January 25, Franklin Pasture Sanitary Sewer Cure-In-Place Pipe Lining Bid No Bid Date: 2/7/17 ADDENDUM NO 1

Similar documents
CLEANING, INSPECTION, AND TESTING OF SEWERS

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

CHAPTER 5 CULVERT DESIGN

SSO 700 Integrated Watershed Action Plan: Continuous Calibration of a Model

SECTION PRESSURE TESTING OF PIPING

MA PHIT- Wastewater Certificate Program

CITY OF MEMPHIS, TENNESSEE

CSO/STORMWATER MANAGEMENT. HYDROVEX VHV / SVHV Vertical Vortex Flow Regulator

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

Introduction to Design and Maintenance Considerations for SNOUT Stormwater Quality Systems

SECTION ACCEPTANCE TESTING FOR SANITARY SEWERS

PERKFILTER. Inspection and Maintenance Guide

Operation and Maintenance Manual. First Defense and First Defense High Capacity. Vortex Separator for Stormwater Treatment

DUAL-VORTEX SEPARATOR. Inspection and Maintenance Guide

Technical Report Culvert A Hydraulic Analysis

Storm Damage Floating Culverts & Other Inlet Issues

CSO/STORMWATER MANAGEMENT. HYDROVEX HHV-E Vortex Driven Regulator

Photo 1: Typical 4 Weephole

TECHNICAL MEMORANDUM 002 EMORANNO. 001

UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

Selecting Flow Metering Sites And Evaluating Data

Fish Passage Assessment Report Mare Brook Culverts

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

Swimming Pool Requirements

Modeling of Long Culverts and Stormdrains A Comparison of Different Methods

Le Sueur County, MN Tuesday, December 13, 2016 Board Meeting

Stormwater Management Report for the Macri Dixon Condo Block

Lecture 10 : Sewer Appurtenances

PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT FLUSHING REPORT

City of Crystal Lake Community Development Department

22. Specialty Valves.

CITY OF ROSEVILLE DESIGN STANDARDS

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM

Lincoln County Environmental Health Department 302 North Academy Street, Suite B Lincolnton, NC Phone: Fax:

SPECIFICATION FOR THE INSTALLATION OF CURED IN PLACE RESIN SLEEVE FROM MANHOLE TO MANHOLE. (TOWN LINER)

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

FIBERGLASS MANHOLES SANITARY SEWER LINES

R-3501-E2 R-3501-H4. R-3501-HL Mountable Curb Frame, Grate

The Classroom Environment

LAZY RIVER 3 3 PUMP LOCATION

PVC DWV FITTINGS PVC-0312 MARCH 2012 SUPERCEDES PVC-0112 ASTM D2665

CERTIFYING DRAINLAYER

Beavers are particularly adept at manipulating their

HIGH WATER/DRY WATER PROTECTION: Managing Our Aging CSO Structures

Inspection Chambers Project

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

Design Guide. Table of Contents

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

SWIMMING POOL REQUIREMENTS

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

Evaluating Surge Potential in CSO Tunnels

The Company With Connections

upvc MANHOLES APPLICATIONS Sewerage applications: Vacuum sewerage applications: Landfill applications: Valve boxes:

SWIMMING POOL / SPA PLAN REVIEW CHECKLIST

Chapter 10 SWIMMING POOLS

Boston s Pilot Project to Measure CSO Flows Relies on New Technology and Scattergraphs to Detect Overflows

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual Minnesota

Return to: Engineering Department Water Quality Administrator COUNTY OF HENDERSON 100 N. King Street Suite 118 Hendersonville, NC 28792

Septic Tank Buoyancy Control 101. David Lentz, P.E.

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual Rhode Island

Appendix A. Imbrium Systems Jellyfish Filter Inspection and Maintenance Information

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

General Information for Culvert Design

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS

GENERAL LEGEND 12"CMP

Fisher and Whisper Disk Diffusers

DIVER INSPECTION REPORT Canyon South, Raw Water Tank

ASSE International Product (Seal) Listing Program. ASSE Performance Requirements for Air Valve and Vent Inflow Preventer

INSTRUCTION MANUAL. CVS P37 LP Gas Reducing Regulator

Preparation and Installation of the Sanitary BDI-FLX Sensor and Connection to the BDI-FLX Interface Cable

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014


WL16 WATER LEVEL LOGGERS Submersible pressure transducer and USB datalogger combination

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs

Revised MTD Lab Certification Environment 21 StormPro Stormwater Treatment Device by Environment 21, LLC On-line Installation

Township of North Huntingdon Application for Permit

CONTROL VALVE SEAT LEAKAGE

Modelling a Stormcell Storage System Within The Micro Drainage Program Win Des - Source Control

City of Crystal Lake Community Development Department

CITY OF ABBOTSFORD CONSOLIDATED PRIVATE SWIMMING POOL REGULATION BYLAW. Bylaw No AMENDMENTS


D.B. Wilson Station CCR Landfill

High-performance submersible pressure transmitter For level measurement Model LH-10

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed. December The Cadmus Group, Inc.

Operating Instructions. Predilution chamber EC. BA 821C/24/ae/01.07

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

THE MOST ADVANCED NAME IN WATER MANAGEMENT SOLUTIONS THE LATERAL CONNECTION SOLUTION

ENGINEERING FIRM OF RECORD COMPANY REPRESENTATIVE PROJECT MANAGER AND ENGINEERING LEAD INDIAN HILL SENIOR LIFESTYLE CENTER YONKERS, NY

PROPOSAL. PROPOSAL OF, a corporation a

San Antonio Creek Spreading Grounds Rehabilitation Project Ojai Valley, CA

STANDARD OPERATING PROCEDURES

Culvert Safety Inspection Report

1213B2 Service Regulators Maximum Inlet Pressure 125 PSIG

Transcription:

PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director January 25, 2017 Franklin Pasture Sanitary Sewer Cure-In-Place Pipe Lining Bid. 2017-005 Bid Date: 2/7/17 ADDENDUM NO 1 SPECIFICATION REVISIONS: QUESTIONS AND ANSWERS: 1. Are inspection videos available? Inspection videos are available and can be sent upon request. 2. Can the City provide rim/invert elevations for the manholes within the scope or is there a profile available? The only rim/invert elevations the City has are from sewer as-built plans (dated June 1973) for the downstream section of the sewer. A profile from the City s Stormwater Management Model (SWMM), which was created for analysis of the city sewer interceptors, is attached to this addendum. The profile is corrected between MH 4170 and MH 4173 based on the 1973 as-built information. The rim elevations shown in the rest of the profile are based on an aerial survey and invert elevations are assumed. Manhole reports for MH s 4168, 4169, and 4170 are also attached to this addendum and will provide additional information on existing invert depths. 3. Can the City provide the depth of ground water or an assumed depth for design purposes? - The City does not have any surveyed groundwater depth information but the sewer line is located adjacent to a stream so the groundwater is near the existing surface. 4. Can the city provide any flow data for this line? The City does not have any measured flow data. Included with this addendum is SWMM modeling output for Pipe ID 2422. The flow seen in the videos will provide the best estimate of base flow rates. 103 Adams Ave, Lewiston, ME 04240 Tel. (207) 513-3003 Fax (207) 784-5647 Email: djones@lewistonmaine.gov Page: www.lewistonmaine.gov

Immediate Action to be taken: Ted Berry Company, Inc 521 Federal Road Livermore, ME 04253 Manhole Inspection Report Owner Coordinator Lewiston ME Public Works TBCI Project Manager Charlie Roberts Inspector Roger Moulton Date 10/27/2016 3:20 PM Flow % of Pipe 5 MH # 4168 Street Woods COVER TYPE: Solid COVER(S) Single COVER CONDITION: Sound STRUCTURE TYPE Precast SHELF TYPE INVERT TYPE CHIMNEY TYPE Metal Ring CHIMNEY LENGTH (INCHES) 6 OVERALL STRUCTURE CONDITIONS / COMMENTS Inlet A is not visible from MH opening. INVERT DEPTH INLET A 16' 9" INLET A PIPE SIZE 36 PIPE MATERIAL INVERT DEPTH INLET B 12' 6" INLET B PIPE SIZE 8 PIPE MATERIAL PVC INVERT DEPTH INLET C INLET C PIPE SIZE PIPE MATERIAL INVERT DEPTH OUTLET 17' OUTLET D PIPE SIZE 36 PIPE MATERIAL **ALL INVERT DEPTHS ARE MEASURED FROM RIM TO INVERT ** IS INFILTRATION PRESENT? IF SO, HOW SEVERE AND WHERE? ADDITIONAL COMMENTS ***All pictures are taken with outlet at bottom of picture***

Immediate Action to be taken: Ted Berry Company, Inc 521 Federal Road Livermore, ME 04253 Manhole Inspection Report Owner Coordinator Lewiston ME Public Works TBCI Project Manager Charlie Roberts Inspector Roger Moulton Date 10/31/2016 8:44 AM Flow % of Pipe 5 MH # 4169 Street Cross Country COVER TYPE: Vented COVER(S) Single COVER CONDITION: Sound STRUCTURE TYPE Brick SHELF TYPE INVERT TYPE CHIMNEY TYPE Metal Ring CHIMNEY LENGTH (INCHES) 8 OVERALL STRUCTURE CONDITIONS / COMMENTS Stone and Metal Chimney. INVERT DEPTH INLET A 8' 5" INLET A PIPE SIZE 36 PIPE MATERIAL INVERT DEPTH INLET B INLET B PIPE SIZE PIPE MATERIAL INVERT DEPTH INLET C INLET C PIPE SIZE PIPE MATERIAL INVERT DEPTH OUTLET 8' 6" OUTLET D PIPE SIZE 36 PIPE MATERIAL **ALL INVERT DEPTHS ARE MEASURED FROM RIM TO INVERT ** IS INFILTRATION PRESENT? IF SO, HOW SEVERE AND WHERE? ADDITIONAL COMMENTS ***All pictures are taken with outlet at bottom of picture***

Immediate Action to be taken: Ted Berry Company, Inc 521 Federal Road Livermore, ME 04253 Manhole Inspection Report Owner Coordinator Lewiston ME Public Works TBCI Project Manager Charlie Roberts Inspector Roger Moulton Date 11/1/2016 11:23 AM Flow % of Pipe 5 MH # 4170 Street Cross Country behind LHS COVER TYPE: Solid COVER(S) Single COVER CONDITION: Sound STRUCTURE TYPE Brick SHELF TYPE INVERT TYPE t Visible CHIMNEY TYPE Brick CHIMNEY LENGTH (INCHES) 20 OVERALL STRUCTURE CONDITIONS / COMMENTS Stone and brick Chimney. Some debris in MH too heavy to remove, off to the side, not restricting flow. INVERT DEPTH INLET A 7' 7" INLET A PIPE SIZE 36 PIPE MATERIAL INVERT DEPTH INLET B INLET B PIPE SIZE PIPE MATERIAL INVERT DEPTH INLET C INLET C PIPE SIZE PIPE MATERIAL INVERT DEPTH OUTLET 7' 5" OUTLET D PIPE SIZE 42 PIPE MATERIAL **ALL INVERT DEPTHS ARE MEASURED FROM RIM TO INVERT ** IS INFILTRATION PRESENT? IF SO, HOW SEVERE AND WHERE? ADDITIONAL COMMENTS ***All pictures are taken with outlet at bottom of picture***