SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Similar documents
SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Twin Peaks Figure 8 Pilot Project

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5883 FOR PUBLIC HEARING

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

Polk Streetscape Project

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

122 Avenue: 107 Street to Fort Road

Addendum to Mitigated Negative Declaration

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Welcome! San Jose Avenue Open House August 25, 2015

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Welcome. If you have any questions or comments on the project, please contact:

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Broad Street Bicycle Boulevard City Council Study Session Summary

The Role of MPOs in Advancing Safe Routes to School through the Transportation Alternatives Program

Pennsylvania Avenue (CR 484) Design Alternatives Study

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

CHAPTER 7.0 IMPLEMENTATION

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Upper Market Street Bike Lane Project

City Council Agenda Item #6-A CITY OF ALAMEDA Memorandum. To: Honorable Mayor and Members of the City Council. John A. Russo City Manager

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Bellevue Downtown Association Downtown Bike Series

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

5. RUNNINGWAY GUIDELINES

Request for Proposals Contra Costa County Contra Costa Centre I 680/Treat Boulevard Bicycle & Pedestrian Plan

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5194 FOR PUBLIC HEARING

Project Description Form 8EE

Clay Street Bridge Replacement Project

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

Active Transportation Facility Glossary

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

TRASBURG RANSPORTATION

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

Freeway ramp intersection study

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Tonight is for you. Learn everything you can. Share all your ideas.

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Zlatko Krstulich, P.Eng. City of O9awa

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Memorandum. Sunday, July 13, Saturday, July 19, 2014

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Transportation Planning Division

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

1.0 EXECUTIVE SUMMARY

Central Freeway and Octavia Circulation Study

Public Works and Infrastructure Committee. General Manager, Transportation Services

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

THIS PRINT COVERS CALENDAR ITEM NO. : 12 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY. DIVISION: Sustainable Streets BRIEF DESCRIPTION:

Transportation Corridor Studies: Summary of Recommendations

City of Novi Non-Motorized Master Plan 2011 Executive Summary

North Shore Transportation Improvement Strategy

Geary Bus Rapid Transit Project

PEDESTRIAN ACTION PLAN

Bay to Bay Boulevard Complete Streets Project

WELCOME Public Information Centre

Transcription:

THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas Tree Point Road and the southern end of the Figure Eight roadway surrounding Twin Peaks from June 1, 2016 to May 31, 2018, as a pilot project in support of the Twin Peaks Connectivity Planning Project. SUMMARY: San Francisco Recreation and Parks Department (Rec Park) secured a Priority Conservation Area Grant to fund the Twin Peaks Connectivity Planning Project (Connectivity Project), a planning effort which will study and prepare redesign proposals for Twin Peaks Boulevard working with San Francisco Public Works (SFPW) and SFMTA. The Twin Peaks Boulevard Figure Eight Pilot Project (Pilot Project) supports the overall Connectivity Project. The Pilot Project reallocates portions of the existing roadway from vehicle use to exclusive pedestrian and bicycle use, and closes the eastern alignment of the Twin Peaks Boulevard Figure Eight to motor vehicle traffic The Pilot Project will last two years, from June 1, 2016 to May 31, 2018. This two year period includes one year to evaluate the Pilot Project and one year to develop recommendations for permanent modifications to Twin Peaks Boulevard. The project team will collect data and public comment on the Pilot Project for one year following implementation, resulting in an evaluation report. Results of the evaluation will then help inform future analysis for a potential permanent road closure as part of the Connectivity Project, which will be presented to the SFMTA Board for approval prior to May 31, 2018. The proposed action is the Approval Action as defined by the S. F. Administrative Code Chapter 31. ENCLOSURES: 1. SFMTAB Resolution 2. Graphical Overview of Proposed Roadway Modifications 3. Twin Peaks Figure 8 Pilot Categorical Exemption: Planning Case No. 2016-000117ENV https://aca.accela.com/ccsf/cap/capdetail.aspx?module=planning&tabname= Planning&capID1=16CAP&capID2=00000&capID3=00039&agencyCode=CCSF APPROVALS: DIRECTOR SECRETARY DATE 4/11/16 4/11/16_ ASSIGNED SFMTAB CALENDAR DATE: April 19, 2016

PAGE 2. PURPOSE Approving traffic modifications on Twin Peaks Boulevard between Christmas Tree Point Road and the southern end of the Figure Eight roadway surrounding Twin Peaks from June 1, 2016 to May 31, 2018, as a pilot project in support of the Twin Peaks Connectivity Planning Project. GOAL This action supports the following SFMTA Strategic Plan Goals and Objectives: Goal 1: Create a safer transportation experience for everyone Objective 1.3: Improve the safety of the transportation system. Goal 2: Make transit, walking, bicycling, taxi, ridesharing and carsharing the preferred means of travel Objective 2.3: Increase use of all non-private auto modes. Goal 3: Improve the environment and quality of life in San Francisco Objective 3.2: Increase the transportation system s positive impact to the economy. DESCRIPTION Background Twin Peaks is an iconic open space landmark, enjoyed by residents living throughout the Bay Area as well as by visitors to San Francisco. Providing safe and comfortable access to the panoramic views of San Francisco and the Bay is vital to ensure the success of this attraction and meet City goals. San Francisco Recreation and Parks Department (Rec Park) secured a Priority Conservation Area Grant to fund the Twin Peaks Connectivity Planning Project (Connectivity Project), a planning effort to study and prepare redesign proposals for Twin Peaks Boulevard with the support of San Francisco Public Works (SFPW) and the SFMTA. The goals of the Connectivity Project include: Reallocate a portion of the existing roadway from vehicle use to pedestrian and bicycle use; Locate pedestrian crossings to link with trail sections; and Recommend realignment of the Bay Area Ridge Trail to cross over Twin Peaks Blvd. Implementation of the Connectivity Project is several years away, requiring detailed design, environmental review, and allocation of funding. The project team identified an opportunity to test the key concept considered in the Connectivity Project through temporary and low cost treatments, and originated the Twin Peaks Boulevard Figure Eight Pilot Project (Pilot Project).

PAGE 3. The Proposed Pilot Project The Pilot Project approves temporary traffic modifications for two years, from June 1, 2016 to May 31, 2018. This will allow the SFMTA and Rec Park to evaluate circulation impacts and solicit community feedback to inform Rec Park s Connectivity Project, which will consider making permanent modifications in the future. The Pilot Project will open the eastern side of the Figure Eight to exclusive use by nonmotorized traffic, allowing people walking and bicycling to enjoy the view of the San Francisco cityscape and the Bay from the safety and comfort of the existing paved roadway. Under the Pilot Project, vehicle access will be allowed on the western side of the Figure Eight as a two-way street with vehicles traveling in both directions, as opposed to the current one-way configuration for all vehicle traffic. The two-way western alignment will maintain access to Christmas Tree Point Road, as well as from Twin Peaks Boulevard to the north and south as it currently exists. Emergency vehicle access to the eastern side of the Figure Eight during the Pilot Project will be established at each of the three intersections of the Figure Eight. The proposal was reviewed by SFPD Park Station and SF Fire Department. Tour Bus access will be preserved on the western side of the Figure Eight, to and from the parking lot at Christmas Tree Point Road. The SFMTA proposes the following parking and traffic modifications from June 1, 2016 until May 31, 2018: A. ESTABLISH - ROAD CLOSURE, EXCEPT PEDESTRIANS AND BICYCLES - Twin Peaks Boulevard, eastern alignment, from Christmas Tree Point Road to 1,700 feet southerly (closes existing northbound one-way portion of figure eight loop to vehicles) B. ESTABLISH - TWO WAY STREET - Twin Peaks Boulevard, western alignment, from Christmas Tree Point Road to 1,500 feet southerly (converts existing southbound oneway portion of figure eight loop to two-way operation) Pilot Project Evaluation Once the Pilot Project is implemented, staff will comprehensively evaluate the new traffic configuration, including traffic counts of the number of private cars and commercial vehicles, speed surveys, field observations of parking and traffic behavior, and user survey to solicit feedback from the public at-large. Observations and findings will be compiled into a report for the Connectivity Project team.

PAGE 4. Initial evaluation will occur in fall of 2016 so that staff has time to coordinate with SFPW s repaving of Twin Peaks Boulevard and Christmas Tree Point Road. The final evaluation and report is expected in spring 2017, one year after the Pilot Project is implemented. Pilot Project Conclusion The Pilot Project will last two years, expiring on May 31, 2018. After evaluation of the Pilot Project is complete in spring 2017, the Connectivity Project team will have one additional year to develop recommendations for permanent modifications to Twin Peaks Boulevard. These modifications will be brought back to the SFMTA Board of Directors for approval prior to May 31, 2018. PUBLIC OUTREACH Public outreach was targeted to stakeholder groups and residents on nearby streets. There are no residences or significant structures on the section of roadway being addressed in the Pilot Project. The following public participation events were conducted: Tour Bus Stakeholder Meeting April 29, 2015 General Stakeholder Meeting May 7, 2015 Community Open House June 25, 2015 Online Survey spring 2015: Solicited feedback on various project alternatives. 450 responses were received, of which 67% supported the design proposed for the Pilot Project. Pilot Project Webpage (www.sfmta.com/figure8) updates throughout the process. Additionally, articles appeared on SFist.com and the SF Bicycle Coalition website in July 2015 discussing the proposed project and promoting the online survey. More recently, the San Francisco Chronicle highlighted the project in March 2016, and several media outlets also reported on the proposed Pilot Project. A public hearing was held on March 4, 2016 to solicit public comment on the proposal. Fourteen individuals gave comments regarding the pilot at the hearing or by correspondence received prior to the hearing: four expressed opposition, seven expressed support, and three gave comment without taking a position. Discussions with the public continued after the public hearing. The primary issues raised by members of the public include: Concern that the availability of parking will be insufficient; Concern that the reduction in road capacity will lead to vehicle congestion during peak times; Concern that tour bus operations will be impacted; and Concern that the two-way segment will reduce safety. SFMTA s engineering analysis for the Pilot Project studied each of these issues and SFMTA

PAGE 5. staff anticipate that the Pilot Project will provide safe and efficient operations along Twin Peaks Boulevard for all users. In addition, the Pilot Project will allow for more thorough analysis of these concerns to inform the permanent recommendations of the Connectivity Project ALTERNATIVES CONSIDERED Rec Park, SFMTA, and SFPW staff considered several alternatives for Twin Peaks Boulevard. Four alternatives were presented to the stakeholders and community members in addition to the option described above: Figure S: This alternative allowed all visitors to view both east and west vistas opening opposite sides of the Figure Eight to pedestrians and people on bicycles. It also required at least two additional roadway crossings to trails when compared with the pilot option. Figure E: This alternative proposed a car-free west side and two way traffic on the eastern alignment. This design included additional pedestrian crossing at Christmas Tree Point Road, but complicates Twin Peaks Trail connections. It also offered no wind protection to pedestrians and cyclists. Figure 8: This Alternative removes a traffic lane around the full Figure Eight and rededicated it to pedestrian and bicycle use. This design would require a physical separation, such as a curb, barrier, or median, between motor vehicle space and car-free space. This option is substantially more expensive than other options and therefore not feasible. It also requires many crossings of the roadway to connect trails. No Project/Minor Changes: This alternative included minor changes and additional crosswalks while maintaining the existing motor vehicle lane configuration. This design would require curb ramps at new crosswalks and there would be no dedicated car-free space on the Figure 8. FUNDING IMPACT Funding for the planning, environmental review, design, and construction phases is provided by Proposition B Population Based General Fund Baseline and Transportation Development Act, Article 3 funds for Bicycle Facility Projects. Funding comprises the following sources and amounts: ENVIRONMENTAL REVIEW A. Proposition B $50,000 B. Transportation Development Act $10,000 Total $60,000 The proposed parking and traffic modifications are subject to environmental review under the California Environmental Quality Act (CEQA). CEQA provides a Class 1 categorical exemption from environmental review for the operation, repair, maintenance or minor alteration of existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails and similar facilities, and provides a Class 6 categorical exemption for information collection including basic data

PAGE 6. collection, research, experimental management, and resource evaluation activities. On January 5, 2016, the San Francisco Planning Department determined that the proposed parking and traffic modifications are categorically exempt from CEQA pursuant to Title 14 of the California Code of Regulations Sections 15301 and 15306. The Planning Department s determination (January 5, 2016, Case No. 2016-000117ENV) is on file with the Secretary to the SFMTA Board of Directors, and may be found in the records of the Planning Department at 1650 Mission Street in San Francisco. The proposed action is the Approval Action as defined by the S. F. Administrative Code Chapter 31. OTHER APPROVALS RECEIVED OR STILL REQUIRED The City Attorney s Office has reviewed this calendar item. RECOMMENDATION Approving traffic modifications on Twin Peaks Boulevard between Christmas Tree Point Road and the southern end of the Figure Eight roadway surrounding Twin Peaks from June 1, 2016 to May 31, 2018, as a pilot project in support of the Twin Peaks Connectivity Planning Project.

PAGE 7. SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. WHEREAS, Twin Peaks is an iconic open space landmark in San Francisco, to be enjoyed by all in safety and comfort; and, WHEREAS, The Twin Peaks Boulevard Figure Eight Pilot Project will allow the SFMTA and the Department of Recreation and Park to evaluate circulation impacts and solicit community feedback to inform the Department of Recreation and Park s Connectivity Project, which will consider making permanent modifications in the future; and, WHEREAS, SFMTA staff have proposed traffic and parking modifications as part of the Twin Peaks Boulevard Figure Eight Pilot Project, from June 1, 2016 until May 31, 2018 as follows: A. ESTABLISH - ROAD CLOSURE, EXCEPT PEDESTRIANS AND BICYCLES - Twin Peaks Boulevard, eastern alignment, from Christmas Tree Point Road to 1,700 feet southerly (closes existing northbound one-way portion of figure eight loop to vehicles) B. ESTABLISH - TWO WAY STREET - Twin Peaks Boulevard, western alignment, from Christmas Tree Point Road to 1,500 feet southerly (converts existing southbound oneway portion of figure eight loop to two-way operation) WHEREAS, The public has been notified about the proposed modifications and has been given the opportunity to comment on those modifications through the public hearing process; and, WHEREAS, The proposed traffic and parking modifications are subject to the California Environmental Quality Act (CEQA) and CEQA provides a Class 1 categorical exemption from environmental review for the operation, repair, maintenance or minor alteration of existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails and similar facilities, and provides a Class 6 categorical exemption for information collection including basic data collection, research, experimental management, and resource evaluation activities; and, WHEREAS, On January 5, 2016, the San Francisco Planning Department determined (Case Number 2016-000117ENV) that the proposed parking and traffic modifications are categorically exempt from CEQA pursuant to Title 14 of the California Code of Regulations Sections 15301 and 15306; the proposed action is the Approval Action as defined by S. F. Administrative Code Chapter 31; and,

PAGE 8. WHEREAS, A copy of the CEQA determination is on file with the Secretary to the SFMTA Board of Directors, and may be found in the records of the Planning Department at 1650 Mission Street in San Francisco, and are incorporated herein by reference; now therefore be it RESOLVED, That the San Francisco Municipal Transportation Agency Board of Directors approves traffic and parking modifications listed in items A-B above to implement the Twin Peaks Boulevard Figure Eight Pilot Project from June 1, 2016 to May 31, 2018. I certify that the foregoing resolution was adopted by the San Francisco Municipal Transportation Agency Board of Directors at its meeting of April 19, 2016. Secretary to the Board of Directors San Francisco Municipal Transportation Agency

Enclosure 2: Graphical Overview of Proposed Roadway Modifications