MOORING INFORMATION FOR BOAT OWNERS AT RGYC

Similar documents
Royal Hamilton Amateur Dinghy Club

Cyclone And Severe Weather Marina Plan

2 RIDER TUBE TOW ROPE PRODUCT INSTRUCTIONS AND WARNINGS

Storm Preparedness Plan for Manchester, Massachusetts Issued by the Manchester Harbormaster Department. A.

Seamanship. A braided line comprises a core of braided or stranded threads covered with a sheath. The center or core of the line gives strength.

Serenity Houseboat. Standard Operating Procedures for:

NAUTICAL TERMINOLOGY

Roles: Presentation Questions:

For ELECTRIC ANCHOR WINCH Models: T Pontoon 35 T sw Salt Water Series Coastal 35

For ANCHOR WINCH Model: T Big Water 45 T sw Salt Water Series Big Water 45

Floatover Installation Method

Aqua Buddy Owner s Manual

Floatover Installation Method

REPORT OF THE INVESTIGATION INTO THE FAILURE OF THE PILOT LADDER FROM THE M.V. "ALEXIA"

Deckhand Crew. Deckhand Crew Responsibilities

OWNERS MANUAL. Model Shown with optional Primary Mooring Cleats. Portable Mooring System SAFETY OPERATION MAINTENANCE PARTS

11.4 FALL-ARREST SYSTEM AND EQUIPMENT CHECKLIST (Must answer yes to all applicable questions)

Mooring Solutions for Yachts

Mooring Systems for Yachts

CONTENTS AIRBERTH OWNER S MANUAL I 3

Safety Tips from the WorkSafe People

Harbor Hurricane Preparedness Plan*

PORT TALBOT BULK TERMINAL MOORING OPERATIONS MANUAL

VL 2K LIFT D-L WINCH INSTRUCTIONS (Applies to P/Ns , , , , , )

SINGLE LONG TERM MOORING AGAINST PRIVATE RESIDENTIAL LAND

T2 Block 2146, 2149, 2152

You may order this publication from WCB Publications and Videos, Please quote ordering number BK60.

VL PONTOON/TRITOON DECK BRACKET 13 INSTRUCTIONS

GUIDELINES FOR USE -GUARD

OWNER'S MANUAL FISHING AND PONTOON BOAT ANCHOR WINCH. 24' Class Rope Anchor Winch

Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning

Unit 18 LEAVING THE DOCK

Installation and service should be performed by a qualified service professional.

Installation and Operating Instructions for Automotive Winch Synthetic Rope

INCIDENT REPORT OASIS SAILING CLUB

Is it right or is it wrong

INSTALLATION AND OPERATING INSTRUCTIONS. T10219-AD Deckboat 40 with AutoDeploy and Wireless Remote Control

CLIENT NAME: LOCATION: CALM BUOY INSPECTION:

Inflatable Pontoons Listing ID:

WORK ENVIRONMENT SAFETY. Body Mechanics. Electrical Safety. Employee. Safety. Fall. Needlestick Prevention. Safety

GUIDELINES FOR USE GUARD

Description: 2 pcs PF2555CTN Delivery: March 3 rd CONTACT:

All passengers and crew are required to wear lifejackets throughout the trip and we will help fit them and demonstrate how they work.

Underwater Blanking Tools. Miko Plaster. Tanker Kit. Sea Chest Blanking. Pipe Plugs

This document to be used with Hurley traditional Davits

User Instruction Manual Fixed Beam Anchor

Storm Owner s Manual

New Mexico Institute of Mining & Technology. Fall Protection Program

1.3 LIMITATIONS: The following application limitations must be recognized and considered before using this product:

Know Your ABCs FALL PROTECTION GUIDE

User Instructions 1790 Rail Anchor

Sail On The Water Teaching Aid Guide

04 Practical Seamanship. Captain

FAQ MOTS (Momac-Offshore-Transfer-System):

Wharf Marina Slip Association Vessel Inspection Report

Wexford Harbour. Yachting Guide. Navigation

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

SEA RAY 290 BOWRIDER SEA RAY

THE RULES AND REGULATIONS OF THE PORT MARINE KAŠTELA d.o.o.

SAIL WELL, STAY WELL. Sydney Flying Squadron ACN Sydney Flying Squadron. SAILING A SKIFF a guide

To find an approved WAH training course and provider in your area, follow this link:

3K SINGLE TRACK OWNERS MANUAL

Provisions for Moorings

Rigging. Student Booklet

FALL PROTECTION WORK PLAN (Alstom Power Installation Canada)

Square Diagonal Tripod Japanese Square Filipino Diagonal Round Shear Ladder

Safety Management System And Marine Occupational Health and Safety Manual

Caving Knots. Prepared by CCPO S C Milton CSCA Technical Training Adviser

WELCOME TO THE MILLENNIUM RIBBLE LINK

National Maritime Center

Frequently Asked Fender Questions

Knot Masters Program

Request for Proposals L4865 The Pier 25 Marine Facility Concession in Hudson River Park (RFP) Questions & Answers.

Jumping Jack Inflatables, Operations Manual Constant air (continuous air flow) Aquatic/Pool/Waterborne inflatables (WBI)

An Ocean of Possibility

STUDENT MEMBERSHIP POLICIES & PROCEDURES

T2 Ratchamatic Blocks 2159, 2160, 2167, 2170

Intermediate Cruising Standard (ASA 104)

ASSEMBLY MANUAL HOBIE CATSY

TOWN OF SOMERSET HARBORMASTER. REGULATIONS FOR MOORING, MOORING PERMITS and ANCHORING

Working Near, On or Above Water

EXHIBIT "A" CITY OF MORRO BAY - HARBOR DEPARTMENT RULES AND REGULATIONS FOR VESSELS USING CITY PIERS, DOCKS AND OFFSHORE MOORINGS

National Maritime Center

STRUCTURAL MEMBERS OF A SHIP. compartment stem frame beam bracket girder stern post hull angle bar stiffener

ISLAND MOORING SUPPLIES, LLC (IMS)

OSHA s new walking working surfaces standards

SURVIVING THE FALL: Leader s Guide. The Proper Use Of Your Personal Fall Arrest System. ERI Safety Videos


Underwater Blanking Tools

14,950 Tax Paid. Moody over 700 boats listed CHICHESTER OFFICE OFFICES THROUGHOUT THE UK AND EUROPE

UMass Boston Waterfront at a glance

Large container ships Builder s and operational risks John Martin, Managing Director, Gard (Singapore) Pte Ltd. 12 January 2016

Accident Report. Onetangi & C Walker. Collision

Sweden Yachts 54 / Specification

lifting.com.au Fibre Ropes for Mining, Industrial & Marine Applications

F4. Coastal Mooring Zone and moorings outside the Coastal Mooring Zone

How to Operate the MYC Support Boats and Equipment

VERSION 1.0 FEBRUARY 1, 2017 FALL PROTECTION AND ELEVATED WORK UNC CHARLOTTE 9201 UNIVERSITY CITY BLVD., CHARLOTTE, NC 28223

User Instructions 1789 Parapet Wall Anchor

Transcription:

MOORING INFORMATION FOR BOAT OWNERS AT RGYC Boat owners with vessels stored in the RGYC Marina are encouraged to review the way their vessel is moored in its pen. Insurance All vessel owners must have appropriate insurance on their vessel to be allowed to keep it in the RGYC marina. All owners must provide a copy of their current insurance policy when pen / mooring leases are purchased or renewed. There are no exceptions to this requirement. It is recommended that owners read their insurance policy to ensure that the cover that is offered includes damage to vessels in marinas. Shore Power Boat owners are reminded that all electrical leads used in the Yard or Marina must be tested and tagged by an authorised person. If you would like to continue to use shore power and have not yet had your lead tested please contact Paul Walters on 0418 524 867 and we will arrange for club electrician Terry Stevenson to test it out on the Marina. We would like to thank Andrew Harvey for making himself available and testing more than 50 members leads over the past month. All untagged leads will be unplugged on Friday 16 th December.

It has also come to our attention that some boat owners are unplugging other boats from shore power. If you are ever in the situation where you require power and there is not a power outlet to plug into, please contact Marina staff on 0418 524 867 and we will endeavour to find a solution. Please think of others before just pulling their plug. Facts to consider when mooring in the Marina: There have been periods of extremely high winds which have caused some vessels to move around in their pen and, in some cases, sustain damage or cause damage to other boats. There is increased risk of damage to vessels in parts of the marina when there is a very strong north westerly wind. Waves generated by these winds rebound off the sea wall located on Stony Pier and on the north face of Fisherman s Basin and travel into the marina causing boats to move violently. The west wall has no moderating effect in these conditions and that has been the case since it was built.

The vessel 1. Is the vessel the right size for the pen? 2. Is the vessel facing in the best direction for the pen s location? Bow to the north is recommended for most situations. 3. Are the cleats and the mountings on the vessel strong enough for the loads encountered during a storm? Would a mooring compensator be useful for your vessel? (See photo). Mooring compensator absorbs shock loads caused by wave action 4. Is there an anchor on the bow? Does it provide a hazard to the vessel as it surges forward in a storm? 5. Are there items on the vessel that can cause damage to the mooring lines as the boat moves about? Are there sharp edges on the hull or deck?

Mooring lines protected against abrasion. Line inside cover must be checked regularly. Lines are crossed to give better control. Anchor on bow may strike the dock if vessel is moored that direction 6. Does the vessel have an increased risk in the pen at a very high or low tide? 7. Should the vessel have protective fenders in place when it is in the pen? Fenders between vessels. Additional fenders and strong timber board protect vessel in dock side pen. Spring lines fitted.

The moorings 1. If you are bringing a new vessel to the marina have you discussed the mooring requirements with Marina staff? 2. Is the existing mooring line configuration appropriate for your vessel? 3. Have the mooring lines become stretched, frayed or brittle with age and use? Mooring line showing wear caused by friction (heat) and compression. 4. Are the mooring lines of the correct length and rope size for the vessel? 5. Do the lines have knots tied in them to make them shorter? Tying a knot in a line weakens the line by up to 70% (depending on the knot).

Knots in lines reduce strength. 6. Are the mooring lines attached to secure cleats on the vessel? 7. Are there spring lines? That is, lines from the mooring pile or dock to midship cleats? Are these lines the correct length? If they are too long the boat may surge too far on the other lines and strike piles, the dock or other boats. If they are too short, they may transmit high shock loads to the cleats as the steel springs on the other lines do not do their work. Spring lines to mid-ship cleats. Line length is critical. 8. Are the steel springs, rings and bolts in good condition? Report heavily worn equipment to marina staff.

9. Does the dock mounted boarding ladder / bridge present a risk to the boat during a storm? Boat has struck the boarding platform Owner Actions Owners should always place the safety of people first. Boats can be very dangerous in storm conditions, even in the marina. Vessel owners should make regular inspections of their mooring devices to reduce the risk of breakage. If the lines or springs are damaged that should be reported to RGYC Marina staff so that appropriate maintenance can be arranged. Owners should not act without advice from the RGYC Marina staff unless there is danger of an imminent failure of a mooring line. Owners are responsible for ensuring that their mooring lines are in good condition. Appropriate, good quality replacement lines can be purchased from the Marina Office.