave. ## = ADT ## 525 = Off-Street Parking Note: Side streets are stop-controlled. Alpine Ave. Sonoma Ave. California St. Source: Traffic Counts by Quality Counts, LLC. 12/09/09-12/10/09 Parking: Fehr & Peers, Estimate from Aerial Photography Sutter Street Bike Lane TRAFFIC CONTROLS, COUNTS AND PARKING Jan 2010 SF09-0468\graphics\0468-3 FIGURE 3

Page 7 of 14 The southbound approach for the intersection of Sutter Street with Alpine Avenue currently operates at LOS F in both the AM and PM peak periods under the existing conditions. Given the heavy vehicle volumes on Alpine Avenue particularly in the PM, a signal warrant was tested at this intersection and satisfies the MUTCD Peak Hour Signal Warrant. Future consideration should be given to signalizing this intersection. A summary of the LOS calculations are included in the Appendix. There were few pedestrians and bicycles observed crossing these intersections during peak hours. Typically less than four percent of the vehicles on Sutter Street were heavy vehicles (trucks). Detailed traffic counts with illustrations of the intersections are included in the Appendix. Field observations were conducted on December 17, 2009. Vehicles appeared to adhere to existing traffic controls and regulations; some vehicles were observed accelerating north of Churchill Street where there are no traffic controls on Sutter Street for the next 0.3 miles (about 1,500 lineal feet), but an official speed study was not conducted. Parking Currently parking is permitted on both sides of the street for the entire corridor with the exception of a few areas in front of St. Luke s Catholic Church and school. No Parking areas are designated by a red curb. Along the length of Sutter Street in the study area, there are approximately 200 available curbside parking spaces. During the site visit, vehicles were observed On-street parking on Sutter Street parked on Sutter Street primarily between Fulton and Churchill Streets, in front of Casa Manana Inn Apartments and St. Luke s Church and schools. Only two vehicles were observed parked along the five blocks south of Fulton Street and only one vehicle was parked on Sutter Street along the six blocks north of Churchill Street. Additional observations were made in January 2010 on a Tuesday evening to evaluate parking conditions when residents are home from work. A total of 19 vehicles were parked along the entire corridor between 7pm-8pm as shown in Table 1. In addition to on-street parking, a surface parking lot adjacent to St. Luke s has capacity for over 200 vehicles. During the site visit the lot was nearly empty, although the City of Stockton Department of Public Works noted that vehicles often spill over onto Sutter Street when church is in session or events occur at the schools. St. Luke s School representatives indicated in addition to their regular enrollment, over 500 students attend the school on Monday afternoons for Catholic education courses. Parents waiting for students park their vehicles in the lot and on the street, increasing traffic activity in front of the school during that time. The Church of Christ/Sierra Christian School located at the north end of the corridor has a surface lot that can accommodate over 100 vehicles, and was only filled to approximately ¼ of its capacity during the site visit. Representatives from Sierra Christian School noted that the parking lot is only used by faculty and staff members during the week, but often fills to capacity during school events on Wednesday evenings and church on Sundays. 7

Page 8 of 14 The parking lot for Oak Park, which can be accessed via Sutter Street or Fulton Street, can accommodate approximately 525 vehicles. A residential parking lot for Casa Manana Inn Apartments located just south of Atlee Street includes nearly 60 spaces that are designated for residents only. Off-street parking locations are shown in Figure 3. A summary of the existing parking supply including both on-and off-street spaces in the study area is shown in Table 1. Table 1. Existing Parking Supply Location Type Existing Capacity a From To # Spaces Observed Occupancyb # Vehicles % of Capacity AM PM AM PM Sutter St. Alpine Ave. Fulton St. On-Street 75 2 2 3% 3% Sutter St. Fulton St. Churchill St. On-Street 52 45 12 86% 23% Sutter St. Churchill St. Ingram St. On-Street 75 1 5 1% 7% Oak Park c Lot 525 125-24% - Casa Manana Inn Apartments Lot 60 40-67% - St. Luke s Church/School Lot 230 20-9% - Church of Christ/Sierra Christian School Lot 115 30-26% - Total 1,132 268-24% - Source: Fehr & Peers and Siegfried Engineering a. Number of parking spaces was estimated based on field observations and aerial photographs. b. Occupancy for AM was observed between 10am-11am on typical weekday in December 2009. Occupancy for PM was observed between 7pm-8pm on typical weekday in January 2010 for on-street parking only. c. Parking occupancy was not documented for Oak Park but was observed to be approximately ¼ full during site visit. The data presented in Table 1 was collected on a typical weekday and is not representative of peak times when parking is in higher demand, particularly on Sundays during church. However, it does indicate that a significant amount of parking is available in the neighborhood to serve the existing destinations. On-street parking is also permitted on all streets intersecting Sutter Street. Transit The San Joaquin County Metro Bus Route 51 travels along Sutter Street from Essex Street to Fulton Street in both directions. The bus service operates weekdays from approximately 6:00am to 11:00pm with an average of 35 minute headways in the morning and 60 minute headways in the afternoon. On weekends and holidays, the bus service operates San Joaquin County Bus Route 51 8

Page 9 of 14 hourly from approximately 6:30am to 8:00pm. A southbound bus stop is located on the northwest corner of Sutter Street and Fulton Street. Bicycle Activity The 2007 Bicycle Master Plan recommended Class II bicycle facilities on Sutter Street to facilitate the connection from downtown Stockton north via California Street to the Class I multi-use path on the north side of the Calaveras River (the Bicycle Master Plan proposed facilities are shown in the Appendix). El Dorado Street, which runs parallel to Sutter Street and currently provides access to the Class I bicycle path via a bridge over the Calaveras River, experiences heavy vehicle volumes that prove to be challenging even to the most experienced cyclists. The City of Stockton is currently considering a new bicycle and pedestrian bridge over the Calaveras River that with potential alignment near the north end of Sutter Street 4. The orientation of Sutter Street along with access to Oak Park and two churches and schools, transit connection, and relatively low vehicular volumes present an ideal location for a designated bicycle facility. Bicycle counts collected at three intersections on Sutter Street are shown in Table 2 and indicate that some bicycle activity is currently present in the study area despite the lack of designated bicycle facilities. The National Bicycle and Pedestrian Documentation Project 5 (NBPD), a nationwide effort to provide a consistent model of data collection to estimate existing and future bicycle and pedestrian demand and activity, determined that there are few distinct peak hour patterns for pedestrians or bicycles and that counts collected during any period of a day can be used to extrapolate daily, monthly and annual users. The NBPD method was applied to the data collected on Sutter Street and the estimated counts 6 are shown in Table 2. Table 2. Bicycle Volumes on Sutter Street Intersection Actual Hourly Counts a Estimated Average Counts b 7-9 am 4-6 pm Total Daily Weekly Monthly Annually Alpine Ave. 5 1 6 30 250 1,100 18,000 Fulton St. 4 13 17 75 625 2,700 45,100 Essex St. 3 8 11 45 375 1,625 27,000 a. Actual volumes are total count of all bicycles movements through the intersection. Counts collected on 12/10/2009, Source: Quality Counts, LLC b. Adjusted counts were calculated by Fehr & Peers based on the National Bicycle and Pedestrian Documentation Project Adjustment Factors. During the field visit in December 2009, cyclists were observed riding in the wrong direction (against traffic) on Sutter Street, which was also observed in other locations throughout Stockton. 4 An alternative alignment is also being considered at the west end of Ingram Street connecting to Claremont Avenue north of the River 5 Alta Planning & Design and ITE Pedestrian and Bicycle Council, March 2009 6 N.B. Count adjustment factors are designed to estimate volumes on multi-use paths or higher density pedestrian entertainment areas, and may not be accurate for Sutter Street. However, the adjusted data accounts for the time of year, day of the week and climate in Stockton, and can be used as a frame of reference for the existing bicycle use of Sutter Street given the actual hourly counts. 9

Page 10 of 14 Pedestrian Activity Approximately 10-15 pedestrians were observed on Sutter Street during the site visit and most were either walking dogs destined for Oak Park, accessing residences, waiting for the bus, or attending the schools. Pedestrian counts during peak hours were collected with vehicular turning movement counts and are included in the Appendix. Sidewalks on Sutter Street are generally in good condition and are present on both sides of the street with the exception of the east side directly adjacent to Oak Park south of East Stadium Drive. Most of the curbs along the corridor are rolled, and several vehicles were observed parked on the sidewalks, blocking a clear pedestrian path. One wheelchair was observed riding in the street due to an obstructed sidewalk. Crosswalks are present at the following intersections: Fulton Street - north and south legs across Sutter Street only Churchill Street - all approaches Barrymore Street - yellow school crosswalk on north leg across Sutter Street only. Advanced warning signs and pavement marking text stating SLOW SCHOOL XING emphasize the presence of schools in the area and are present northbound at Atlee Street and southbound at Churchill Street. School crossing pavement markings on Sutter Street ALTERNATIVES Based on the field observations, data collection, resident concerns and discussions with the City of Stockton Department of Public Works, Fehr & Peers developed three alternatives to provide bicycle facilities on Sutter Street without removing vehicular parking in high demand areas. The alternatives include a combination of Class II and Class III bicycle facilities which are defined below. Class II Bikeway (Bike Lane) provides a restricted right-of-way and is designated for the use of bicycles with a striped lane on a street or highway. Bicycle lanes are generally five feet wide. Vehicle parking and vehicle/pedestrian cross-flow are permitted. Class III Bikeway (Bike Route) provides for a right-of-way designated by signs or pavement markings for shared use with pedestrians or motor vehicles. A plan of each alternative is shown in Figure 4 with the features described below. Alternative 1. Class III bicycle facility for entire corridor Indicates bicycles may be present in the area, but does not prioritize as highly as Class II Does not provide separated bicycle lane Maintains existing parking configuration for entire street 10

Blanchi Rd. Blanchi Rd. Blanchi Rd. Calaveras River Bike Path Calaveras River Bike Path Calaveras River Bike Path Ingram St. Ingram St. Ingram St. Harper St. Harper St. Harper St. Gibson St. Gibson St. Gibson St. Fargo St. Fargo St. Fargo St. N. Sutter St. N. Sutter St. N. Sutter St. Churchill St. Churchill St. Churchill St. Fulton St. Fulton St. Fulton St. Oak Park Oak Park Oak Park N NOT TO SCALE LEGEND: Alpine Ave. Alpine Ave. Alpine Ave. = Class II Bike Lanes = Class III Shared Lanes Alternative 1 Parking removed = 0 Alternative 2 Parking If removed from west = 30 If removed from east = 45 Alternative 3 Parking If removed from west = 65 If removed from east = 85 Sutter Street Bike Lane PROPOSED ALTERNATIVES Jan 2010 SF09-0468\graphics\0468-4 FIGURE 4

Page 12 of 14 Alternative 2. Class II from Alpine Street to Fulton Street, Class III north to Ingram Street Bicycles have designated space on the street where vehicle volumes are highest Indicates to motorists that bicycles are likely to be present on the street Removes on-street parking one one side of the street (approximately 30 spaces south of Fulton Street if removed on the west side or 45 spaces if removed on the east) Alternative 3. Class II south of Fulton Street and north of Churchill Street, Class III between Fulton Street and Churchill Street Provides higher priority for bicycles Still maintains vehicle parking in most critical area between Fulton and Churchill Streets Supports Bicycle Master Plan with designated connections between California Street Class II facilities/oak Park Class I along Alpine Avenue, and to Calaveras River Class I Bicycle Path Provides traffic calming benefit of narrower lanes, which tend to reduce vehicles speeds; particularly benefit would be afforded to the area north of Churchill Street where vehicles were observed speeding Removes approximately 65 spaces from entire corridor if removed on the west side or 85 spaces if removed on the east RECOMMENDATIONS The plans shown in Figure 4 provide alternatives to Class II facilities for the entire corridor. Alternative 3 provides the most significant benefit to cyclists while maintaining the existing supply of on-street vehicular parking in the area with the highest demand and providing on-street parking on one side of the street throughout. The proposed configuration does not alter vehicular travel capacity or transit operations, and provides traffic calming benefits while filling a missing link in the City s bicycle network. For the Class II facilities recommended south of Fulton Street and north of Churchill Street, bicycle lanes should be five feet wide and marked on the right side of the vehicular travel lane (see page 13). On-street parking adjacent to the bicycle lane should be eight feet wide 7 and consistently located on the east side of Sutter Street to minimize loss in total parking spaces. The section between Fulton Street and Churchill Street should maintain the existing vehicular parking on both sides of the street with a designated Class III shared bicycle facility in each direction. Pavement markings, or sharrows, should be installed 11-feet from the curb to encourage motorists to share the road with bicycles (see page 13). 7 The recommended minimum width of the parking lane adjacent to a bicycle lane is eight feet to provide a buffer between cyclist and open car doors. Where the parking lane is less than eight feet due to geometric constraints, a 4 edge line or parking Tees are recommended between the parking lane and bicycle lane. 12

Page 13 of 14 13

Page 14 of 14 Other considerations to enhance the bicycle experience in the project area include: Implementation of directional arrows in bike lanes and increased enforcement to ensure proper use of facilities Use of Bikes Wrong Way (R5-1b and R9-3c) on the back of bike lane signs Provision of sufficient bicycle parking at Oak Park and schools Connections at south end of Sutter Street to Class II on California Street, and from north end of Sutter Street to Calaveras River Bike Path 8 Wayfinding signage - consider comprehensive Citywide program (e.g. City of Oakland Design Guidelines for Bicycle Wayfinding Signage) Other considerations to offset parking loss caused by the project include: Encourage alternative modes of transportation to school and church through incentives Coordinate peak activity at schools. Consider staggering class time to minimize peak dropoff/pick-up activity, particularly at St. Luke s on Mondays with increased attendance for Catholic education Encourage shared parking among surface lots, e.g. church parking at Oak Park (the parking lot for Oak Park is less than ¼ mile from St. Luke s) As discussed in the Vehicular Circulation section, consideration should be given to the installation of a signal at the intersection of Alpine Avenue and Sutter Street to improve Level of Service, particularly for southbound vehicles making the left turn movement. 8 City of Stockton DPW indicated future plans for these connections. The south end will connect to a Class I path in Oak Park to the intersection of California Street where it will connect to existing Class II facilities. The north end will connect to the Calaveras River Bike Path via a new bicycle and pedestrian bridge at a location to be determined. 14