Kyrgyz Republic Bishkek and Osh Urban Infrastructure Project

Similar documents
THRESHOLDS FOR PROCUREMENT METHODS AND BANK PRIOR REVIEW. Contracts Subjects to Prior Review (US$)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Expenditure Category. Goods. Works

Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$)

Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$)

Contracts Subjects to Prior Review (US$)

Public Disclosure Authorized. Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$)

Total planned cost under the Grant USD 19,8 mln.

REVISED PROCUREMENT PLAN 30-Dec-12

Request for Proposals. Prep & Submissio n by Ex Ag. Noobjection. Plan vs. Actual. Date

Procurement Plan-Goods. Draft Bid Documents, including specs and quantities, draft SPN. Notice Advert. Noobjection. Prep & Submis sion by Ex Agency

STEP-4-CP-O-WD-3. Contract under execution. Post Review STEP-26-NCB-B-GD-3.2. Contract under execution Post Review STEP-22-NCB-B-GD-1.

General. Procurement Plan

Kyrgyzstan Agricultural Productivity Assistance Project

Category Works: Activities ShowHide

Prior Review Threshold

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Procurement Plan-Goods

Axon Enterprise, Inc. (OS)

Category Goods: Activities ShowHide Description Reference #

City Council Report 915 I Street, 1 st Floor Sacramento, CA

Procurement Plan for Consultancy Services (As of April 30, 2010)

Director, Purchasing and Materials Management

Operational Ranking of Intersections: A Novel Prioritization Methodology

REQUEST FOR PROPOSALS Race Coordination and Event Timing for 5K Race and Children s Fun Run

MBOMBELA STADIUM Management and Operation of Stadium

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF FINANCE AND ECONOMIC AFFAIRS (VOTE 21 & 50) GENERAL PROCUREMENT NOTICE (GPN)

Outline 2017/3/9. Presented at JTRI Symposium, Tokyo, 20 February 2017

CITY OF VANCOUVER ADMINISTRATIVE REPORT

MOTION NO. M Contract Amendment for Systems Construction Management Consultant Services

THE CITY OF TORONTO. Minutes of the Bid Committee. Meeting 98

WELCOME to the Eaglebrooke Meet & Greet! Presentations by: CDD, HOA Property Management & The Club at Eaglebrooke

Wellington Public Transport Spine Study

Board Members Vancouver Park Board General Manager Parks and Recreation. SUBJECT: Construction Contract Award Kitsilano Beach Tennis Courts Renovation

UNEP BEIJING 2008 OLYMPIC GAMES AN ENVIRONMENTAL REVIEW UNITED NATIONS ENVIRONMENT PROGRAMME

Caltrain Bicycle Parking Management Plan

UNESCO activity on establishment of Community Multimedia Centre (CMC) in Talas, Kyrgyzstan

The modes of government guidance for public bicycle operation and state-owned company operation: a case study of Hangzhou city in China

Planned Procurement Opportunities Report. June 2018

BURGAS INTEGRATED PUBLIC TRANSPORT PROJECT. Information day, 5 th July 2011, Burgas

Future Options for City Operated Golf Courses

Members of the Board of Directors. Wendy Knowles, Clerk of the Board

A guide to how local communities can change local speed limits

ANNUAL PROCUREMENT PLAN FOR ERB DATE FOR. No.

Charlottesville Regional Chamber of Commerce. October 28, 2014

GENERAL PROCUREMENT NOTICE NO.1/2016/2017. PPF Pensions Fund. Morogoro Road/Samora Avenue. Dar es Salaam, Tanzania. Telephone: /21

Procurement Plan-Goods. Prior or Post Review. Procurement Method. Estimated Amount in US $ Pre-or Post Qualification

THE UNITED REPUBLIC OF TANZANIA

Contracts awarded by the Bid Committee and amendments approved by the City Manager during the 2014 Election Period. Government Management Committee

Winter Maintenance in Lithuania

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

THE CITY OF TORONTO. Minutes of the Bid Committee. Meeting 49

Working with School Bus Operators to Provide Community Transportation

Appendix D: Public Meeting Notice

Current Bid Advertisements for Murray State University

Director, Purchasing and Materials Management

Members & Firms

THE UNITED REPUBLIC OF TANZANIA

1. What are FIFA s general objectives in the area of football development? How does development relate to FIFA s daily business?...

Outline of the Position Duties and Responsibilities

19/HQ/G/02 MC RFQ L.P.O N/A N/A N/A N/A N/A N/A 28/08/2018 Plan 174,218,051

Capital Improvement Program. TDP Meeting Friday, February 12, 2016

BOXING FEDERATION OF INDIA

Elite Canada in Men s & Women s Artistic Gymnastics

As featured in business IN Focus

DEPARTMENT OF TRANSPORT

STAFF REPORT ACTION REQUIRED. Public Works and Infrastructure Committee. General Manager, Transportation Services

Constitution of Ukraine

Addressing Traffic Congestion in Jakarta: what went wrong and the road ahead

Golf Professional Services - Independent Contractor

CANADA GAMES COUNCIL REQUEST FOR PROPOSAL

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

Project/PrANAMBRA STATE EDUCATION PROGRAMME INVESTMENT PROJECT. Estimated Amount in US $'000. Procure ment Method

Director, Purchasing and Materials Management

Performance Measures Target Setting NCTCOG Public Meetings

Pocatello Regional Transit Master Transit Plan Draft Recommendations

Report to Cabinet. 18 May 2016

Wicklow County Council Chomairle Chontae Chill Mhantáin. Traffic Calming Policy

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division. 12 August Braddock Dam

5. WOODROFFE AVENUE BUS-ONLY LANES BASELINE STATION TO FALLOWFIELD PARK & RIDE CONSULTANT APPOINTMENTS CONTRACTS NOS. ETL , 6001 AND 6002

Public Works and Infrastructure Committee. General Manager, Transportation Services

Review of Considerations and Requirements for Automated Enforcement

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Note # US$1 Mil Total for Other Cost - ESTIMATE SH: <US$100 K Total for Other Cost - ACTUALS DC: None

Dallas ISD Procurement Services First Advertising Date

EUROPEAN MOBILITY WEEK September 2015

ROSEE Road safety in Sout East European regions: Safe Road Infrastructure

Conductors Urban traffic management administrations. Conductors State council. Conductors The original State Education Commission

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB)

Le Sueur County, MN Tuesday, December 13, 2016 Board Meeting

DOE Climate Change Proposals

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

Number 17 of Rugby World Cup 2023 Act 2017

July 2016 JD No 6 Post No 6 JOB DESCRIPTION

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013

Frequently asked questions

WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL

Fiscal Year Budget Overview

The Willingness to Walk of Urban Transportation Passengers (A Case Study of Urban Transportation Passengers in Yogyakarta Indonesia)

Application of new information system and technologies to road management & control at ANAS S.p.A.

ПРОЕКТНА ЗАДАЧА КОНСУЛТАНТСКИ УСЛУГИ. Истражување на задоволство на корисниците на патиштата REPUBLIC OF MACEDONIA PUBLIC ENTERPRISE FOR STATE ROADS

Transcription:

re uthorized Public Disclosure uthorized Public Disclosure uthorized Public Disclosure uthorized Item GOODS/ 1 2 3 WORKS ost Table odes omponent Reference as per PD D ontract Ref. ontract Description BO-HO-1-G-NS-2-3/4 omputer, office Equipment and furniture for MPUs Supply of computer equipment for Bishkek and Osh MPUs omputer, office Equipment and furniture for MPUs Supply of office furniture Bishkek and Osh MPUs omputer, office Equipment and furniture for MPUs Supply of office furniture Bishkek and Osh MPUs Manufacturing and deliver of 4 ID-BO-G-NS-08-1 information boards to novostroikas in Bishkek 5 ID-BO-G-NS-08-2 Manufacturing and deliver of information boards to 6 7 8 BO-HO-1-G-NS-2-1/2 9 D ID-BO-G-NS-10-10 10 ID-BO-G-2010-1 11 12 13 14 BO-HO-1-G-NS-1 Plan vs amount of the contract in KGS Estimated ost (US$ equivalent) mount in KGS (US$) Procu. Method WB (Prior/ ) (./.) Draft BD to WB. WB Noobjection to BD 15,000.00 Shopping n/a n/a 10,586.00 Shopping 06/26/2008 n/a 2,000.00 Shopping n/a n/a 61,800 Shopping post 06/26/2008 n/a 3,000.00 Shopping n/a 67,492 Shopping 06/26/2008.. Invitation to Bids Bid Opening Bid Evaluation Report WB Noobjection to ontract ward ontract Signing ontract ompletion 06/26/2008 07/09/2008 07/25/2008 n/a 07/29/2008 08/29/2008 06/25/2008 07/09/2008 07/24/2008 n/a 07/28/2008 09/03/2008 06/26/2008 07/09/2008 07/25/2008 n/a 07/29/2009 08/29/2008 06/25/2008 07/09/2008 07/24/2008 n/a 07/28/2008 08/19/2008 n/a 06/26/2008 07/09/2008 07/25/2008 n/a 07/29/2008 08/29/2008 n/a 06/25/2008 07/09/2008 07/24/2008 n/a 07/28/2008 08/27/2008 15,000.00 Shopping n/a n/a 06/25/2008 07/09/2008 07/28/2008 n/a 07/29/2008 09/29/2008 680,315.90 Shopping 06/20/2008 n/a 06/26/2008 07/09/2008 07/23/2008 n/a 07/25/2008 09/16/2008 4,000.00 Shopping n/a n/a 06/25/2008 07/09/2008 07/28/2008 n/a 07/29/2008 09/29/2008 134,373.60 Shopping 06/20/2008 n/a 06/26/2008 07/09/2008 07/23/2008 n/a 07/25/2008 09/09/2008 ID-BO-G-NS-08-5 Supply of vehicle 14,000.00 Shopping 04/20/2008 04/13/2008 04/20/2008 05/10/2008 05/24/2008 n/a 06/07/2008 08/06/2008 10,200.00 Shopping 07/01/2008 07/01/2008 07/08/2008 07/28/2008 07/30/2008 n/a 08/05/2008 09/10/2008 omputer, office Equipment and ID-BO-G-NS-08-6 furniture for MPUs 1,000.00 Shopping n/a n/a 06/26/2008 07/09/2008 07/25/2008 n/a 07/29/2008 08/29/2008 Supply of photocameras 930.00 Shopping 04/01/2009 n/a 04/15/2009 04/29/2009 06/22/2009 n/a 06/22/2009 07/22/2009 omputer, office Equipment and 7,000.00 Shopping n/a n/a furniture for RIS 06/26/2008 07/09/2008 07/25/2008 n/a 07/29/2008 08/29/2008 ID-STBO-1-G-NS-20/3 Supply of computer equipment 258,066.00 Shopping for BOUIP 12/01/2009 n/a 12/11/2009 12/25/2009 01/15/2010 n/a 01/12/2010 02/12/2010 BO-HO-O-G-NS-29 1 ID-BO-W-2008-1 Supply of electronic tacheometer Pumping station #5: Supply and installation of pump and other equipment Supply of computer equipment for Osh city Introduction of services and data base automation in Municipal territorial administrations of Bishkek Introducing GPS navigation system in vehicles of the Municipal enterprise "Spetsavtobaza", Osh Supply of mini bus for RIS entral office Rehabilitation of pumping station #4 and construction of Turan 15,000.00 Shopping n/a n/a 02/19/2010 03/05/2010 04/05/2010 n/a 04/19/2010 06/18/2010 9,098.00 Shopping n/a n/a 02/03/2010 02/17/2010 03/17/2010 n/a 04/15/2010 05/15/2010 IB Prior 695,440.00 02/25/2010 03/11/2010 03/19/2010 04/30/2010 06/18/2010 01/31/2011 02/20/2011 02/20/2012 IB Prior 08/08/2010 08/09/2010 09/17/2010 10/29/2010 01/25/2011 01/25/2011 20,000.00 Shopping n/a n/a 09/24/2010 10/08/2010 11/07/2010 n/a 11/21/2010 02/02/2011 30,513.00 Shopping n/a n/a 09/24/2010 10/11/2010 11/17/2010 n/a 12/01/2010 02/24/2011 80,000.00 Shopping n/a n/a 08/01/2011 08/15/2011 08/30/2011 n/a 09/01/2011 10/01/2011 20,000.00 Shopping n/a n/a 08/01/2011 08/15/2011 08/30/2011 n/a 09/01/2011 10/01/2011 40,000.00 Shopping n/a n/a Kyrgyz Republic Bishkek and Osh Urban Infrastructure Project PROUREMENT PLN - GOODS ND WORKS for Jan 2011 - Dec 2011 2011 2011 ( PP:01.03.2011; Update No. ; WB NOL: ) ( : 01.03.2011.; ; : ) 04/01/2011 04/15/2011 04/25/2011 n/a 04/28/2011 07/27/2011 211,700.00 NB Prior 08/10/2008 08/10/2008 08/10/2008 09/24/2008 10/24/2008 11/03/2008 12/01/2008 12/01/2009

1 ID-BO-W-2008-1 watermain and Turan distribution network 10,208,957.99 NB Prior 08/18/2008 03/09/208 09/12/2008 10/28/2008 11/27/2008 12/11/2008 12/26/2008 12/14/2009 2 ID-BO-W-2008-2 Rehabilitation of pumping station #5: General civil works and drilling of water-wells #1,2,3. 878,000 NB 08/20/2008 n/a 08/20/2008 10/04/2008 11/03/2008 n/a 12/01/2008 12/31/2010 50,701,317.90 NB 08/18/2008 n/a 09/12/2008 10/28/2008 12/01/2008 n/a 12/29/2008 12/27/2010 3 ID-BO-W-2008-3/1 4 ID-BO-W-2008-3/2 5 6 7 9 ID-BO-W-2008-3/3 ID-BO-W-2008-4/1 8 ID-BO-W-2008-4/3 ID-BO-W-2008-4/2 ID-BO-W-2008-4/4 onstruction of water mains and distribution networks for Kalinina&Dostuk novostroikas Lot#1:onstruction of water pipelines for Kalinina novostroika Lot#2:onstruction of watermain networks in Kalinin novostroika (part1, part2) Lot#3: Rehabilitation and construction of watermains and distribution networks for Kalinina and Dostuk novostroikas onstruction of roads in Bishkek novostroikas Lot#1: Rehabilitation and novostroikas k-orgo and k- Ordo Lot#2: Rehabilitation and novostroikas Dordoi and Kalys- Ordo Lot#3: Rehabilitation and novostroikas Dostuk and Tynchtyk Lot#4: Rehabilitation and novostroika Kara-Jigach IB Prior 08/25/2008 n/a 08/25/2008 10/24/2008 11/23/2008 12/03/2008 12/31/2008 07/01/2010 51,283,582.00 IB Prior 02/09/2009 03/11/2009 03/27/2009 05/15/2009 07/29/2009 08/03/2009 09/15/2009 12/23/2010 3,961,495 IB Prior 08/25/2008 n/a 08/25/2008 10/24/2008 11/23/2008 12/03/2008 12/31/2008 06/30/2011 48,269,285.00 IB Prior 02/09/2009 03/11/2009 03/27/2009 05/15/2009 07/29/2009 08/03/2009 09/24/2009 IB Prior 08/25/2008 n/a 08/25/2008 10/24/2008 11/23/2008 12/03/2008 12/31/2008 06/04/2011 46,218,473.00 NB Prior 09/10/2009 10/14/2009 10/23/2009 12/07/2009 01/22/2010 01/29/2010 03/04/2010 IB Prior 08/15/2008 08/11/2008 08/15/2008 10/17/2008 11/20/2008 12/01/2008 12/20/2008 10/31/2011 51,481,269.70 IB Prior 03/10/2009 04/21/2009 04/10/2009 05/22/2009 08/26/2009 09/01/2009 09/22/2009 IB Prior 08/15/2008 08/11/2008 08/15/2008 10/17/2008 11/20/2008 12/01/2008 12/20/2008 10/31/2011 6,000,000 79,638,896.57 IB Prior 03/10/2009 04/21/2009 04/10/2009 05/22/2009 08/26/2009 09/01/2009 09/22/2009 IB Prior 08/15/2008 08/11/2008 08/15/2008 10/17/2008 11/20/2008 12/01/2008 12/20/2008 10/31/2011 33,805,870.16 IB Prior 03/10/2009 04/21/2009 04/10/2009 05/22/2009 08/26/2009 08/19/2009 09/22/2009 IB Prior 08/15/2008 08/11/2008 08/15/2008 10/17/2008 11/20/2008 12/01/2008 12/20/2008 10/31/2011 50,629,545.12 IB Prior 03/10/2009 04/21/2009 04/10/2009 05/22/2009 08/26/2009 08/19/2009 09/22/2009

Remarks "Logic" Ltd. "Hrom-Metal" Ltd. "Tisu Furniture" Ltd. "Enkon" Ltd. "Enkon" Ltd. JS "Kyrgyzavtovaz" "Logic" Ltd. "KG Information Technology" Ltd. "lpstroi"ltd..i. Ltd. + Injenernaya Zaschita Ltd. "Logic" OJS JS "Stroitel"

JS "Stroitel" onsortium "Suukurulush": "Injenernaya zashita" Ltd.& JS "Kyrgyzelectroset stroi" onsortium "Minur" Ltd.& "Ekaras"Ltd.&"holman" Ltd. onsortium: JS "Stroitel"& JS "Manas" onsortium: JS "Yugstroiservis" & JS "Vodstroi" onsortium: "vtotransstroi" Ltd.&"Gradient" Ltd. & JS "Karakol" onsortium: "Mostdorstroi" Ltd.&JS "erodromdorstroi"&"orion " Ltd. JS "huiskoe USM" onsortium: "vtotransstroi" Ltd.&"Gradient" Ltd. & JS "Karakol"

KYRGYZ REPUBLI Bishkek and Osh Urban Infrastructure Project PROUREMENT PLN - ONSULTNTS (QS or Individual onsultants) - JN 2011 ( PP: 01.03.2011; Update No. ; WB NOL: 31.12.2011) WB Request Evaluation WB Noobjection to Draft Final objection to WB No- omponent Estimated WB Noobjection Issued Submissio ontract ontract RFP Proposal ontract Firm or Select. Draft for Exp. report for Item Reference as ontract Description Plan vs ost (US$ Ref. Ind. Method (Prior/ TOR Of Short list RFP/ Short ontract Draft per PD equivalent) to TOR (for QS) n Signing ompletion ) Interest & RFP list ontract 1 D RIS Staff (Individuals) 282,778 Ind. I ######## n/a ######## 07/02/2008 n/a n/a n/a n/a n/a 15/07/08 03/31/2011 2 D MPU Bishkek Staff 58,674 Ind. I ######## n/a ######## 07/02/2008 n/a n/a n/a n/a n/a 15/07/08 03/31/2011 3 D MPU Osh Staff 58,333 Ind. I ######## n/a ######## 07/02/2008 n/a n/a n/a n/a n/a 15/07/08 03/31/2011 Preparation of detailed designs (Multiple contracts 4 155000 Firm Q ######## ######## ######## 01/26/2009 n/a ######## 02/02/2009 n/a n/a 02/26/2009 02/01/2010 depending on the proposals of Municipalities) 5 D udit 2240 Firm Q n/a n/a n/a n/a 11/26/2009 ######## 12/11/2009 n/a n/a 30.12.09. 03/26/2010 Training Program for BOUIP Plan 7000 Firm Q ######## ######## ######## 03/04/2010 n/a ######## 03/23/2010 03/30/2010 n/a 03/30/2010 04/19/2010 6 Technical Supervision 8304 Firm Q ######## ######## ######## 02/19/2010 n/a ######## 02/24/2010 02/25/2010 n/a 02/25/2010 03/31/2010 Engineers Baseline Qualitative Study 7 D 8,920 Firm Q n/a n/a 28/07/09 09/17/2009 n/a ######## 10/02/2009 n/a n/a 10/19/2009 01/11/2010 (Focus-Group Interviews) Laboratory for testing of quality of materials for road 8 D construction Plan 45,000 Firm SSS ######## n/a ######## 03/05/2010 n/a ######## 03/23/2010 03/26/2010 n/a 03/29/2010 03/29/2011 Ind. I n/a n/a ######## 03/05/2010 n/a n/a n/a 04/16/2010 05/07/2010 Plan 3,654 05/24/2010 03/31/2011 D Procurement specialist Prior Ind. I n/a n/a ######## 03/05/2010 n/a n/a n/a 04/16/2010 05/07/2010 9 3,654 05/24/2010 03/31/2011 Ind. I ######## ######## ######## 12/18/2009 n/a n/a n/a 12/28/2009 01/04/2010 12/30/2009 D Engineer-surveoyr Plan 6,982 03/31/2011 Prior Ind. I ######## ######## ######## 12/18/2009 n/a n/a n/a 12/28/2009 01/04/2010 12/30/2009 10 6,982 03/31/2011 Ind. I ######## ######## ######## 03/04/2011 n/a n/a n/a n/a n/a 03/04/2011 06/04/2011 Outlook system Plan 1,000 implementation and support Ind. I ######## ######## ######## n/a n/a n/a n/a n/a 11 specialist Ind. I n/a n/a 01/28/2011 n/a n/a n/a 02/11/2011 02/21/2011 Plan 6,113 ######## 03/01/2011 12/31/2011 Prior 12 D oordinator 7,186 Ind. I n/a n/a ######## 01/24/2011 n/a n/a n/a 01/26/2011 02/08/2011 02/09/2011 12/31/2011 Plan 7,000 Firm QS ######## n/a ######## 12/09/2011 n/a ######## 12/23/2011 12/30/2011 n/a 01/04/2012 03/25/2012 Financial udit 13 D Development of detailed 35,000 ######## n/a ######## 05/26/2011 n/a ######## 06/09/2011 06/16/2011 n/a 06/21/2011 09/21/2011 Plan Firm Q design estimates for 14 B component B suprojects Hydraulic simulation of 80,000 ######## n/a ######## 05/26/2011 n/a ######## 06/09/2011 06/16/2011 n/a 06/21/2011 09/21/2011 Plan Firm Q water supply schemes of 15 Bishkek Remarks

[ountry] [Project Name] THRESHOLDS FOR PROUREMENT METHODS ND BNK PRIOR REVIEW Expenditure ategory ontract Value Threshold (US$) Procurement Method ontracts Subjects to Prior (US$) Goods Works onsultant Services (including training) IB ll IB contracts NB First 2 NB contracts <100,000 Shopping First Shopping contract N D ll D contracts IB ll IB contracts NB First 2 NB contracts <100,000 Shopping First Shopping contract N D ll D contracts >=200,000 QBS/QBS/LS/FBS a/ b/ <200,000 QS >=100,000 for firms; all SSS contracts; all TORs N SSS N I >=50,000 for individuals; all SSS contracts; all TORs Notes: a/ Shortlist may compose entirely of national consultants for assignments of less than US$100,000 equivalent per contract. b/ s appropriate, these methods may be adopted for assignments costing less than $200,000. IB International ompetitive Bidding NB National ompetitive Bidding D Direct ontracting QBS Quality and ost Based Selection QBS Quality Based Selection LS Least ost Selection FBS Fixed Budget Selection QS Selection Based on onsultants Qualifications SSS Single Source Selection I Individual onsultants